Cost Estimate for Jack -up Girder

Per 4 Nos. of Jacks


No.

Description

1 Material Cost
Jack Bracket (Steel Fabricated)
Anchor Bolt M20x200

Sub-total
2 Labor Cost
Foreman
Technician (Jack-up & down)
Skilled Labor (Setting Bracket)
Skilled Labor (Installation & Jack-up)
Skilled Labor (Jack-down & Demolish)
Common Labor (Setting Bracket)
Common Labor (Installation & Jack-up)
Common Labor (Jack-down & Demolish)

Sub-total
3 Equipment/ Tool Cost
Hydraulic Jack 75 ton (4Nos x 5days)
Dial Gauge

Sub-total
4 Direct Cost (1+2+3)

Unit
kg
No.

Quantity
120.00
16.00

Unit Price (Php.) Amount (Php.)


170.00
250.00

20,400.00
4,000.00

24,400.00
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D

4.00
2.00
2.00
3.00
3.00
2.00
2.00
2.00

1,200.00
1,000.00
703.00
703.00
703.00
542.00
542.00
542.00

4,800.00
2,000.00
1,406.00
2,109.00
2,109.00
1,084.00
1,084.00
1,084.00

15,676.00
No.day
No.day

20.00
20.00

2,666.00
75.00

53,320.00
1,500.00

54,820.00
94,896.00

Man

Day
1
1
2
3
3
2
2
2

No.

4
2
1
1
1
1
1
1

Day
4
4

5
5

No.
M.
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33
M-34
M-35
M-36
M-37
M-38
M-39
M-40
M-41
M-42
M-43
M-44
M-45
M-46
M-47
M-48

List of Materials
Item Name
Material
Injection set for Epoxy Injection)
Injection Pipe for Caulking
Epoxy Resin for Injection
Epoxy Grout for Caulking
Epoxy Putty
Caulking sealant
Epoxy Primer
Epoxy coating for crack
Epoxy Resin Adhesive CFS
Epoxy Resin Adhesive CFP
Epoxy Resin Adhesive Steel Plate
Thinner
Gasoline
Carbon fiber sheet
Carbon fiber sheet Strap (W=500)
Carbon fiber Plate (W=50mm, t=1mm)
Carbon fiber Plate (W=50mm, t=2mm)
Steel plate (SS400) incl. fabrication
Rubber compound membrane
Primer for waterproof
Tack coat
Asphalt compound membrane
Silica sand #4
Primer to Concrete Surface
Zinc Rich Primer
Special Anti-Corrosion Paint
Polyurethane Aluminum Paint
Epoxy Polyimide Paint
Concrete Class-A
Concrete Class-B
Leveling Concrete
Cement Mortar 1:3
Polymer cement mortar
Non-shrink Mortar
Formwork (Soffit type)
Formwork (Mail box type)
Formwork (Envelop type)
Rebar
Anchor Bolt M20x50mm
Anchor Bolt M20x200mm
Wood (5 time use)
Steel Angle 75x75x6
Seamless joint set
Steel Finger Expansion Joint(2030mm)
Laminate Rubber Bearing
H.T.B M22x125(Average)
Boulder
Crushed Stone

Unit

Unit Price (Php)

Set
Set
kg
kg
kg
Lit.
kg
kg
kg
kg
kg
Lit.
Lit.
M2
M2
M
M
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
M3
M3
M3
M3
kg
M3
M2
M2
M2
kg
No.
No.
M3
kg
M
M
M3
No.
M3
M3

175.00
127.00
1,465.00
1,360.00
658.00
700.00
1,465.00
1,465.00
1,565.00
1,565.00
1,565.00
100.00
50.00
6,750.00
6,750.00
102.00
138.00
170.00
630.00
495.00
400.00
320.00
54.00
440.00
530.00
700.00
415.00
300.00
7,900.00
5,500.00
4,000.00
3,600.00
190.00
16,500.00
560.00
580.00
380.00
45.00
100.00
250.00
3,500.00
45.00
10,500.00
15,500.00
1,300,000.00
108.00
380.00
540.00

Unit Price (Php)


175.00
127.00
1,465.00
1,360.00
658.00
700.00
1,465.00
1,465.00
1,565.00
1,565.00
1,565.00
100.00
50.00
6,750.00
6,750.00
102.00
138.00
170.00
630.00
495.00
400.00
320.00
54.00
440.00
530.00
700.00
415.00
300.00
7,900.00
5,500.00
4,000.00
3,600.00
170.00 per kg
7,500.00
390.00 per sq.m.
560.00 per sq.m.
580.00 per sq.m.
45.00
100.00
250.00
3,500.00
45.00
10,500.00
15,500.00
1,300,000.00
150,000.00 per ton
380.00
540.00

M-49
M-50
M-51
M-52

Gabion Mattress 3.0x1.5x0.5


Cobble Filling
Wooden Pile 0.2x0.2x2.0m
Filter Fabric Sheet

B.
B-1
B-2
B-3
B-4

Foreman
Technician
Skilled Worker
Common Labor

No.
M3
No.
M2

3,500.00
450.00
2,100.00
110.00

M/D
M/D
M/D
M/D

1,200.00
1,000.00
703.00
542.00

Labor

Note: Foreman & Technician are Manila base and Skilled worker
and Common labor are locally recruited.
E.
E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
E-9
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20

Equipment/Tool
Disc Sander 50
Concrete Breaker
Saw Cutter
Injection Pump
Generator 2KVA
Generator 15KVA
Air Compressor 0.4KW
High Pressure Water Blaster
Melting Kettle 400 Lit.
Grout Mixer 200lit
Vibrator 45mm
Welder 300A
Concrete Drilling Machine
Vibration Roller
Compactor
Sand Blast Machine
Hydraulic Jack 75 ton
Dial Gauge
Torque Wrench
Pile Hammer

210.00
3,877.00
290.00
150.00
104.00
113.00
125.00
380.00
250.00
374.00
101.00
74.00
2,182.00
3,082.00
187.00
300.00
2,666.00
75.00
122.00
4,427.00

3,500.00
450.00
2,100.00
110.00

#######
#######
705.00
658.00
658.00
658.00
658.00
752.00
752.00
752.00
771.00
100.00
50.00
#######
#######
102.00
138.00
170.00

1368.056

1465.774

383.3333
1565.217

184

0.719 1390.821 107.9137

You might also like