Professional Documents
Culture Documents
DESCRIPTION
S/S
Cap.
VOLTAGE PROFILE
FEED
ER
WITH PROJECT
WITHOUT PROJECT
2010 2011 2012 2013 2014 2010 2011 2012 2013 2014
Construction of
5MVA
Substation at
San Vecente
Laur with
refeedering of
bangabon
Substation
(Project No.5)
10 MVA
Bongabon
Substation
Proposed
5MVA
Laur
Substation
PROJECT
DESCRIPTION
F1
0.74
0.74
0.73
0.72
0.72
F2
0.94 0.94
0.94
0.94
0.94
0.95
0.95 0.95
0.95
0.95
F1
0.98
0.98 0.98
0.98
0.98
F2
0.96
0.95 0.95
0.95
0.95
CAPACITY PROFILE in %
S/S
Cap.
WITH PROJECT
WITHOUT PROJECT
2010 2011 2012 2013 2014 2010 2011 2012 2013 2014
Upgrading of 5
MVA power
transformer of
Gen. Natividad
Substation to 10
MVA
5 MVA
10 MVA
73
82
90
99
107
37
41
46
50
54
Particulars
Average Demand
Peak Demand
Load Factor
Loss Factor
Loss Reduction (MW)
Average Losses (kWh)
kWh Reduction
Possible kWh Purchase
kWh loss
Year 2011
2,631
4,190
0.63
0.44
0.007
3.09
27,041.91
137,733,445.09
13,872,774.65