Grade of concrete M25, ESP Unit No 6
Cube compressive strength at age of 28 days
Average Average
Weight of sample
Average Density of Density of
Date of Sized 150 mm x Density of Compressive Compressive Standard
Sr.No. Location of concrete compressive concrete in concrete in
Casting 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation
strength of the Kg / M3
for the Kg / M3
for ten
in gms N /mm2 kg/cm2
sample in Kg/cm2 sample samples

1 8851.00 2622.52 980.00 43.56 426.84


ESP-
2 23-Apr-08 S19,S20,T19,T20,M19,M 8807.00 2609.48 980.00 43.56 426.84 428.30 2613.43
20
3 8803.00 2608.30 990.00 44.00 431.20

4 8913.00 2640.89 1050.00 46.67 457.33


ESP-
5 23-Apr-08 S19,S20,T19,T20,M19,M 8885.00 2632.59 1100.00 48.89 479.11 457.33 2633.78
20
6 8869.00 2627.85 1000.00 44.44 435.56

7 8700.00 2577.78 1100.00 48.89 479.11


ESP-Footing-T3,VB-3-
8 24-Apr-08 8711.00 2581.04 1050.00 46.67 457.33 457.33 2594.47
13,B12
9 8858.00 2624.59 1000.00 44.44 435.56

10 8732.00 2587.26 910.00 40.44 396.36

11 26-Apr-08 ESP-P,Q,R,S, TM-18 8760.00 2595.56 940.00 41.78 409.42 392.00 2611.46

12 8949.00 2651.56 850.00 37.78 370.22

13 8791.00 2604.74 820.00 36.44 357.16

14 26-Apr-08 ESP-P,Q,R,S, TM-18 8613.00 2552.00 740.00 32.89 322.31 342.64 2574.62

15 8664.00 2567.11 800.00 35.56 348.44

16 8751.00 2592.89 975.00 43.33 424.67


ESP-
17 1-May-08 M17,T17,S17,R17,Q17,F 8710.00 2580.74 920.00 40.89 400.71 398.53 2592.59
1,F-2-4 with beam
18 8789.00 2604.15 850.00 37.78 370.22

19 8640.00 2560.00 990.00 44.00 431.20


ESP-M14,T14,S14 with
20 1-May-08 8640.00 2560.00 990.00 44.00 431.20 429.75 2554.86
beam
ESP-M14,T14,S14 with
1-May-08 429.75 2554.86
beam
21 8588.00 2544.59 980.00 43.56 426.84

22 8630.00 2557.04 940.00 41.78 409.42


ESP-M14,T14,S14 with
23 2-May-08 8869.00 2627.85 950.00 42.22 413.78 403.61 2603.56
beam
24 8862.00 2625.78 890.00 39.56 387.64

25 ESP-R14,Q14 with 8880.00 2631.11 1000.00 44.44 435.56


beam,F1-1no.,F2-
26 3-May-08 2nos.&M16-15,T16- 8816.00 2612.15 960.00 42.67 418.13 412.33 2607.90
15,P16-15,F4-2nos.,S15-
27 16 with beam,F-5-2nos. 8709.00 2580.44 880.00 39.11 383.29

28 8707.00 2579.85 900.00 40.00 392.00


ESP-R14,Q14 with
29 beam,F1-1no.,F2- 8749.00 2592.30 860.00 38.22 374.58
3-May-08 2nos.&M16-15,T16- 386.19 2591.31
15,P16-15,F4-2nos.,S15-
30 16 with beam,F-5-2nos. 8781.00 2601.78 900.00 40.00 392.00
3.76
31 8739.00 2589.33 840.00 37.33 365.87
ESP-G15,16,R15,16,F5-
32 5-May-08 8821.00 2613.63 850.00 37.78 370.22 390.55 2590.22
2nos.with beam
33 8666.00 2567.70 1000.00 44.44 435.56

34 8773.00 2599.41 1040.00 46.22 452.98


ESP-P13,Q13,R13 with
35 7-May-08 beam.F1-01no.,F2- 8558.00 2535.70 1030.00 45.78 448.62 438.46 2567.11
01no.,F3-01no.
36 8661.00 2566.22 950.00 42.22 413.78

37 8823.00 2614.22 920.00 40.89 400.71


ESP-T13,T13,M13 with
38 8-May-08 8707.00 2579.85 820.00 36.44 357.16 384.74 2597.73
beam
39 8772.00 2599.11 910.00 40.44 396.36

40 8544.00 2531.56 650.00 28.89 283.11


ESP-P11,Q11,Column
41 9-May-08 P20,Q20,R20,S20,T20,M 8700.00 2577.78 710.00 31.56 309.24 284.56 2567.01
20,BQ-2 wall
42 8747.00 2591.70 600.00 26.67 261.33

43 8624.00 2555.26 820.00 36.44 357.16

44 10-May-08 ESP-R11,S11,T11,M11 8561.00 2536.59 790.00 35.11 344.09 349.90 2566.12

45 8797.00 2606.52 800.00 35.56 348.44


46 8680.00 2571.85 1020.00 45.33 444.27
ESP-Column T15,16,
47 12-May-08 8763.00 2596.44 1030.00 45.78 448.62 447.17 2581.33
M15,16 1st lift
48 8693.00 2575.70 1030.00 45.78 448.62

49 8781.00 2601.78 1000.00 44.44 435.56


ESP-P12,Q12,R12,S12
50 13-May-08 8797.00 2606.52 990.00 44.00 431.20 428.30 2601.78
with beam
51 8765.00 2597.04 960.00 42.67 418.13

52 8539.00 2530.07 910.00 40.44 396.36


ESP-S16,R16 wall &
Pedestal 1st lift.M17 to
53 17-May-08 8486.00 2514.37 920.00 40.89 400.71 396.36 2530.17
M19 wall & Pedestal 1st
lift.
54 8593.00 2546.07 900.00 40.00 392.00

55 8697.00 2576.89 910.00 40.44 396.36


ESP-T17 to T19 wall &
56 19-May-08 8689.00 2574.52 920.00 40.89 400.71 397.81 2581.83
Pedestal 1st lift.
57 8755.00 2594.07 910.00 40.44 396.36

58 8643.00 2560.89 930.00 41.33 405.07


ESP-SR-17 to SR-19 wall
59 23-May-08 8599.00 2547.85 1130.00 50.22 492.18 429.75 2547.65
& pedestal
60 8553.00 2534.22 900.00 40.00 392.00
5.24
61 8681.00 2572.15 990.00 44.00 431.20
ESP-SR14 to SR-12 with
62 28-May-08 8695.00 2576.30 980.00 43.56 426.84 429.75 2561.09
Column 1st lift
8555.00 2534.81 990.00 44.00 431.20
63
8537.00 2529.48 840.00 37.33 365.87
64
ESP-J12 to 14 wall &
31-May-08 8582.00 2542.81 900.00 40.00 392.00 383.29 2538.67
65 column 1st lift.
8585.00 2543.70 900.00 40.00 392.00
66
8427.00 2496.89 1050.00 46.67 457.33
67
ESP-M12 to 14 wall &
2-Jun-08 8540.00 2530.37 1030.00 45.78 448.62 454.43 2525.83
68 column 1st lift.
8607.00 2550.22 1050.00 46.67 457.33
69
8479.00 2512.30 1060.00 47.11 461.69
70
ESP-Q12 to 14 wall &
3-Jun-08 458.79 2540.25
column 1st lift.
ESP-Q12 to 14 wall &
3-Jun-08 8533.00 2528.30 1050.00 46.67 457.33 458.79 2540.25
71 column 1st lift.
8708.00 2580.15 1050.00 46.67 457.33
72
8731.00 2586.96 890.00 39.56 387.64
73
ESP-P12 to 14 wall &
6-Jun-08 8606.00 2549.93 870.00 38.67 378.93 384.74 2551.41
74 column 1st lift.
8496.00 2517.33 890.00 39.56 387.64
75
8432.00 2498.37 740.00 32.89 322.31
76
27-Jun-08 ESP 16P, 16 Q,R,S,T,M . 8421.00 2495.11 810.00 36.00 352.80 351.35 2480.20
77
8259.00 2447.11 870.00 38.67 378.93
78
79 8459.00 2506.37 850.00 37.78 370.22

80 28-Jun-08 ESP 17P, 17 Q,R,S,T,M . 8512.00 2522.07 860.00 38.22 374.58 364.41 2496.89

81 8310.00 2462.22 800.00 35.56 348.44

82 8425.00 2496.30 710.00 31.56 309.24

83 2-Jul-08 ESP Pedestal MP13 . 8415.00 2493.33 780.00 34.67 339.73 325.21 2505.19

84 8525.00 2525.93 750.00 33.33 326.67

85 8546.00 2532.15 900.00 40.00 392.00

86 7-Jul-08 ESP Pedestal MP 11 . 8477.00 2511.70 980.00 43.56 426.84 412.33 2515.26

87 8444.00 2501.93 960.00 42.67 418.13

88 8571.00 2539.56 920.00 40.89 400.71


ESP Wall R13,14,
89 9-Jul-08 Q13,14,M12,13,T12 ,13 8595.00 2546.67 910.00 40.44 396.36 403.61 2541.04
,S12,13
90 8562.00 2536.89 950.00 42.22 413.78
4.45
91 8692.00 2575.41 1030.00 45.78 448.62
ESPWall -G12-13,P12-
92 12-Jul-08 8657.00 2565.04 990.00 44.00 431.20 434.10 2564.84
13,S11top lift
8620.00 2554.07 970.00 43.11 422.49
93
94

95
96

97
98

99
100

101
102

103
104

105
106

107
108

109
110

111
112

113
114

115
116

117
118

119
120
Average of
Coefficient
CCS in Result and remarks
of variation
N/mm 2
Degree of quality
41.92 8.96 control is Good
Degree of quality
40.28 13.00 control is Good
Degree of quality
40.49 10.99 control is Good
UPDATED 21.01.2009
Grade of concrete M30, TG , Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8329.00 2467.85 1010.00 44.89 439.91


TG Raft Unit
2 23-Jun-08 8399.00 2488.59 1120.00 49.78 487.82 468.95
No 6
3 8275.00 2451.85 1100.00 48.89 479.11

4 8508.00 2520.89 1000.00 44.44 435.56


TG Raft Unit
5 23-Jun-08 8453.00 2504.59 990.00 44.00 431.20 442.81
No 6
6 8598.00 2547.56 1060.00 47.11 461.69

7 8737.00 2588.74 830.00 36.89 361.51


TG Raft Unit
8 23-Jun-08 8695.00 2576.30 870.00 38.67 378.93 376.03
No 6
9 8694.00 2576.00 890.00 39.56 387.64

10 8792.00 2605.04 890.00 39.56 387.64


TG Raft Unit
11 23-Jun-08 8720.00 2583.70 850.00 37.78 370.22 367.32
No 6
12 8857.00 2624.30 790.00 35.11 344.09

13 8588.00 2544.59 930.00 41.33 405.07


TG Raft Unit
14 24-Jun-08 8576.00 2541.04 870.00 38.67 378.93 386.19
No 6
15 8514.00 2522.67 860.00 38.22 374.58

16 8586.00 2544.00 900.00 40.00 392.00


TG Raft Unit
17 24-Jun-08 8528.00 2526.81 900.00 40.00 392.00 399.26
No 6
18 8541.00 2530.67 950.00 42.22 413.78

19 8509.00 2521.19 900.00 40.00 392.00


TG Raft Unit
20 24-Jun-08 8480.00 2512.59 990.00 44.00 431.20 419.59
No 6
TG Raft Unit
24-Jun-08 419.59
No 6
21 8628.00 2556.44 1000.00 44.44 435.56

22 8496.00 2517.33 960.00 42.67 418.13


TG Raft Unit
23 24-Jun-08 8556.00 2535.11 910.00 40.44 396.36 413.78
No 6
24 8599.00 2547.85 980.00 43.56 426.84

25 8454.00 2504.89 1030.00 45.78 448.62


TG Raft Unit
26 24-Jun-08 8675.00 2570.37 1100.00 48.89 479.11 468.95
No 6
27 8560.00 2536.30 1100.00 48.89 479.11

28 8425.00 2496.30 1050.00 46.67 457.33


TG Raft Unit
29 24-Jun-08 8550.00 2533.33 1040.00 46.22 452.98 452.98
No 6
Degree of Quality control
30 8479.00 2512.30 1030.00 45.78 448.62
4.00 42.81 9.33 is good
31 8675.00 2570.37 900.00 40.00 392.00
TG Raft Unit
32 24-Jun-08 8611.00 2551.41 690.00 30.67 300.53 368.77
No 6
33 8604.00 2549.33 950.00 42.22 413.78

34 8562.00 2536.89 1030.00 45.78 448.62


TG Raft Unit
35 24-Jun-08 8464.00 2507.85 950.00 42.22 413.78 444.27
No 6
36 8618.00 2553.48 1080.00 48.00 470.40

37 8503.00 2519.41 910.00 40.44 396.36


TG Raft Unit
38 24-Jun-08 8606.00 2549.93 990.00 44.00 431.20 383.29
No 6
39 8482.00 2513.19 740.00 32.89 322.31

40 8575.00 2540.74 940.00 41.78 409.42


TG Raft Unit
41 24-Jun-08 8647.00 2562.07 920.00 40.89 400.71 400.71
No 6
42 8540.00 2530.37 900.00 40.00 392.00

43 8343.00 2472.00 1050.00 46.67 457.33


TG Raft Unit
44 24-Jun-08 8483.00 2513.48 910.00 40.44 396.36 415.23
No 6
45 8392.00 2486.52 900.00 40.00 392.00
46 8643.00 2560.89 1010.00 44.89 439.91
TG Raft Unit
47 25-Jun-08 8554.00 2534.52 1000.00 44.44 435.56 439.91
No 6
48 8640.00 2560.00 1020.00 45.33 444.27

49 8743.00 2590.52 980.00 43.56 426.84


TG Raft Unit
50 25-Jun-08 8550.00 2533.33 970.00 43.11 422.49 415.23
No 6
51 8693.00 2575.70 910.00 40.44 396.36

52 8341.00 2471.41 990.00 44.00 431.20


TG Raft Unit
53 25-Jun-08 8570.00 2539.26 910.00 40.44 396.36 406.52
No 6
54 8583.00 2543.11 900.00 40.00 392.00

55 8707.00 2579.85 960.00 42.67 418.13


TG Raft Unit
56 25-Jun-08 8633.00 2557.93 980.00 43.56 426.84 410.87
No 6
57 8730.00 2586.67 890.00 39.56 387.64

58 8642.00 2560.59 800.00 35.56 348.44


TG Raft Unit
59 25-Jun-08 8677.00 2570.96 940.00 41.78 409.42 383.29
No 6
Degree of Quality control
60 8624.00 2555.26 900.00 40.00 392.00
3.69 41.51 8.89 is good
61 8682.00 2572.44 900.00 40.00 392.00
TG Raft Unit
62 25-Jun-08 8642.00 2560.59 960.00 42.67 418.13 400.71
No 6
63 8536.00 2529.19 900.00 40.00 392.00

64 8333.00 2469.04 910.00 40.44 396.36


TG Raft Unit
65 25-Jun-08 8522.00 2525.04 990.00 44.00 431.20 419.59
No 6
66 8742.00 2590.22 990.00 44.00 431.20

67 8567.00 2538.37 970.00 43.11 422.49


TG Raft Unit
68 25-Jun-08 8699.00 2577.48 940.00 41.78 409.42 421.04
No 6
69 8599.00 2547.85 990.00 44.00 431.20

70 8406.00 2490.67 990.00 44.00 431.20


TG Raft Unit
25-Jun-08 428.30
No 6
TG Raft Unit
71 25-Jun-08 8311.00 2462.52 980.00 43.56 426.84 428.30
No 6
72 8307.00 2461.33 980.00 43.56 426.84

73 8849.00 2621.93 920.00 40.89 400.71


TG Raft Unit
74 25-Jun-08 8661.00 2566.22 960.00 42.67 418.13 416.68
No 6
75 8635.00 2558.52 990.00 44.00 431.20

76 8476.00 2511.41 920.00 40.89 400.71


SD and CoV are
TG Raft Unit calculated for 18
77 25-Jun-08 8553.00 2534.22 900.00 40.00 392.00 394.90
No 6 observations .
Degree of Quality control
78 8664.00 2567.11 900.00 40.00 392.00
1.67 42.20 3.95 is good
UPDATED 21.01.2009
Grade of concrete M30, TG , Unit No 8
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8502.00 2519.11 980.00 43.56 426.84


TG Raft Unit
2 5-Nov-08 8530.00 2527.41 920.00 40.89 400.71 413.78
No 8
3 8640.00 2560.00 950.00 42.22 413.78

4 8520.00 2524.44 990.00 44.00 431.20


TG Raft Unit
5 5-Nov-08 8680.00 2571.85 910.00 40.44 396.36 406.52
No 8
6 8550.00 2533.33 900.00 40.00 392.00

7 8512.00 2522.07 890.00 39.56 387.64


TG Raft Unit
8 5-Nov-08 8520.00 2524.44 900.00 40.00 392.00 389.10
No 8
9 8490.00 2515.56 890.00 39.56 387.64

10 8470.00 2509.63 870.00 38.67 378.93


TG Raft Unit
11 5-Nov-08 8490.00 2515.56 880.00 39.11 383.29 384.74
No 8
12 8572.00 2539.85 900.00 40.00 392.00

13 8560.00 2536.30 980.00 43.56 426.84


TG Raft Unit
14 5-Nov-08 8658.00 2565.33 970.00 43.11 422.49 428.30
No 8
15 8556.00 2535.11 1000.00 44.44 435.56

16 8510.00 2521.48 890.00 39.56 387.64


TG Raft Unit
17 5-Nov-08 8530.00 2527.41 990.00 44.00 431.20 415.23
No 8
18 8640.00 2560.00 980.00 43.56 426.84

19 8660.00 2565.93 930.00 41.33 405.07


TG Raft Unit
20 5-Nov-08 8583.00 2543.11 980.00 43.56 426.84 418.13
No 8
TG Raft Unit
5-Nov-08 418.13
No 8
21 8780.00 2601.48 970.00 43.11 422.49

22 8396.00 2487.70 910.00 40.44 396.36


TG Raft Unit
23 6-Nov-08 8386.00 2484.74 900.00 40.00 392.00 406.52
No 8
24 8336.00 2469.93 990.00 44.00 431.20

25 8259.00 2447.11 890.00 39.56 387.64


TG Raft Unit
26 6-Nov-08 8375.00 2481.48 880.00 39.11 383.29 394.90
No 8
27 8385.00 2484.44 950.00 42.22 413.78

28 8360.00 2477.04 870.00 38.67 378.93


TG Raft Unit
29 6-Nov-08 8398.00 2488.30 960.00 42.67 418.13 402.16
No 8
Degree of Quality control
30 8341.00 2471.41 940.00 41.78 409.42
1.91 41.42 4.62 is good
31 8422.00 2495.41 860.00 38.22 374.58
TG Raft Unit
32 6-Nov-08 8377.00 2482.07 890.00 39.56 387.64 384.74
No 8
33 8468.00 2509.04 900.00 40.00 392.00

34 8508.00 2520.89 900.00 40.00 392.00


TG Raft Unit
35 6-Nov-08 8568.00 2538.67 910.00 40.44 396.36 402.16
No 8
36 8498.00 2517.93 960.00 42.67 418.13

37 8459.00 2506.37 880.00 39.11 383.29


TG Raft Unit
38 6-Nov-08 8462.00 2507.26 920.00 40.89 400.71 390.55
No 8
39 8532.00 2528.00 890.00 39.56 387.64

40 8615.00 2552.59 860.00 38.22 374.58


TG Raft Unit
41 6-Nov-08 8523.00 2525.33 840.00 37.33 365.87 376.03
No 8
42 8569.00 2538.96 890.00 39.56 387.64

43 8580.00 2542.22 880.00 39.11 383.29


TG Raft Unit
44 6-Nov-08 8669.00 2568.59 920.00 40.89 400.71 400.71
No 8
45 8532.00 2528.00 960.00 42.67 418.13
46 8598.00 2547.56 870.00 38.67 378.93
TG Raft Unit
47 6-Nov-08 8427.00 2496.89 920.00 40.89 400.71 390.55
No 8
48 8411.00 2492.15 900.00 40.00 392.00

49 8522.00 2525.04 1000.00 44.44 435.56


TG Raft Unit
50 6-Nov-08 8483.00 2513.48 970.00 43.11 422.49 419.59
No 8
51 8474.00 2510.81 920.00 40.89 400.71

52 8463.00 2507.56 880.00 39.11 383.29


TG Raft Unit
53 6-Nov-08 8366.00 2478.81 890.00 39.56 387.64 397.81
No 8
54 8322.00 2465.78 970.00 43.11 422.49

55 8412.00 2492.44 910.00 40.44 396.36


TG Raft Unit
56 6-Nov-08 8326.00 2466.96 990.00 44.00 431.20 419.59
No 8
57 8349.00 2473.78 990.00 44.00 431.20

58 8633.00 2557.93 950.00 42.22 413.78


TG Raft Unit
59 7-Nov-08 8355.00 2475.56 970.00 43.11 422.49 421.04
No 8
Degree of Quality control
60 8321.00 2465.48 980.00 43.56 426.84
1.98 40.84 4.84 is good
61 8300.00 2459.26 900.00 40.00 392.00
TG Raft Unit
62 7-Nov-08 8252.00 2445.04 920.00 40.89 400.71 394.90
No 8
63 8173.00 2421.63 900.00 40.00 392.00

64 8267.00 2449.48 900.00 40.00 392.00


TG Raft Unit
65 7-Nov-08 8357.00 2476.15 940.00 41.78 409.42 399.26
No 8
66 8197.00 2428.74 910.00 40.44 396.36

67 8287.00 2455.41 960.00 42.67 418.13


SD and CoV are
TG Raft Unit calculated for 9
68 7-Nov-08 8535.00 2528.89 910.00 40.44 396.36 406.52
No 8 observations .
Degree of Quality control
69 8121.00 2406.22 930.00 41.33 405.07
0.93 20.42 4.55 is good
UPDATED 21.01.2009
Grade of concrete M30, Boiler,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8620.00 2554.07 950.00 42.22 413.78


Boiler-
2 23-May-08 8535.00 2528.89 890.00 39.56 387.64 368.77
Footing J-4
3 8821.00 2613.63 700.00 31.11 304.89

4 8837.00 2618.37 760.00 33.78 331.02


Boiler-
5 24-May-08 J9(J,B), 8686.00 2573.63 890.00 39.56 387.64 392.00
J9(M,B48)
6 8784.00 2602.67 1050.00 46.67 457.33

7 8446.00 2502.52 920.00 40.89 400.71


Boiler-
8 24-May-08 J9(J,B), 8744.00 2590.81 900.00 40.00 392.00 394.90
J9(M,B48)
9 8540.00 2530.37 900.00 40.00 392.00

10 8556.00 2535.11 1050.00 46.67 457.33


Boiler-J-
11 26-May-08 10(B-24-M) 8672.00 2569.48 1020.00 45.33 444.27 448.62
with beam
12 8693.00 2575.70 1020.00 45.33 444.27

13 Boiler- 8762.00 2596.15 980.00 43.56 426.84


Footing J-
3(B-41-M)
14 27-May-08 8653.00 2563.85 980.00 43.56 426.84 428.30
with beam,
T3(B-7-M)
15 with beam 8776.00 2600.30 990.00 44.00 431.20

16 8691.00 2575.11 1050.00 46.67 457.33


Boiler-J-5(
17 28-May-08 8714.00 2581.93 1040.00 46.22 452.98 454.43
B38.5-T)
18 8700.00 2577.78 1040.00 46.22 452.98

19 8379.00 2482.67 1020.00 45.33 444.27


Boiler-J-
20 28-May-08 8512.00 2522.07 1030.00 45.78 448.62 449.35
5(B38.5J)
Boiler-J-
28-May-08 449.35
5(B38.5J)
21 8494.00 2516.74 1045.00 46.44 455.16

22 8648.00 2562.37 990.00 44.00 431.20


Boiler-J-
23 28-May-08 8659.00 2565.63 980.00 43.56 426.84 428.30
5(B38.5J)
24 8563.00 2537.19 980.00 43.56 426.84

25 8617.00 2553.19 1030.00 45.78 448.62


Boiler-J-
26 28-May-08 8459.00 2506.37 1020.00 45.33 444.27 442.81
5(B38.5J)
27 8625.00 2555.56 1000.00 44.44 435.56

28 8871.00 2628.44 1020.00 45.33 444.27


Boiler-J-6
29 29-May-08 8790.00 2604.44 1000.00 44.44 435.56 437.01
with beam
Degree of Quality control
30 8634.00 2558.22 990.00 44.00 431.20
3.69 43.31 8.51 is good
31 8681.00 2572.15 1000.00 44.44 435.56
Boiler-J-
32 31-May-08 8736.00 2588.44 980.00 43.56 426.84 419.59
5(B38.5-K)
33 8641.00 2560.30 910.00 40.44 396.36

34 8699.00 2577.48 930.00 41.33 405.07


Boiler-J-
35 31-May-08 8732.00 2587.26 960.00 42.67 418.13 416.68
5(B38.5-K)
36 8655.00 2564.44 980.00 43.56 426.84

37 8648.00 2562.37 1070.00 47.56 466.04


Boiler-J-
38 31-May-08 8691.00 2575.11 990.00 44.00 431.20 463.14
5(B38.5-K)
39 8739.00 2589.33 1130.00 50.22 492.18

40 8506.00 2520.30 1100.00 48.89 479.11


Boiler-J-
41 31-May-08 8679.00 2571.56 1050.00 46.67 457.33 452.98
5(B38.5-K)
42 8532.00 2528.00 970.00 43.11 422.49

43 8590.00 2545.19 910.00 40.44 396.36


Boiler-
44 2-Jun-08 J7(B48-L) 8638.00 2559.41 910.00 40.44 396.36 386.19
with beam
45 8726.00 2585.48 840.00 37.33 365.87
46 8295.00 2457.78 940.00 41.78 409.42
Boiler-
47 2-Jun-08 J7(B48-L) 8533.00 2528.30 1000.00 44.44 435.56 394.90
with beam
48 8529.00 2527.11 780.00 34.67 339.73

49 8624.00 2555.26 800.00 35.56 348.44


Boiler-
50 2-Jun-08 J7(B48-L) 8555.00 2534.81 880.00 39.11 383.29 370.22
with beam
51 8602.00 2548.74 870.00 38.67 378.93

52 8711.00 2581.04 1000.00 44.44 435.56

53 4-Jun-08 Boiler-J5 8452.00 2504.30 970.00 43.11 422.49 421.04

54 8833.00 2617.19 930.00 41.33 405.07

55 8367.00 2479.11 1060.00 47.11 461.69

56 4-Jun-08 Boiler-J5 8574.00 2540.44 1030.00 45.78 448.62 454.43

57 8616.00 2552.89 1040.00 46.22 452.98

58 8934.00 2647.11 1090.00 48.44 474.76

59 4-Jun-08 Boiler-J5 8545.00 2531.85 1000.00 44.44 435.56 450.07


Degree of Quality control
60 8417.00 2493.93 1010.00 44.89 439.91
3.79 43.16 8.78 is good
61 8396.00 2487.70 920.00 40.89 400.71
Boiler-J5-K
62 6-Jun-08 8500.00 2518.52 900.00 40.00 392.00 394.90
with beam
63 8448.00 2503.11 900.00 40.00 392.00

64 8566.00 2538.07 920.00 40.89 400.71


Boiler-J5-K
65 6-Jun-08 8244.00 2442.67 900.00 40.00 392.00 400.71
with beam
66 8468.00 2509.04 940.00 41.78 409.42

67 8530.00 2527.41 980.00 43.56 426.84


Boiler-J5-K
68 6-Jun-08 8629.00 2556.74 920.00 40.89 400.71 408.70
with beam
69 8559.00 2536.00 915.00 40.67 398.53

70 8503.00 2519.41 720.00 32.00 313.60


Boiler J5-K
7-Jun-08 310.70
with beam
Boiler J5-K
71 7-Jun-08 8683.00 2572.74 700.00 31.11 304.89 310.70
with beam
72 8612.00 2551.70 720.00 32.00 313.60

73 8525.00 2525.93 860.00 38.22 374.58


Boiler-J5
74 9-Jun-08 8619.00 2553.78 810.00 36.00 352.80 358.61
Raft
75 8456.00 2505.48 800.00 35.56 348.44

76 8655.00 2564.44 940.00 41.78 409.42


Boiler-J5
77 9-Jun-08 8525.00 2525.93 1050.00 46.67 457.33 428.30
Raft
78 8795.00 2605.93 960.00 42.67 418.13

79 8551.00 2533.63 750.00 33.33 326.67


Boiler-J5
80 9-Jun-08 8646.00 2561.78 800.00 35.56 348.44 358.61
Raft
81 8498.00 2517.93 920.00 40.89 400.71

82 8516.00 2523.26 870.00 38.67 378.93


Boiler-J5
83 9-Jun-08 8434.00 2498.96 900.00 40.00 392.00 386.19
Raft
84 8509.00 2521.19 890.00 39.56 387.64

85 8642.00 2560.59 1050.00 46.67 457.33


Boiler-J8
86 3-Jul-08 8625.00 2555.56 1030.00 45.78 448.62 455.88
Raft L Grid
87 8656.00 2564.74 1060.00 47.11 461.69

88 8462.00 2507.26 1010.00 44.89 439.91


Boiler-J8
89 3-Jul-08 8545.00 2531.85 1060.00 47.11 461.69 445.72
Raft L Grid
Degree of Quality control
90 8798.00 2606.81 1000.00 44.44 435.56
4.57 44.81 44.02 is good
91 8727.00 2585.78 990.00 44.00 431.20
Boiler-J8
92 3-Jul-08 8703.00 2578.67 1000.00 44.44 435.56 437.01
Raft L Grid
93 8618.00 2553.48 1020.00 45.33 444.27

94 8557.00 2535.41 1020.00 45.33 444.27


Boiler-J8
95 3-Jul-08 8516.00 2523.26 1030.00 45.78 448.62 445.72
Raft L Grid
Boiler-J8
3-Jul-08 445.72
Raft L Grid
96 8562.00 2536.89 1020.00 45.33 444.27

97 8565.00 2537.78 1030.00 45.78 448.62


Boiler-J8
98 4-Jul-08 8499.00 2518.22 1010.00 44.89 439.91 441.36
Raft L Grid
99 8537.00 2529.48 1000.00 44.44 435.56

100 8604.00 2549.33 790.00 35.11 344.09


Boiler-J8
101 4-Jul-08 8567.00 2538.37 1010.00 44.89 439.91 403.61
Raft L Grid
102 8560.00 2536.30 980.00 43.56 426.84

103 8550.00 2533.33 1000.00 44.44 435.56


Boiler-J8
104 4-Jul-08 8680.00 2571.85 1040.00 46.22 452.98 451.53
Raft L Grid
105 8480.00 2512.59 1070.00 47.56 466.04

106 8594.00 2546.37 1000.00 44.44 435.56


Boiler-J8
107 4-Jul-08 8618.00 2553.48 1050.00 46.67 457.33 447.17
Raft L Grid
108 8595.00 2546.67 1030.00 45.78 448.62

109 8577.00 2541.33 1010.00 44.89 439.91


Boiler-J8
110 4-Jul-08 8633.00 2557.93 970.00 43.11 422.49 432.65
Raft L Grid
111 8421.00 2495.11 1000.00 44.44 435.56

112 8478.00 2512.00 1100.00 48.89 479.11


Boiler-J8
113 4-Jul-08 8366.00 2478.81 1060.00 47.11 461.69 464.59
Raft L Grid
114 8439.00 2500.44 1040.00 46.22 452.98

115 8480.00 2512.59 910.00 40.44 396.36


Boiler-J8
116 4-Jul-08 8470.00 2509.63 950.00 42.22 413.78 413.78
Raft L Grid
117 8438.00 2500.15 990.00 44.00 431.20

118 8411.00 2492.15 990.00 44.00 431.20


Boiler-J8
119 5-Jul-08 8607.00 2550.22 1010.00 44.89 439.91 434.10
Raft L Grid
Degree of Quality control
120 8369.00 2479.70 990.00 44.00 431.20
2.40 23.51 17.80 is good
121 8651.00 2563.26 1000.00 44.44 435.56
Boiler-J8
122 5-Jul-08 8454.00 2504.89 980.00 43.56 426.84 429.75
Raft L Grid
123 8467.00 2508.74 980.00 43.56 426.84

124 8867.00 2627.26 900.00 40.00 392.00


Boiler-J8
125 5-Jul-08 8453.00 2504.59 970.00 43.11 422.49 410.87
Raft L Grid
126 8539.00 2530.07 960.00 42.67 418.13

127 8475.00 2511.11 950.00 42.22 413.78


Boiler-J8
128 5-Jul-08 8497.00 2517.63 960.00 42.67 418.13 421.04
Raft L Grid
129 8415.00 2493.33 990.00 44.00 431.20

130 8729.00 2586.37 890.00 39.56 387.64


Boiler-J8
131 5-Jul-08 8571.00 2539.56 900.00 40.00 392.00 390.55
Raft L Grid
132 8590.00 2545.19 900.00 40.00 392.00

133 8467.00 2508.74 1000.00 44.44 435.56


Boiler-J1
134 14-Jul-08 8373.00 2480.89 1040.00 46.22 452.98 425.39
Raft
135 8568.00 2538.67 890.00 39.56 387.64

136 8472.00 2510.22 1010.00 44.89 439.91


Boiler-J1
137 14-Jul-08 8481.00 2512.89 1050.00 46.67 457.33 429.75
Raft
138 8583.00 2543.11 900.00 40.00 392.00

139 8675.00 2570.37 980.00 43.56 426.84


Boiler-J1
140 14-Jul-08 8623.00 2554.96 950.00 42.22 413.78 410.87
Raft
141 8751.00 2592.89 900.00 40.00 392.00

142 8585.00 2543.70 980.00 43.56 426.84


Boiler-J1
143 14-Jul-08 8604.00 2549.33 940.00 41.78 409.42 422.49
Raft
144 8429.00 2497.48 990.00 44.00 431.20

145 8650.00 2562.96 920.00 40.89 400.71


Boiler-J1
15-Jul-08 415.23
Raft

Degree of Quality control


2.19 21.42 11.66 is good
Boiler-J1
146 15-Jul-08 8461.00 2506.96 960.00 42.67 418.13 415.23
Raft
147 8271.00 2450.67 980.00 43.56 426.84

148 8334.00 2469.33 1010.00 44.89 439.91


Boiler-J1
149 15-Jul-08 8710.00 2580.74 850.00 37.78 370.22 415.23
Raft
Degree of Quality control
150 8585.00 2543.70 1000.00 44.44 435.56
2.19 21.42 11.66 is good
151 8513.00 2522.37 950.00 42.22 413.78
Boiler-J1
152 15-Jul-08 8605.00 2549.63 1000.00 44.44 435.56 423.94
Raft
153 8420.00 2494.81 970.00 43.11 422.49

154 8453.00 2504.59 990.00 44.00 431.20


Boiler-J1
155 15-Jul-08 8507.00 2520.59 1000.00 44.44 435.56 432.65
Raft
156 8491.00 2515.85 990.00 44.00 431.20

157 8686.00 2573.63 1020.00 45.33 444.27


Boiler Raft
158 18-Jul-08 BO-B48 8752.00 2593.19 1000.00 44.44 435.56 434.10
Grid
159 8678.00 2571.26 970.00 43.11 422.49

160 8520.00 2524.44 890.00 39.56 387.64


Boiler Raft
161 19-Jul-08 BO-B48 8642.00 2560.59 800.00 35.56 348.44 374.58
Grid
162 8515.00 2522.96 890.00 39.56 387.64

163 8638.00 2559.41 1050.00 46.67 457.33


Wall BO [L-
164 24-Jul-08 8484.00 2513.78 1040.00 46.22 452.98 439.91
M]
165 8716.00 2582.52 940.00 41.78 409.42

166 8489.00 2515.26 1000.00 44.44 435.56


Boiler-J1
167 31-Jul-08 8617.00 2553.19 970.00 43.11 422.49 429.75
Raft Beam
168 8928.00 2645.33 990.00 44.00 431.20

169 8618.00 2553.48 980.00 43.56 426.84


Boiler-J1
170 31-Jul-08 8904.00 2638.22 950.00 42.22 413.78 434.10
Raft Beam
Boiler-J1
31-Jul-08 434.10
Raft Beam
171 8458.00 2506.07 1060.00 47.11 461.69

172 8733.00 2587.56 970.00 43.11 422.49


Boiler-J1
173 31-Jul-08 8548.00 2532.74 1100.00 48.89 479.11 445.72
Raft Beam
174 8539.00 2530.07 1000.00 44.44 435.56

175 8778.00 2600.89 900.00 40.00 392.00


Boiler-J1
176 31-Jul-08 8759.00 2595.26 940.00 41.78 409.42 407.97
Raft Beam
177 9013.00 2670.52 970.00 43.11 422.49

178 8758.00 2594.96 920.00 40.89 400.71


Boiler-J1
179 1-Aug-08 8848.00 2621.63 900.00 40.00 392.00 407.97
Raft Beam
Degree of Quality control
180 8777.00 2600.59 990.00 44.00 431.20
2.63 25.77 21.04 is good
181 8636.00 2558.81 760.00 33.78 331.02
Boiler-J1
182 1-Aug-08 8849.00 2621.93 800.00 35.56 348.44 362.96
Raft Beam
183 8630.00 2557.04 940.00 41.78 409.42

184 8522.00 2525.04 920.00 40.89 400.71


Boiler-J1
185 1-Aug-08 8693.00 2575.70 960.00 42.67 418.13 383.29
Raft Beam
186 8522.00 2525.04 760.00 33.78 331.02

187 8614.00 2552.30 930.00 41.33 405.07


Boiler-J1
188 1-Aug-08 8650.00 2562.96 850.00 37.78 370.22 360.06
Raft Beam
189 8573.00 2540.15 700.00 31.11 304.89

190 8670.00 2568.89 920.00 40.89 400.71


Boiler J-2
191 8-Aug-08 Raft B24 8563.00 2537.19 950.00 42.22 413.78 413.78
Grid
192 8396.00 2487.70 980.00 43.56 426.84

193 8360.00 2477.04 1010.00 44.89 439.91


Shear Wall
194 2-Oct-08 8233.00 2439.41 970.00 43.11 422.49 423.94
J6 -J7
195 8358.00 2476.44 940.00 41.78 409.42
196 8111.00 2403.26 1000.00 44.44 435.56
Shear Wall
197 6-Oct-08 8223.00 2436.44 1020.00 45.33 444.27 428.30
J5 -J8
198 8123.00 2406.81 930.00 41.33 405.07

199 8297.00 2458.37 1120.00 49.78 487.82


Mass PCC
on
200 7-Oct-08 8399.00 2488.59 1100.00 48.89 479.11 489.27
undergroun
d Silo
201 8277.00 2452.44 1150.00 51.11 500.89

202 8452.00 2504.30 1040.00 46.22 452.98


Mass PCC
on
203 7-Oct-08 8338.00 2470.52 1080.00 48.00 470.40 438.46
undergroun
d Silo
204 8321.00 2465.48 900.00 40.00 392.00

205 8335.00 2469.63 1070.00 47.56 466.04


Mass PCC
on
206 7-Oct-08 8474.00 2510.81 1000.00 44.44 435.56 447.17
undergroun
d Silo
207 8503.00 2519.41 1010.00 44.89 439.91

208 8541.00 2530.67 1110.00 49.33 483.47


Mass PCC
on
209 7-Oct-08 8466.00 2508.44 1020.00 45.33 444.27 448.62
undergroun
d Silo Degree of Quality control
210 8530.00 2527.41 960.00 42.67 418.13
4.86 47.65 40.84 is good
211 8440.00 2500.74 890.00 39.56 387.64
Shear wall
212 10-Oct-08 between J8 8390.00 2485.93 850.00 37.78 370.22 392.00
J7
213 8332.00 2468.74 960.00 42.67 418.13

214 8245.00 2442.96 890.00 39.56 387.64


Shear wall
215 10-Oct-08 between J8 8329.00 2467.85 810.00 36.00 352.80 376.03
J7
216 8264.00 2448.59 890.00 39.56 387.64

217 8322.00 2465.78 1020.00 45.33 444.27

218 13-Oct-08 8320.00 2465.19 1010.00 44.89 439.91 447.17

219 8352.00 2474.67 1050.00 46.67 457.33

220 8421.00 2495.11 980.00 43.56 426.84

221 14-Oct-08 Slag Silo 8264.00 2448.59 830.00 36.89 361.51 413.78
14-Oct-08 Slag Silo 413.78

222 8344.00 2472.30 1040.00 46.22 452.98

223 8272.00 2450.96 1030.00 45.78 448.62

224 14-Oct-08 Slag Silo 8293.00 2457.19 1030.00 45.78 448.62 413.78

225 8287.00 2455.41 1020.00 45.33 444.27

226 8218.00 2434.96 890.00 39.56 387.64

227 1-Nov-08 Slag Silo 8234.00 2439.70 920.00 40.89 400.71 447.17

228 8223.00 2436.44 890.00 39.56 387.64

229 940.00 41.78 409.42

230 940.00 41.78 409.42 392.00

231 940.00 41.78 409.42

232 940.00 41.78 409.42

233 940.00 41.78 409.42 409.42

234 940.00 41.78 409.42

235 940.00 41.78 409.42


Degree of Quality control
236 940.00 41.78 409.42 409.42 is good Based on
calculation with figures
237 940.00 41.78 409.42 appearing in Bold red
which are presumtive
238 940.00 41.78 409.42 figures.
In actual there are 18
239 940.00 41.78 409.42 409.42 observations therefore
12 observations are
presumed as an
240 940.00 41.78 409.42
2.71 26.55 22.57 average.
UPDATED 22.01.2009
Grade of concrete M30, Boiler,Unit No 8
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8274.00 2451.56 900.00 40.00 392.00


Boiler-
2 29-Sep-08 8213.00 2433.48 920.00 40.89 400.71 406.52
Footing J-2
3 8345.00 2472.59 980.00 43.56 426.84

4 8179.00 2423.41 990.00 44.00 431.20


Boiler-
5 29-Sep-08 8390.00 2485.93 970.00 43.11 422.49 416.68
Footing J-2
6 8177.00 2422.81 910.00 40.44 396.36

7 8381.00 2483.26 1000.00 44.44 435.56


Boiler-
8 2-Oct-08 8436.00 2499.56 980.00 43.56 426.84 428.30
Footing J-7
9 8356.00 2475.85 970.00 43.11 422.49

10 8253.00 2445.33 920.00 40.89 400.71


Boiler-
11 2-Oct-08 8246.00 2443.26 950.00 42.22 413.78 412.33
Footing J-7
12 8113.00 2403.85 970.00 43.11 422.49

13 8273.00 2451.26 910.00 40.44 396.36


Boiler-
14 2-Oct-08 8178.00 2423.11 930.00 41.33 405.07 403.61
Footing J-7
15 8265.00 2448.89 940.00 41.78 409.42

16 8748.00 2592.00 920.00 40.89 400.71


Boiler-
17 3-Oct-08 8293.00 2457.19 940.00 41.78 409.42 403.61
Footing J-12
18 8359.00 2476.74 920.00 40.89 400.71

19 8333.00 2469.04 980.00 43.56 426.84


Boiler-
20 3-Oct-08 8383.00 2483.85 1000.00 44.44 435.56 434.10
Footing J-12
Boiler-
3-Oct-08 434.10
Footing J-12
21 8261.00 2447.70 1010.00 44.89 439.91

22 8230.00 2438.52 970.00 43.11 422.49


Boiler-
23 3-Oct-08 8284.00 2454.52 1030.00 45.78 448.62 434.10
Footing J-12
24 8449.00 2503.41 990.00 44.00 431.20

25 8316.00 2464.00 930.00 41.33 405.07


Boiler-
26 3-Oct-08 8278.00 2452.74 910.00 40.44 396.36 407.97
Footing J-12
27 8354.00 2475.26 970.00 43.11 422.49

28 8281.00 2453.63 920.00 40.89 400.71


Boiler-
29 4-Oct-08 8167.00 2419.85 950.00 42.22 413.78 403.61
Footing J-12
Degree of Quality control
30 8405.00 2490.37 910.00 40.44 396.36
1.59 42.36 3.75 is good
31 8254.00 2445.63 920.00 40.89 400.71
Boiler-
32 4-Oct-08 8626.00 2555.85 1000.00 44.44 435.56 415.23
Footing J-12
33 8221.00 2435.85 940.00 41.78 409.42

34 8368.00 2479.41 940.00 41.78 409.42


Boiler-
35 8-Oct-08 8481.00 2512.89 940.00 41.78 409.42 412.33
Footing J-7
36 8588.00 2544.59 960.00 42.67 418.13

37 8149.00 2414.52 990.00 44.00 431.20


Boiler-
38 8-Oct-08 8266.00 2449.19 960.00 42.67 418.13 422.49
Footing J-7
39 8247.00 2443.56 960.00 42.67 418.13

40 8318.00 2464.59 980.00 43.56 426.84


Boiler-
41 10-Oct-08 8770.00 2598.52 1000.00 44.44 435.56 434.10
Footing J-11
42 8313.00 2463.11 1010.00 44.89 439.91

43 8133.00 2409.78 1020.00 45.33 444.27


Boiler-
44 10-Oct-08 8159.00 2417.48 970.00 43.11 422.49 432.65
Footing J-11
45 8234.00 2439.70 990.00 44.00 431.20
46 8205.00 2431.11 1050.00 46.67 457.33
Boiler-
47 10-Oct-08 8203.00 2430.52 1100.00 48.89 479.11 468.95
Footing J-11
48 8251.00 2444.74 1080.00 48.00 470.40

49 8294.00 2457.48 930.00 41.33 405.07


Boiler-
50 13-Oct-08 8265.00 2448.89 1200.00 53.33 522.67 461.69
Footing J-4
51 8444.00 2501.93 1050.00 46.67 457.33

52 8400.00 2488.89 1060.00 47.11 461.69


Boiler-
53 13-Oct-08 8337.00 2470.22 1010.00 44.89 439.91 444.27
Footing J-4
54 8248.00 2443.85 990.00 44.00 431.20

55 8337.00 2470.22 1000.00 44.44 435.56


Boiler-
56 15-Oct-08 8596.00 2546.96 1000.00 44.44 435.56 438.46
Footing J-5
57 8280.00 2453.33 1020.00 45.33 444.27

58 8347.00 2473.19 1000.00 44.44 435.56


Boiler-
59 15-Oct-08 8375.00 2481.48 1020.00 45.33 444.27 437.01
Footing J-5
Degree of Quality control
60 8260.00 2447.41 990.00 44.00 431.20
2.54 44.56 5.70 is good
61 8303.00 2460.15 1060.00 47.11 461.69
Boiler-
62 15-Oct-08 8475.00 2511.11 950.00 42.22 413.78 441.36
Footing J-5
63 8454.00 2504.89 1030.00 45.78 448.62

64 8156.00 2416.59 910.00 40.44 396.36


Boiler-
65 16-Oct-08 8245.00 2442.96 940.00 41.78 409.42 400.71
Footing J-11
66 8195.00 2428.15 910.00 40.44 396.36

67 8266.00 2449.19 920.00 40.89 400.71


Boiler-
68 16-Oct-08 8315.00 2463.70 850.00 37.78 370.22 384.74
Footing J-11
69 8268.00 2449.78 880.00 39.11 383.29

70 8527.00 2526.52 830.00 36.89 361.51


Boiler-
16-Oct-08 390.55
Footing J-11
Boiler-
71 16-Oct-08 8381.00 2483.26 1010.00 44.89 439.91 390.55
Footing J-11
72 8411.00 2492.15 850.00 37.78 370.22

73 8463.00 2507.56 960.00 42.67 418.13


Boiler-
74 17-Oct-08 8158.00 2417.19 950.00 42.22 413.78 419.59
Footing J-1
75 8429.00 2497.48 980.00 43.56 426.84

76 8289.00 2456.00 920.00 40.89 400.71


Boiler-
77 17-Oct-08 8551.00 2533.63 960.00 42.67 418.13 413.78
Footing J-1
78 8334.00 2469.33 970.00 43.11 422.49

79 8326.00 2466.96 910.00 40.44 396.36


Boiler-
80 17-Oct-08 8453.00 2504.59 900.00 40.00 392.00 397.81
Footing J-1
81 8293.00 2457.19 930.00 41.33 405.07

82 8465.00 2508.15 890.00 39.56 387.64


Boiler-
83 17-Oct-08 8232.00 2439.11 960.00 42.67 418.13 399.26
Footing J-1
84 8446.00 2502.52 900.00 40.00 392.00

85 8378.00 2482.37 1030.00 45.78 448.62


Boiler-
86 18-Oct-08 8400.00 2488.89 1050.00 46.67 457.33 455.88
Footing J-1
87 8336.00 2469.93 1060.00 47.11 461.69

88 8381.00 2483.26 920.00 40.89 400.71


Boiler-
89 18-Oct-08 8733.00 2587.56 750.00 33.33 326.67 371.67
Footing J-1
Degree of Quality control
90 8344.00 2472.30 890.00 39.56 387.64
3.15 41.59 7.57 is good
91 8366.00 2478.81 900.00 40.00 392.00
Boiler-
92 18-Oct-08 8454.00 2504.89 1000.00 44.44 435.56 399.26
Footing J-1
93 8242.00 2442.07 850.00 37.78 370.22

94 8395.00 2487.41 870.00 38.67 378.93


Boiler-
95 18-Oct-08 8579.00 2541.93 980.00 43.56 426.84 377.48
Footing J-1
Boiler-
18-Oct-08 377.48
Footing J-1
96 8482.00 2513.19 750.00 33.33 326.67

97 8384.00 2484.15 1200.00 53.33 522.67


Boiler-
98 18-Oct-08 8323.00 2466.07 800.00 35.56 348.44 439.91
Footing J-1
99 8343.00 2472.00 1030.00 45.78 448.62

100 8205.00 2431.11 1010.00 44.89 439.91


Boiler-
101 22-Oct-08 8258.00 2446.81 950.00 42.22 413.78 419.59
Footing J-5
102 8296.00 2458.07 930.00 41.33 405.07

103 8279.00 2453.04 1030.00 45.78 448.62


Boiler-
104 22-Oct-08 8276.00 2452.15 920.00 40.89 400.71 421.04
Footing J-5
105 8344.00 2472.30 950.00 42.22 413.78

106 8230.00 2438.52 1000.00 44.44 435.56


Boiler-
107 22-Oct-08 8346.00 2472.89 1020.00 45.33 444.27 438.46
Footing J-5
108 8192.00 2427.26 1000.00 44.44 435.56

109 8422.00 2495.41 980.00 43.56 426.84


Boiler-
110 22-Oct-08 Footing J-5 8309.00 2461.93 960.00 42.67 418.13 425.39
B 38.5
111 8445.00 2502.22 990.00 44.00 431.20

112 8470.00 2509.63 880.00 39.11 383.29


Boiler-
113 31-Oct-08 Footing J-5 8407.00 2490.96 890.00 39.56 387.64 381.84
B 9.5
114 8341.00 2471.41 860.00 38.22 374.58

115 8452.00 2504.30 910.00 40.44 396.36


Boiler-
116 31-Oct-08 Footing J-5 8375.00 2481.48 940.00 41.78 409.42 400.71
B 9.5
117 8316.00 2464.00 910.00 40.44 396.36

118 8425.00 2496.30 900.00 40.00 392.00


Boiler-
119 31-Oct-08 Footing J-5 8316.00 2464.00 920.00 40.89 400.71 390.55
B 9.5
Degree of Quality control
120 8385.00 2484.44 870.00 38.67 378.93
3.73 41.78 8.93 is good
121 8394.00 2487.11 980.00 43.56 426.84
Boiler-
122 4-Nov-08 8481.00 2512.89 920.00 40.89 400.71 406.52
Footing J-12
123 8377.00 2482.07 900.00 40.00 392.00

124 8558.00 2535.70 900.00 40.00 392.00


Boiler-
125 4-Nov-08 8436.00 2499.56 890.00 39.56 387.64 389.10
Footing J-12
126 8392.00 2486.52 890.00 39.56 387.64

127 8369.00 2479.70 920.00 40.89 400.71


Boiler-
128 4-Nov-08 8387.00 2485.04 900.00 40.00 392.00 393.45
Footing J-12
129 8476.00 2511.41 890.00 39.56 387.64

130 8480.00 2512.59 980.00 43.56 426.84


Boiler-
131 5-Nov-08 8460.00 2506.67 970.00 43.11 422.49 415.23
Footing J-12
132 8550.00 2533.33 910.00 40.44 396.36

133 8452.00 2504.30 890.00 39.56 387.64


Boiler-
134 5-Nov-08 8315.00 2463.70 950.00 42.22 413.78 403.61
Footing J-12
135 8498.00 2517.93 940.00 41.78 409.42

136 8316.00 2464.00 1040.00 46.22 452.98


Boiler-
137 17-Nov-08 8448.00 2503.11 1060.00 47.11 461.69 447.17
Footing J-5
138 8354.00 2475.26 980.00 43.56 426.84

139 8280.00 2453.33 990.00 44.00 431.20


Boiler-
140 17-Nov-08 8385.00 2484.44 1020.00 45.33 444.27 437.01
Footing J-5
141 8270.00 2450.37 1000.00 44.44 435.56

142 7967.00 2360.59 930.00 41.33 405.07


Boiler-
143 19-Nov-08 7992.00 2368.00 990.00 44.00 431.20 421.04
Footing J-9
144 8013.00 2374.22 980.00 43.56 426.84

145 8320.00 2465.19 920.00 40.89 400.71


Boiler-
21-Nov-08 409.42
Footing J-8

Degree of Quality control


2.30 42.40 5.43 is good
Boiler-
146 21-Nov-08 8629.00 2556.74 900.00 40.00 392.00 409.42
Footing J-8
147 8538.00 2529.78 1000.00 44.44 435.56

148 8432.00 2498.37 930.00 41.33 405.07


Boiler-
149 21-Nov-08 8453.00 2504.59 1020.00 45.33 444.27 432.65
Footing J-8
Degree of Quality control
150 8562.00 2536.89 1030.00 45.78 448.62
2.30 42.40 5.43 is good
151 8237.00 2440.59 990.00 44.00 431.20
Boiler-
152 21-Nov-08 8333.00 2469.04 910.00 40.44 396.36 422.49
Footing J-8
153 8579.00 2541.93 1010.00 44.89 439.91

154 8629.00 2556.74 1040.00 46.22 452.98


Boiler-
155 21-Nov-08 8597.00 2547.26 980.00 43.56 426.84 439.91
Footing J-8
156 8366.00 2478.81 1010.00 44.89 439.91

157 8356.00 2475.85 990.00 44.00 431.20


Boiler-
158 21-Nov-08 8426.00 2496.59 1020.00 45.33 444.27 432.65
Footing J-8
159 8322.00 2465.78 970.00 43.11 422.49

160 8633.00 2557.93 1030.00 45.78 448.62


Boiler-
161 21-Nov-08 8523.00 2525.33 1010.00 44.89 439.91 432.65
Footing J-8
162 8426.00 2496.59 940.00 41.78 409.42

163 8399.00 2488.59 1010.00 44.89 439.91


Boiler-
164 21-Nov-08 8433.00 2498.67 960.00 42.67 418.13 428.30
Footing J-8
165 8566.00 2538.07 980.00 43.56 426.84

166 8353.00 2474.96 950.00 42.22 413.78


Boiler-
167 21-Nov-08 8623.00 2554.96 950.00 42.22 413.78 416.68
Footing J-8
168 8377.00 2482.07 970.00 43.11 422.49

169 8327.00 2467.26 930.00 41.33 405.07


Boiler-
170 21-Nov-08 8357.00 2476.15 940.00 41.78 409.42 418.13
Footing J-8
Boiler-
21-Nov-08 418.13
Footing J-8
171 8432.00 2498.37 1010.00 44.89 439.91

172 8456.00 2505.48 950.00 42.22 413.78


Boiler-
173 21-Nov-08 8336.00 2469.93 990.00 44.00 431.20 429.75
Footing J-8
174 8359.00 2476.74 1020.00 45.33 444.27

175 8430.00 2497.78 940.00 41.78 409.42


Boiler-
176 22-Nov-08 8560.00 2536.30 1010.00 44.89 439.91 423.94
Footing J-8
177 8532.00 2528.00 970.00 43.11 422.49

178 8620.00 2554.07 950.00 42.22 413.78


Boiler-
179 22-Nov-08 8630.00 2557.04 1020.00 45.33 444.27 422.49
Footing J-8
Degree of Quality control
180 8540.00 2530.37 940.00 41.78 409.42
1.54 43.54 3.53 is good
181 8333.00 2469.04 960.00 42.67 418.13
Boiler-
182 22-Nov-08 8433.00 2498.67 920.00 40.89 400.71 405.07
Footing J-8
183 8539.00 2530.07 910.00 40.44 396.36

184 8323.00 2466.07 1000.00 44.44 435.56


Boiler-
185 22-Nov-08 8426.00 2496.59 1030.00 45.78 448.62 437.01
Footing J-8
186 8201.00 2429.93 980.00 43.56 426.84

187 8530.00 2527.41 920.00 40.89 400.71


Boiler-
188 22-Nov-08 8560.00 2536.30 950.00 42.22 413.78 412.33
Footing J-8
189 8430.00 2497.78 970.00 43.11 422.49

190 8320.00 2465.19 990.00 44.00 431.20


Boiler-
191 22-Nov-08 8630.00 2557.04 990.00 44.00 431.20 428.30
Footing J-8
192 8559.00 2536.00 970.00 43.11 422.49

193 8301.00 2459.56 960.00 42.67 418.13


Boiler-
Footing
194 26-Nov-08 8196.00 2428.44 900.00 40.00 392.00 413.78
Between J 2
and J 11
195 8389.00 2485.63 990.00 44.00 431.20
196 960.00 42.67 418.13

197 960.00 42.67 418.13 418.13

198 960.00 42.67 418.13

199 960.00 42.67 418.13

200 960.00 42.67 418.13 418.13

201 960.00 42.67 418.13

202 960.00 42.67 418.13

203 960.00 42.67 418.13 418.13

204 960.00 42.67 418.13

205 960.00 42.67 418.13


Degree of Quality control
206 960.00 42.67 418.13 418.13 is good Based on
calculation with figures
207 960.00 42.67 418.13 appearing in Bold red
which are presumtive
208 960.00 42.67 418.13 figures.
In actual there are 15
209 960.00 42.67 418.13 418.13 observations therefore
15 observations are
presumed as an
210 960.00 42.67 418.13
1.14 42.73 2.67 average.
UPDATED 21.01.2009
Grade of concrete M30, A Row ,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8649.00 2562.67 860.00 38.22 374.58

2 12-Jun-08 A -Row J2 8627.00 2556.15 880.00 39.11 383.29 381.84

3 8540.00 2530.37 890.00 39.56 387.64

4 8635.00 2558.52 890.00 39.56 387.64

5 12-Jun-08 A -Row J2 8529.00 2527.11 890.00 39.56 387.64 384.74

6 8560.00 2536.30 870.00 38.67 378.93

7 8613.00 2552.00 840.00 37.33 365.87

8 12-Jun-08 A -Row J2 8544.00 2531.56 740.00 32.89 322.31 345.54

9 8564.00 2537.48 800.00 35.56 348.44

10 8447.00 2502.81 890.00 39.56 387.64

11 12-Jun-08 A -Row J2 8453.00 2504.59 860.00 38.22 374.58 376.03

12 8719.00 2583.41 840.00 37.33 365.87

13 8468.00 2509.04 880.00 39.11 383.29

14 12-Jun-08 A -Row J2 8692.00 2575.41 890.00 39.56 387.64 386.19

15 8891.00 2634.37 890.00 39.56 387.64

16 8468.00 2509.04 880.00 39.11 383.29

17 12-Jun-08 A -Row J2 8692.00 2575.41 890.00 39.56 387.64 386.19

18 8891.00 2634.37 890.00 39.56 387.64

19 8637.00 2559.11 810.00 36.00 352.80

20 17-Jun-08 A -Row J1 8561.00 2536.59 820.00 36.44 357.16 373.13


17-Jun-08 A -Row J1 373.13

21 8584.00 2543.41 940.00 41.78 409.42

22 8475.00 2511.11 850.00 37.78 370.22

23 17-Jun-08 A -Row J1 8541.00 2530.67 990.00 44.00 431.20 400.71

24 8398.00 2488.30 920.00 40.89 400.71

25 8571.00 2539.56 990.00 44.00 431.20

26 17-Jun-08 A -Row J1 8592.00 2545.78 950.00 42.22 413.78 425.39

27 8650.00 2562.96 990.00 44.00 431.20

28 8538.00 2529.78 1000.00 44.44 435.56

29 17-Jun-08 A -Row J1 8684.00 2573.04 970.00 43.11 422.49 428.30


Degree of Quality control
30 8719.00 2583.41 980.00 43.56 426.84
2.79 39.67 7.04 is good
31 8447.00 2502.81 980.00 43.56 426.84

32 17-Jun-08 A -Row J1 8574.00 2540.44 1000.00 44.44 435.56 434.10

33 8689.00 2574.52 1010.00 44.89 439.91

34 8646.00 2561.78 1020.00 45.33 444.27

35 17-Jun-08 A -Row J1 8682.00 2572.44 970.00 43.11 422.49 434.10

36 8682.00 2572.44 1000.00 44.44 435.56

37 8673.00 2569.78 1000.00 44.44 435.56

38 18-Jun-08 A -Row J1 8461.00 2506.96 1040.00 46.22 452.98 442.81

39 8710.00 2580.74 1010.00 44.89 439.91

40 8453.00 2504.59 950.00 42.22 413.78

41 28-Jun-08 A -Row J2 8526.00 2526.22 820.00 36.44 357.16 387.64

42 8628.00 2556.44 900.00 40.00 392.00

43 8590.00 2545.19 960.00 42.67 418.13

44 28-Jun-08 A -Row J2 8498.00 2517.93 910.00 40.44 396.36 390.55

45 8578.00 2541.63 820.00 36.44 357.16


46 8584.00 2543.41 1000.00 44.44 435.56

47 23-Aug-08 A -Row J1 8460.00 2506.67 1040.00 46.22 452.98 450.07

48 8408.00 2491.26 1060.00 47.11 461.69

49 8367.00 2479.11 990.00 44.00 431.20

50 29-Aug-08 A -Row J3 8412.00 2492.44 990.00 44.00 431.20 432.65

51 8264.00 2448.59 1000.00 44.44 435.56

52 8436.00 2499.56 990.00 44.00 431.20

53 2-Sep-08 A -Row J7 8476.00 2511.41 950.00 42.22 413.78 419.59

54 8518.00 2523.85 950.00 42.22 413.78

55 8524.00 2525.63 980.00 43.56 426.84

56 2-Sep-08 A -Row J7 8595.00 2546.67 960.00 42.67 418.13 418.13

57 8436.00 2499.56 940.00 41.78 409.42

58 8756.00 2594.37 990.00 44.00 431.20

59 2-Sep-08 A -Row J7 8555.00 2534.81 1000.00 44.44 435.56 437.01


Degree of Quality control
60 8692.00 2575.41 1020.00 45.33 444.27
2.45 43.33 5.66 is good
61 8520.00 2524.44 960.00 42.67 418.13

62 2-Sep-08 A -Row J7 8514.00 2522.67 950.00 42.22 413.78 409.42

63 8642.00 2560.59 910.00 40.44 396.36

64 8647.00 2562.07 990.00 44.00 431.20

65 2-Sep-08 A -Row J7 8543.00 2531.26 970.00 43.11 422.49 422.49

66 8619.00 2553.78 950.00 42.22 413.78

67 8626.00 2555.85 980.00 43.56 426.84

68 3-Sep-08 A -Row J7 8594.00 2546.37 1000.00 44.44 435.56 429.75

69 8596.00 2546.96 980.00 43.56 426.84

70 8620.00 2554.07 960.00 42.67 418.13

4-Sep-08 J7 Raft 419.59


71 4-Sep-08 J7 Raft 8484.00 2513.78 980.00 43.56 426.84 419.59

72 8600.00 2548.15 950.00 42.22 413.78

73 8687.00 2573.93 980.00 43.56 426.84

74 4-Sep-08 J7 Raft 8588.00 2544.59 930.00 41.33 405.07 418.13

75 8372.00 2480.59 970.00 43.11 422.49

76 8447.00 2502.81 950.00 42.22 413.78

77 4-Sep-08 J7 Raft 8244.00 2442.67 970.00 43.11 422.49 419.59

78 8305.00 2460.74 970.00 43.11 422.49

79 8498.00 2517.93 930.00 41.33 405.07

80 4-Sep-08 J7 Raft 8354.00 2475.26 910.00 40.44 396.36 406.52

81 8352.00 2474.67 960.00 42.67 418.13

82 8179.00 2423.41 960.00 42.67 418.13

83 4-Sep-08 J7 Raft 8304.00 2460.44 920.00 40.89 400.71 410.87

84 8568.00 2538.67 950.00 42.22 413.78

85 8561.00 2536.59 1020.00 45.33 444.27


J8 Raft Grid
86 9-Sep-08 13 with 8693.00 2575.70 1000.00 44.44 435.56 438.46
beam
87 8537.00 2529.48 1000.00 44.44 435.56

88 8403.00 2489.78 1080.00 48.00 470.40


J8 Raft Grid
89 9-Sep-08 13 with 8418.00 2494.22 1020.00 45.33 444.27 457.33
beam
Degree of Quality control
90 8381.00 2483.26 1050.00 46.67 457.33
1.70 16.62 10.20 is good
91 8403.00 2489.78 960.00 42.67 418.13
J8 Raft Grid
92 10-Sep-08 13 with 8377.00 2494.22 980.00 43.56 426.84 426.84
beam
93 8394.00 2483.26 1000.00 44.44 435.56

94 8496.00 2489.78 990.00 44.00 431.20


J8 Raft Grid
95 10-Sep-08 13 with 8411.00 2482.07 950.00 42.22 413.78 423.94
beam
J8 Raft Grid
10-Sep-08 13 with 423.94
beam
96 8378.00 2487.11 980.00 43.56 426.84

97 8504.00 2517.33 1250.00 55.56 544.44


J8 Raft Grid
98 11-Sep-08 13 with 8438.00 2492.15 1150.00 51.11 500.89 518.31
beam
99 8426.00 2482.37 1170.00 52.00 509.60

100 8419.00 2519.70 1100.00 48.89 479.11


J8 Raft Grid
101 11-Sep-08 13 with 8383.00 2500.15 1050.00 46.67 457.33 457.33
beam
102 8394.00 2496.59 1000.00 44.44 435.56

103 8513.00 2494.52 1000.00 44.44 435.56


J8 Raft Grid
104 11-Sep-08 13 with 8479.00 2483.85 990.00 44.00 431.20 431.20
beam
105 8429.00 2487.11 980.00 43.56 426.84

106 8397.00 2522.37 990.00 44.00 431.20


J8 Raft Grid
107 11-Sep-08 13 with 8331.00 2512.30 960.00 42.67 418.13 421.04
beam
108 8377.00 2497.48 950.00 42.22 413.78

109 8459.00 2488.00 930.00 41.33 405.07


J1 Raft Grid
110 24-Sep-08 8298.00 2468.44 990.00 44.00 431.20 409.42
12
111 8378.00 2482.07 900.00 40.00 392.00

112 8422.00 2506.37 950.00 42.22 413.78


Shear wall
113 25-Nov-08 8467.00 2458.67 1030.00 45.78 448.62 434.10
J2 Raft
114 8315.00 2482.37 1010.00 44.89 439.91

115 0.00 1010.00 44.89 439.91


Degree of Quality control
116 0.00 1010.00 44.89 439.91 439.91 is good .Based on
calculation with figures
117 0.00 1010.00 44.89 439.91 appearing in Bold red
which are presumtive
118 0.00 1010.00 44.89 439.91 figures.
In actual there are 24
119 0.00 1010.00 44.89 439.91 439.91 observations therefore
06 observations are
presumed as an
120 0.00 1010.00 44.89 439.91
3.22 31.51 10.20 average.
UPDATED 21.01.2009
Grade of concrete M30, B Row, Unit No 6
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8509.00 2521.19 880.00 39.11 383.29

2 6-Aug-08 B-Row 8516.00 2523.26 960.00 42.67 418.13 399.26

3 8414.00 2493.04 910.00 40.44 396.36

4 8406.00 2490.67 950.00 42.22 413.78

5 6-Aug-08 8454.00 2504.89 920.00 40.89 400.71 403.61

6 8396.00 2487.70 910.00 40.44 396.36

7 8599.00 2547.85 870.00 38.67 378.93

8 7-Aug-08 8599.00 2547.85 950.00 42.22 413.78 390.55

9 8551.00 2533.63 870.00 38.67 378.93

10 8513.00 2522.37 950.00 42.22 413.78

11 7-Aug-08 8489.00 2515.26 980.00 43.56 426.84 415.23

12 8639.00 2559.70 930.00 41.33 405.07

13 8713.00 2581.63 1030.00 45.78 448.62

14 9-Aug-08 8691.00 2575.11 1000.00 44.44 435.56 442.81

15 8717.00 2582.81 1020.00 45.33 444.27

16 8472.00 2510.22 950.00 42.22 413.78


J4 Raft Grid
17 13-Sep-08 8389.00 2485.63 800.00 35.56 348.44 377.48
13
18 8325.00 2466.67 850.00 37.78 370.22

19 8447.00 2502.81 1010.00 44.89 439.91


J6 Raft Grid
20 19-Sep-08 14,15,16 8423.00 2495.70 810.00 36.00 352.80 416.68
with beam
21 8303.00 2460.15 1050.00 46.67 457.33
22 8502.00 2519.11 1010.00 44.89 439.91
J6 Raft Grid
23 19-Sep-08 14,15,16 8459.00 2506.37 1050.00 46.67 457.33 458.79
with beam
24 8580.00 2542.22 1100.00 48.89 479.11

25 8399.00 2488.59 900.00 40.00 392.00


J6 Raft Grid
26 20-Sep-08 14,15,16 8537.00 2529.48 1090.00 48.44 474.76 438.46
with beam
27 8264.00 2448.59 1030.00 45.78 448.62

28 8616.00 2552.89 870.00 38.67 378.93


J6 Raft Grid
29 20-Sep-08 14,15,16 8547.00 2532.44 890.00 39.56 387.64 399.26
with beam
Degree of Quality control
30 8694.00 2576.00 990.00 44.00 431.20
3.49 42.27 8.26 is good
31 8434.00 2498.96 930.00 41.33 405.07
J6 Raft Grid
32 20-Sep-08 14,15,16 8356.00 2475.85 980.00 43.56 426.84 422.49
with beam
33 8348.00 2473.48 1000.00 44.44 435.56

34 8543.00 2531.26 890.00 39.56 387.64


J6 Raft Grid
35 20-Sep-08 14,15,16 8434.00 2498.96 900.00 40.00 392.00 397.81
with beam
36 8429.00 2497.48 950.00 42.22 413.78

37 8337.00 2470.22 1100.00 48.89 479.11

38 20-Oct-08 J14 Raft 8303.00 2460.15 960.00 42.67 418.13 455.88

39 8358.00 2476.44 1080.00 48.00 470.40

40 8454.00 2504.89 1060.00 47.11 461.69

41 20-Oct-08 J14 Raft 8402.00 2489.48 900.00 40.00 392.00 444.27

42 8339.00 2470.81 1100.00 48.89 479.11

43 8505.00 2520.00 1000.00 44.44 435.56

44 21-Oct-08 J14 Raft 8571.00 2539.56 980.00 43.56 426.84 437.01

45 8554.00 2534.52 1030.00 45.78 448.62

46 8493.00 2516.44 1040.00 46.22 452.98

21-Oct-08 J14 Raft 450.07


47 21-Oct-08 J14 Raft 8391.00 2486.22 1010.00 44.89 439.91 450.07

48 8535.00 2528.89 1050.00 46.67 457.33

49 8320.00 2465.19 920.00 40.89 400.71


Shear wall
50 27-Nov-08 8569.00 2538.96 960.00 42.67 418.13 412.33
Grid 12 13
51 8436.00 2499.56 960.00 42.67 418.13

52 990.00 44.00 431.20

53 990.00 44.00 431.20 431.20

54 990.00 44.00 431.20

55 990.00 44.00 431.20


Degree of Quality control
56 990.00 44.00 431.20 431.20 is good .Based on
calculation with figures
57 990.00 44.00 431.20 appearing in Bold red
which are presumtive
58 990.00 44.00 431.20 figures.
In actual there are 21
59 990.00 44.00 431.20 431.20 observations therefore
09 observations are
presumed as an
60 990.00 44.00 431.20
2.40 44.01 5.46 average.
UPDATED 21.01.2009
Grade of concrete M30, C Row ,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8494.00 2516.74 1000.00 44.44 435.56


C -Row J8
2 5-Sep-08 8604.00 2549.33 990.00 44.00 431.20 434.10
with beam
3 8594.00 2546.37 1000.00 44.44 435.56

4 8606.00 2549.93 930.00 41.33 405.07


C -Row J8
5 5-Sep-08 8688.00 2574.22 940.00 41.78 409.42 400.71
with beam
6 8644.00 2561.19 890.00 39.56 387.64

7 8508.00 2520.89 840.00 37.33 365.87


C -Row J8
8 5-Sep-08 8692.00 2575.41 840.00 37.33 365.87 383.29
with beam
9 8644.00 2561.19 960.00 42.67 418.13

10 8782.00 2602.07 970.00 43.11 422.49


C -Row J8
11 6-Sep-08 8630.00 2557.04 990.00 44.00 431.20 422.49
with beam
12 8698.00 2577.19 950.00 42.22 413.78

13 8580.00 2542.22 920.00 40.89 400.71


C -Row J8
14 6-Sep-08 8584.00 2543.41 960.00 42.67 418.13 406.52
with beam
15 8481.00 2512.89 920.00 40.89 400.71

16 8438.00 2500.15 920.00 40.89 400.71


C -Row J8
17 6-Sep-08 8388.00 2485.33 900.00 40.00 392.00 399.26
with beam
18 8369.00 2479.70 930.00 41.33 405.07

19 8538.00 2529.78 990.00 44.00 431.20


C -Row J8
20 6-Sep-08 8463.00 2507.56 920.00 40.89 400.71 418.13
with beam
C -Row J8
6-Sep-08 418.13
with beam
21 8330.00 2468.15 970.00 43.11 422.49

22 8428.00 2497.19 970.00 43.11 422.49


C -Row J8
23 6-Sep-08 8362.00 2477.63 940.00 41.78 409.42 407.97
with beam
24 8600.00 2548.15 900.00 40.00 392.00

25 8393.00 2486.81 900.00 40.00 392.00


C -Row J8
26 6-Sep-08 8538.00 2529.78 930.00 41.33 405.07 405.07
with beam
27 8682.00 2572.44 960.00 42.67 418.13

28 8482.00 2513.19 980.00 43.56 426.84


C -Row J8
29 6-Sep-08 8589.00 2544.89 960.00 42.67 418.13 418.13
with beam
Degree of Quality control
30 8487.00 2514.67 940.00 41.78 409.42
1.84 41.79 4.41 is good
31 8321.00 2465.48 910.00 40.44 396.36
J9 -Raft
Grid
32 22-Sep-08 8334.00 2469.33 900.00 40.00 392.00 393.45
13,14,15 ,16
with beam
33 8275.00 2451.85 900.00 40.00 392.00

34 8413.00 2492.74 930.00 41.33 405.07


J9 -Raft
Grid
35 22-Sep-08 8531.00 2527.70 890.00 39.56 387.64 394.90
13,14,15 ,16
with beam
36 8445.00 2502.22 900.00 40.00 392.00

37 8442.00 2501.33 910.00 40.44 396.36


J9 -Raft
Grid
38 22-Sep-08 8491.00 2515.85 930.00 41.33 405.07 397.81
13,14,15 ,16
with beam
39 8218.00 2434.96 900.00 40.00 392.00

40 8042.00 2382.81 890.00 39.56 387.64


J9 -Raft
Grid
41 22-Sep-08 8145.00 2413.33 940.00 41.78 409.42 403.61
13,14,15 ,16
with beam
42 8136.00 2410.67 950.00 42.22 413.78

43 8235.00 2440.00 1010.00 44.89 439.91


J9 -Raft
Grid
44 23-Sep-08 8336.00 2469.93 1020.00 45.33 444.27 439.91
13,14,15 ,16
with beam
45 8266.00 2449.19 1000.00 44.44 435.56
46 8301.00 2459.56 1050.00 46.67 457.33
J9 -Raft
Grid
47 23-Sep-08 8440.00 2500.74 1000.00 44.44 435.56 448.62
13,14,15 ,16
with beam
48 8249.00 2444.15 1040.00 46.22 452.98

49 8466.00 2508.44 1000.00 44.44 435.56


J9 -Raft
Grid
50 23-Sep-08 8249.00 2444.15 980.00 43.56 426.84 434.10
13,14,15 ,16
with beam
51 8378.00 2482.37 1010.00 44.89 439.91

52 8423.00 2495.70 800.00 35.56 348.44


J1A -Raft
53 20-Oct-08 8332.00 2468.74 870.00 38.67 378.93 349.90
with beam
54 8338.00 2470.52 740.00 32.89 322.31

55 8324.00 2466.37 810.00 36.00 352.80


J1A -Raft Degree of Quality control
56 20-Oct-08 8480.00 2512.59 830.00 36.89 361.51 358.61 is good.Based on
with beam
calculation with figures
57 8392.00 2486.52 830.00 36.89 361.51 appearing in Bold red
which are presumtive
58 1090.00 48.44 474.76 figures.
In actual there are 27
59 1090.00 48.44 474.76 474.76 observations therefore
03 observations are
presumed as an
60 1090.00 48.44 474.76
4.02 41.79 9.62 average.
Updated 02.10.2008
UPDATED 21.01.2009
Grade of concrete M30, D Row,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8515.00 2522.96 950.00 42.22 413.78

2 27-Aug-08 D -Row J10 8676.00 2570.67 900.00 40.00 392.00 402.16

3 8559.00 2536.00 920.00 40.89 400.71

4 8438.00 2500.15 910.00 40.44 396.36

5 27-Aug-08 D -Row J10 8334.00 2469.33 930.00 41.33 405.07 394.90

6 8401.00 2489.19 880.00 39.11 383.29

7 8436.00 2499.56 890.00 39.56 387.64

8 27-Aug-08 D -Row J10 8404.00 2490.07 970.00 43.11 422.49 405.07

9 8442.00 2501.33 930.00 41.33 405.07

10 8616.00 2552.89 920.00 40.89 400.71

11 27-Aug-08 D -Row J10 8505.00 2520.00 960.00 42.67 418.13 418.13

12 8536.00 2529.19 1000.00 44.44 435.56

13 8644.00 2561.19 900.00 40.00 392.00

14 27-Aug-08 D -Row J10 8581.00 2542.52 970.00 43.11 422.49 409.42

15 8554.00 2534.52 950.00 42.22 413.78

16 8549.00 2533.04 980.00 43.56 426.84

17 27-Aug-08 D -Row J10 8671.00 2569.19 960.00 42.67 418.13 428.30

18 8665.00 2567.41 1010.00 44.89 439.91

19 8372.00 2480.59 850.00 37.78 370.22

20 28-Aug-08 D -Row J10 8514.00 2522.67 900.00 40.00 392.00 387.64


28-Aug-08 D -Row J10 387.64

21 8409.00 2491.56 920.00 40.89 400.71

22 8573.00 2540.15 930.00 41.33 405.07

23 28-Aug-08 D -Row J10 8573.00 2540.15 910.00 40.44 396.36 403.61

24 8503.00 2519.41 940.00 41.78 409.42

25 8447.00 2502.81 750.00 33.33 326.67


J10 Raft
26 26-Sep-08 8484.00 2513.78 950.00 42.22 413.78 377.48
Grid 1
27 8492.00 2516.15 900.00 40.00 392.00

28 8306.00 2461.04 870.00 38.67 378.93


J10 Raft
29 26-Sep-08 8465.00 2508.15 930.00 41.33 405.07 384.74
Grid 1
Degree of Quality control
30 8293.00 2457.19 850.00 37.78 370.22
2.26 40.93 5.53 is good.
31 8506.00 2520.30 840.00 37.33 365.87
J10 Raft
32 26-Sep-08 8316.00 2464.00 910.00 40.44 396.36 381.84
Grid 1
33 8350.00 2474.07 880.00 39.11 383.29

34 8556.00 2535.11 960.00 42.67 418.13


J10 Raft
35 26-Sep-08 8487.00 2514.67 920.00 40.89 400.71 399.26
Grid 1
36 8389.00 2485.63 870.00 38.67 378.93

37 8424.00 2496.00 910.00 40.44 396.36


J10 Raft
38 27-Sep-08 8357.00 2476.15 980.00 43.56 426.84 418.13
Grid 1
39 8639.00 2559.70 990.00 44.00 431.20

40 8420.00 2494.81 960.00 42.67 418.13


J10 Raft
41 27-Sep-08 8653.00 2563.85 930.00 41.33 405.07 405.07
Grid 1
42 8494.00 2516.74 900.00 40.00 392.00

43 8301.00 2459.56 950.00 42.22 413.78


J10 Raft
44 27-Sep-08 8409.00 2491.56 990.00 44.00 431.20 413.78
Grid 1
45 8347.00 2473.19 910.00 40.44 396.36
46 8406.00 2490.67 910.00 40.44 396.36
J10 Raft
47 27-Sep-08 8278.00 2452.74 900.00 40.00 392.00 394.90
Grid 1
48 8410.00 2491.85 910.00 40.44 396.36

49 8281.00 2453.63 960.00 42.67 418.13


J10 Raft
50 27-Sep-08 8159.00 2417.48 930.00 41.33 405.07 405.07
Grid 1
51 8332.00 2468.74 900.00 40.00 392.00

52 8525.00 2525.93 920.00 40.89 400.71


J10 Raft
53 27-Sep-08 8602.00 2548.74 970.00 43.11 422.49 405.07
Grid 1
54 8447.00 2502.81 900.00 40.00 392.00

55 0.00 920.00 40.89 400.71


Degree of Quality control
56 0.00 920.00 40.89 400.71 400.71 is good Based on
calculation with figures
57 0.00 920.00 40.89 400.71 appearing in Bold Red
which are presumtive
58 0.00 920.00 40.89 400.71 figures.
In actual there are 24
59 0.00 920.00 40.89 400.71 400.71 observations therefore 6
observations are
presumed as an
60 0.00 920.00 40.89 400.71
1.52 41.07 3.70 average.
UPDATED 21.01.2009
Grade of concrete M30, N Row,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8559.00 2536.00 950.00 42.22 413.78


N-row J11
2 19-Aug-08 8663.00 2566.81 820.00 36.44 357.16 387.64
J12 Raft
3 8645.00 2561.48 900.00 40.00 392.00

4 8535.00 2528.89 1000.00 44.44 435.56


N-row J11
5 19-Aug-08 8545.00 2531.85 960.00 42.67 418.13 426.84
J12 Raft
6 8601.00 2548.44 980.00 43.56 426.84

7 8556.00 2535.11 980.00 43.56 426.84


N-row J11
8 19-Aug-08 8613.00 2552.00 990.00 44.00 431.20 431.20
J12 Raft
9 8637.00 2559.11 1000.00 44.44 435.56

10 8670.00 2568.89 1010.00 44.89 439.91


N-row J11
11 19-Aug-08 8720.00 2583.70 950.00 42.22 413.78 425.39
J12 Raft
12 8597.00 2547.26 970.00 43.11 422.49

13 8633.00 2557.93 920.00 40.89 400.71


N-row J11
14 20-Aug-08 8682.00 2572.44 950.00 42.22 413.78 412.33
J12 Raft
15 8608.00 2550.52 970.00 43.11 422.49

16 8610.00 2551.11 1100.00 48.89 479.11


N-row J11
17 20-Aug-08 8738.00 2589.04 1000.00 44.44 435.56 455.88
J12 Raft
18 8688.00 2574.22 1040.00 46.22 452.98

19 8781.00 2601.78 1020.00 45.33 444.27


N-row J11
20 20-Aug-08 8800.00 2607.41 1080.00 48.00 470.40 454.43
J12 Raft
N-row J11
20-Aug-08 454.43
J12 Raft
21 8737.00 2588.74 1030.00 45.78 448.62

22 8858.00 2624.59 1000.00 44.44 435.56


N-row J11
23 20-Aug-08 8585.00 2543.70 980.00 43.56 426.84 426.84
J12 Raft
24 8648.00 2562.37 960.00 42.67 418.13

25 8632.00 2557.63 1000.00 44.44 435.56


N-row J11
26 25-Aug-08 8566.00 2538.07 980.00 43.56 426.84 428.30
Raft
27 8735.00 2588.15 970.00 43.11 422.49

28 8378.00 2482.37 840.00 37.33 365.87


N-row J11
29 25-Aug-08 8534.00 2528.59 880.00 39.11 383.29 386.19
Raft
Degree of Quality control
30 8594.00 2546.37 940.00 41.78 409.42
2.66 43.21 6.16 is good
31 8633.00 2557.93 920.00 40.89 400.71
N-row J11
32 25-Aug-08 8642.00 2560.59 950.00 42.22 413.78 399.26
Raft
33 8634.00 2558.22 880.00 39.11 383.29

34 8632.00 2557.63 850.00 37.78 370.22


N-row J11
35 25-Aug-08 8610.00 2551.11 870.00 38.67 378.93 380.39
Raft
36 8596.00 2546.96 900.00 40.00 392.00

37 8681.00 2572.15 920.00 40.89 400.71


N-row J11
38 25-Aug-08 8839.00 2618.96 900.00 40.00 392.00 396.36
Raft
39 8634.00 2558.22 910.00 40.44 396.36

40 8723.00 2584.59 1010.00 44.89 439.91


N-row J12
41 26-Aug-08 8785.00 2602.96 930.00 41.33 405.07 415.23
Raft
42 8741.00 2589.93 920.00 40.89 400.71

43 8586.00 2544.00 960.00 42.67 418.13


N-row J12
44 26-Aug-08 8624.00 2555.26 940.00 41.78 409.42 418.13
Raft
45 8574.00 2540.44 980.00 43.56 426.84
46 8554.00 2534.52 1000.00 44.44 435.56
N-row J12
47 26-Aug-08 8580.00 2542.22 990.00 44.00 431.20 429.75
Raft
48 8581.00 2542.52 970.00 43.11 422.49

49 8557.00 2535.41 920.00 40.89 400.71


N-row J12
50 26-Aug-08 8627.00 2556.15 940.00 41.78 409.42 405.07
Raft
51 8577.00 2541.33 930.00 41.33 405.07

52 8699.00 2577.48 1020.00 45.33 444.27


N-row J12
53 26-Aug-08 8790.00 2604.44 1000.00 44.44 435.56 431.20
Raft
54 8788.00 2603.85 950.00 42.22 413.78

55 0.00 940.00 41.78 409.42


Degree of Quality control
56 0.00 940.00 41.78 409.42 409.42 is good Based on
calculation with figures
57 0.00 940.00 41.78 409.42 appearing in Bold red
which are presumtive
58 0.00 940.00 41.78 409.42 figures.
In actual there are 24
59 0.00 940.00 41.78 409.42 409.42 observations therefore 6
observations are
presumed as an
60 0.00 940.00 41.78 409.42
1.78 41.78 4.26 average.
UPDATED 21.01.2009
Grade of concrete M30, CCB ,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8513.00 2522.37 1210.00 53.78 527.02

2 17-Jul-08 J1Raft 8603.00 2549.04 1280.00 56.89 557.51 535.73

3 8431.00 2498.07 1200.00 53.33 522.67

4 8633.00 2557.93 1150.00 51.11 500.89

5 17-Jul-08 J1Raft 8864.00 2626.37 1170.00 52.00 509.60 500.89

6 8631.00 2557.33 1130.00 50.22 492.18

7 8660.00 2565.93 1010.00 44.89 439.91

8 17-Jul-08 J1Raft 8586.00 2544.00 1050.00 46.67 457.33 458.79

9 8724.00 2584.89 1100.00 48.89 479.11

10 8813.00 2611.26 1020.00 45.33 444.27

11 17-Jul-08 J1Raft 8621.00 2554.37 1070.00 47.56 466.04 448.62

12 8470.00 2509.63 1000.00 44.44 435.56

13 8741.00 2589.93 800.00 35.56 348.44

14 23-Jul-08 J2 Raft 8730.00 2586.67 1000.00 44.44 435.56 399.26

15 8798.00 2606.81 950.00 42.22 413.78

16 8710.00 2580.74 1010.00 44.89 439.91

17 23-Jul-08 J2 Raft 8751.00 2592.89 980.00 43.56 426.84 428.30

18 8923.00 2643.85 960.00 42.67 418.13

19 8681.00 2572.15 1020.00 45.33 444.27

20 23-Jul-08 J2 Raft 8698.00 2577.19 1000.00 44.44 435.56 434.10


23-Jul-08 J2 Raft 434.10

21 8871.00 2628.44 970.00 43.11 422.49

22 8789.00 2604.15 1030.00 45.78 448.62

23 23-Jul-08 J2 Raft 8731.00 2586.96 980.00 43.56 426.84 435.56

24 8906.00 2638.81 990.00 44.00 431.20

25 8724.00 2584.89 1000.00 44.44 435.56

26 25-Jul-08 J3 Raft 8775.00 2600.00 1000.00 44.44 435.56 437.01

27 8876.00 2629.93 1010.00 44.89 439.91

28 8710.00 2580.74 910.00 40.44 396.36

29 25-Jul-08 J3 Raft 8764.00 2596.74 950.00 42.22 413.78 384.74


Degree of Quality control
30 8647.00 2562.07 790.00 35.11 344.09
4.76 45.54 10.45 is good
31 8578.00 2541.63 960.00 42.67 418.13

32 25-Jul-08 J3 Raft 8819.00 2613.04 980.00 43.56 426.84 425.39

33 8813.00 2611.26 990.00 44.00 431.20

34 8740.00 2589.63 900.00 40.00 392.00

35 25-Jul-08 J3 Raft 8661.00 2566.22 980.00 43.56 426.84 412.33

36 8612.00 2551.70 960.00 42.67 418.13

37 8779.00 2601.19 970.00 43.11 422.49

38 26-Jul-08 J2Raft 8798.00 2606.81 980.00 43.56 426.84 431.20

39 8956.00 2653.63 1020.00 45.33 444.27

40 8568.00 2538.67 970.00 43.11 422.49

41 26-Jul-08 J2Raft 8548.00 2532.74 990.00 44.00 431.20 426.84

42 8514.00 2522.67 980.00 43.56 426.84

43 8422.00 2495.41 900.00 40.00 392.00

44 23-Oct-08 J4 Raft 8417.00 2493.93 1030.00 45.78 448.62 422.49

45 8316.00 2464.00 980.00 43.56 426.84


46 8303.00 2460.15 990.00 44.00 431.20

47 23-Oct-08 J4 Raft 8672.00 2569.48 1010.00 44.89 439.91 432.65

48 8376.00 2481.78 980.00 43.56 426.84

49 8343.00 2472.00 950.00 42.22 413.78

50 23-Oct-08 J4 Raft 8316.00 2464.00 970.00 43.11 422.49 423.94

51 8310.00 2462.22 1000.00 44.44 435.56

52 8315.00 2463.70 1010.00 44.89 439.91

53 23-Oct-08 J4 Raft 8380.00 2482.96 1040.00 46.22 452.98 442.81

54 8335.00 2469.63 1000.00 44.44 435.56

55 8481.00 2512.89 1000.00 44.44 435.56

56 24-Oct-08 J4 Raft 8517.00 2523.56 930.00 41.33 405.07 412.33

57 8335.00 2469.63 910.00 40.44 396.36

58 8456.00 2505.48 1020.00 45.33 444.27

59 24-Oct-08 J4 Raft 8491.00 2515.85 960.00 42.67 418.13 432.65


Degree of Quality control
60 8471.00 2509.93 1000.00 44.44 435.56
1.56 43.50 3.58 is good
61 8310.00 2462.22 940.00 41.78 409.42

62 24-Oct-08 J4 Raft 8322.00 2465.78 980.00 43.56 426.84 419.59

63 8275.00 2451.85 970.00 43.11 422.49

64 8530.00 2527.41 910.00 40.44 396.36

65 24-Oct-08 J4 Raft 8482.00 2513.19 940.00 41.78 409.42 399.26

66 8245.00 2442.96 900.00 40.00 392.00

67 8550.00 2533.33 970.00 43.11 422.49

68 24-Oct-08 J4 Raft 8547.00 2532.44 950.00 42.22 413.78 418.13

69 8629.00 2556.74 960.00 42.67 418.13

70 8306.00 2461.04 920.00 40.89 400.71


J2
foundation
30-Oct-08 413.78
shear wall
Grid 2/D
J2
foundation
71 30-Oct-08 8236.00 2440.30 930.00 41.33 405.07 413.78
shear wall
Grid 2/D
72 8117.00 2405.04 1000.00 44.44 435.56

73 0.00 940.00 41.78 409.42

74 0.00 940.00 41.78 409.42 409.42

75 0.00 940.00 41.78 409.42

76 0.00 940.00 41.78 409.42

77 0.00 940.00 41.78 409.42 409.42

78 0.00 940.00 41.78 409.42

79 0.00 940.00 41.78 409.42

80 0.00 940.00 41.78 409.42 409.42

81 0.00 940.00 41.78 409.42

82 0.00 940.00 41.78 409.42

83 0.00 940.00 41.78 409.42 409.42

84 0.00 940.00 41.78 409.42

85 0.00 940.00 41.78 409.42


Degree of Quality control
86 0.00 940.00 41.78 409.42 409.42 is good Based on
calculation with figures
87 0.00 940.00 41.78 409.42 appearing in Bold red
which are presumtive
88 0.00 940.00 41.78 409.42 figures.
In actual there are 12
89 0.00 940.00 41.78 409.42 409.42 observations therefore
18 observations are
presumed as an
90 0.00 940.00 41.78 409.42
0.83 41.91 1.99 average.
UPDATED 21.01.2009
Grade of concrete M30, Main Plant Building ,Unit No 6
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8828.00 2615.70 960.00 42.67 418.13


J4R aft with
2 20-Aug-08 8712.00 2581.33 980.00 43.56 426.84 434.10
beam
3 8661.00 2566.22 1050.00 46.67 457.33

4 8633.00 2557.93 950.00 42.22 413.78


J4R aft with
5 20-Aug-08 8674.00 2570.07 970.00 43.11 422.49 422.49
beam
6 8640.00 2560.00 990.00 44.00 431.20

7 8642.00 2560.59 980.00 43.56 426.84


J4R aft with
8 20-Aug-08 8650.00 2562.96 920.00 40.89 400.71 422.49
beam
9 8590.00 2545.19 1010.00 44.89 439.91

10 8528.00 2526.81 970.00 43.11 422.49


J4R aft with
11 21-Aug-08 8645.00 2561.48 1020.00 45.33 444.27 422.49
beam
12 8703.00 2578.67 920.00 40.89 400.71

13 8508.00 2520.89 1000.00 44.44 435.56


J4R aft with
14 21-Aug-08 8772.00 2599.11 980.00 43.56 426.84 434.10
beam
15 8546.00 2532.15 1010.00 44.89 439.91

16 0.00 980.00 43.56 426.84

17 0.00 980.00 43.56 426.84 426.84

18 0.00 980.00 43.56 426.84

19 0.00 980.00 43.56 426.84

20 0.00 980.00 43.56 426.84 426.84

21 0.00 980.00 43.56 426.84

Degree of Quality control


22 0.00 980.00 43.56 426.84

23 0.00 980.00 43.56 426.84 426.84

24 0.00 980.00 43.56 426.84

25 0.00 980.00 43.56 426.84


Degree of Quality control
26 0.00 980.00 43.56 426.84 426.84 is good Based on
calculation with figures
27 0.00 980.00 43.56 426.84 appearing in Bold red
which are presumtive
28 0.00 980.00 43.56 426.84 figures.
In actual there are 15
29 0.00 980.00 43.56 426.84 426.84 observations therefore
15 observations are
presumed as an
30 0.00 980.00 43.56 426.84
1.09 43.57 2.51 average.
UPDATED 21.01.2009
Grade of concrete M30, FD Fan ,P A Fan,ID Fan,Coal Mill,Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8333.00 2469.04 990.00 44.00 431.20

2 27-Oct-08 FD Fan 8375.00 2481.48 940.00 41.78 409.42 419.59

3 8314.00 2463.41 960.00 42.67 418.13

4 8318.00 2464.59 900.00 40.00 392.00


FD Fan J1
5 27-Oct-08 8412.00 2492.44 1050.00 46.67 457.33 422.49
J2
6 8188.00 2426.07 960.00 42.67 418.13

7 8158.00 2417.19 960.00 42.67 418.13

8 30-Oct-08 FD Fan 8266.00 2449.19 1020.00 45.33 444.27 431.20

9 8361.00 2477.33 990.00 44.00 431.20

10 8486.00 2514.37 980.00 43.56 426.84

11 30-Oct-08 FD Fan 8453.00 2504.59 900.00 40.00 392.00 406.52

12 8244.00 2442.67 920.00 40.89 400.71

13 8320.00 2465.19 940.00 41.78 409.42

14 30-Oct-08 FD Fan 8316.00 2464.00 980.00 43.56 426.84 416.68

15 8357.00 2476.15 950.00 42.22 413.78

16 8336.00 2469.93 900.00 40.00 392.00


FD Fan J2
17 11-Nov-08 8420.00 2494.81 940.00 41.78 409.42 412.33
with beam
18 8449.00 2503.41 1000.00 44.44 435.56

19 8390.00 2485.93 1040.00 46.22 452.98


FD Fan J2
20 11-Nov-08 8427.00 2496.89 970.00 43.11 422.49 434.10
with beam
FD Fan J2
11-Nov-08 434.10
with beam
21 8392.00 2486.52 980.00 43.56 426.84

22 8620.00 2554.07 1010.00 44.89 439.91


FD Fan J4
23 24-Nov-08 8530.00 2527.41 970.00 43.11 422.49 423.94
with beam
24 8329.00 2467.85 940.00 41.78 409.42

25 8532.00 2528.00 1000.00 44.44 435.56


FD Fan J4
26 24-Nov-08 8446.00 2502.52 960.00 42.67 418.13 438.46
with beam
27 8509.00 2521.19 1060.00 47.11 461.69

28 8174.00 2421.93 950.00 42.22 413.78

29 26-Nov-08 FD Fan J3 8068.00 2390.52 900.00 40.00 392.00 396.36


Degree of Quality control
30 8182.00 2424.30 880.00 39.11 383.29
2.03 42.87 4.74 is good
31 8543.00 2531.26 920.00 40.89 400.71
Coal mill
foundation
32 29-Nov-08 8469.00 2509.33 990.00 44.00 431.20 410.87
CD 13 and
14
33 8320.00 2465.19 920.00 40.89 400.71

34 8540.00 2530.37 1010.00 44.89 439.91


Coal mill
foundation
35 29-Nov-08 8539.00 2530.07 970.00 43.11 422.49 428.30
CD 13 and
14
36 8362.00 2477.63 970.00 43.11 422.49

37 8329.00 2467.85 900.00 40.00 392.00


CCB unit 6
Connecting
38 1-Dec-08 8356.00 2475.85 860.00 38.22 374.58 390.55
wall grid 12
and 13
39 8388.00 2485.33 930.00 41.33 405.07

40 Coal mill 8536.00 2529.19 900.00 40.00 392.00


foundation
41 3-Dec-08 second lift 8432.00 2498.37 990.00 44.00 431.20 413.78
CD 18 and
42 17 8569.00 2538.96 960.00 42.67 418.13

43 8569.00 2538.96 890.00 39.56 387.64


CW Pit RCC
44 4-Dec-08 8438.00 2500.15 910.00 40.44 396.36 396.36
Wall
45 8469.00 2509.33 930.00 41.33 405.07
46 8580.00 2542.22 940.00 41.78 409.42
CW Pit RCC
47 4-Dec-08 8568.00 2538.67 980.00 43.56 426.84 416.68
Wall
48 8329.00 2467.85 950.00 42.22 413.78

49 8336.00 2469.93 900.00 40.00 392.00


CW Pit RCC
50 4-Dec-08 8389.00 2485.63 860.00 38.22 374.58 392.00
Wall
51 8201.00 2429.93 940.00 41.78 409.42

52 8439.00 2500.44 980.00 43.56 426.84


Coal mill
foundation
53 5-Dec-08 8567.00 2538.37 930.00 41.33 405.07 409.42
CD 16 and
15
54 8533.00 2528.30 910.00 40.44 396.36

55 8469.00 2509.33 1020.00 45.33 444.27


Coal mill
foundation
56 5-Dec-08 8331.00 2468.44 940.00 41.78 409.42 426.84
CD 16 and
15
57 8325.00 2466.67 980.00 43.56 426.84

58 8365.00 2478.52 950.00 42.22 413.78


Coal mill
foundation
59 5-Dec-08 8469.00 2509.33 1000.00 44.44 435.56 423.94
CD 16 and
15 Degree of Quality control
60 8430.00 2497.78 970.00 43.11 422.49
1.86 41.93 4.43 is good
61 8462.00 2507.26 1010.00 44.89 439.91
Coal mill
foundation
62 6-Dec-08 8381.00 2483.26 1030.00 45.78 448.62 437.01
CD 15 and
14
63 8459.00 2506.37 970.00 43.11 422.49

64 8321.00 2465.48 980.00 43.56 426.84


Coal mill
foundation
65 6-Dec-08 8372.00 2480.59 1020.00 45.33 444.27 435.56
CD 15 and
14
66 8360.00 2477.04 1000.00 44.44 435.56

67 8515.00 2522.96 910.00 40.44 396.36


Coal mill
foundation
68 11-Dec-08 8469.00 2509.33 970.00 43.11 422.49 413.78
CD 17 and
16
69 8319.00 2464.89 970.00 43.11 422.49

70 8370.00 2480.00 930.00 41.33 405.07


Coal mill
foundation
11-Dec-08 409.42
CD 17 and
16
Coal mill
foundation
71 11-Dec-08 8407.00 2490.96 950.00 42.22 413.78 409.42
CD 17 and
16
72 8425.00 2496.30 940.00 41.78 409.42

73 8426.00 2496.59 900.00 40.00 392.00


Coal mill
foundation
74 11-Dec-08 8402.00 2489.48 960.00 42.67 418.13 410.87
CD 17 and
16
75 8327.00 2467.26 970.00 43.11 422.49

76 8351.00 2474.37 1020.00 45.33 444.27


Coal mill
foundation
77 11-Dec-08 8405.00 2490.37 980.00 43.56 426.84 435.56
CD 17 and
16
78 8485.00 2514.07 1000.00 44.44 435.56

79 0.00 970.00 43.11 422.49

80 0.00 970.00 43.11 422.49 422.49

81 0.00 970.00 43.11 422.49

82 0.00 970.00 43.11 422.49

83 0.00 970.00 43.11 422.49 422.49

84 0.00 970.00 43.11 422.49

85 0.00 970.00 43.11 422.49


Degree of Quality control
86 0.00 970.00 43.11 422.49 422.49 is good Based on
calculation with figures
87 0.00 970.00 43.11 422.49 appearing in Bold red
which are presumtive
88 0.00 970.00 43.11 422.49 figures.
In actual there are 18
89 0.00 970.00 43.11 422.49 422.49 observations therefore
12 observations are
presumed as an
90 0.00 970.00 43.11 422.49
1.27 43.19 2.94 average.
Updated 02.10.2008
UPDATED 26.01.2009
Grade of concrete M30, CHP , Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8420.00 2494.81 1050.00 46.67 457.33


Coal Mill
2 11-Nov-08 Raft 8382.00 2483.56 1020.00 45.33 444.27 455.88
CD 19 - 18
3 8469.00 2509.33 1070.00 47.56 466.04

4 8315.00 2463.70 1020.00 45.33 444.27


Coal Mill
5 11-Nov-08 Raft 8361.00 2477.33 980.00 43.56 426.84 439.91
CD 19 - 18
6 8352.00 2474.67 1030.00 45.78 448.62

7 8202.00 2430.22 880.00 39.11 383.29


Coal Mill
8 12-Nov-08 Raft 8155.00 2416.30 900.00 40.00 392.00 397.81
CD 18 - 17
9 8215.00 2434.07 960.00 42.67 418.13

10 8216.00 2434.37 1040.00 46.22 452.98


Coal Mill
11 12-Nov-08 Raft 8270.00 2450.37 980.00 43.56 426.84 438.46
CD 18 - 17
12 8239.00 2441.19 1000.00 44.44 435.56

13 8219.00 2435.26 900.00 40.00 392.00


Coal Mill
14 13-Nov-08 Raft 8063.00 2389.04 950.00 42.22 413.78 418.13
CD 16 - 15
15 8205.00 2431.11 1030.00 45.78 448.62

16 8377.00 2482.07 900.00 40.00 392.00


Coal Mill
17 18-Nov-08 Raft 8206.00 2431.41 940.00 41.78 409.42 396.36
CD 15 - 14
18 8283.00 2454.22 890.00 39.56 387.64

19 8442.00 2501.33 910.00 40.44 396.36


Coal Mill
20 18-Nov-08 Raft 8360.00 2477.04 920.00 40.89 400.71 412.33
CD 15 - 14
Coal Mill
18-Nov-08 Raft 412.33
CD 15 - 14
21 8454.00 2504.89 1010.00 44.89 439.91

22 8132.00 2409.48 930.00 41.33 405.07


Coal Mill
23 19-Nov-08 Raft 8368.00 2479.41 890.00 39.56 387.64 392.00
CD 14 - 13
24 8289.00 2456.00 880.00 39.11 383.29

25 8266.00 2449.19 940.00 41.78 409.42


Coal Mill
26 19-Nov-08 Raft 8362.00 2477.63 900.00 40.00 392.00 400.71
CD 14 - 13
27 8235.00 2440.00 920.00 40.89 400.71

28 8332.00 2468.74 1010.00 44.89 439.91


Coal Mill
29 24-Nov-08 Raft 8269.00 2450.07 1000.00 44.44 435.56 444.27
CD 17 - 16
Degree of Quality control
30 8456.00 2505.48 1050.00 46.67 457.33
2.67 42.81 6.24 is good
31 8392.00 2486.52 980.00 43.56 426.84
Coal Mill
32 24-Nov-08 Raft 8326.00 2466.96 930.00 41.33 405.07 418.13
CD 17 - 16
33 8456.00 2505.48 970.00 43.11 422.49

34 0.00 0.00 0.00 0.00

35 0.00 0.00 0.00 0.00 0.00

36 0.00 0.00 0.00 0.00

37 0.00 0.00 0.00 0.00

38 0.00 0.00 0.00 0.00 0.00

39 0.00 0.00 0.00 0.00

40 0.00 0.00 0.00 0.00

41 0.00 0.00 0.00 0.00 0.00

42 0.00 0.00 0.00 0.00

43 0.00 0.00 0.00 0.00

44 0.00 0.00 0.00 0.00 0.00

45 0.00 0.00 0.00 0.00


46 0.00 0.00 0.00 0.00

47 0.00 0.00 0.00 0.00 0.00

48 0.00 0.00 0.00 0.00

49 0.00 0.00 0.00 0.00

50 0.00 0.00 0.00 0.00 0.00

51 0.00 0.00 0.00 0.00

52 0.00 0.00 0.00 0.00

53 0.00 0.00 0.00 0.00 0.00

54 0.00 0.00 0.00 0.00

55 0.00 0.00 0.00 0.00

56 0.00 0.00 0.00 0.00 0.00

57 0.00 0.00 0.00 0.00

58 0.00 0.00 0.00 0.00

59 0.00 0.00 0.00 0.00 0.00

60 0.00 0.00 0.00 0.00


13.02 4.27 305.21
UPDATED 21.01.2009
Grade of concrete M35, APL Culvert
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8421.00 2495.11 1120.00 49.78 487.82

2 22-Aug-08 APL Culvert 8475.00 2511.11 1110.00 49.33 483.47 480.56

3 8495.00 2517.04 1080.00 48.00 470.40

4 8633.00 2557.93 830.00 36.89 361.51

5 22-Aug-08 APL Culvert 8620.00 2554.07 950.00 42.22 413.78 403.61

6 8580.00 2542.22 1000.00 44.44 435.56

7 8530.00 2527.41 990.00 44.00 431.20

8 22-Aug-08 APL Culvert 8420.00 2494.81 970.00 43.11 422.49 431.20

9 8550.00 2533.33 1010.00 44.89 439.91

10 8570.00 2539.26 940.00 41.78 409.42

11 22-Aug-08 APL Culvert 8709.00 2580.44 900.00 40.00 392.00 426.84

12 8649.00 2562.67 1100.00 48.89 479.11

13 8665.00 2567.41 970.00 43.11 422.49

14 22-Aug-08 APL Culvert 8645.00 2561.48 1040.00 46.22 452.98 434.10

15 8573.00 2540.15 980.00 43.56 426.84

16 8656.00 2564.74 1000.00 44.44 435.56

17 22-Aug-08 APL Culvert 8621.00 2554.37 970.00 43.11 422.49 429.75

18 8618.00 2553.48 990.00 44.00 431.20

19 8452.00 2504.30 1000.00 44.44 435.56


FGD Culvert
1 st and 2
20 10-Sep-08 8480.00 2512.59 1020.00 45.33 444.27 437.01
nd wall from
South side
FGD Culvert
1 st and 2
10-Sep-08 437.01
nd wall from
South side
21 8508.00 2520.89 990.00 44.00 431.20

22 8415.00 2493.33 920.00 40.89 400.71

23 11-Sep-08 8436.00 2499.56 990.00 44.00 431.20 406.52

24 8400.00 2488.89 890.00 39.56 387.64

25 FGD Culvert 8325.00 2466.67 900.00 40.00 392.00


3 rd , 4 th
26 27-Sep-08 and 5 th wall 8462.00 2507.26 990.00 44.00 431.20 422.49
from South
27 side 8390.00 2485.93 1020.00 45.33 444.27

28 8311.00 2462.52 1030.00 45.78 448.62

29 29-Sep-08 8230.00 2438.52 1020.00 45.33 444.27 457.33


Degree of Quality control
30 8288.00 2455.70 1100.00 48.89 479.11
3.01 44.18 6.81 is good .
31 FGD Culvert 8319.00 2464.89 1000.00 44.44 435.56
6 th , 7 th
32 7-Oct-08 and 8 th wall 8429.00 2497.48 1030.00 45.78 448.62 447.17
from South
33 side 8449.00 2503.41 1050.00 46.67 457.33

34 FGD Culvert 8225.00 2437.04 1060.00 47.11 461.69


6 th , 7 th
35 7-Oct-08 and 8 th wall 8260.00 2447.41 1040.00 46.22 452.98 447.17
from South
36 side 8369.00 2479.70 980.00 43.56 426.84

37 8326.00 2466.96 950.00 42.22 413.78


Raft of drain
38 15-Oct-08 besides L3 8395.00 2487.41 1000.00 44.44 435.56 425.39
L4
39 8255.00 2445.93 980.00 43.56 426.84

40 8308.00 2461.63 930.00 41.33 405.07


Raft of drain
41 15-Oct-08 besides L3 8310.00 2462.22 970.00 43.11 422.49 419.59
L4
42 8090.00 2397.04 990.00 44.00 431.20

43 8361.00 2477.33 990.00 44.00 431.20


Top slab of
44 16-Oct-08 L7 L8 8497.00 2517.63 1000.00 44.44 435.56 431.20
Culvert
45 8568.00 2538.67 980.00 43.56 426.84
46 8356.00 2475.85 1010.00 44.89 439.91
Top slab of
47 16-Oct-08 L7 L8 8394.00 2487.11 960.00 42.67 418.13 428.30
Culvert
48 8320.00 2465.19 980.00 43.56 426.84

49 Top slab of 8583.00 2543.11 1160.00 51.56 505.24


FGD Culvert
50 21-Oct-08 3rd , 4 th, 5 8672.00 2569.48 1100.00 48.89 479.11 476.21
th and 6 th
51 span 8679.00 2571.56 1020.00 45.33 444.27

52 Top slab of 8813.00 2611.26 1080.00 48.00 470.40


FGD Culvert
53 21-Oct-08 3rd , 4 th, 5 8687.00 2573.93 1180.00 52.44 513.96 495.08
th and 6 th
54 span 8735.00 2588.15 1150.00 51.11 500.89

55 Top slab of 8395.00 2487.41 1030.00 45.78 448.62


FGD Culvert
56 25-Oct-08 7 th, 8 th 8407.00 2490.96 990.00 44.00 431.20 431.20
and 9th
57 span 8416.00 2493.63 950.00 42.22 413.78

58 Top slab of 8243.00 2442.37 1000.00 44.44 435.56


FGD Culvert
59 25-Oct-08 7 th, 8 th 8155.00 2416.30 1020.00 45.33 444.27 438.46
and 9th
span Degree of Quality control
60 8158.00 2417.19 1000.00 44.44 435.56
2.74 45.30 6.05 is good
61 Top slab of 8362.00 2477.63 1040.00 46.22 452.98
FGD Culvert
62 25-Oct-08 7 th, 8 th 8173.00 2421.63 1010.00 44.89 439.91 450.07
and 9th
63 span 8242.00 2442.07 1050.00 46.67 457.33

64 1030.00 45.78 448.62

65 1030.00 45.78 448.62 448.62

66 1030.00 45.78 448.62

67 1030.00 45.78 448.62

68 1030.00 45.78 448.62 448.62

69 1030.00 45.78 448.62

70 1030.00 45.78 448.62

448.62
71 1030.00 45.78 448.62 448.62

72 1030.00 45.78 448.62

73 1030.00 45.78 448.62

74 1030.00 45.78 448.62 448.62

75 1030.00 45.78 448.62

76 1030.00 45.78 448.62

77 1030.00 45.78 448.62 448.62

78 1030.00 45.78 448.62

79 1030.00 45.78 448.62

80 1030.00 45.78 448.62 448.62

81 1030.00 45.78 448.62

82 1030.00 45.78 448.62

83 1030.00 45.78 448.62 448.62

84 1030.00 45.78 448.62

85 1030.00 45.78 448.62


Degree of Quality control
86 1030.00 45.78 448.62 448.62 is good Based on
calculation with figures
87 1030.00 45.78 448.62 appearing in Bold red
which are presumtive
88 1030.00 45.78 448.62 figures.
In actual there are 03
89 1030.00 45.78 448.62 448.62 observations therefore
27 observations are
presumed as an
90 1030.00 45.78 448.62
0.25 45.79 0.54 average.
Updated 21.01.2009
Grade of concrete M35, Shangdong Culvert, Unit No 6
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8499.00 2518.22 970.00 43.11 422.49


Culvert CW
2 28-Aug-08 8612.00 2551.70 1000.00 44.44 435.56 425.39
Pipe line
3 8550.00 2533.33 960.00 42.67 418.13

4 8556.00 2535.11 970.00 43.11 422.49


Culvert CW
5 28-Aug-08 8600.00 2548.15 700.00 31.11 304.89 357.16
Pipe line
6 8613.00 2552.00 790.00 35.11 344.09

7 8519.00 2524.15 1100.00 48.89 479.11


Culvert CW
8 28-Aug-08 8509.00 2521.19 1110.00 49.33 483.47 468.95
Pipe line
9 8579.00 2541.93 1020.00 45.33 444.27

10 8691.00 2575.11 920.00 40.89 400.71


Culvert CW
11 30-Aug-08 8717.00 2582.81 1010.00 44.89 439.91 425.39
Pipe line
12 8580.00 2542.22 1000.00 44.44 435.56

13 8411.00 2492.15 990.00 44.00 431.20


Culvert CW
14 30-Aug-08 8448.00 2503.11 980.00 43.56 426.84 429.75
Pipe line
15 8278.00 2452.74 990.00 44.00 431.20

16 8497.00 2517.63 1000.00 44.44 435.56


Culvert CW
17 30-Aug-08 8579.00 2541.93 990.00 44.00 431.20 428.30
Pipe line
18 8586.00 2544.00 960.00 42.67 418.13

19 8554.00 2534.52 1000.00 44.44 435.56


Culvert CW
20 30-Aug-08 8459.00 2506.37 990.00 44.00 431.20 428.30
Pipe line
Culvert CW
30-Aug-08 428.30
Pipe line
21 8577.00 2541.33 960.00 42.67 418.13

22 8366.00 2478.81 1000.00 44.44 435.56


Raft of Box
23 9-Sep-08 Culvert L5 8234.00 2439.70 990.00 44.00 431.20 431.20
L6
24 8185.00 2425.19 980.00 43.56 426.84

25 8464.00 2507.85 920.00 40.89 400.71


Box culvert
26 13-Sep-08 for CW 8309.00 2461.93 820.00 36.44 357.16 389.10
Pipes
27 8286.00 2455.11 940.00 41.78 409.42

28 8299.00 2458.96 900.00 40.00 392.00


Box culvert
29 13-Sep-08 for CW 8276.00 2452.15 820.00 36.44 357.16 380.39
Pipes
Degree of Quality control
30 8308.00 2461.63 900.00 40.00 392.00
3.76 42.49 8.85 is good
31 8207.00 2431.70 960.00 42.67 418.13
Box culvert
32 22-Sep-08 for CW 8292.00 2456.89 990.00 44.00 431.20 431.20
Pipes
33 8348.00 2473.48 1020.00 45.33 444.27

34 8611.00 2551.41 990.00 44.00 431.20


Box culvert
35 23-Sep-08 for CW 8406.00 2490.67 930.00 41.33 405.07 421.04
Pipes
36 8593.00 2546.07 980.00 43.56 426.84

37 8530.00 2527.41 920.00 40.89 400.71


Box culvert
38 25-Sep-08 for CW 8580.00 2542.22 900.00 40.00 392.00 399.26
PipesL1 L2
39 8400.00 2488.89 930.00 41.33 405.07

40 8303.00 2460.15 1010.00 44.89 439.91


Box culvert
41 30-Sep-08 for CW 8250.00 2444.44 980.00 43.56 426.84 429.75
PipesL1 L2
42 8329.00 2467.85 970.00 43.11 422.49

43 8460.00 2506.67 980.00 43.56 426.84


Culvert CW
Pipe line 3
44 2-Oct-08 8340.00 2471.11 960.00 42.67 418.13 428.30
rd and 4 th
wall
45 8378.00 2482.37 1010.00 44.89 439.91
46 8406.00 2490.67 1040.00 46.22 452.98
Culvert CW
47 4-Oct-08 Pipe line 5 8536.00 2529.19 1050.00 46.67 457.33 460.24
th wall
48 8383.00 2483.85 1080.00 48.00 470.40

49 8347.00 2473.19 900.00 40.00 392.00


Raft of drain
50 13-Oct-08 besides L3 8205.00 2431.11 990.00 44.00 431.20 407.97
L4
51 8324.00 2466.37 920.00 40.89 400.71

52 8275.00 2451.85 970.00 43.11 422.49


Wall of drain
53 17-Oct-08 besides L5 8453.00 2504.59 990.00 44.00 431.20 426.84
L6
54 8289.00 2456.00 980.00 43.56 426.84

55 8716.00 2582.52 990.00 44.00 431.20


Wall of drain
56 20-Oct-08 besides L3 8408.00 2491.26 590.00 26.22 256.98 373.13
L4
57 8598.00 2547.56 990.00 44.00 431.20

58 8491.00 2515.85 1070.00 47.56 466.04


Wall L1 L2
59 22-Oct-08 8226.00 2437.33 1120.00 49.78 487.82 477.66
1st lift
Degree of Quality control
60 8308.00 2461.63 1100.00 48.89 479.11
4.06 43.42 9.36 is good
61 8381.00 2483.26 1000.00 44.44 435.56
Wall L1 L2
62 22-Oct-08 8323.00 2466.07 1030.00 45.78 448.62 442.81
1st lift
63 8254.00 2445.63 1020.00 45.33 444.27

64 8133.00 2409.78 1010.00 44.89 439.91


Top slab of
65 25-Oct-08 CW Culvert 8237.00 2440.59 980.00 43.56 426.84 442.81
L3 with wall
66 8355.00 2475.56 1060.00 47.11 461.69

67 8495.00 2517.04 1030.00 45.78 448.62


Top slab of
68 25-Oct-08 CW Culvert 8221.00 2435.85 1050.00 46.67 457.33 445.72
L3 with wall
69 8300.00 2459.26 990.00 44.00 431.20

70 8480.00 2512.59 1030.00 45.78 448.62


Top slab of
26-Oct-08 CW Culvert 451.53
L3 with wall
Top slab of
71 26-Oct-08 CW Culvert 8413.00 2492.74 1080.00 48.00 470.40 451.53
L3 with wall
72 8444.00 2501.93 1000.00 44.44 435.56

73 8152.00 2415.41 980.00 43.56 426.84


Top slab of
74 27-Oct-08 CW Culvert 8150.00 2414.81 1010.00 44.89 439.91 438.46
L3 with wall
75 8206.00 2431.41 1030.00 45.78 448.62

76 8259.00 2447.11 1010.00 44.89 439.91


Top slab of
drain
77 30-Oct-08 8806.00 2609.19 1060.00 47.11 461.69 451.53
besides L5
L6
78 8330.00 2468.15 1040.00 46.22 452.98

79 8398.00 2488.30 940.00 41.78 409.42


Wall of
Drain
80 31-Oct-08 8530.00 2527.41 990.00 44.00 431.20 428.30
besides L3,
L4
81 8502.00 2519.11 1020.00 45.33 444.27

82 8504.00 2519.70 1010.00 44.89 439.91


Top slab of
83 1-Nov-08 CW Culvert 8279.00 2453.04 1000.00 44.44 435.56 437.01
L 4 with wall
84 8487.00 2514.67 1000.00 44.44 435.56

85 8265.00 2448.89 940.00 41.78 409.42


Top slab of
86 1-Nov-08 CW Culvert 8229.00 2438.22 980.00 43.56 426.84 418.13
L 4 with wall
87 8203.00 2430.52 960.00 42.67 418.13

88 8346.00 2472.89 960.00 42.67 418.13


Top slab of
89 1-Nov-08 CW Culvert 8406.00 2490.67 980.00 43.56 426.84 425.39
L 4 with wall
Degree of Quality control
90 8353.00 2474.96 990.00 44.00 431.20
1.52 44.71 3.39 is good
91 8291.00 2456.59 990.00 44.00 431.20
Top slab of
92 3-Nov-08 CW Pipe L7 8383.00 2483.85 980.00 43.56 426.84 425.39
L8
93 8291.00 2456.59 960.00 42.67 418.13

94 8286.00 2455.11 960.00 42.67 418.13


Top slab of
95 3-Nov-08 CW Pipe L7 8243.00 2442.37 980.00 43.56 426.84 423.94
L8
Top slab of
3-Nov-08 CW Pipe L7 423.94
L8
96 8250.00 2444.44 980.00 43.56 426.84

97 8326.00 2466.96 920.00 40.89 400.71


Top slab of
Drain
98 8-Nov-08 8340.00 2471.11 930.00 41.33 405.07 407.97
besides L3
L4
99 8401.00 2489.19 960.00 42.67 418.13

100 8456.00 2505.48 980.00 43.56 426.84


Top slab of
Drain
101 8-Nov-08 8368.00 2479.41 1000.00 44.44 435.56 428.30
besides L3
L4
102 8356.00 2475.85 970.00 43.11 422.49

103 8296.00 2458.07 980.00 43.56 426.84


Wall of
RCC Drain
104 12-Nov-08 8408.00 2491.26 1020.00 45.33 444.27 437.01
besides L5
L6
105 8421.00 2495.11 1010.00 44.89 439.91

106 8138.00 2411.26 1050.00 46.67 457.33


Culvert L1
107 18-Nov-08 L2 Top slab 7915.00 2345.19 1000.00 44.44 435.56 439.91
with wall
108 7884.00 2336.00 980.00 43.56 426.84

109 7998.00 2369.78 1030.00 45.78 448.62


Culvert L1
110 18-Nov-08 L2 Top slab 8042.00 2382.81 1050.00 46.67 457.33 444.27
with wall
111 7935.00 2351.11 980.00 43.56 426.84

112 8236.00 2440.30 1000.00 44.44 435.56


Raft of RCC
Drain
113 19-Nov-08 8287.00 2455.41 970.00 43.11 422.49 434.10
besides L1
L2
114 8332.00 2468.74 1020.00 45.33 444.27

115 8369.00 2479.70 1010.00 44.89 439.91


Wall of RCC
Drain
116 24-Nov-08 8456.00 2505.48 1010.00 44.89 439.91 451.53
besides L1
L2
117 8536.00 2529.19 1090.00 48.44 474.76

118 8139.00 2411.56 1100.00 48.89 479.11


Culvert L1
119 25-Nov-08 L2 Top slab 8515.00 2522.96 1120.00 49.78 487.82 487.82
with wall
Degree of Quality control
120 8284.00 2454.52 1140.00 50.67 496.53
2.32 44.70 5.19 is good
121 8179.00 2423.41 1000.00 44.44 435.56
Culvert L1
122 25-Nov-08 L2 Top slab 8168.00 2420.15 990.00 44.00 431.20 445.72
with wall
123 8182.00 2424.30 1080.00 48.00 470.40

124 8162.00 2418.37 1050.00 46.67 457.33


Top slab of
RCC Drain
125 26-Nov-08 8176.00 2422.52 1030.00 45.78 448.62 452.98
besides L1
L2
126 8202.00 2430.22 1040.00 46.22 452.98

127 8568.00 2538.67 1120.00 49.78 487.82


Top slab of
128 13-Dec-08 8547.00 2532.44 1180.00 52.44 513.96 490.73
RCC Drain
129 8438.00 2500.15 1080.00 48.00 470.40

130 1000.00 44.44 435.56

131 1000.00 44.44 435.56 435.56

132 1000.00 44.44 435.56

133 1000.00 44.44 435.56

134 1000.00 44.44 435.56 435.56

135 1000.00 44.44 435.56

136 1000.00 44.44 435.56

137 1000.00 44.44 435.56 435.56

138 1000.00 44.44 435.56

139 1000.00 44.44 435.56

140 1000.00 44.44 435.56 435.56

141 1000.00 44.44 435.56

142 1000.00 44.44 435.56

143 1000.00 44.44 435.56 435.56

144 1000.00 44.44 435.56

145 1000.00 44.44 435.56


Degree of Quality control
435.56 is good Based on
calculation with figures
appearing in Bold red
which are presumtive
figures.
In actual there are 06
observations therefore
24 observations are
presumed as an
1.92 45.29 4.23 average.
Degree of Quality control
146 1000.00 44.44 435.56 435.56 is good Based on
calculation with figures
147 1000.00 44.44 435.56 appearing in Bold red
which are presumtive
148 1000.00 44.44 435.56 figures.
In actual there are 06
149 1000.00 44.44 435.56 435.56 observations therefore
24 observations are
presumed as an
150 1000.00 44.44 435.56
1.92 45.29 4.23 average.
UPDATED 21.01.2009
Grade of concrete M35, Intake Pump House
Cube compressive strength at age of 28 days

Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8268.00 2449.78 1050.00 46.67 457.33


Intake Pump
2 14-Nov-08 8312.00 2462.81 1010.00 44.89 439.91 455.88
House raft
3 8361.00 2477.33 1080.00 48.00 470.40

4 8349.00 2473.78 1000.00 44.44 435.56


Intake Pump
5 14-Nov-08 8381.00 2483.26 990.00 44.00 431.20 438.46
House raft
6 8277.00 2452.44 1030.00 45.78 448.62

7 8265.00 2448.89 1040.00 46.22 452.98


Intake Pump
8 14-Nov-08 8243.00 2442.37 980.00 43.56 426.84 437.01
House raft
9 8307.00 2461.33 990.00 44.00 431.20

10 8253.00 2445.33 1070.00 47.56 466.04


Intake Pump
11 15-Nov-08 8340.00 2471.11 1020.00 45.33 444.27 448.62
House raft
12 8381.00 2483.26 1000.00 44.44 435.56

13 8229.00 2438.22 980.00 43.56 426.84


Intake Pump
14 15-Nov-08 8375.00 2481.48 990.00 44.00 431.20 426.84
House raft
15 8254.00 2445.63 970.00 43.11 422.49

16 8378.00 2482.37 960.00 42.67 418.13


Intake Pump
17 15-Nov-08 8326.00 2466.96 1060.00 47.11 461.69 444.27
House raft
18 8416.00 2493.63 1040.00 46.22 452.98

19 8324.00 2466.37 980.00 43.56 426.84


Intake Pump
20 15-Nov-08 8478.00 2512.00 950.00 42.22 413.78 425.39
House raft
Intake Pump
15-Nov-08 425.39
House raft
21 8359.00 2476.74 1000.00 44.44 435.56

22 8592.00 2545.78 950.00 42.22 413.78


Intake Pump
23 15-Nov-08 8317.00 2464.30 990.00 44.00 431.20 428.30
House raft
24 8483.00 2513.48 1010.00 44.89 439.91

25 8330.00 2468.15 980.00 43.56 426.84


Intake Pump
26 15-Nov-08 8417.00 2493.93 1030.00 45.78 448.62 432.65
House Raft
27 8369.00 2479.70 970.00 43.11 422.49

28 8380.00 2482.96 1020.00 45.33 444.27


Intake Pump
29 15-Nov-08 8462.00 2507.26 1040.00 46.22 452.98 444.27
House Raft
Degree of Quality control
30 8490.00 2515.56 1000.00 44.44 435.56
1.53 44.71 3.42 is good
31 8392.00 2486.52 960.00 42.67 418.13
Intake Pump
32 15-Nov-08 8359.00 2476.74 990.00 44.00 431.20 429.75
House Raft
33 8512.00 2522.07 1010.00 44.89 439.91

34 8471.00 2509.93 1050.00 46.67 457.33


Intake Pump
35 15-Nov-08 8527.00 2526.52 1030.00 45.78 448.62 458.79
House Raft
36 8357.00 2476.15 1080.00 48.00 470.40

37 8316.00 2464.00 1020.00 45.33 444.27


Intake Pump
38 15-Nov-08 8492.00 2516.15 1070.00 47.56 466.04 463.14
House Raft
39 8437.00 2499.85 1100.00 48.89 479.11

40 8550.00 2533.33 1150.00 51.11 500.89

41 12-Dec-08 Wall 8483.00 2513.48 1110.00 49.33 483.47 497.99

42 8269.00 2450.07 1170.00 52.00 509.60

43 8403.00 2489.78 1070.00 47.56 466.04

44 12-Dec-08 8289.00 2456.00 1130.00 50.22 492.18 477.66

45 8619.00 2553.78 1090.00 48.44 474.76


46 8316.00 2464.00 1050.00 46.67 457.33

47 12-Dec-08 8358.00 2476.44 1120.00 49.78 487.82 464.59

48 8306.00 2461.04 1030.00 45.78 448.62

49 0.00 1060.00 47.11 461.69

50 0.00 1060.00 47.11 461.69 461.69

51 0.00 1060.00 47.11 461.69

52 0.00 1060.00 47.11 461.69

53 0.00 1060.00 47.11 461.69 461.69

54 0.00 1060.00 47.11 461.69

55 0.00 1060.00 47.11 461.69


Degree of Quality control
56 0.00 1060.00 47.11 461.69 461.69 is good based on
calculation with figures
57 0.00 1060.00 47.11 461.69 appearing in Bold red
which are presumtive
58 0.00 1060.00 47.11 461.69 figures.
In actual there are 18
59 0.00 1060.00 47.11 461.69 461.69 observations therefore
12 observations are
presumed as an
60 0.00 1060.00 47.11 461.69
1.93 47.33 4.07 average.
UPDATED 21.01.2009
Grade of concrete M40 , TG Pedestals, Unit No 6
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8623.00 2554.96 1320.00 58.67 574.93


TG Unit No
2 10-Jul-08 6 pedestal 8615.00 2552.59 1100.00 48.89 479.11 532.83
1st Lift D1
3 8468.00 2509.04 1250.00 55.56 544.44

4 8471.00 2509.93 1140.00 50.67 496.53


TG Unit No
5 11-Jul-08 6 pedestal 8352.00 2474.67 1150.00 51.11 500.89 508.15
1st Lift E1
6 8510.00 2521.48 1210.00 53.78 527.02

7 8522.00 2525.04 1100.00 48.89 479.11


TG Unit No
8 12-Jul-08 6 pedestal 8608.00 2550.52 1200.00 53.33 522.67 489.27
1st Lift C1
9 8621.00 2554.37 1070.00 47.56 466.04

10 8541.00 2530.67 1100.00 48.89 479.11


TG Unit No
11 16-Jul-08 6 pedestal 8584.00 2543.41 1170.00 52.00 509.60 486.37
1st Lift B1
12 8401.00 2489.19 1080.00 48.00 470.40

13 8680.00 2571.85 1120.00 49.78 487.82


TG Unit No
14 18-Jul-08 6 pedestal 8797.00 2606.52 1190.00 52.89 518.31 502.34
1st Lift D2
15 8664.00 2567.11 1150.00 51.11 500.89

16 8519.00 2524.15 1150.00 51.11 500.89


TG Unit No
17 19-Jul-08 6 pedestal 8609.00 2550.81 1080.00 48.00 470.40 483.47
1st Lift E2
18 8694.00 2576.00 1100.00 48.89 479.11

19 8855.00 2623.70 1010.00 44.89 439.91


TG Unit No
20 24-Jul-08 6 pedestal 8591.00 2545.48 960.00 42.67 418.13 409.42
1st Lift B2
21 8688.00 2574.22 850.00 37.78 370.22
22 8402.00 2489.48 1120.00 49.78 487.82
TG Unit No
23 25-Jul-08 6 pedestal 8516.00 2523.26 900.00 40.00 392.00 455.88
1st Lift D1
24 8494.00 2516.74 1120.00 49.78 487.82

25 8580.00 2542.22 920.00 40.89 400.71


TG Unit No
26 11-Aug-08 8531.00 2527.70 1100.00 48.89 479.11 458.79
6 pedestal
27 8671.00 2569.19 1140.00 50.67 496.53

28 8480.00 2512.59 1180.00 52.44 513.96


TG Unit No
29 23-Aug-08 8431.00 2498.07 1150.00 51.11 500.89 508.15
6 pedestal
Degree of Quality control
30 8588.00 2544.59 1170.00 52.00 509.60
4.47 49.33 9.06 is good
31 8466.00 2508.44 990.00 44.00 431.20
TG Unit No
32 18-Oct-08 6 pedestal 8349.00 2473.78 990.00 44.00 431.20 429.75
2nd Lift E2
33 8337.00 2470.22 980.00 43.56 426.84

34 8402.00 2489.48 1070.00 47.56 466.04


TG Unit No
35 31-Oct-08 6 pedestal 8475.00 2511.11 1090.00 48.44 474.76 477.66
D1
36 8397.00 2488.00 1130.00 50.22 492.18

37 8203.00 2430.52 1100.00 48.89 479.11


TG Unit No
38 3-Nov-08 6 pedestal 8281.00 2453.63 1090.00 48.44 474.76 480.56
D1
39 8291.00 2456.59 1120.00 49.78 487.82

40 8227.00 2437.63 1120.00 49.78 487.82


TG Unit No
41 4-Nov-08 6 pedestal 8287.00 2455.41 1090.00 48.44 474.76 480.56
D1
42 8228.00 2437.93 1100.00 48.89 479.11

43 8350.00 2474.07 1090.00 48.44 474.76


TG Unit No
44 14-Nov-08 6 pedestal 8384.00 2484.15 1120.00 49.78 487.82 476.21
2nd lift B1
45 8291.00 2456.59 1070.00 47.56 466.04

46 8118.00 2405.33 1150.00 51.11 500.89


TG Unit No
18-Nov-08 6 pedestal 468.95
1st lift A2
TG Unit No
47 18-Nov-08 6 pedestal 8279.00 2453.04 1020.00 45.33 444.27 468.95
1st lift A2
48 8295.00 2457.78 1060.00 47.11 461.69

49 8332.00 2468.74 1100.00 48.89 479.11


TG Unit No
50 20-Nov-08 6 pedestal 8291.00 2456.59 1080.00 48.00 470.40 482.01
2nd lift A2
51 8376.00 2481.78 1140.00 50.67 496.53

52 0.00 1090.00 48.44 474.76

53 0.00 1090.00 48.44 474.76 474.76

54 0.00 1090.00 48.44 474.76

55 0.00 1090.00 48.44 474.76


Degree of Quality control
56 0.00 1090.00 48.44 474.76 474.76 is good Based on
calculation with figures
57 0.00 1090.00 48.44 474.76 appearing in Bold red
which are presumtive
58 0.00 1090.00 48.44 474.76 figures.
In actual there are 21
59 0.00 1090.00 48.44 474.76 474.76 observations therefore
09 observations are
presumed as an
60 0.00 1090.00 48.44 474.76
1.81 48.16 3.77 average.
UPDATED 21.01.2009
Grade of concrete M40 , Boiler Pedestals, [ A,B C D,and N ] Unit No 6
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation of variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8645.00 2561.48 1030.00 45.78 448.62


Unit No 6
Boiler
2 12-Jun-08 8415.00 2493.33 1000.00 44.44 435.56 432.65
Pedestal B-
48 -J
3 8544.00 2531.56 950.00 42.22 413.78

4 8707.00 2579.85 970.00 43.11 422.49


Unit No 6
Boiler
5 19-Jun-08 8607.00 2550.22 1060.00 47.11 461.69 441.36
Pedestal B-
38.5 - J
6 8621.00 2554.37 1010.00 44.89 439.91

7 Unit No 6 8255.00 2445.93 910.00 40.44 396.36


Boiler
8 27-Jun-08 Pedestal 8424.00 2496.00 820.00 36.44 357.16 386.19
KB- 9.5 - J5,
9 J10-B 25 M 8427.00 2496.89 930.00 41.33 405.07

10 Unit No 6 8272.00 2450.96 870.00 38.67 378.93


Boiler
11 28-Jun-08 Pedestal B- 8316.00 2464.00 820.00 36.44 357.16 389.10
7 M , J3
12 8362.00 2477.63 990.00 44.00 431.20

13 Unit No 6 8491.00 2515.85 890.00 39.56 387.64


Boiler
14 25-Sep-08 Pedestal J 8435.00 2499.26 900.00 40.00 392.00 393.45
11
15 8530.00 2527.41 920.00 40.89 400.71

16 8109.00 2402.67 970.00 43.11 422.49


Unit No 6
Boiler
17 29-Sep-08 8287.00 2455.41 1020.00 45.33 444.27 438.46
Pedestal
18 8319.00 2464.89 1030.00 45.78 448.62

19 8304.00 2460.44 1000.00 44.44 435.56


Unit No 6
Boiler
20 30-Sep-08 8314.00 2463.41 1060.00 47.11 461.69 447.17
Pedestal
21 8239.00 2441.19 1020.00 45.33 444.27
22 8421.00 2495.11 920.00 40.89 400.71
J-9 Pedestal
23 14-Oct-08 Grid B 0 8264.00 2448.59 1030.00 45.78 448.62 416.68
Final lift
24 8344.00 2472.30 920.00 40.89 400.71

25 Unit No 6 8420.00 2494.81 1120.00 49.78 487.82


Boiler
26 17-Oct-08 Pedestal J7 8465.00 2508.15 1100.00 48.89 479.11 489.27
, J9
27 8346.00 2472.89 1150.00 51.11 500.89

28 8231.00 2438.81 910.00 40.44 396.36


Unit No 6
Boiler
29 18-Oct-08 8385.00 2484.44 1000.00 44.44 435.56 407.97
Pedestal J1
Degree of Quality control
30 8416.00 2493.63 900.00 40.00 392.00
3.65 43.29 8.44 is good .
31 8323.00 2466.07 1030.00 45.78 448.62
J1 Pedestal
32 20-Oct-08 Grid B0 8409.00 2491.56 1080.00 48.00 470.40 464.59
Final lift
33 8324.00 2466.37 1090.00 48.44 474.76

34 0.00 960.00 42.67 418.13

35 25-Oct-08 0.00 990.00 44.00 431.20 426.84

36 0.00 990.00 44.00 431.20

37 0.00 1020.00 45.33 444.27


AB Bay Grid
38 27-Oct-08 0.00 1170.00 52.00 509.60 480.56
2A
39 0.00 1120.00 49.78 487.82

40 0.00 1050.00 46.67 457.33

41 1-Nov-08 J 2 Pedestal 0.00 1020.00 45.33 444.27 447.17

42 0.00 1010.00 44.89 439.91

43 0.00 1040.00 46.22 452.98

44 3-Nov-08 J 1 Pedestal 0.00 1080.00 48.00 470.40 466.04

45 0.00 1090.00 48.44 474.76

46 0.00 1130.00 50.22 492.18

4-Nov-08 489.27
47 4-Nov-08 0.00 1100.00 48.89 479.11 489.27

48 0.00 1140.00 50.67 496.53

49 0.00 1080.00 48.00 470.40


Pedastal,
50 12-Nov-08 Grid 12 -13 0.00 1050.00 46.67 457.33 458.79
C - Row
51 0.00 1030.00 45.78 448.62

52 Unit No 6 0.00 1090.00 48.44 474.76


Boiler
53 25-Nov-08 Pedestal 3, 0.00 1110.00 49.33 483.47 486.37
Grid 15 16
54 17 0.00 1150.00 51.11 500.89

55 0.00 1150.00 51.11 500.89


D Row, 4 ,
56 25-Nov-08 Grid 14 15 0.00 1120.00 49.78 487.82 489.27
and 16
57 0.00 1100.00 48.89 479.11

58 0.00 1060.00 47.11 461.69


D Row, 1,
59 26-Nov-08 0.00 1100.00 48.89 479.11 476.21
Grid 13
Degree of Quality control
60 0.00 1120.00 49.78 487.82
2.37 47.81 4.95 is good
61 0.00 1100.00 48.89 479.11
A Row
62 3-Dec-08 pedestal 0.00 1030.00 45.78 448.62 474.76
Grid 12
63 0.00 1140.00 50.67 496.53

64 0.00 1080.00 48.00 470.40


A Row Grid
13 A
65 5-Dec-08 0.00 1130.00 50.22 492.18 476.21
J 2 and J 8
footing
66 0.00 1070.00 47.56 466.04

67 0.00 1050.00 46.67 457.33


A Row Grid
68 8-Dec-08 14 A 0.00 1090.00 48.44 474.76 473.30
J 2 footing
69 0.00 1120.00 49.78 487.82

70 0.00 1030.00 45.78 448.62


Grid 19 B
71 11-Dec-08 J 2 and J 4 0.00 1100.00 48.89 479.11 464.59
Pedestal
Grid 19 B
11-Dec-08 J 2 and J 4 464.59
Pedestal
72 0.00 1070.00 47.56 466.04

73 0.00 1080.00 48.00 470.40

74 0.00 1080.00 48.00 470.40 470.40

75 0.00 1080.00 48.00 470.40

76 0.00 1080.00 48.00 470.40

77 0.00 1080.00 48.00 470.40 470.40

78 0.00 1080.00 48.00 470.40

79 0.00 1080.00 48.00 470.40

80 0.00 1080.00 48.00 470.40 470.40

81 0.00 1080.00 48.00 470.40

82 0.00 1080.00 48.00 470.40

83 0.00 1080.00 48.00 470.40 470.40

84 0.00 1080.00 48.00 470.40

85 0.00 1080.00 48.00 470.40


Degree of Quality control
86 0.00 1080.00 48.00 470.40 470.40 is good .Based on
calculation with figures
87 0.00 1080.00 48.00 470.40 appearing in Bold red
which are presumtive
88 0.00 1080.00 48.00 470.40 figures.
In actual there are 12
89 0.00 1080.00 48.00 470.40 470.40 observations therefore
18 observations are
presumed as an
90 0.00 1080.00 48.00 470.40
1.00 48.07 2.08 average.
UPDATED 21.01.2009
Grade of concrete M40 , Boiler Pedestals, [ A,B C D,and N ] Unit No 8
Cube compressive strength at age of 28 days
Weight of sample
Average Average of
Date of Location of Sized 150 mm x Density of Compressive Compressive Standard Coefficient of
Sr.No. compressive CCS in Result and remarks
Casting concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in strength in deviation variation
strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8129.00 2408.59 1080.00 48.00 470.40


Pedestal J2
2 25-Nov-08 8145.00 2413.33 1110.00 49.33 483.47 476.21
- J10
3 8417.00 2493.93 1090.00 48.44 474.76

4 8356.00 2475.85 1080.00 48.00 470.40

5 27-Nov-08 Pedestal J6 8436.00 2499.56 1090.00 48.44 474.76 468.95

6 8322.00 2465.78 1060.00 47.11 461.69

7 8207.00 2431.70 1070.00 47.56 466.04

8 5-Dec-08 Pedestal J5 8286.00 2455.11 1120.00 49.78 487.82 477.66

9 8359.00 2476.74 1100.00 48.89 479.11

10 8362.00 2477.63 1090.00 48.44 474.76


Pedestal J9
11 6-Dec-08 8426.00 2496.59 1130.00 50.22 492.18 477.66
Grid B0
12 8341.00 2471.41 1070.00 47.56 466.04

13 8351.00 2474.37 1060.00 47.11 461.69


Pedestal J4
14 11-Dec-08 8443.00 2501.63 1130.00 50.22 492.18 476.21
Grid B0
15 8287.00 2455.41 1090.00 48.44 474.76

16 0.00 1090.00 48.44 474.76

17 0.00 1090.00 48.44 474.76 474.76

18 0.00 1090.00 48.44 474.76

19 0.00 1090.00 48.44 474.76

20 0.00 1090.00 48.44 474.76 474.76

21 0.00 1090.00 48.44 474.76

Degree of Quality control


22 0.00 1090.00 48.44 474.76

23 0.00 1090.00 48.44 474.76 474.76

24 0.00 1090.00 48.44 474.76

25 0.00 1090.00 48.44 474.76


Degree of Quality control
26 0.00 1090.00 48.44 474.76 474.76 is good .Based on
calculation with figures
27 0.00 1090.00 48.44 474.76 appearing in Bold red
which are presumtive
28 0.00 1090.00 48.44 474.76 figures.
In actual there are15
29 0.00 1090.00 48.44 474.76 474.76 observations therefore
15 observations are
presumed as an
30 0.00 1090.00 48.44 474.76
0.71 48.47 1.46 average.
UPDATED 20.01.2009
Grade of concrete M25, Chimney Raft Phase III
Cube compressive strength at age of 28 days
Weight of
sample Sized Density of Average Average of
Date of Location of Compressiv Compressive Standard Coefficient of
Sr.No. 150 mm x 150 concrete in Kg / compressive CCS in Result and remarks
Casting concrete Load in KN e strength in strength in deviation variation
mm x 150 mm in M3 strength of the N/mm 2
gms N /mm2 kg/cm2
sample in Kg/cm2

1 8401.00 2489.19 750.00 33.33 326.67

2 1-Dec-08 Segment I 8336.00 2469.93 780.00 34.67 339.73 338.28

3 8292.00 2456.89 800.00 35.56 348.44

4 8326.00 2466.96 760.00 33.78 331.02

5 1-Dec-08 Segment I 8456.00 2505.48 710.00 31.56 309.24 320.86

6 8329.00 2467.85 740.00 32.89 322.31

7 8320.00 2465.19 760.00 33.78 331.02

8 1-Dec-08 Segment I 8369.00 2479.70 780.00 34.67 339.73 329.57

9 8456.00 2505.48 730.00 32.44 317.96

10 8536.00 2529.19 810.00 36.00 352.80

11 1-Dec-08 Segment I 8469.00 2509.33 770.00 34.22 335.38 338.28

12 8538.00 2529.78 750.00 33.33 326.67

13 8582.00 2542.81 760.00 33.78 331.02

14 2-Dec-08 Segment I 8463.00 2507.56 720.00 32.00 313.60 312.15

15 8465.00 2508.15 670.00 29.78 291.82

16 8530.00 2527.41 790.00 35.11 344.09

17 2-Dec-08 Segment I 8620.00 2554.07 800.00 35.56 348.44 336.83

18 8321.00 2465.48 730.00 32.44 317.96

19 8538.00 2529.78 770.00 34.22 335.38

20 2-Dec-08 Segment I 8469.00 2509.33 760.00 33.78 331.02 332.47


2-Dec-08 Segment I 332.47

21 8438.00 2500.15 760.00 33.78 331.02

22 8332.00 2468.74 720.00 32.00 313.60

23 2-Dec-08 Segment I 8456.00 2505.48 750.00 33.33 326.67 320.86

24 8320.00 2465.19 740.00 32.89 322.31

25 8320.00 2465.19 770.00 34.22 335.38

26 2-Dec-08 Segment I 8531.00 2527.70 710.00 31.56 309.24 319.41

27 8469.00 2509.33 720.00 32.00 313.60

28 8438.00 2500.15 760.00 33.78 331.02

29 2-Dec-08 Segment I 8467.00 2508.74 790.00 35.11 344.09 344.09


Degree of quality control
30 8430.00 2497.78 820.00 36.44 357.16
1.49 33.60 4.43 is Good
31 8320.00 2465.19 750.00 33.33 326.67

32 2-Dec-08 Segment I 8311.00 2462.52 810.00 36.00 352.80 338.28

33 8269.00 2450.07 770.00 34.22 335.38

34 8102.00 2400.59 750.00 33.33 326.67

35 2-Dec-08 Segment I 8216.00 2434.37 790.00 35.11 344.09 344.09

36 8328.00 2467.56 830.00 36.89 361.51

37 8333.00 2469.04 760.00 33.78 331.02

38 2-Dec-08 Segment I 8345.00 2472.59 780.00 34.67 339.73 329.57

39 8202.00 2430.22 730.00 32.44 317.96

40 8530.00 2527.41 810.00 36.00 352.80

41 3-Dec-08 Segment I 8460.00 2506.67 780.00 34.67 339.73 344.09

42 8321.00 2465.48 780.00 34.67 339.73

43 8332.00 2468.74 740.00 32.89 322.31

44 3-Dec-08 Segment I 8269.00 2450.07 760.00 33.78 331.02 331.02

45 8357.00 2476.15 780.00 34.67 339.73


46 8538.00 2529.78 720.00 32.00 313.60

47 3-Dec-08 Segment I 8569.00 2538.96 730.00 32.44 317.96 319.41

48 8438.00 2500.15 750.00 33.33 326.67

49 8395.00 2487.41 820.00 36.44 357.16

50 8-Dec-08 Segment II 8456.00 2505.48 800.00 35.56 348.44 349.90

51 8328.00 2467.56 790.00 35.11 344.09

52 8260.00 2447.41 770.00 34.22 335.38

53 8-Dec-08 Segment II 8249.00 2444.15 780.00 34.67 339.73 342.64

54 8310.00 2462.22 810.00 36.00 352.80

55 8366.00 2478.81 740.00 32.89 322.31

56 8-Dec-08 Segment II 8327.00 2467.26 760.00 33.78 331.02 320.86

57 8370.00 2480.00 710.00 31.56 309.24

58 8359.00 2476.74 700.00 31.11 304.89

59 8-Dec-08 Segment II 8394.00 2487.11 750.00 33.33 326.67 315.05


Degree of quality control
60 8432.00 2498.37 720.00 32.00 313.60
1.50 34.03 4.40 is Good
61 8596.00 2546.96 760.00 33.78 331.02

62 9-Dec-08 Segment II 8299.00 2458.96 740.00 32.89 322.31 325.21

8439.00 2500.44 740.00 32.89 322.31


63
8237.00 2440.59 720.00 32.00 313.60
64
9-Dec-08 Segment II 8302.00 2459.85 690.00 30.67 300.53 313.60
65
8381.00 2483.26 750.00 33.33 326.67
66
8436.00 2499.56 710.00 31.56 309.24
67
9-Dec-08 Segment II 8261.00 2447.70 770.00 34.22 335.38 328.12
68
8419.00 2494.52 780.00 34.67 339.73
69
8075.00 2392.59 760.00 33.78 331.02
70
9-Dec-08 Segment II 333.93
9-Dec-08 Segment II 8295.00 2457.78 800.00 35.56 348.44 333.93
71
8282.00 2453.93 740.00 32.89 322.31
72
8488.00 2514.96 730.00 32.44 317.96
73
9-Dec-08 Segment II 8508.00 2520.89 710.00 31.56 309.24 325.21
74
8363.00 2477.93 800.00 35.56 348.44
75
8151.00 2415.11 780.00 34.67 339.73
76
9-Dec-08 Segment II 8229.00 2438.22 840.00 37.33 365.87 354.25
77
8249.00 2444.15 820.00 36.44 357.16
78
79 8472.00 2510.22 830.00 36.89 361.51

80 9-Dec-08 Segment II 8445.00 2502.22 850.00 37.78 370.22 365.87

81 8490.00 2515.56 840.00 37.33 365.87

82 8521.00 2524.74 780.00 34.67 339.73

83 9-Dec-08 Segment II 8521.00 2524.74 810.00 36.00 352.80 352.80

84 8571.00 2539.56 840.00 37.33 365.87

85 8404.00 2490.07 790.00 35.11 344.09

86 9-Dec-08 Segment II 8596.00 2546.96 860.00 38.22 374.58 355.70

87 8482.00 2513.19 800.00 35.56 348.44

88 8514.00 2522.67 770.00 34.22 335.38

89 9-Dec-08 Segment II 8680.00 2571.85 790.00 35.11 344.09 335.38


Degree of quality control
90 8767.00 2597.63 750.00 33.33 326.67
2.02 34.59 5.84 is Good
91 8727.00 2585.78 740.00 32.89 322.31

92 9-Dec-08 Segment II 8723.00 2584.59 790.00 35.11 344.09 332.47

8414.00 2493.04 760.00 33.78 331.02


93
94 8685.00 2573.33 780.00 34.67 339.73

10-Dec-08 Segment II 8537.00 2529.48 760.00 33.78 331.02 336.83


95
10-Dec-08 Segment II 336.83

96 8611.00 2551.41 780.00 34.67 339.73

8500.00 2518.52 740.00 32.89 322.31


97
98 10-Dec-08 Segment II 8528.00 2526.81 770.00 34.22 335.38 335.38

8594.00 2546.37 800.00 35.56 348.44


99
100 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02 331.02


101
102 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02


103
104 0.00 760.00 33.78 331.02 331.02

0.00 760.00 33.78 331.02


105
106 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02 331.02


107
108 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02


109
110 0.00 760.00 33.78 331.02 331.02

0.00 760.00 33.78 331.02


111
112 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02 331.02


113
114 0.00 760.00 33.78 331.02

0.00 760.00 33.78 331.02


115
116 0.00 760.00 33.78 331.02 331.02 Degree of quality control
is Good.Based on
0.00 760.00 33.78 331.02 calculation with figures
117
appearing in Bold red
118 0.00 760.00 33.78 331.02 which are presumtive
figures.
0.00 760.00 33.78 331.02 331.02 In actual there are 9
119 observations therefore 21
observations are presumed
120 0.00 760.00 33.78 331.02
0.52 33.90 1.54 as an average.
UPDATED 21.01.2009
Grade of concrete M30, CCB ,Unit No 8
Cube compressive strength at age of 28 days

Weight of sample
Location Density of Average Average of
Date of Sized 150 mm x Compressive Compressive Standard Coefficient
Sr.No. of concrete in Kg / compressive CCS in Result and remarks
Casting 150 mm x 150 mm Load in KN strength in strength in deviation of variation
concrete M3 strength of the N/mm 2
in gms N /mm2 kg/cm2
sample in Kg/cm2

1 8195.00 2428.15 920.00 40.89 400.71

2 10-Dec-08 CCB J1 8325.00 2466.67 900.00 40.00 392.00 400.71

3 8121.00 2406.22 940.00 41.78 409.42

4 8277.00 2452.44 930.00 41.33 405.07

5 10-Dec-08 CCB J1 8298.00 2458.67 910.00 40.44 396.36 399.26

6 8316.00 2464.00 910.00 40.44 396.36

7 8350.00 2474.07 970.00 43.11 422.49

8 10-Dec-08 CCB J1 8217.00 2434.67 940.00 41.78 409.42 409.42

9 8326.00 2466.96 910.00 40.44 396.36

10 8266.00 2449.19 950.00 42.22 413.78

11 10-Dec-08 CCB J1 8388.00 2485.33 910.00 40.44 396.36 406.52

12 8208.00 2432.00 940.00 41.78 409.42

13 8329.00 2467.85 980.00 43.56 426.84

14 12-Dec-08 CCB J5 8347.00 2473.19 960.00 42.67 418.13 421.04

15 8316.00 2464.00 960.00 42.67 418.13

16 0.00 930.00 41.33 405.07

17 0.00 930.00 41.33 405.07 405.07

18 0.00 930.00 41.33 405.07

19 0.00 930.00 41.33 405.07

20 0.00 930.00 41.33 405.07 405.07

21 0.00 930.00 41.33 405.07

Degree of Quality control


22 0.00 930.00 41.33 405.07

23 0.00 930.00 41.33 405.07 405.07

24 0.00 930.00 41.33 405.07

25 0.00 930.00 41.33 405.07

26 0.00 930.00 41.33 405.07 405.07 Degree of Quality control


is good .Based on
27 0.00 930.00 41.33 405.07 calculation with figures
appearing in Bold red
28 0.00 930.00 41.33 405.07 which are presumtive
figures.
29 0.00 930.00 41.33 405.07 405.07 In actual there are 15
observations therefore 15
observations are
30 0.00 930.00 41.33 405.07
0.78 41.45 1.89 presumed as an average.
Updated 02.10.2008