You are on page 1of 1

UPCL 2x507.

5MW Thermal Power Project, Erection of Boiler # 1


Quality Inspection &Evaluation Sheet for Element Projects
Project No:boiler01-02-01-01 Feature:major Element project:drum inspection, lineation
Sl.N
Inspected items Feature unit Quality standard Inspection result Assessment
o.

No crack, double
1 appearance skin ,indentation and pockmark
drum major no more than3~4mm
2 material
As per design requirement
3 Wall thickness mm
4 Location
5 Height
6 Outer diameter major mm
stub As per design requirement
7 Wall thickness Major
tube
8 Groove
9 Angle major
10 Inner cleanness No dirt, rust, or other metal swarf

L<5m ≤5
Degre L=5~7m ≤7
e of
11 L=7~10m mm ≤10
curvatu
re L=10~15m ≤15
L≥15m ≤20
flat,no radial transfixion
12 Man hole interface
damage,local damage≤0.5m
Drum center mark on both ends,
13 Drum lineation major
mark drum centerline

Remarks

Owner: Supervisor: Erection department: