components:

A Power Conditioning Unit (PCU) is required


to set and control reservoir temperature, log
downhole temperatures, pressure and other
operating information.

An offset Tubing Hanger and Feed Through are required


to connect the surface power cables to the downhole
ESP cable and provide a pressure seal between the
annulus and atmosphere.
ESP Cable is banded to the tubing string from
the feed through to the Side Outlet Sub.
A splice is required at each end.

A Side Outlet Sub is required to transition the ESP cable


from the side of the tubing to the connection at the
Induction Heater. The pump suction pups are installed
above the SoSub.
The Induction Heater consists of inductors in smooth wall steel casing together
with temperature sensors and a bottom hole pressure sensor. The picture shows
a system in the shop hooked up with jumper wires for testing and calibration.
OFFSET TUBING HANGER CONFIGURED FOR
ESP CABLE FEED THROUGH. SOME OPTIONS ARE:
BIW MANDREL STYLE
GENCO TRIPLE PENETRATOR
PACK-OFF STYLE
NICKLE PLATED COPPER GROUND LUG ATTACHED TO CASING
BOWL WITH #4 CONDUCTOR BACK TO PCU
POWER CONDITIONING UNIT (PCU)
JOIN FEED THROUGH AND SURFACE CONVERTS THREE PHASE SUPPLY
CABLES IN JUNCTION BOX. TO THREE INDIVIDUALLY CONTROLLED
DURING A WORKOVER THE CABLES HEATING ZONES AT THE RESERVOIR.
ARE DISCONNECTED AND THE THE WAVE SHAPE AND FREQUENCY
FEED THROUGH CABLE PULLED IS CONTROLLED TO MAXIMIZE THE
BACK THROUGH THE TUBING HANGER DELIVERY OF ENERGY TO THE
RESERVOIR IN ACCORDANCE WITH
TEMPERATURE SETTINGS IN THE PCU

BAND ESP CABLE


SURFACE CASING
TO TUBING
SURFACE POWER CABLE TO
WELL HEAD

PRODUCTION CASING
PRODUCTION TUBING J-55,177.8 mm,
34.26 kg/m.

PUMP

ESP CABLE COLLAR PROTECTORS


AROUND BEND

SIDE OUTLET SUB TO TRANSITION


ESP CABLE FROM SIDE OF TUBING OPEN HOLE COMPLETION
TO TOP OF INDUCTION HEATER

PUMP SUCTION PUPS


Casing: 1225.6 mKB

HEATED ZONE HEATED ZONE


HEATED ZONE
PRODUCING INDUCTOR SECTION A
INDUCTOR SECTION B INDUCTOR SECTION C
ZONE

818.5 mKB

2269.0 mKB
1193.8 mKB

INDUCTION HEATING TOOL CONSISTING OF 13 m LONG


by 4.5 INCH DIAMETER JOINTS OF SMOOTH WALL CASING
CONTAINING INDUCTORS, TEMPERATURE AND PRESSURE
SENSORS. JOINTS ARE SCREWED TOGETHER WITH THE RIG
C MADIS ENGINEERING LTD. THE DESIGN AND INFORMATION PRESENTED BY THIS DOCUMENT IS

TONGS AND ELECTRICAL CONNECTIONS ARE MADE IN PROPRIETARY TO MADIS AND MAY NOT BE REPRODUCED WITHOUT CONSENT OF MADIS

PORTS AT THE END OF THE JOINT. BLANK SECTIONS ELECTRIC HEATING ARRANGEMENT
HORIZONTAL WELL
OF CASING MAY BE USED AS SPACERS IF REQUIRED.
ENGINEERING LTD CALGARY ALBERTA
MADIS ENGINEERING LTD.
CALGARY ALBERTA

DRAWN REI SCALE NOT TO SCALE CADD NO. DRAWING NO. REV.

CHK'D PLOT 1.0

APPR. PROJECT NO. MC300


MHC300 MHC-300-1

This is a drawing showing how the horizontal Induction Heating System is configured
PCU installed in below ground bunker
on a military base. 100 KVA horizontal

50 KVA PCU in Bahrain


100 KVA PCU for a horizontal well
in Southeastern Alberta.

25 KVA PCU 25 KVA PCU


in Montana in Northeastern
Alberta
Typical PCU control panel with
LCD to view set points and real
time formation temperatures and
bottom hole pressure as well as
power, flow line temperature,
flow rate, Amps, Volts, ambient
temperature and a full set of
interlock data. The operating
data are stored and may be
downloaded to the floppy disk,
SD card or transferred, in real
time, over a serial radio link.
A wellhead electrical
feed through that
seals the annulus
must be provided
A BIW well head penetrator with flat cable
on the left, protective mesh over the O-ring
seals and round cable on the right is shown
in the above photo.

The photo at the left shows a BIW penetrator about to


be installed in an offset tubing hanger.
The Genco penetrator, in some cases, A pack-off style tubing hanger
may be installed in a regular tubing may be used as a feed through
hanger to deliver electricity to the
Induction Heater
ESP cable reel and spooler truck rigging-up
with cable sheave in derrick.

ESP cable sheave with cable in derrick


A joint of inductor in elevators, “tailed by picker crane”, being raised into derrick.
An electrical port is provided, at the end of each
joint of inductor, for connection of wires.

The instrument circuit board and


pressure sensor are housed in the
“bullnose” at the end of the tool.
The temperatures and bottom hole
pressure signals are collected and
then transmitted to the PCU over
the ESP cable during delivery of
power to the tool. Real time closed
loop control of downhole temperature
is provided from the PCU.