Professional Documents
Culture Documents
01 Overview of Offshore Platform
01 Overview of Offshore Platform
Concession in Thailand
-Bongkot Field Development (PTTEP) -Arthit Field Development (PTTEP) -Erawan Group -Nang Nuan -Tantawan -etc
-Carigali - Triton Company Sdn.Bhd (CTOC) -Carigali PTTEPI Operating Company Sdn.Bhd (CPOC) -etc
-Fixed Platform Gravity Base Platform, Jacket Type Platform -Compliant Tower Compliant Piled Tower, Guyed Tower -Tension Leg Platform -Floating Platform Semi-Submersible, Extendable Draft Platform, FSO, FPSO -Spar
Drilling Rig
Jack-Up
Tender Rig
Field Development
HSE
Exploration Drilling
Project Development
Operation
Major Modification
Abandonment
Conceptual Design
Detailed Design
Procurement
Fabrication
E : Engineering
Engineering Design Feasibility Study Conceptual Design FEED ( Front End Engineering Design) Detail Engineering HAZOP ENGINEERING
Process
Structure
Piping
Mechanical
Electrical
Instrument
6 C ON DE
FP
NS AT
E L INE
FSO
WP3
14 E L IN 16 E L IN
WP4
E L IN 8 1
18
LIN
14
18
LIN
LIN
WP6 WP2
WP1 CPP
Field Development
QP
WP5
Design condition
Reservoirs Characteristic of wave Direction of wind 100 years storm 30 years design life. 80 meters water depth No seismic.
Wellhead
Glycol Contactor
Platform
Separator
Wellhead
Platform
Condensate Stabilization
Wellhead
Platform
QP Facilities Design
Diamond Living Quarters Building Designed for modular construction with maximaum capacity of 150 personnel A Helideck to land a Sikorsky S-61, S-76 or a Eurocopter EC155 helicopter Dining/mess facilities designed to accommodate 90 personnel at one serving A medical centre A gymnasium and outdoor recreation facilities (at roof level just below the Helideck). A TV/cinema/training room provided to accommodate 80 personnel
QP Facilities Design
TopsideLayout Three deck levels are envisaged which include a Main deck, a Mezzanine deck, and a Lower deck. The LQB shall be installed on the Main deck. The Central Control Room building will be installed on a cantilever on the QP. All other facilities shall be located either on the Mezzanine deck, Lower deck or in spaces available on the Main Deck. A single level bridge shall be used to connect the CPP to the LQ.
QP Facilities Design
Structure Design Fixed platform 4 legs Through-leg piles and grouted annuli Side-lifting and crane assisted upending 20 years of sacrificial anodes
FP/T Design
A flare tower, bridge connected to the CPP shall be provided. The tower will support the flare tips of the HP, LP and Acid Gas flare systems. Preliminary flare and dispersion studies have initially set the bridge length to be 120 m and tower height to be 25 m above the flare platform deck. Structure Design A 3 legged tripod structure Ungrouted leg piles 15 years of sacrificial anodes
WP Design
The function of the wellhead is to maintain surface control of the well. All actuated wellhead valves will be hydraulically operated. Wells will be drilled by tender rig. All of Christmas trees that be used in the project are dry type. Structure Design 4 legs with though leg piles Sided lifting and crane assisted upending 20 years of sacrificial anodes
3D Design