Professional Documents
Culture Documents
layer/ Strat de protectie Waterproofing/ Hidroizolatie Leveling layer/ Strat de egalizare 2000 110 1 Bridge deck/ Suprastructura - 70 mm - 40 mm - 5 mm - 30 mm
Pavement/ Sistem rutier Waterproofing/ Strat de hidroizolar e Approach slab/ Dala de racordare 1000 6 40 1 Position/ Pozitia 3 Bridge deck/ 4,5 Suprastructura 1 2 2 3 Abutment/ Culeea 4 5 Expanssion joint between the spans/ Rostul intre deschideri (1:20) Stone mastic asphalt concrete/ Beton asfaltic - 70 mm Protective layer/ Strat de protectie - 40 mm Waterproofing/ Hidroizolatie - 5 mm Leveling layer/ Strat de egalizare - 30 mm Bridge deck/ Suprastructura 1000 70 40 1 4 5 6 Bridge deck/ Suprastructura Schimb. nr. inv. 2 4,5 3 Bridge deck/ Suprastructura 6
55
55
2000
20
20
110
2000
110
Quantities per 1 lin.m of expanssion joints/ Lista de materiale pentru 1 m.liniar al rosturilor de dilatatie Reference/ Indicativ
Quantity/ Cant.
Name/ Denumirea
Weight/ Masa, kg
Note/ Nota
6-11-217-71
1 2 3
6-11-217-71
Expanssion joint at the abutment/ Rost de dilatatie la culee Glass fibre mesh/ Plasa cu fibre de sticla, L=1,0 m Lyre-shaped brass sheet / Bucla din tabla de alama, GOST 19904-90 Steel expanssion bolts/ Dibluri de otel, L=5cm, GOST 19904-90 Bituminous mastic/ Mastic bituminos Porous rubber cord/ Cordon din cauciuc poros Epoxy glue/ Rasina epoxidica Span joints/ Rost intre deschideri Glass fibre mesh/ Plasa cu fibre de sticla, L=1,0 m Lyre-shaped brass sheet / Bucla din tabla de alama, GOST 19904-90 Steel expansion bolts/ Dibluri de otel, L=5cm, GOST 19904-90 Bituminous mastic/ Mastic bituminos Porous rubber cord/ Cordon din cauciuc poros Epoxy glue/ Rasina epoxidica
2,0 m
0,5 m
12
0,008
1,5
0,7
0,6
2,0 m
0,5 m
12
0,008
1,5
0,7
0,6
Note/ Nota: 1. The Layer-Shaped (brass) element shall be glued to the top surface of brass sheet the deck and approach slabs with epoxy glue/ 2. Inainte de fixare, pe suprafata de rezemare a buclei din tabla de alama si suprafata betonului de suport se aplica un strat de rasina epoxidica cu grosimea de 2mm. 40 Lyre-shaped brass sheet (pos.3)/ Bucla din tabla de alama (poz.3) ( 1:20) 2000
Semnat la data
30 130
256 - LA
R20
Semnat
Data
Reabilitarea i extinderea drumului M3 Chiinu - Giurgiuleti/ Frontiera cu Romania sectorul Comrat - Ciumai
LOT I Km 96+800 - Km 122+800 Bridge/Pod Km 118+356 50 100 Verificat Elaborat A. Ghimpu V. Serdiuc 10.12 10.12
Faza
Plan
Plane
DE
62
S.C. PA & CO
International
F..P."Universinj" S.R.L.
Format A3