PROJECT

DESCRIPTION

S/S
Cap.

VOLTAGE PROFILE

FEED
ER

WITH PROJECT

WITHOUT PROJECT

2010 2011 2012 2013 2014 2010 2011 2012 2013 2014
Construction of
5MVA
Substation at
San Vecente
Laur with
refeedering of
bangabon
Substation
(Project No.5)

10 MVA
Bongabon
Substation
Proposed
5MVA
Laur
Substation

PROJECT
DESCRIPTION

F1

0.74

0.74

0.73

0.72

0.72

F2

0.94 0.94

0.94

0.94

0.94

0.95

0.95 0.95

0.95

0.95

F1

0.98

0.98 0.98

0.98

0.98

F2

0.96

0.95 0.95

0.95

0.95

CAPACITY PROFILE in %
S/S
Cap.

WITH PROJECT

WITHOUT PROJECT

2010 2011 2012 2013 2014 2010 2011 2012 2013 2014
Upgrading of 5
MVA power
transformer of
Gen. Natividad
Substation to 10
MVA

5 MVA

10 MVA

73

82

90

99

107

37

41

46

50

54

Particulars
Average Demand
Peak Demand
Load Factor
Loss Factor
Loss Reduction (MW)
Average Losses (kWh)
kWh Reduction
Possible kWh Purchase
kWh loss

Year 2011
2,631
4,190
0.63
0.44
0.007
3.09
27,041.91
137,733,445.09
13,872,774.65