SABLE TRANSPORT AD CONSTRUCTION LTD

BITUMINOUS SURFACING: RECORD SHEET


SPECIFICATION:
SITE:
..
DATE:

ROAD:
SUPERVISOR i/c:. B.D. OPERATOR:

Binder:

SPECIFICATION:
Appn. Rate:. I/m2
Temp:..

Appn. Rate:. m3/m2


Stone Type:.
Size:..
Bulk Density=
RECOMMENDED SETTINGS FOR DISTRIBUTOR: Road Speed:.rpm
Pump Speed:rpm Pump Output:.I/min Spray bar heightmm
Distributor NO: BD Capacity.litres
Make

Kilometre start
Kilometre finish
Length sprayed
Width sprayed
Area Covered
LANE (LHS/RHS)
Dip Stick start
Dip Stick finish
Binder sprayed
Binder appn.rate
Tank number
Delivery Date
Batch No.
Binder Temp.
Air Temp. in shade APX
Pump speed Setting
Road speed Setting
Duration of Spray
Road speed
Pump output

m
m
2
m
litres
litres
litres
I/m2

C
C
rpm
m/min
seconds
m/min
I/min

Stone applied

m3

Stone app. Rate

m /m x 10

Total surface Covered:

..m2

Average App.Rate:..I/M2

Total stone used:


Total binder used:

..m3
..litres

Average App.Rate:m3/m2

-3

Remarks:

SIGNATURE:.
Materials Technician

SIGNATURE:.
R.E'S Representative

SIGNATURE:
Materials Engineer

SIGNATURE:
Resident Engineer

JOB No.:
OPERATOR:

:. I/m2

:. m3/m2 x10-3

pp.Rate:..I/M2

pp.Rate:m3/m2 x10-3

E:
Materials Engineer

E:.
Resident Engineer