UPCL 2x507.

5MW Thermal Power Project, Erection of Boiler # 1

Quality Inspection &Evaluation Sheet for Element Projects


Project Noboiler01-02-01-01
Sl.N o. 1 2 3 4 5 6 7 8 9 10 stub tube drum Inspected items

Featuremajor Element projectdrum inspection, lineation


Quality standard No crack, double skin indentation and pockmark no more than34mm mm As per design requirement Inspection result Assessment

Feature unit

appearance material Wall thickness Location Height Outer diameter Wall thickness Groove Angle Inner cleanness L<5m major major Major mm major

As per design requirement

No dirt, rust, or other metal swarf 5 7 mm 10 15 20 flatno radial transfixion damagelocal damage0.5m Drum center mark on both ends, mark drum centerline

Degree of 11 curvatu re

L=57m L=710m L=1015m L15m

12 13

Man hole interface Drum lineation major

Remarks

Owner

Supervisor

Erection department Date: