You are on page 1of 1

PRODUCTIVITY EVALUATION FOR IIP-176 KFCA BLDG. SA 02 (IMMIGRATION DEPARTMENT BLDG.

) & IIP-185 (PUBLIC TOILET)


Period: February 04 - 10, 2012

ESTIMATED QTY.

BOQ ITEM
NO.

ACTIVITY DESCRIPTION

UNIT

QUANTITY

CARPENTER GROUP
IIP-176 BLDG. SA-02

ACTUAL MANPOWER COST

MANHOUR REQUIREMENTS
Qty.

U. Rate MH / EQPT. AMOUNT

Qty.

MH

Total MH AMOUNT

+ PROFIT /
- LOSE

DATE

REMARKS

- Demolition of Existing Floor

M2

30.00

30.00

16.00

480.00

9.00

10.00

90.00

Feb. 04-06, 2012

Joselito Group

Installation of Ceiling Grid in


- Preparation for the Installation of
Ceiling Tiles

M2

40.00

40.00

1.60

64.00

3.00

10.00

30.00

Feb. 04, 2012

Joselito Group

- Installation of Ceiling Tiles

M2

45.00

45.00

1.60

8.00

10.00

Feb. 05-06 & 09, 2012

Joselito Group

TOTAL FOR CARPENTER GROUP


MASON GROUP
IIP-176 BLDG. SA-02

72.00
136.00

1,904.00

80.00
110.00

1,540.00

364.00

Installation of Granite Riser, Thread &


Step

Nr.

4.00

4.00

5.00

20.00

3.00

10.00

30.00

Feb. 04, 2012

Mahabob Group

Fixing of Granite Tiles

M2

56.00

56.00

1.60

89.60

12.00

10.00

120.00

Feb. 04-06 & 09, 2012

Mahabob Group

Installation of Skirtings

ln.m

55.00

55.00

1.60

88.00

4.00

10.00

40.00

Feb. 07-08, 2012

Mahabob Group

M2

95.00

95.00

0.50

5.00

10.00

Feb. 07-09, 2012

Mahabob Group

Grouting
TOTAL FOR MASON GROUP
ELECTRICAL G R O U P
IIP-176 BLDG. SA-02
Installation of Electrical Cable & EMT
Pipe
Installation of Utility Boxes
Installation of 600x600 Lighting
Fixtures
IIP-185 PUBLIC TOILET
Installation of NLCP 270 Lights
TOTAL FOR ELECTRICAL G R O U P
PLUMBING GROUP
IIP-185 PUBLIC TOILET
Installation of WC PVC Pipe
Connection including cutting to get
the right fix
IIP-176 BLDG. SA-02
Installation of Flush Valve including
the cutting and measuring to get
correct size and fit
Installation of Perrenial Spray in
toilets for SA02 including fitting the
different components of the spray
TOTAL FOR PLUMBING GROUP
PAINTER GROUP

ln.m

300.00

47.50
245.10

3,431.40

50.00
240.00

3,360.00

71.40

300.00

1.00

300.00

6.00

6.67

40.00

Feb. 06-08, 2012

Perlito Group

3.00
3.00

10.00
10.00

30.00
30.00

Feb. 04, 2012


Feb. 05, 2012

Perlito Group
Perlito Group

3.00

10.00

30.00
130.00

Feb. 05, 2012

Perlito Group

pcs
pcs

25
6

25.00
6.00

3.00
3.00

75.00
18.00

pcs

2.00
-

3.00

6.00
399.00

5,586.00

1,820.00

3,766.00

ln.m

4.00

8.00

32.00

2.00

10.00

20.00

Feb. 06, 2012

Sanjay Group

pcs

3.00

20.00

60.00

2.00

10.00

20.00

Feb. 05, 2012

Sanjay Group

pcs

3.00

20.00

60.00

7.00

10.00

70.00

Feb. 08-09, 2012

Sanjay Group

152.00

2,128.00

110.00

1,540.00

588.00

IIP-176 BLDG. SA-02


Application of Wall Filler & Sanding

M2

45

45.00

1.00

45.00

23.00

10.00

230.00

Feb. 04-09, 2012

Enrique Group

Application of Texture

M2

60

60.00

1.00

60.00

2.00

10.00

20.00

Feb. 05, 2012

Enrique Group

Application of Final Coating

M2

60

60.00

1.00

60.00

10.00

10.00

100.00

Feb. 06 & 08-09, 2012

Enrique Group

TOTAL FOR PAINTER GROUP

165.00

2,310.00

350.00

4,900.00

(2,590.00)

2199.40

151990116.xls.ms_office/ Summary

PREPARED BY:

CHECKED BY:

APPROVED BY:

GLENBERT IMPERIAL
Civi-Site Engineer

ALAA EBIED ELSAID HASSAN


Construction Manager

MOHAMED ALI M. SAID


Project Manager

Page 1/1