Job Procedure For Hydrotest/Water Fillup Test: Project Title
Job Procedure For Hydrotest/Water Fillup Test: Project Title
PROJECT
TITLE
JOB PROCEDURE FOR HYDRO TEST / WATER FILL UP TEST
Prepared by CONTRACTOR .
VS
PROJECT
TITLE
JOB PROCEDURE FOR HYDRO TEST / WATER FILL UP TEST
Settling markers shall be provided at every 300 outside the tank at a height of 500 mm from the top of annular plate. Setting marker shall be welded and initial level reading shall be taken with respect to the permanent benchmark using dumpy level / Total station Shell settlement measurements shall be made after tank erection, prior to hydrotesting and during water filling at 1000 mm intervals up to maximum filling height of tank. The levels taken before water filling called as initial level of the tank and shall be record in an approved format. The water filling height shall be restricted to the max. Liquid Level or up to the curb angle. The water filling shall be carried out in four stages (25%, 50%, 75% & 100% of the max liquid level of the tank) Any leaks observed in the shell joint during the hydro test shall be noted and repaired with the water level min. of 300mm below the leak spot. The repaired shall be carried out as per the procedure and tank test shall be recommenced. After each stage of filling, a load stabilization period shall be observed as minimum 24 hours max between each stage of filling. During the stabilization period the settlement reading shall be observed and recorded jointly with HPCL Engineer-In-Charge through dumpy level only. Filling rate shall be not exceed 5 meters per day. After completion of the water filling the water load shall be maintained for 24 hours. After 24 hours the final settlement reading shall be recorded jointly with engineer-In-Charge. Tank shall be emptied at a maximum water level variation rate of 5 meters per day. Care shall be taken that top manholes are open during empty operation of conical roof tanks. If salt water is used then corrosion inhibitor should be sprayed (mixed) prior to filling / after hydro test the tank should be thoroughly cleaned with sweat water.
Prepared by CONTRACTOR .
Concurred by
Approved by
PROJECT
TITLE
JOB PROCEDURE FOR HYDRO TEST / WATER FILL UP TEST
6. CLEANING After draining the water the tank shall be thoroughly cleaned, free from dirt and foreign materials and shall be dried by air. 7. RECORDS Records shall be prepared and submitted to Engineer in-charge for approval. 8. SAFETY All Safety precaution shall be taken during water fill up test. 9. REFRENCE (A) API 650 (B) OISD 129 (C) PO Tech Specification Note : Permanent B M shall be min. 50Mtr away from Tank shell