ESTIMATED QTY.
BOQ ITEM
NO.
ACTIVITY DESCRIPTION
UNIT
QUANTITY
CARPENTER GROUP
IIP-176 BLDG. SA-02
MANHOUR REQUIREMENTS
Qty.
Qty.
MH
Total MH AMOUNT
+ PROFIT /
- LOSE
DATE
REMARKS
M2
30.00
30.00
16.00
480.00
9.00
10.00
90.00
Joselito Group
M2
40.00
40.00
1.60
64.00
3.00
10.00
30.00
Joselito Group
M2
45.00
45.00
1.60
8.00
10.00
Joselito Group
72.00
136.00
1,904.00
80.00
110.00
1,540.00
364.00
Nr.
4.00
4.00
5.00
20.00
3.00
10.00
30.00
Mahabob Group
M2
56.00
56.00
1.60
89.60
12.00
10.00
120.00
Mahabob Group
Installation of Skirtings
ln.m
55.00
55.00
1.60
88.00
4.00
10.00
40.00
Mahabob Group
M2
95.00
95.00
0.50
5.00
10.00
Mahabob Group
Grouting
TOTAL FOR MASON GROUP
ELECTRICAL G R O U P
IIP-176 BLDG. SA-02
Installation of Electrical Cable & EMT
Pipe
Installation of Utility Boxes
Installation of 600x600 Lighting
Fixtures
IIP-185 PUBLIC TOILET
Installation of NLCP 270 Lights
TOTAL FOR ELECTRICAL G R O U P
PLUMBING GROUP
IIP-185 PUBLIC TOILET
Installation of WC PVC Pipe
Connection including cutting to get
the right fix
IIP-176 BLDG. SA-02
Installation of Flush Valve including
the cutting and measuring to get
correct size and fit
Installation of Perrenial Spray in
toilets for SA02 including fitting the
different components of the spray
TOTAL FOR PLUMBING GROUP
PAINTER GROUP
ln.m
300.00
47.50
245.10
3,431.40
50.00
240.00
3,360.00
71.40
300.00
1.00
300.00
6.00
6.67
40.00
Perlito Group
3.00
3.00
10.00
10.00
30.00
30.00
Perlito Group
Perlito Group
3.00
10.00
30.00
130.00
Perlito Group
pcs
pcs
25
6
25.00
6.00
3.00
3.00
75.00
18.00
pcs
2.00
-
3.00
6.00
399.00
5,586.00
1,820.00
3,766.00
ln.m
4.00
8.00
32.00
2.00
10.00
20.00
Sanjay Group
pcs
3.00
20.00
60.00
2.00
10.00
20.00
Sanjay Group
pcs
3.00
20.00
60.00
7.00
10.00
70.00
Sanjay Group
152.00
2,128.00
110.00
1,540.00
588.00
M2
45
45.00
1.00
45.00
23.00
10.00
230.00
Enrique Group
Application of Texture
M2
60
60.00
1.00
60.00
2.00
10.00
20.00
Enrique Group
M2
60
60.00
1.00
60.00
10.00
10.00
100.00
Enrique Group
165.00
2,310.00
350.00
4,900.00
(2,590.00)
2199.40
151990116.xls.ms_office/ Summary
PREPARED BY:
CHECKED BY:
APPROVED BY:
GLENBERT IMPERIAL
Civi-Site Engineer
Page 1/1