PRODUCTION

ENGINEERING
UNLOADING WELL AFTER
WORKOVER/COMPLETION

WELL HEAD PRESSURE ZERO

PACKER SETTING DEPTH 2438 M = 8000 FT

TOP PERFORATION 2500 M = 8200 FT

Reservoir pressure = 3380 psi

Completion fluid KCL 8.4 ppg


METHODS

➢SLIDING SIDE DOOR SSD DIESEL SG

➢COILED TUBING NITROGEN PUMPING

➢GAS LIFT (IF PLANNED )


ANNULAR CAPACITY
TUBING CAPACITY
• psi/ft = SG x 0.433
• WATER : PSI/FT = 1 x 0.433 = 0.433

• Psi/ft = ppg x 0,052


• Water : psi/ft = 8,34 x 0,052 = 0.433