You are on page 1of 45

SUMMARY

with 0.8 pf
Total demand for lighting and general power (kVA) 85.9 85.9
Total demand for Mechanical Equipments (kVA) 631.8 582.5
Total (kVA) 717.7 668.4
Total demand with 15% spare (kVA) 825.3 768.6
Total Area of the Building (m2) 19024 19024
Total demand of the project (VA/m2) 43.4 40.4
Selected Transformer(kVA) 800 800
Maximum Transformer Loading (%) 89.71 83.55
Selected Generators (kVA) 3x200+10+110
Maximum Generator Loading (%) 100.00
with 0.8 pf

574.1359
PROPOSED TEA FACTORY COMPLEX FOR GEORGE STEUART TEAS (PVT.) LTD. AT BIYAGAMA
Estimated Electrical Demand
Lighting and Power KVA

Light Fixture Details


Efficacy 90 lm/W
Miantenance Factor 0.8
Utilization Factor 0.7
pf 0.9

Demand Calculation for Lighitng and General Power

SDB-Name DB-Name LEVEL

Ground Floor & Mezzanine Floor 1


LO SDB-GF1 DB-GF1-OL Office Lounge & Reception
LO SDB-GF1 DB-GF1-OL Smoke Free Lobby
ST SDB-GF1 DB-GF1-OL Staircase
CP SDB-GF1 DB-GF1-OL Car Parking
UB SDB-GF1 DB-GF1-MUB Unloading Bay (Mattakkuliya)
BOH SDB-GF1 DB-GF1-MUB Store
TO SDB-GF1 DB-GF1-MUB Disable Toilet
ST SDB-GF1 DB-GF1-MUB Staircase
LO SDB-GF1 DB-GF1-OL Lift Lobby, Corridor & Ramp
CP SDB-GF1 DB-GF1-OD Driveway
UB SDB-GF1 DB-GF1-COR Unloading Bay
CP SDB-GF1 DB-GF1-COR Lorry Parking Area
CP SDB-GF1 DB-GF1-OD Corridor & Ramp
STO SDB-GF1 DB-GF1-COR Equipment Store
OF SDB-GF1 DB-GF1-TDS Temporary Dispatch Store & Office
UB SDB-GF1 DB-GF1-TDS Dispatch Bay
SR SDB-GF1 DB-GF1-SH Security Hut
MEP SDB-GF1 DB-GF1-TR CEB Meter Room
TO SDB-GF1 DB-GF1-TDS Wash Room
CP SDB-GF1 DB-GF1-TDS Driveway
CP SDB-GF1 DB-GF1-OD Lorry Parking Area
OF SDB-GF1 DB-GF1-FCC Fire Command Center
MEP SDB-GF1 DB-GF1-FCC Main Panel Room
LO SDB-GF2 DB-GF2-O&M Verandah & Front Office Lobby
OF SDB-GF2 DB-GF2-O&M Doctor's Room
TO SDB-GF2 DB-GF2-O&M Washroom Area
UB SDB-GF2 DB-GF2-COR Unloading Bay
CP SDB-GF2 DB-GF2-COR Lorry Parking Area
STO SDB-GF2 DB-GF2-COR Stores Executive
SA SDB-GF2 DB-GF2-CAN Staff Dining Area
SA SDB-GF2 DB-GF2-CAN Staff Dining Area
STO SDB-GF2 DB-GF2-KIT Dry store
STO SDB-GF2 DB-GF2-KIT Cold Store
SA SDB-GF2 DB-GF2-KIT Kitchen
BOH SDB-GF2 DB-GF2-CAN Storage
SR SDB-GF2 DB-GF2-CAN Security Point
ST SDB-GF2 DB-GF2-CAN Staircase & Paved Area
CP SDB-GF2 DB-GF2-COR Car Parking
CP SDB-GF2 DB-GF2-OD1 Driveway
BOH SDB-GF2 DB-GF2-OD1 Garbage Rooms
SF SDB-GF2 DB-GF2-DRR Drivers' Rest Room
TO SDB-GF2 DB-GF2-DRR Drivers' Wash Room
BOH SDB-GF2 DB-GF2-OD1 Storage/Tool Room
MEP SDB-GF2 DB-GF2-GR Generator Room
MEP SDB-GF2 DB-GF2-GR Pump Room
ST SDB-GF2 DB-GF2-LO2 Staircase
OF SDB-GF2 DB-GF2-LO2 Local Operation 2
BOH SDB-GF2 DB-GF2-LO2 Storage
OF SDB-GF2 DB-GF2-LO1 Local Operation 1
TO SDB-GF2 DB-GF2-FS Toilet
CO SDB-GF2 DB-GF2-FS Corridor
M SDB-GF2 DB-GF2-FS Flavour Store
First Floor
M SDB-1F1 DB-1F1-MSM Material Store - Mattakkuliya
ST SDB-1F1 DB-1F1-MSM Staricases & other circulation areas
M SDB-1F1 DB-1F1-MBA Machine Blending Area
STO SDB-1F1 DB-1F1-MBA Material Store
M SDB-1F1 DB-1F1-MBL Manual Blending Line - 1
M SDB-1F1 DB-1F1-MBL Manual Blending Line - 2
CO SDB-1F1 DB-1F1-COR Circulation Areas
M SDB-1F2 DB-1F2-MBL Manual Blending Line - 3
M SDB-1F2 DB-1F2-MBL Manual Blending Line - 4
CO SDB-1F2 DB-1F2-COR Circulation Areas
MEP SDB-1F2 DB-1F2-COR Electrical Duct Room
TO SDB-1F2 DB-1F2-COR Janitor's Store & Toilet
M SDB-1F2 DB-1F2-TS-1 Tea Store
ST SDB-1F2 DB-1F2-TS-1 Staricases & other circulation areas
M SDB-1F2 DB-1F2-TS-2 Tea Store
Second Floor & Mezzanine Floor 2
M SDB-2F1 DB-2F1-MPL1 Manual Packeting Line - 1
M SDB-2F1 DB-2F1-MPL2 Manual Packeting Line - 2
M SDB-2F1 DB-2F1-MPL3 Manual Packeting Line - 3
CO SDB-2F1 DB-2F1-MPL3 Circulation Areas
M SDB-2F1 DB-2F1-MPL4 Manual Packeting Line - 4
M SDB-2F1 DB-2F1-MM-L Mattakkuliya Machinery
M SDB-2F1 DB-2F1-MM-P Mattakkuliya Machinery
M SDB-2F1 DB-2F1-PM Perfecta Machine Area
BOH SDB-2F1 DB-2F1-COR1 Store
CO SDB-2F1 DB-2F1-COR1 Corridor
BOH SDB-2F1 DB-2F1-COR2 Store
CO SDB-2F1 DB-2F1-COR2 Corridor
TO SDB-2F1 DB-2F1-COR2 Washroom Area
LO SDB-2F1 DB-2F1-COR2 Lobby
ST SDB-2F1 DB-2F1-COR2 Staricases
TO SDB-2F1 DB-2F1-COR2 Washroom Area
MEP SDB-2F1 DB-2F1-MPL3 Electrical Duct Room
TO SDB-2F1 DB-2F1-MPL3 Janitor's Store & Toilet
M SDB-2F2 DB-2F2-KM-L Kelanimulla Machinery
M SDB-2F2 DB-2F2-KM-P Kelanimulla Machinery
M SDB-2F2 DB-2F2-MSK Material Store - Kelanimulla
M SDB-2F2 DB-2F2-PAC Packeting - Kelanimulla
CO SDB-2F2 DB-2F2-O&C1 Corridor & Staircase
OF SDB-2F2 DB-2F2-O&C1 Office
M SDB-2F2 DB-2F2-TFA1 Tea Bagging Machine Feeding 1
M SDB-2F2 DB-2F2-TFA2 Tea Bagging Machine Feeding 2
CO SDB-2F2 DB-2F2-TFA1 Corridor & Staircase
CO SDB-2F2 DB-2F2-TFA2 Corridor & Staircase
MEP SDB-2F2 DB-2F2-TFA2 Roof Terrace - MEP Area
Total (kVA)
Overall Diversity
Total demand for lighting and general power (kVA)
VT.) LTD. AT BIYAGAMA

LOAD TYPE
AREA (m2) LIGHTING GENERAL POWER
LUX LEVEL (lx) DEMAND (VA) POWER (VA/m2) DEMAND (VA) Total(kVA)

120 300 793.65 30 3600.00 4.39


24.7 100 54.45 5 123.50 0.18
20.9 100 46.08 0 0.00 0.05
110 75 181.88 0 0.00 0.18
79.2 150 261.90 2 158.40 0.42
41.5 100 91.49 2 83.00 0.17
7 100 15.43 1 7.00 0.02
18.3 100 40.34 0 0.00 0.04
67.1 100 147.93 0 0.00 0.15
2384 50 2627.87 N/A N/A 2.63
288.5 150 954.03 2 577.00 1.53
597.3 100 1316.80 N/A N/A 1.32
138.4 100 305.11 N/A N/A 0.31
25.4 100 56.00 5 127.00 0.18
113 200 498.24 10 1130.00 1.63
114.2 150 377.65 2 228.40 0.61
24 100 52.91 10 240.00 0.29
6.4 150 21.16 2 12.80 0.03
6.3 150 20.83 2 12.60 0.03
975 50 1074.74 N/A N/A 1.07
314.4 100 693.12 N/A N/A 0.69
40 200 176.37 10 400.00 0.58
76.7 150 253.64 5 383.50 0.64
50.5 100 111.33 2 N/A 0.11
34 300 224.87 10 340.00 0.56
240 150 793.65 2 480.00 1.27
337.4 150 1115.74 2 674.80 1.79
824.5 100 1817.68 N/A N/A 1.82
23.8 200 104.94 10 238.00 0.34
110 150 363.76 2 220.00 0.58
268 150 886.24 2 536.00 1.42
5.2 100 11.46 10 52.00 0.06
5.4 100 11.90 0.00 0.01
65 200 286.60 200 13000.00 13.29
6 100 13.23 2 12.00 0.03
5.6 150 18.52 5 28.00 0.05
38.4 100 84.66 N/A N/A 0.08
1370 75 2265.21 N/A N/A 2.27
665 50 733.02 N/A N/A 0.73
20 100 44.09 5 100.00 0.14
75 150 248.02 5 375.00 0.62
19.5 150 64.48 1 19.50 0.06
43.8 100 96.56 5 219.00 0.32
101.7 150 336.31 2 203.40 0.54
4.8 150 15.87 2 9.60 0.03
60.1 100 132.50 N/A N/A 0.13
478 200 2107.58 5 2390.00 4.50
6 100 13.23 5 30.00 0.04
478 200 2107.58 5 2390.00 4.50
24 150 79.37 1 24.00 0.10
64.2 100 141.53 1 64.20 0.21
242 100 533.51 2 484.00 1.02

553 100 1219.14 1 553.00 1.77


55 100 121.25 N/A N/A 0.12
431 300 2850.53 1 431.00 3.28
186 100 410.05 1 186.00 0.60
414 200 1825.40 1 414.00 2.24
420 200 1851.85 1 420.00 2.27
452 100 996.47 1 452.00 1.45
422 200 1860.67 1 422.00 2.28
233 200 1027.34 1 233.00 1.26
219 100 482.80 1 219.00 0.70
12 150 39.68 N/A N/A 0.04
11 100 24.25 1 11.00 0.04
945 100 2083.33 1 945.00 3.03
55 100 121.25 N/A N/A 0.12
667 100 1470.46 1 667.00 2.14

467 200 2059.08 1 467.00 2.53


272 200 1199.29 1 272.00 1.47
250 200 1102.29 1 250.00 1.35
37 100 81.57 2 74.00 0.16
198 200 873.02 1 198.00 1.07
214 400 1887.13 0 0.00 1.89
214 0 0.00 5 1070.00 1.07
170 400 1499.12 5 850.00 2.35
203.2 100 447.97 1 203.20 0.65
174 100 383.60 1 174.00 0.56
80.3 100 177.03 1 80.30 0.26
187.5 100 413.36 1 187.50 0.60
36.2 150 119.71 2 72.40 0.19
33.6 100 74.07 1 33.60 0.11
26.5 100 58.42 0 0.00 0.06
37.7 150 124.67 2 75.40 0.20
12 150 39.68 1 12.00 0.05
11 100 24.25 1 0.00 0.02
289 400 2548.50 0 0.00 2.55
289 0 0.00 1 289.00 0.29
448 100 987.65 1 448.00 1.44
442 200 1948.85 1 442.00 2.39
143 100 315.26 1 143.00 0.46
46 300 304.23 30 1380.00 1.68
720 200 3174.60 1 720.00 3.89
213.6 200 941.80 1 213.60 1.16
183 100 403.44 1 183.00 0.59
143.5 100 316.36 1 143.50 0.46
1243 100 2740.30 0 0.00 2.74
107.3
0.8
general power (kVA) 85.9
HOURS OF LIGHT ENERGY POWER ENERGY Lighting power diversity 0.7
OPERATION USAGE PER USAGE PER General power diversity 0.1
PER DAY MONTH MONTH

10 166.67 108.00 ST Staircase 8


10 11.44 3.71 TO Toilet 4
8 7.74 0.00 LO Lobby/ Waiting 10
12 45.83 0.00 CO Corridor/Passage 10
10 55.00 4.75 MEP MEP 2
2 3.84 0.50 OF Office 10
4 1.30 0.08 BOH BOH/General Storage 2
8 6.78 0.00 STO Store 4
10 31.06 0.00 GAR Garbage collection 2
12 662.22 0 OT Outdoor 10
10 200.35 17.31 CP Car park 12
12 331.83 0 SA Service Area 12
12 76.89 0 SR Security Room 12
4 4.70 1.52 UB Unloading Bay 10
10 104.63 33.90 M 18
10 79.31 6.85 SF Staff rooms 5
12 13.33 8.64
2 0.89 0.08
4 1.75 0.15
12 270.83 0
12 174.67 0
10 37.04 12.00
2 10.65 2.30
10 23.38 0
10 47.22 10.20
4 66.67 5.76
10 234.31 20.24
12 458.06 0
4 8.81 2.86
12 91.67 7.92
12 223.33 19.30
4 0.96 0.62
4 1.00 0.00
12 72.22 468.00
2 0.56 0.07
12 4.67 1.01
8 14.22 0
12 570.83 0
12 184.72 0
2 1.85 0.60
5 26.04 5.63
4 5.42 0.23
2 4.06 1.31
2 14.13 1.22
2 0.67 0.06
8 22.26 0
10 442.59 71.70
2 0.56 0.18
10 442.59 71.70
4 6.67 0.29
10 29.72 1.93
18 201.67 26.14

18 460.83 29.86
8 20.37 0
18 1077.50 23.27
4 34.44 2.23
18 690.00 22.36
18 700.00 22.68
10 209.26 13.56
18 703.33 22.79
18 388.33 12.58
10 101.39 6.57
2 1.67 0
4 2.04 0.13
18 787.50 51.03
8 20.37 0
18 555.83 36.02

18 778.33 25.22
18 453.33 14.69
18 416.67 13.50
10 17.13 2.22
18 330.00 10.69
18 713.33 0.00
18 0.00 57.78
18 566.67 45.90
2 18.81 1.22
10 80.56 5.22
2 7.44 0.48
10 86.81 5.63
4 10.06 0.87
10 15.56 1.01
8 9.81 0.00
4 10.47 0.90
2 1.67 0.07
4 2.04 0.00
18 963.33 0.00
18 0.00 15.61
18 373.33 24.19
18 736.67 23.87
10 66.20 4.29
10 63.89 41.40
18 1200.00 38.88
18 356.00 11.53
10 84.72 5.49
10 66.44 4.31
2 115.09 0.00
18,796.81 1,514.80
PF 0.8
12,029.96 969.47 12,999.43 kWh
Demand Calculation for Mechanical Equipment
Power Factor 0.8
Power Factor for lifts 0.6
Power Factor for machinery 0.6
Power per Demand/ Connection Type Power Source Connection
Equipment Equipment Power (kVA) Qty Diversity Demand Demand (kVA) Phase (Isolator/Industrial Socket (UPS/Row Method (Top/
(kVA) with 0.8 pf Outlet/ Socket Outlet) Power) Bottom)
(kW) Factor
Ground Floor & First Floor
Reach Truck Charger 16.55 20.69 6 0.3 37.24 37.24 3 ph IND RP -
Roller Door 0.37 0.46 2 0.6 0.56 0.56 1ph ISO RP -

First Floor (Machine Blending Area)


M Blending Machine 56.25 1 0.7 39.38 39.38 3 ph ISO RP -
M Blending Machine Compressor 4.00 5.00 1 0.7 3.50 3.50 3 ph ISO RP -
Electric Scales - MBA 0.30 0.38 3 1.0 1.13 1.13 1ph S/O RP -
M Heating Machine - 1 - MBA 1.00 1.25 2 0.8 2.00 2.00 1ph S/O RP -
M Heating Machine - 2 - MBA 0.75 0.94 3 0.8 2.25 2.25 1ph S/O RP -
M Flavor Machine -M 4.00 5.00 1 0.7 3.50 3.50 3 ph ISO RP -
Compressor-M 4.00 5.00 1 0.7 3.50 3.50 3 ph ISO RP -
Flavor Machine -K 1.50 1.88 1 0.7 1.31 1.31 1ph S/O RP -

Second Floor (Packeting - Kelanimulla)


Heating Machine - KP 0.75 0.94 3 0.8 2.25 2.25 1ph S/O RP TOP
Electric Scale - KP 0.30 0.38 1 1.0 0.38 0.38 1ph S/O RP TOP

Second Floor (Manual Packeting - Mattakkuliya)


Heating Machine-1-MP 1.00 1.25 12 0.8 12.00 12.00 1ph S/O RP TOP
Electric Scale-1-MP 0.30 0.38 6 1.0 2.25 2.25 1ph S/O RP TOP
Heating Machine-2-MP 1.00 1.25 12 0.8 12.00 12.00 1ph S/O RP TOP
Electric Scale-2-MP 0.30 0.38 6 1.0 2.25 2.25 1ph S/O RP TOP
Heating Machine-3-MP 1.00 1.25 8 0.8 8.00 8.00 1ph S/O RP TOP
Electric Scale-3-MP 0.30 0.38 4 1.0 1.50 1.50 1ph S/O RP TOP
Heating Machine-4-MP 1.00 1.25 8 0.8 8.00 8.00 1ph S/O RP TOP
Electric Scale-4-MP 0.30 0.38 4 1.0 1.50 1.50 1ph S/O RP TOP

Second Floor (Kelanimulla Machinery)


Tea Bag Machines-KM 1.00 1.67 7 1.0 11.67 8.75 3 ph ISO RP TOP
Sollas Machine - 2 - KM 1.73 3 0.7 3.62 0.00 3 ph ISO RP -
Shrinking Machine-KM 3.00 5.00 3 0.7 10.50 7.88 3 ph ISO RP -
FUSO (Pyramid) Machine-KM 2.00 3.33 3 0.7 7.00 5.25 1 ph ISO RP -
IMA Machine - 2-KM 6.00 6 0.7 25.20 25.20 3 ph ISO RP -
Maisa Machine-KM 1.00 1.67 2 0.7 2.33 1.75 1 ph ISO RP -
Conveyor motor 4.50 7.50 1 0.7 5.25 3.94 3 ph ISO RP -
PC-KM 0.30 0.38 2 1.0 0.75 0.75 1 ph S/O RP -
Data Rack-KM 0.50 1 1.0 0.50 0.50 1 ph S/O RP -
Printer-KM 0.75 0.94 1 1.0 0.94 0.94 1 ph S/O RP -
Barcode Reader-KM 0.30 0.38 1 1.0 0.38 0.38 1 ph S/O RP -
Vaccum Cleaner-KM 2.40 3.00 1 1.0 3.00 3.00 3 ph ISO RP -
Compressor - KM 7.50 9.38 8 0.7 52.50 52.50 3 ph ISO RP
UPS-KM 10.00 1 1.0 10.00 10.00 3 ph
UPS Powerd FUSO Machine-KM 2.00 3.33 1 0.0 0.00 1 ph ISO UPS -

Second Floor (Mattakkuliya Machinery)


Tea Bag Machines-MM 1.00 1.67 6 1.0 10.00 7.50 3 ph ISO RP TOP
Sollas Machine-MM 1.73 2 0.7 2.42 2.42 3 ph ISO RP -
Shrinking Machine-MM 6.50 10.83 2 0.7 15.17 11.38 3 ph ISO RP -
Strapping Machine-MM 1.61 2 0.7 2.25 2.25 1 ph ISO RP -
Conveyor motor 4.50 7.50 1 0.7 5.25 3.94 3 ph ISO RP -
Vaccum Cleaner-MM 1.60 2.00 1 0.7 1.40 1.40 3 ph ISO RP -
Compressor-MM 7.50 9.38 2 0.7 13.13 13.13 3 ph ISO RP -

Second Floor (Perfecta Machine Room)


Shrinking Machine-MM 6.50 8.13 1 0.7 5.69 5.69 3 ph ISO RP -
UPS-PM 40.00 1 1.0 40.00 40.00 3 ph
Perfacta Machine 14.10 17.63 1 0.0 0.00 3 ph ISO UPS TOP
Domino Printer 4.85 1 0.0 0.00 3 ph ISO UPS TOP
Outside Convey-PM 6.50 8.13 1 0.0 0.00 3 ph ISO UPS -
Vacuum Cleaner (3ph)-PM 2.55 3.19 1 0.0 0.00 3 ph ISO UPS -

Ground Floor (AC)


O&M Doctor's Room 1.40 1.56 1 0.8 1.24 IDU-GF-06 1.40 1
TDS Temporary Dispatch Store & Office 1 1.40 1.56 1 0.8 1.24 IDU-GF-01 1.40 1
TDS Temporary Dispatch Store & Office 2 2.03 2.26 1 0.8 1.80 IDU-GF-02 2.03 1
OL Reception 3.09 3.43 1 0.8 2.75 IDU-GF-05 3.09 1
OL Office Lounge 3.09 3.43 1 0.8 2.75 IDU-GF-04 3.09 1
OL Smoke free lobby 1.06 1.18 1 0.8 0.94 IDU-GF-03 1.06 1
GF2-COR Store's executive room 1.43 1.59 1 0.8 1.27 IDU-GF-07 1.43 1

Mezzanine Floor 1 (AC)


FCC Panel Room 2.29 2.54 1 0.8 2.04 IDU-M1-02 2.29 1
FCC Fire Commanding Center 1.83 2.03 1 0.8 1.63 IDU-M1-01 1.83 1
FS Flavour Store 2.57 2.86 4 0.8 9.14 IDU-M1-03 10.28 1

Second Floor (AC)


MM-P Mattakkuliya Machinery 58.60 65.11 1 0.8 52.09 2F-ID-02 58.60 3
KM-P Kelanimulla Machinery 29.30 32.56 1 0.8 26.04 2F-ID-01 29.30 3
O&C1 Office 1.71 1.90 1 0.8 1.52 IDU-2F-01 1.71 1

Mezzanine Floor 2 (AC)


O&C2 Office 1.71 1.90 1 0.8 1.52 IDU-2F-01 1.71 1

Ventilation Fans - Ground Floor


KIT Kitchen 7.50 9.38 1 0.6 5.63 KEF-GF-01 5.63 3
LSDB Car Park 3.30 4.13 1 0.7 2.89 SEF-GF-01 2.89 3
O&M Lockers Room 1 0.18 0.23 1 0.7 0.16 TEF-GF-08 0.16 1
O&M Female wash room 1 0.18 0.23 1 0.7 0.16 TEF-GF-07 0.16 1
O&M Female wash room 2 0.41 0.51 1 0.7 0.36 TEF-GF-06 0.36 3
O&M Male wash room 1 0.41 0.51 1 0.7 0.36 TEF-GF-05 0.36 3
O&M Male wash room 2 0.12 0.15 1 0.7 0.11 TEF-GF-04 0.11 1
O&M Lockers Room 2 0.10 0.13 1 0.7 0.09 TEF-GF-03 0.09 1
O&M Lockers Room 3 0.41 0.51 1 0.7 0.36 FAF-GF-01 0.36 3

Generator room 0.50 1 0.6 0.30 0.30

Ventilation Fans - First Floor


TS-1 Tea Store 1 3.30 4.13 1 0.7 2.89 GEF-2F-03 2.89 3
TS-2 Tea Store 2 3.30 4.13 1 0.7 2.89 GEF-2F-04 2.89 3
1F1-MBA Machine Blending Area 1.21 1.51 1 0.7 1.06 GEF-1F-01 1.06 3
1F1-MSM Material Store - Mattakkuliya 0.83 1.04 2 0.7 1.45 GEF-1F-02/04 1.45 3
1F2-MBL Manual Blending Line- 3 & 4 1.21 1.51 1 0.7 1.06 GEF-1F-07 1.06 3
1F1-MBL Manual Blending Line- 1 2.42 3.03 1 0.7 2.12 GEF-1F-03 2.12 3

Ventilation Fans - Second Floor


2F1-COR2 Toilet 1 0.10 0.13 2 0.7 0.18 GEF-1F-01/02 0.18 1
2F1-COR2 Toilet 2 0.09 0.11 2 0.7 0.16 GEF-1F-03/04 0.16 1
MPL1 Manual packeting line 1 1.65 2.0625 1 0.7 1.44 GEF-M2-01 1.44 3
MPL3 Manual packeting line 3 1.65 2.06 1 0.7 1.44 GEF-M2-02 1.44 3
MPL4 Manual packeting line 4 1.65 2.06 1 0.7 1.44 GEF-M2-03 1.44 3
MSK Material Store - Kelanimulla 1.65 2.06 1 0.7 1.44 GEF-M2-05 1.44 3
2F2-PAC Packeting - Kelanimulla 1.21 1.51 1 0.7 1.06 GEF-M2-06 1.06 3

Wet scrubber 5.00 6.25 1 0.8 5.00 ISO-GF1-WSB 5.00 3

Booster Pump 0.75 0.9375 1 0.8 0.75 MSSB-RT-BP 0.75 3


Rain Water Booster Pump 0.75 0.9375 1 0.8 0.75 MSSB-1MF-RWBP 0.75 3
Water Transfer Pump 3.00 3.75 1 0.8 3.00 MSSB-1MF-WTP 3.00 3
Sewer Lifting Pump (set 1) 1.20 1.50 1 0.8 1.20 ISO-GF1-SLP1 1.20 3
Sewer Lifting Pump (set 2) 1.20 1.50 1 0.8 1.20 ISO-GF1-SLP2 1.20 3
Sewer Lifting Pump (set 3) 2.20 2.75 1 0.8 2.20 ISO-GF2-SLP3 2.20 3

Fire Pillar Hydrant Pump 38.00 47.50 1 0.8 38.00 38.00 3


Fire Jockey Pump 1.40 1.75 1 0.8 1.40 1.40 3

Passenger Lift 1 6.0 10.0 1 0.6 6.00 4.50


Passenger Lift 2 6.0 10.0 1 0.60 6.00 4.50 0.45 pf
Car Lift 1 26.0 43.3 1 1.0 43.33 32.50 P L
Car Lift 2 26.0 43.3 1 0.75 32.50 24.38 6 26 kW
Car Lift 3 26.0 43.3 1 0.6 26.00 19.50 12.8 49.4 kVA
Car Lift 4 26.0 43.3 1 0.6 26.00 19.50 28 97 MAX.A
Car Lift 5 26.0 43.3 1 0.6 26.00 19.50 0.47 0.53 pf
Car Lift 6 26.0 43.3 1 0.6 26.00 19.50 18.5 71.3 A
Car Lift 7 26.0 43.3 1 0.6 26.00 19.50 19.25 83.40 A pf 28.9 32
125.1 160
Miscellaneous Load (kVA) 10.00 10.00 250.2 400
62.5 63
Total (kVA) 789.75 728.13
Overall Diversity 0.80 0.80
Total demand for MEP Equipment (kVA) 631.80 582.50
Demand Calculation of MEP Equipment for DB Sizing

SDB-Name DB/ISO -Name

SDB-GF1 DB-GF1-COR
SDB-GF2 DB-GF2-COR
SDB-GF1 DB-GF1-COR
SDB-GF1 DB-GF1-MUB
SDB-1F2 DB-1F2-COR
SDB-2F2 DB-2F2-MSK

SDB-1F1 ISO-1F1-BM
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA
SDB-1F1 DB-1F1-MBA

SDB-2F2 DB-2F2-PAC
SDB-2F2 DB-2F2-PAC

SDB-2F1 DB-2F1-MPL1
SDB-2F1 DB-2F1-MPL1
SDB-2F1 DB-2F1-MPL2
SDB-2F1 DB-2F1-MPL2
SDB-2F1 DB-2F1-MPL3
SDB-2F1 DB-2F1-MPL3
SDB-2F1 DB-2F1-MPL4
SDB-2F1 DB-2F1-MPL4

SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
SDB-2F2 DB-2F2-KM-P
DB-UPS-2F DB-2F2-UPS-KM
DB-UPS-2F

SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P
SDB-2F1 DB-2F1-MM-P

SDB-2F1 DB-2F1-PM
DB-UPS-2F DB-2F1-UPS-PM
DB-UPS-2F DB-2F1-UPS-PM
DB-UPS-2F DB-2F1-UPS-PM
DB-UPS-2F DB-2F1-UPS-PM
DB-UPS-2F

OF SDB-GF2 DB-GF2-O&M
OF SDB-GF1 DB-GF1-TDS
OF SDB-GF1 DB-GF1-TDS
LO SDB-GF1 DB-GF1-OL
LO SDB-GF1 DB-GF1-OL
LO SDB-GF1 DB-GF1-OL
STO SDB-GF2 DB-GF2-COR

MEP SDB-GF1 DB-GF1-FCC


MEP SDB-GF1 DB-GF1-FCC
FP SDB-GF2 DB-GF2-FS

M SDB-2F1 ISO-2F1-MM
M SDB-2F2 ISO-2F2-KM
OF SDB-2F2 DB-2F2-O&C1

OF SDB-2F2 DB-2F2-TFA1

CP LSDB ISO-GF2-VF
KIT SDB-GF2 DB-GF2-KIT
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M
TO SDB-GF2 DB-GF2-O&M

MEP SDB-GF2 DB-GF2-GR

N SDB-1F2 DB-1F2-TS-1
N SDB-1F2 DB-1F2-TS-2
N SDB-1F1 DB-1F1-MBA
N SDB-1F1 DB-1F1-MSM
N SDB-1F2 DB-1F2-MBL
N SDB-1F1 DB-1F1-MBL

TO SDB-2F1 DB-2F1-COR2
TO SDB-2F1 DB-2F1-COR2
N SDB-2F1 DB-2F1-MPL1
N SDB-2F1 DB-2F1-MPL3
N SDB-2F1 DB-2F1-MPL4
N SDB-2F2 DB-2F2-MSK
N SDB-2F2 DB-2F2-PAC

N SDB-GF1 ISO-GF1-WSB

MDB MSSB-RT-BP
SMDB MSSB-1MF-RWBP
SMDB MSSB-1MF-WTP
SDB-GF1 ISO-GF1-SLP1
SDB-GF1 ISO-GF1-SLP2
SDB-GF2 ISO-GF2-SLP3

LSDB MSSB-1MF-FP
LSDB MSSB-1MF-FP

LT MSSB-2F-LIFT1
LT MSSB-2F-LIFT1
LT MSSB-2F-LIFT2
LT MSSB-2F-LIFT2
LT MSSB-2MF-LIFT3
LT MSSB-2MF-LIFT3
LT MSSB-2MF-LIFT3
LT MSSB-2MF-LIFT3
LT MSSB-2MF-LIFT4
Total MEP Equipment Load (kVA)
quipment for DB Sizing

Demand Demand
Equipment Power (kVA) Qty
Factor (kVA)

Reach Truck Charger 20.69 2 1 41.38


Reach Truck Charger 20.69 2 1 41.38
Roller Door 0.46 2 1 0.93
Roller Door 0.46 1 1 0.46
Reach Truck Charger 20.69 2 1 41.38
Reach Truck Charger 20.69 2 1 41.38

First Floor (Machine Blending Area) 0.00


Blending Machine 56.25 1 1 56.25
Blending Machine Compressor 5.00 1 1 5.00
Electric Scales - MBA 0.38 3 1 1.13
Heating Machine - 1 - MBA 1.25 2 1 2.50
Heating Machine - 2 - MBA 0.94 3 1 2.81
Flavor Machine -M 5.00 1 1 5.00
Compressor-M 5.00 1 1 5.00
Flavor Machine -K 1.88 1 1 1.88

Second Floor (Packeting-Kelanimulla)


Heating Machine - KP 0.94 3 1 2.81
Electric Scale - KP 0.38 1 1 0.38

Second Floor (Manual Packeting - Mattakkuliya)


Heating Machine-1-MP 1.25 12 1 15.00
Electric Scale-1-MP 0.38 6 1 2.25
Heating Machine-2-MP 1.25 12 1 15.00
Electric Scale-2-MP 0.38 6 1 2.25
Heating Machine-3-MP 1.25 8 1 10.00
Electric Scale-3-MP 0.38 4 1 1.50
Heating Machine-4-MP 1.25 8 1 10.00
Electric Scale-4-MP 0.38 4 1 1.50

Second Floor (Kelanimulla Machinery)


Tea Bag Machines-KM 1.67 7 1 11.67
Sollas Machine - 2 - KM 1.73 3 1 5.18
Shrinking Machine-KM 5.00 3 1 15.00
FUSO (Pyramid) Machine-KM 3.33 3 1 10.00
IMA Machine - 2-KM 6.00 6 1 36.00
Maisa Machine-KM 1.67 2 1 3.33
Conveyor motor 7.50 1 1 7.50
PC-KM 0.38 2 1 0.75
Data Rack-KM 0.50 1 1 0.50
Printer-KM 0.94 1 1 0.94
Barcode Reader-KM 0.38 1 1 0.38
Vaccum Cleaner-KM 3.00 1 1 3.00
Compressor - KM 9.38 8 1 75.00
UPS Powerd FUSO Machine-KM 3.33 1 1 3.33
UPS-KM 10.00 1 1 10.00

Second Floor (Mattakkuliya Machinery)


Tea Bag Machines-MM 1.67 6 1 10.00
Sollas Machine-MM 1.73 2 1 3.46
Shrinking Machine-MM 10.83 2 1 21.67
Strapping Machine-MM 1.61 2 1 3.22
Conveyor motor 7.50 1 1 7.50
Vaccum Cleaner-MM 2.00 1 1 2.00
Compressor-MM 9.38 2 1 18.75

Second Floor (Perfecta Machine Room)


Shrinking Machine-MM 10.83 1 1 10.83
Outside Convey-PM 8.13 1 1 8.13
Vacuum Cleaner (3ph)-PM 3.19 1 1 3.19
Domino Printer 5.00 1 1 5.00
Perfacta Machine 12.50 1 1 12.50
UPS-PM 36.00 1 1 36.00

Ground Floor (AC)


Doctor's Room 1.56 1 0.8 1.24
Temporary Dispatch Store & Office 1 1.56 1 0.8 1.24
Temporary Dispatch Store & Office 2 2.26 1 0.8 1.80
Reception 3.43 1 0.8 2.75
Office Lounge 3.43 1 0.8 2.75
Smoke free lobby 1.18 1 0.8 0.94
Store's executive room 1.59 1 0.8 1.27

Mezzanine Floor 1 (AC)


Panel Room 2.54 1 0.8 2.04
Fire Commanding Center 2.03 1 0.8 1.63
Flavour Store 2.86 4 0.8 9.14

Second Floor (AC)


Mattakkuliya Machinery 65.11 1 0.8 52.09
Kelanimulla Machinery 32.56 1 0.8 26.04
Office 1.90 1 0.8 1.52

Mezzanine Floor 2 (AC)


Office 1.90 1 0.8 1.52

Ventilation Fans - Ground Floor


Car Park 4.13 1 0.7 2.89
Kitchen 9.38 1 0.6 5.63
Lockers Room 1 0.23 1 0.7 0.16
Female wash room 1 0.23 1 0.7 0.16
Female wash room 2 0.51 1 0.7 0.36
Male wash room 1 0.51 1 0.7 0.36
Male wash room 2 0.15 1 0.7 0.11
Lockers Room 2 0.13 1 0.7 0.09
Lockers Room 3 0.51 1 0.7 0.36

Generator room 0.50 1 0.6 0.30

Ventilation Fans - First Floor


Tea Store 1 4.13 1 0.7 2.89
Tea Store 2 4.13 1 0.7 2.89
Machine Blending Area 1.51 1 0.7 1.06
Material Store - Mattakkuliya 1.04 2 0.7 1.45
Manual Blending Line- 3 & 4 1.51 1 0.7 1.06
Manual Blending Line- 1 3.03 1 0.7 2.12

Ventilation Fans - Second Floor


Toilet 1 0.13 2 0.7 0.18
Toilet 2 0.11 2 0.7 0.16
Manual packeting line 1 2.06 1 0.7 1.44
Manual packeting line 3 2.06 1 0.7 1.44
Manual packeting line 4 2.06 1 0.7 1.44
Material Store - Kelanimulla 2.06 1 0.7 1.44
Packeting - Kelanimulla 1.51 1 0.7 1.06

Wet scrubber 6.25 1 0.8 5.00

Booster Pump 0.94 1 1 0.94


Rain Water Booster Pump 0.94 1 1 0.94
Water Transfer Pump 3.75 1 1 3.75
Sewer Lifting Pump (set 1) 1.50 1 1 1.50
Sewer Lifting Pump (set 2) 1.50 1 1 1.50
Sewer Lifting Pump (set 3) 2.75 1 1 2.75

Fire Jockey Pump 1.75 1 0.2 0.35


Fire Pillar Hydrant Pump 47.50 1 1 47.50

Passenger Lift 1 10.0 1 1.0 10.00


Passenger Lift 2 10.0 1 1.0 10.00
Car Lift 1 43.3 1 1.0 43.33
Car Lift 2 43.3 1 1.0 43.33
Car Lift 3 43.3 1 1.0 43.33
Car Lift 4 43.3 1 1.0 43.33
Car Lift 5 43.3 1 1.0 43.33
Car Lift 6 43.3 1 1.0 43.33
Car Lift 7 43.3 1 1.0 43.33
Miscellaneous Load (kVA) 10.00

1164.51
Operating
kWh per
Hours per
month
day

4 3,177.6 PF 0.8
4 3,177.6 DIVERSITY 0.8
2 35.5
2 17.8
4 3,177.6
4 3,177.6

0 0.0
4 384.0
10 216.0
10 480.0
10 540.0
18 1,728.0
4 384.0
18 648.0

10 540.0
4 28.8

10 2,880.0
4 172.8
10 2,880.0
4 172.8
10 1,920.0
4 115.2
10 1,920.0
4 115.2

18 4,032.0
24 2,384.6
18 5,184.0
2 384.0
2 1,382.4
10 640.0
12 1,728.0
12 172.8
12 115.2
4 72.0
1 7.2
12 691.2
12 17,280.0
12 768.0
0 0.0

12 2,304.0
12 797.2
4 1,664.0
18 1,112.8
10 1,440.0
10 384.0
1 360.0

12 2,496.0
18 2,808.0
1 61.2
4 384.0
18 4,320.0
0 0.0
VENTI. FAN/AC DIVERSITY 0.8

10 238.9 KIT Kitchen 9


10 238.9 TO Toilet 4
10 346.5 LO Lobby/ Waiting 10
10 527.4 CO Corridor/Passage 10
10 527.4 MEP MEP 2
10 180.9 OF Office 10
4 97.6 BOH BOH/General Storage 2
STO Store 4
GAR Garbage collection 2
2 78.2 OT Outdoor 10
2 62.5 CP Car park 12
24 4,210.7 SA Service Area 12
SR Security Room 12
UB Unloading Bay 10
18 18,001.9 FP Flavour store/ Pump rm 24
18 9,001.0 M 18
10 291.8 N 12
LT Lift 5

10 291.8

12 665.3
9 972.0
4 12.1
4 12.1
4 27.6
4 27.6
4 8.1
4 6.7
4 27.6

2 11.5

12 665.3
12 665.3
12 243.9
12 334.7
12 243.9
12 487.9

4 13.4
4 12.1
12 332.6
12 332.6
12 332.6
12 332.6
12 243.9

12 1,152.0

4 72.0
4 72.0
4 288.0
2 57.6
2 57.6
2 105.6

0 0.0
0 0.0

5 960.0
5 960.0
5 4,160.0
5 4,160.0
5 4,160.0
5 4,160.0
5 4,160.0
5 4,160.0
5 4,160.0
0.0
3 576.0
154,388.8 kWh
Calculation for the DB Sizing
Load with 15% Simultaneous Demand Electric System
Level DB-Name Load (kVA) Spare (kVA) Factor (kVA) Ib (A) In (A) (Ph/V/Hz) Ib (A) < In (A) 5 < kVA
T/F 800 1154.7 1200 3/400/50 1
ATS 800 1154.7 1200
MDB (summary) 825.32 1191.3 1200 3/400/50 1
MDB 983.88 1131.46 0.7 792.02 1143.2 1200 3/400/50 1
MDB SMDB 537.33 617.93 0.7 432.55 624.4 630 3/400/50 1
GEN-1 200 288.7 400 3/400/50 1
GEN-2 200 288.7 400 3/400/50 1
GEN-3 200 288.7 400 3/400/50 1
GEN-4 110 158.8 250 3/400/50 1
GEN-5 10 14.4 32 3/400/50 1 SDB SMDB MDB
GDB 710 1024.83 1200 3/400/50 1 SDB Load (kVA) D. F Demand Load (kVA) D. F Demand Load (kVA) D. F Demand
APFCR 250 541 630 3/400/50 1 SDB-GF2 131.42 0.6 78.85 638.08 0.7 446.65 1047.37 0.7 733.16
Ground Floor + Mezzanine SDB-1F2 76.46 0.8 61.17
MDB SDB-GF1 92.51 106.39 0.6 63.83 92.1 100 3/400/50 1 1 SDB-2F2 347.86 0.7 243.50
DB-GF1-OL 11.38 13.09 1 13.09 18.9 32 3/400/50 1 1 MSSB-1MF-RWBP 1.08 1 1.08
DB-GF1-MUB 1.11 1.28 1 1.28 5.6 32 1/230/50 1 0 MSSB-1MF-WTP 4.31 1 4.31
DB-GF1-OD 3.63 4.17 1 4.17 6.0 32 3/400/50 1 0 OD MSSB-2MF-LIFT3 199.33 1 199.33
DB-GF1-COR 45.33 52.13 1 52.13 75.2 100 3/400/50 1 1 MSSB-2MF-LIFT4 49.83 1 49.83
DB-GF1-TDS 6.39 7.35 1 7.35 10.6 32 3/400/50 1 1 SDB-GF1 106.39 0.6 63.83
DB-GF1-FCC 4.88 5.61 1 5.61 8.1 32 3/400/50 1 1 SDB-1F1 126.86 0.8 101.49
DB-GF1-TR 0.03 0.04 1 0.04 0.2 32 1/230/50 1 0 SDB-2F1 272.79 0.6 163.67
DB-GF1-SH 0.29 0.34 1 0.34 0.5 32 3/400/50 1 0 SH MSSB-2F-LIFT1 23.00 1 23.00
ISO-GF1-SLP1 1.50 1.73 0.8 1.38 2.0 16 3/400/50 1 0 ISO MSSB-2F-LIFT2 99.67 1 99.67
ISO-GF1-SLP2 1.50 1.73 0.8 1.38 2.0 16 3/400/50 1 0 ISO MSSB-RT-BP 1.08 1 1.08
ISO-GF1-WSB 5.00 5.75 1 5.75 8.3 16 3/400/50 1 1 DB-UPS-2F 89.87 0.9 80.88
81.05 92.51 LSDB 67.10 1 67.10

SMDB SDB-GF2 114.28 131.42 0.6 78.85 113.8 160 3/400/50 1 1


DB-GF2-O&M 4.78 5.49 1 5.49 7.9 32 3/400/50 1 1
DB-GF2-COR 48.86 56.19 1 56.19 81.1 100 3/400/50 1 1
DB-GF2-CAN 2.16 2.49 1 2.49 3.6 32 3/400/50 1 0 CAN
DB-GF2-OD1 1.19 1.37 1 1.37 2.0 32 3/400/50 1 0 OD
DB-GF2-DRR 0.69 0.79 1 0.79 3.4 32 1/230/50 1 0
DB-GF2-LO1 4.50 5.17 1 5.17 7.5 32 3/400/50 1 1
DB-GF2-LO2 4.67 5.37 1 5.37 7.8 32 3/400/50 1 1
DB-GF2-KIT 18.99 21.84 1 21.84 31.5 40 3/400/50 1 1
DB-GF2-GR 0.87 0.99 1 0.99 4.3 32 1/230/50 1 0
DB-GF2-FS 10.46 12.03 1 12.03 17.4 32 3/400/50 1 1
ISO-GF2-SLP3 2.75 3.16 0.8 2.53 3.7 16 3/400/50 1 0 ISO
99.92 114.28

SMDB MSSB-1MF-WTP 3.75 4.31 0.8 3.45 5.0 16 3/400/50 1 0.00 MSSB
SMDB MSSB-1MF-RWBP 0.94 1.08 0.8 0.86 1.2 16 3/400/50 1 0 MSSB

MDB LSDB 58.35 67.10 1 67.10 96.9 100 3/400/50 1 1 LSDB


ISO-GF2-VF 2.89 3.32 1 3.32 4.8 16 3/400/50 1 0 VF
MSSB-1MF-FP 47.85 55.03 1 55.03 79.4 100 3/400/50 1 1 MSSB
50.74 58.35
First Floor Locked rotor current of fire pump
MDB SDB-1F1 110.31 126.86 0.8 101.49 146.5 160 3/400/50 1 1 Jockey pump current
DB-1F1-MSM 3.35 3.85 1 3.85 5.6 32 3/400/50 1 0 VF
DB-1F1-MBA 28.25 32.49 1 32.49 46.9 63 3/400/50 1 1
DB-1F1-MBL 6.63 7.62 1 7.62 11.0 32 3/400/50 1 1
DB-1F1-COR 1.45 1.67 1 1.67 7.2 32 1/230/50 1 0
ISO-1F1-BM 56.25 64.69 1 64.69 93.4 100 3/400/50 1 1
95.92 110.31

SMDB SDB-1F2 66.49 76.46 0.8 61.17 88.3 100 3/400/50 1 1


DB-1F2-MBL 4.60 5.29 1 5.29 7.6 32 3/400/50 1 1
DB-1F2-COR 42.15 48.47 1 48.47 70.0 100 3/400/50 1 1
DB-1F2-TS-1 6.04 6.94 1 6.94 10.0 32 3/400/50 1 1
DB-1F2-TS-2 5.02 5.78 1 5.78 8.3 32 3/400/50 1 1
66.49
Second Floor + Mezzanine
MDB SDB-2F1 237.21 272.79 0.6 163.67 236.2 250 3/400/50 1 1
DB-2F1-MPL1 21.22 24.40 1 24.40 35.2 40 3/400/50 1 1
DB-2F1-MPL2 18.72 21.53 1 21.53 31.1 32 3/400/50 1 1
DB-2F1-MPL3 14.53 16.71 1 16.71 24.1 32 3/400/50 1 1
DB-2F1-MPL4 14.01 16.12 1 16.12 23.3 32 3/400/50 1 1
DB-2F1-MM-L 1.89 2.17 1 2.17 9.4 32 1/230/50 1 0
DB-2F1-MM-P 67.67 77.82 1 77.82 112.3 160 3/400/50 1 1
DB-2F1-COR1 1.21 1.39 1 1.39 6.0 32 1/230/50 1 0
DB-2F1-COR2 1.75 2.01 1 2.01 2.9 32 3/400/50 1 0 VF
DB-2F1-PM 13.18 15.16 1 15.16 21.9 32 3/400/50 1 1
ISO-2F1-MM 52.09 59.90 1 59.90 86.5 100 3/400/50 1 1
237.21

MDB DB-UPS-2F 78.15 89.87 0.9 80.88 116.7 160 3/400/50 1 1


DB-UPS-2F DB-2F2-UPS-KM 3.33 3.83 1 3.83 5.5 32 3/400/50 1 0 UPS
DB-UPS-2F DB-2F1-UPS-PM 28.81 33.13 1 33.13 47.8 63 3/400/50 1 1 UPS
32.15 36.97

SMDB SDB-2F2 302.48 347.86 0.7 243.50 351.5 400 3/400/50 1 1


DB-2F2-KM-L 2.55 2.93 1 2.93 12.7 32 1/230/50 1 0
DB-2F2-KM-P 169.53 194.96 1 194.96 281.4 400 3/400/50 1 1
DB-2F2-MSK 44.25 50.89 1 50.89 73.5 100 3/400/50 1 1
DB-2F2-PAC 6.64 7.63 1 7.63 11.0 32 3/400/50 1 1
DB-2F2-TFA1 6.00 6.90 1 6.90 10.0 32 3/400/50 1 1
DB-2F2-TFA2 4.36 5.01 1 5.01 7.2 32 3/400/50 1 1
DB-2F2-O&C1 3.66 4.21 1 4.21 6.1 32 3/400/50 1 0?
ISO-2F2-KM 26.04 29.95 1 29.95 43.2 63 3/400/50 1 1
302.48

MDB MSSB-2F-LIFT1 20.00 23.00 0.6 13.80 19.9 63 3/400/50 1 1


MDB MSSB-2F-LIFT2 86.67 99.67 0.6 59.80 86.3 250 3/400/50 1 1
SMDB MSSB-2MF-LIFT3 173.33 199.33 0.6 119.60 172.6 400 3/400/50 1 1
SMDB MSSB-2MF-LIFT4 43.33 49.83 0.6 29.90 43.2 100 3/400/50 1 1

MDB MSSB-RT-BP 0.94 1.08 0.8 0.75 1.1 16 3/400/50 1 0 MSSB


Length It (for one Rating Grouping I (for one Total Z (total) Voltage V Drop V Drop Total V Drop
From To (m) Ib (A) In (A) Cable size run) (A) Factor Ca Factor Cg z run) Runs Current Z (mV/m.A) Z (mΩ) (mΩ) Isc (kA) Drop (V) V. Drop % SUM % Permisable current<In Permisable< Remarks
(30°C) or Cc (A) % SUM

E16 GEN-1 GDB 15 288.68 400 4Cx185 Sqmm Cu/XLPE/PVC without earth 456 1 1.00 456.00 1 456.00 0.26 1.13 0.28 0.28 1 0 1 Multcore, Cable Ladder System. One dia space.
E16 GEN-2 GDB 15 288.68 400 4Cx185 Sqmm Cu/XLPE/PVC without earth 456 1 1.00 456.00 1 456.00 0.26 1.13 0.28 0.28 1 0 1 Multcore, Cable Ladder System. One dia space.
E16 GEN-3 GDB 15 288.68 400 4Cx185 Sqmm Cu/XLPE/PVC without earth 456 1 1.00 456.00 1 456.00 0.26 1.13 0.28 0.28 1 0 1 Multcore, Cable Ladder System. One dia space.
E17 GEN-5 DB-GF2-FS 35 14.43 32 4Cx10 Sqmm Cu/PVC/PVC without earth 60 1 1.00 60.00 1 60.00 3.8 1.92 0.48 0.48 3 0 1 Multcore, Cable Ladder System. One dia space.

E1 GDB MDB 50 1024.83 1200 4Cx4x240 Sqmm AL/XLPE/PVC without earth 409 1 0.75 306.75 4 1227.00 0.31 3.97 0.99 1.27 2 0 1 Multcore, Cable Ladder System. One dia space.
F1 GDB LSDB 50 96.85 100 4Cx25 Sqmm Cu/FR 127 1 1.00 127.00 1 127.00 1.65 7.99 2.00 2.00 4 0 1
E0 TF MDB 110 1143.22 1200 4Cx6x240 Sqmm AL/XLPE/SWA without earth 418 1 0.53 221.54 6 1329.24 0.31 5.68 15.68 14.73 6.50 1.62 1.62 2 0 1 Multcore, Cable Tray System, In trench

TF ATS 15 1154.73 1200 4Cx4x240 Sqmm Cu/XLPE/SWA without earth 546 1 0.63 343.98 4 1375.92 0.21 0.91 0.23 0.23 1 0 1
GDB ATS 20 1024.83 1200 4Cx4x240 Sqmm Cu/XLPE/PVC without earth 538 1 1.00 538.00 4 2152.00 0.31 1.59 0.40 0.40 1 0 1
ATS MDB 65 1143.22 1200 3Cx4x240 Sqmm Cu/XLPE/PVC without earth 538 1 1.00 538.00 3 1614.00 0.31 7.68 1.92 2.32 2 0 0

F0 LSDB MSSB-1MF-FP 110 79.43 100 4Cx35 Sqmm Cu/FR 158 1 1.00 158.00 1 158.00 1.15 126.50 142.18 1.62 10.05 2.51 4.14 4 1 0 Multcore, Cable Ladder System. One dia space.
F2 LSDB ISO-GF2-VF 145 4.79 16 4Cx4 Sqmm Cu/FR 34 1 1.00 34.00 1 34.00 9.5 1377.50 1393.18 0.17 6.60 1.65 3.27 4 1 1 Multcore, Cable Ladder System. One dia space.

E4 MDB SMDB 70 624.35 630 4Cx3x240 Sqmm Cu/XLPE/PVC 538 1 1.00 538.00 3 1614.00 0.21 4.90 20.58 11.22 3.06 0.76 2.39 2.7 0 1 Multcore, Cable Ladder System. One dia space.
E6 MDB APFCR 10 541.28 630 4Cx2x120 Sqmm Cu/XLPE/PVC 346 1 1.00 346.00 2 692.00 0.37 1.85 17.53 13.17 1.00 0.25 1.87 3 0 1 Multcore, Cable Tray System. One dia space.
E8 MDB SDB-GF1 5 92.14 100 4Cx50 Sqmm Cu/XLPE/PVC 192 1 1.00 192.00 1 192.00 0.87 4.35 20.03 11.53 0.40 0.10 1.72 3 0 1 Multcore, Cable Ladder System. One dia space.
E8 MDB SDB-1F1 15 146.49 160 4Cx50 Sqmm Cu/XLPE/PVC 192 1 1.00 192.00 1 192.00 0.87 13.05 28.73 8.04 1.91 0.48 2.10 3 0 1 Multcore, Cable Ladder System. One dia space.
E5 MDB SDB-2F1 20 236.25 250 4Cx185 Sqmm Cu/XLPE/PVC 456 1 1.00 456.00 1 456.00 0.26 5.20 20.88 11.06 1.23 0.31 1.93 3 0 1 Multcore, Cable Ladder System. One dia space.
E13 MDB MSSB-2F-LIFT1 60 19.92 63 4Cx6 Sqmm Cu/PVC/PVC 43 1 1.00 43.00 1 43.00 6.4 384.00 399.68 0.58 7.65 1.91 3.54 4 0 1 Multcore, Cable Ladder System. One dia space.
E11 MDB MSSB-2F-LIFT2 40 86.32 250 4Cx16 Sqmm Cu/XLPE/PVC 100 1 1.00 100.00 1 100.00 2.5 100.00 115.68 2.00 8.63 2.16 3.78 4 0 1 Multcore, Cable Ladder System. One dia space.
E13 MDB MSSB-RT-BP 90 1.08 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 1.00 43.00 1 43.00 6.4 576.00 591.68 0.39 0.62 0.16 1.78 4 1 1 Multcore, Cable Ladder System. One dia space.
E10 MDB DB-UPS-2F 65 116.75 160 4Cx25 Sqmm Cu/XLPE/PVC 127 1 1.00 127.00 1 127.00 1.65 107.25 122.93 1.88 12.52 3.13 4.75 4 0 0 Multcore, Cable Ladder System. One dia space.

E8 SMDB SDB-GF2 40 113.81 160 4Cx50 Sqmm Cu/XLPE/PVC 192 1 1.00 192.00 1 192.00 0.87 34.80 55.38 4.17 3.96 0.99 3.38 3 0 0 Multcore, Cable Ladder System. One dia space.
E10 SMDB SDB-1F2 5 88.29 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 1.00 127.00 1 127.00 1.65 8.25 28.83 8.01 0.73 0.18 2.57 3 0 1 Multcore, Cable Ladder System. One dia space.
E7 SMDB SDB-2F2 40 351.47 400 4Cx120 Sqmm Cu/XLPE/PVC 346 1 1.00 346.00 1 346.00 0.37 14.80 35.38 6.53 5.20 1.30 3.69 3 0 0 Multcore, Cable Ladder System. One dia space.
E13 SMDB MSSB-1MF-WTP 60 4.98 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 384.00 404.58 0.57 1.91 0.48 2.87 3 1 1 Multcore, Cable Tray System. One dia space.
E13 SMDB MSSB-1MF-RWBP 60 1.24 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 1.00 43.00 1 43.00 6.4 384.00 404.58 0.57 0.48 0.12 2.51 3 1 1 Multcore, Cable Ladder System. One dia space.
E10 SMDB MSSB-2MF-LIFT3 40 172.63 400 4Cx25 Sqmm Cu/XLPE/PVC 127 1 1.00 127.00 1 127.00 1.65 66.00 86.58 2.67 11.39 2.85 5.24 4 0 0 Multcore, Cable Ladder System. One dia space.
E11 SMDB MSSB-2MF-LIFT4 110 43.16 100 4Cx16 Sqmm Cu/XLPE/PVC 100 1 1.00 100.00 1 100.00 2.5 275.00 295.58 0.78 11.87 2.97 5.36 4 0 0 Multcore, Cable Ladder System. One dia space.

E13 SDB-GF1 DB-GF1-OL 70 18.90 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 448.00 468.03 0.49 8.46 2.12 3.84 4 1 1 Multcore, Cable Tray System. One dia space.
E13 SDB-GF1 DB-GF1-OD 50 6.02 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 320.00 321.72 0.72 1.93 0.48 2.21 4 1 1
E10 SDB-GF1 DB-GF1-COR 25 75.25 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 41.25 42.97 5.37 3.10 0.78 2.50 4 1 1
E13 SDB-GF1 DB-GF1-TDS 15 10.61 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 96.00 97.72 2.36 1.02 0.25 1.98 4 1 1
Ground

E2 SDB-GF1 DB-GF1-SH 120 0.49 32 4Cx6 Sqmm Cu/PVC/SWA 43 1 0.91 39.13 1 39.13 6.4 768.00 769.72 0.30 0.37 0.16 1.89 4 1 1
E3 SDB-GF1 DB-GF1-TR 120 0.17 32 2Cx6 Sqmm Cu/PVC/SWA 51 1 0.91 46.41 1 46.41 7.3 876.00 877.72 0.15 0.15 0.06 1.79 4 1 1
E15 SDB-GF1 DB-GF1-MUB 110 5.57 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.91 46.41 1 46.41 7.3 803.00 804.72 0.17 4.47 1.94 3.67 4 1 1
E13 SDB-GF1 ISO-GF1-SLP1 120 1.99 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 768.00 769.72 0.30 1.53 0.67 2.39 4 1 1
E13 SDB-GF1 ISO-GF1-SLP2 35 1.99 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 224.00 225.72 1.02 0.45 0.19 1.92 4 1 1
E11 SDB-GF1 ISO-GF1-WSB 35 8.30 16 4Cx16 Sqmm Cu/XLPE/PVC 80 1 0.91 72.80 1 72.80 2.4 84.00 85.72 2.69 0.70 0.30 2.03 4 1 1

E13 SDB-GF2 DB-GF2-O&M 20 7.93 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 128.00 183.38 1.26 1.02 0.25 3.63 4 1 1 Multcore, Cable Tray System. One dia space.
E10 SDB-GF2 DB-GF2-COR 10 81.11 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 16.50 71.88 3.21 1.34 0.33 3.71 4 1 1 (Table 4C4, Installation Method 31)
E13 SDB-GF2 DB-GF2-CAN 55 3.59 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 352.00 407.38 0.57 1.26 0.32 3.70 4 1 1
Ground

E13 SDB-GF2 DB-GF2-OD1 25 1.98 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 160.00 215.38 1.07 0.32 0.14 3.52 4 1 1
E15 SDB-GF2 DB-GF2-DRR 35 3.44 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.91 46.41 1 46.41 7.3 255.50 310.88 0.43 0.88 0.38 3.76 4 1 1
E11 SDB-GF2 DB-GF2-KIT 50 31.52 40 4Cx16 Sqmm Cu/XLPE/PVC 80 1 0.91 72.80 1 72.80 2.4 120.00 175.38 1.32 3.78 0.95 4.32 4 1 0
E13 SDB-GF2 ISO-GF2-SLP3 70 3.65 16 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 448.00 503.38 0.46 1.64 0.41 3.79 4.2 1 1

E13 SDB-GF1 DB-GF1-FCC 15 8.09 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 96.00 116.03 1.99 0.78 0.34 2.06 4 1 1
1 Mezzanine

E13 SDB-GF2 DB-GF2-LO1 45 7.47 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 288.00 308.03 0.75 2.15 0.54 3.92 4 1 1
E13 SDB-GF2 DB-GF2-LO2 75 7.76 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 480.00 500.03 0.46 3.72 0.93 4.31 4 1 0
E15 SDB-GF2 DB-GF2-GR 65 4.33 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.91 46.41 1 46.41 7.3 474.50 494.53 0.27 2.05 0.89 4.27 4 1 0
E13 SDB-GF2 DB-GF2-FS 25 17.37 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 160.00 180.03 1.28 2.78 0.69 4.07 4 1 0

E13 SDB-1F1 DB-1F1-MSM 25 5.55 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.98 42.14 1 42.14 6.4 160.00 188.73 1.22 0.89 0.22 2.32 4 1 1 Multcore, Cable Tray System. One dia space.
E11 SDB-1F1 DB-1F1-MBA 25 46.89 63 4Cx16 Sqmm Cu/XLPE/PVC 80 1 1.00 80.00 1 80.00 2.4 60.00 88.73 2.60 2.81 0.70 2.81 4 1 1 (Table 4C4, Installation Method 31)
1 Floor

E13 SDB-1F1 DB-1F1-MBL 40 11.00 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.98 42.14 1 42.14 6.4 256.00 284.73 0.81 2.82 0.70 2.81 4 1 1
E15 SDB-1F1 DB-1F1-COR 30 7.24 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.98 49.98 1 49.98 7.3 219.00 247.73 0.54 1.59 0.69 2.79 4 1 1
E10 SDB-1F1 ISO-1F1-BM 50 93.37 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 1.00 127.00 1 127.00 1.65 82.50 111.23 2.08 7.70 1.93 4.03 4 1 0

E13 SDB-1F2 DB-1F2-MBL 45 7.64 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 288.00 316.83 0.73 2.20 0.55 3.12 4 1 1
1 Floor

E10 SDB-1F2 DB-1F2-COR 30 69.97 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 49.50 78.33 2.95 3.46 1.51 4.08 4 1 0
E13 SDB-1F2 DB-1F2-TS-1 50 10.02 32 4Cx6 Sqmm Cu/PVC/PVC 42 1 0.91 38.22 1 38.22 6.4 320.00 348.83 0.66 3.21 1.39 3.97 4 1 1
E13 SDB-1F2 DB-1F2-TS-2 20 8.34 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 128.00 156.83 1.47 1.07 0.27 2.84 4 1 1

E12 SDB-2F1 DB-2F1-MPL1 35 35.22 40 4Cx10 Sqmm Cu/PVC/PVC 60 1 0.91 54.60 1 54.60 3.8 133.00 153.88 1.50 4.68 1.17 3.10 4 1 1 Multcore, Cable Tray System. One dia space.
E12 SDB-2F1 DB-2F1-MPL2 30 31.08 32 4Cx10 Sqmm Cu/PVC/PVC 60 1 0.91 54.60 1 54.60 3.8 114.00 134.88 1.71 3.54 0.89 2.82 4 1 1 (Table 4C4, Installation Method 31)
E13 SDB-2F1 DB-2F1-MPL3 50 24.11 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 320.00 340.88 0.68 7.72 1.93 3.86 4 1 1
E13 SDB-2F1 DB-2F1-MPL4 25 23.26 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 160.00 180.88 1.28 3.72 0.93 2.86 4 1 1
E15 SDB-2F1 DB-2F1-MM-L 40 9.44 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.91 46.41 1 46.41 7.3 292.00 312.88 0.42 2.76 1.20 3.13 4 1 1
2 Floor

E10 SDB-2F1 DB-2F1-MM-P 40 112.32 160 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 66.00 86.88 2.66 7.41 1.85 3.78 4 0 1
E15 SDB-2F1 DB-2F1-COR1 30 6.04 32 2Cx6 Sqmm Cu/PVC/PVC 51 1 0.91 46.41 1 46.41 7.3 219.00 239.88 0.55 1.32 0.58 2.51 4 1 1
E13 SDB-2F1 DB-2F1-COR2 50 2.90 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 320.00 340.88 0.68 0.93 0.23 2.16 4 1 1
E13 SDB-2F1 DB-2F1-PM 50 21.88 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 320.00 340.88 0.68 7.00 1.75 3.68 4 1 1
E10 SDB-2F1 ISO-2F1-MM 45 86.46 100 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 74.25 95.13 2.43 6.42 1.60 3.54 4 1 1
E11 DB-UPS-2F DB-2F1-UPS-PM 45 47.83 63 4Cx16 Sqmm Cu/XLPE/PVC 80 1 0.91 72.80 1 72.80 2.4 108.00 128.88 1.79 5.17 1.29 3.22 4 1 1

E14 SDB-2F2 DB-2F2-KM-L 40 12.74 32 2Cx10 Sqmm Cu/PVC/PVC 70 1 0.91 63.70 1 63.70 4.4 176.00 211.38 0.63 2.24 0.98 4.66 4 1 0 Multcore, Cable Tray System. One dia space.
E8 SDB-2F2 DB-2F2-KM-P 40 281.40 400 4Cx50 Sqmm Cu/XLPE/PVC 192 1 0.91 174.72 1 174.72 0.87 34.80 70.18 3.29 9.79 2.45 6.14 4 0 0 (Table 4C4, Installation Method 31)
E9 SDB-2F2 DB-2F2-MSK 45 73.46 100 4Cx35 Sqmm Cu/XLPE/PVC 158 1 0.91 143.78 1 143.78 1.15 51.75 87.13 2.65 3.80 0.95 4.64 4 1 0
2 Floor

E13 SDB-2F2 DB-2F2-PAC 35 11.02 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 224.00 259.38 0.89 2.47 0.62 4.31 4 1 0
E13 SDB-2F2 DB-2F2-O&C1 10 6.08 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 64.00 99.38 2.32 0.39 0.17 3.86 4 1 1
E10 SDB-2F2 ISO-2F2-KM 45 43.23 63 4Cx25 Sqmm Cu/XLPE/PVC 127 1 0.91 115.57 1 115.57 1.65 74.25 109.63 2.11 3.21 1.40 5.09 4.3 1 0
E13 DB-UPS-2F DB-2F2-UPS-KM 40 5.53 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.91 39.13 1 39.13 6.4 256.00 291.38 0.79 1.42 0.35 4.04 4 1 0
2 Mezzanine

E13 SDB-2F2 DB-2F2-TFA1 45 9.96 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.95 40.85 1 40.85 6.4 288.00 323.38 0.71 2.87 1.25 4.94 4.15 1 0 Multcore, Cable Tray System. One dia space.
E13 SDB-2F2 DB-2F2-TFA2 50 7.23 32 4Cx6 Sqmm Cu/PVC/PVC 43 1 0.95 40.85 1 40.85 6.4 320.00 355.38 0.65 2.31 1.01 4.70 4 1 0
Cable size (4C-sqmm) Runes Cable

4Cx6x240 Sqmm Al/XLPE/SWA without earth 4 E0


4Cx4x240 Sqmm Al/XLPE/PVC without earth 4 E1
4Cx6 Sqmm Cu/PVC/SWA 1 E2
2Cx6 Sqmm Cu/PVC/SWA 1 E3
4Cx3x240 Sqmm Cu/XLPE/PVC 3 E4
4Cx185 Sqmm Cu/XLPE/PVC 1 E5
4Cx2x120 Sqmm Cu/XLPE/PVC 2 E6
4Cx120 Sqmm Cu/XLPE/PVC 1 E7
4Cx50 Sqmm Cu/XLPE/PVC 1 E8
4Cx35 Sqmm Cu/XLPE/PVC 1 E9
4Cx25 Sqmm Cu/XLPE/PVC 1 E10
4Cx16 Sqmm Cu/XLPE/PVC 1 E11
4Cx10 Sqmm Cu/PVC/PVC 1 E12
4Cx6 Sqmm Cu/PVC/PVC 1 E13
2Cx10 Sqmm Cu/PVC/PVC 1 E14
2Cx6 Sqmm Cu/PVC/PVC 1 E15
4Cx185 Sqmm Cu/XLPE/PVC without earth 1 E16
4Cx10 Sqmm Cu/PVC/PVC without earth 1 E17
1 E18

4Cx35 Sqmm Cu/FR 1 F0


4Cx25 Sqmm Cu/FR 1 F1
4Cx4 Sqmm Cu/FR 1 F2
Cable Tray and Cable Ladder Calculation

Cable Tray / Total


From To Cables Number of
Ladder Route
Cables

2MF Duct 2 MSSB-LIFT-3 Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1


4Cx16 Sqmm Cu/PVC/PVC 1
4Cx10 Sqmm Cu/PVC/PVC 2
4Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F2-O&C2 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F2-TFA1 Cable Tray 4Cx10 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F2-TFA2 Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1


4Cx10 Sqmm Cu/PVC/PVC 1

2nd Junction DB-2F2-RT Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1

2F Duct 2 Cable Ladder 4Cx25 Sqmm Cu/XLPE/PVC 1


4Cx16 Sqmm Cu/PVC/PVC 1
4Cx10 Sqmm Cu/PVC/PVC 2
4Cx6 Sqmm Cu/PVC/PVC 1

2F2 Duct 2 SDB-2F2 Cable Tray 4Cx240 Sqmm Cu/XLPE/PVC 1

SDB-2F2 1st Junction Cable Tray 4Cx50 Sqmm Cu/XLPE/PVC 1


4Cx35 Sqmm Cu/XLPE/PVC 1
4Cx10 Sqmm Cu/PVC/PVC 1
4Cx6 Sqmm Cu/PVC/PVC 2
2Cx10 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F2-PAC Cable Tray 4Cx35 Sqmm Cu/XLPE/PVC 1


4Cx6 Sqmm Cu/PVC/PVC 1

DB-2F2-PAC DB-2F2-MSK Cable Tray 4Cx35 Sqmm Cu/XLPE/PVC 1

1st Junction DB-2F2-KM-P Cable Tray 4Cx50 Sqmm Cu/XLPE/PVC 1


4Cx10 Sqmm Cu/PVC/PVC 1
4Cx6 Sqmm Cu/PVC/PVC 1
2Cx10 Sqmm Cu/PVC/PVC 1
1F Duct 2 Cable Ladder 4Cx240 Sqmm Cu/XLPE/PVC 1

2F1 Duct 1 SDB-2F1 Cable Tray 4Cx185 Sqmm Cu/XLPE/PVC 1

SDB-2F1 1st Junction Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1


2Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F1-MPL4 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F1-COR1 Cable Tray 2Cx6 Sqmm Cu/PVC/PVC 1

SDB-2F1 1st Junction Cable Tray 4Cx50 Sqmm Cu/XLPE/PVC 1


4Cx16 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F1-MPL1 Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1

1st Junction DB-2F1-MM-P Cable Tray 4Cx50 Sqmm Cu/XLPE/PVC 1


2Cx6 Sqmm Cu/PVC/PVC 1

SDB-2F1 2nd Junction Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1


4Cx10 Sqmm Cu/PVC/PVC 2
4Cx6 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 1

2nd Junction MSSB-LIFT-1 Cable Tray 4Cx10 Sqmm Cu/PVC/PVC 1

2nd Junction DB-2F1-MPL2 Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1


4Cx10 Sqmm Cu/PVC/PVC 1
4Cx6 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 1

DB-2F1-MPL2 3rd Junction Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1


4Cx6 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 1

3rd Junction DB-2F1-UPS-PM Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1

3rd Junction 4th Junction Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1


2Cx6 Sqmm Cu/PVC/PVC 1

4th Junction DB-2F1-MPL3 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1


4th Junction DB-2F1-COR2 Cable Tray 2Cx6 Sqmm Cu/PVC/PVC 1

1F Duct 1 Cable Ladder 4Cx185 Sqmm Cu/XLPE/PVC 1

1F2 Duct 2 DB-1F2-TS-2 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

SDB-1F2 1st Junction Cable Tray 4Cx3x240 Sqmm Cu/XLPE/PVC 3


4Cx25 Sqmm Cu/XLPE/PVC 1
4Cx6 Sqmm Cu/PVC/PVC 2

1st Junction DB-1F2-COR Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1


4Cx6 Sqmm Cu/PVC/PVC 2

DB-1F2-COR DB-1F2-MBL Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 2

DB-1F2-MBL DB-1F2-TS-1 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

Duct 2 GF Cable Ladder 4Cx25 Sqmm Cu/XLPE/PVC 1

1F1 SDB-1F1 DB-1F1-MBA Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1

SDB-1F1 1st Junction Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1


2Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-1F1-MSM Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-1F1-COR Cable Tray 2Cx6 Sqmm Cu/PVC/PVC 1

Duct 1 ISO-1F1-COR Cable Tray 4Cx3x240 Sqmm Cu/XLPE/PVC 3


4Cx6 Sqmm Cu/PVC/PVC 2

ISO-1F1-COR DB-1F1-MBL Cable Tray 4Cx3x240 Sqmm Cu/XLPE/PVC 3


4Cx6 Sqmm Cu/PVC/PVC 1

DB-1F1-MBL SMDB Cable Tray 4Cx3x240 Sqmm Cu/XLPE/PVC 3

Duct 1 GF Cable Ladder 4Cx3x240 Sqmm Cu/XLPE/PVC 3


4Cx95 Sqmm Cu/XLPE/PVC 1
1MF Duct 2 1st Junction Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 2
2Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-GF2-LO2 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

1st Junction DB-GF2-LO1 Cable Tray 4Cx4x240 Sqmm Cu/XLPE/PVC 4


4Cx6 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 1

DB-GF2-LO1 GDB Cable Tray 4Cx4x240 Sqmm Cu/XLPE/PVC 4


2Cx6 Sqmm Cu/PVC/PVC 1

MDB GDB Cable Tray 4Cx4x240 Sqmm Cu/XLPE/PVC 4

SDB-GF1 Duct3 Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

SDB-GF1 DB-GF1-FCC Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1

Duct3 GF Cable Ladder 4Cx6 Sqmm Cu/PVC/PVC 1

GF2 Duct2 SDB-GF2 Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1


4Cx6 Sqmm Cu/PVC/PVC 3
2Cx6 Sqmm Cu/PVC/PVC 1

SDB-GF2 1st Junction Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1

1st Junction 2nd Junction Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1


4Cx10 Sqmm Cu/PVC/PVC 1
2Cx6 Sqmm Cu/PVC/PVC 3

2nd Junction DB-GF2-KIT Cable Tray 4Cx10 Sqmm Cu/PVC/PVC 1


2Cx6 Sqmm Cu/PVC/PVC 1

DB-GF2-KIT DB-GF2-CAN-1 Cable Tray 2Cx6 Sqmm Cu/PVC/PVC 1

2nd Junction DB-GF2-OD1 Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 2


2Cx6 Sqmm Cu/PVC/PVC 1

DB-GF2-OD1 DB-GF2-DRR1 Cable Tray 2Cx6 Sqmm Cu/PVC/PVC 1


GF1 Duct1 DB-GF1-OD1 Cable Tray 2Cx10 Sqmm Cu/PVC/PVC 1

Duct1 DB-GF1-COR Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1

Duct1 DB-GF1-TDS Cable Tray 2Cx10 Sqmm Cu/PVC/PVC 1

Duct2 DB-GF1-OL Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 1


Selected tray
size

200

50

50

75

50

200

100

300

75

50

150
100

100

75

50

50

150

50

75

200

50

150

100

50

75

50
50

100

50

450

100

75

50

50

50

75

50

50

450

450

300

450
75

50

450

450

450

50

50

50

200

50

100

75

50

75

50
50

50

50

50
POWER FACTOR CORRECTION CAPACITOR BANK

Network Voltage (U) 400 V

Network Frequency (f) 50 Hz

Uncompensated Power
Factor cos Φ of the
network 0.8

Targeted Power Factor 0.95


cos Φ of the network

T/F
Loading (kVA) 825.32
Actual Power (kW) 660.26
Factor Qc (kVar) 278.18
Cap. Bank Rating (kVar) 250 0
Steps (kVar)
Generator kVA Fuel consumption at 100% (L/hr)
(Prime Rated)
182 44
182 44
182 44
100 23.8
Total Fuel requirement for 2 days
Selected Bulk Fuel tank capacity (L)
Total fuel for 48 hrs (L)

2112
2112
2112
1142.4
7478.4
15000
Cable Tray and Cable Ladder Calculation
Cable
Total Selecte
Tray /
From To Cables Number of d tray
Ladder
Cables size
Route
Cable Tray and Cable Ladder Calculation
Cable Total
No. of Total Cable With Selected
Cable Tray / Ladder Route Cables Diameter Number of
Cables Diameter Spare tray size
x2 Cables
Cable Ladder 4x1Cx240 Sqmm Cu/XLPE/SWA 16 32.8 524.8 16
(From T/F to MDB)
524.8 734.72 100 X 800
Cable Ladder 4Cx95 Sqmm Cu/XLPE/PVC 2 74 148
(From MDB to SDBs and MSSBs)
4Cx50 Sqmm Cu/XLPE/PVC 1 57.6 57.6
5
4Cx16 Sqmm Cu/PVC/PVC 1 39.6 39.6
4Cx10 Sqmm Cu/PVC/PVC 1 38.6 38.6
283.8 397.32 100 X 450
Cable Ladder 4Cx120 Sqmm Cu/XLPE/PVC 1 81.8 81.8
(From SMDB to SDBs,DBs and MSSBs) 1 74
4Cx95 Sqmm Cu/XLPE/PVC 74
4Cx50 Sqmm Cu/XLPE/PVC 1 57.6 57.6
4Cx35 Sqmm Cu/XLPE/PVC 1 50.6 50.6
4Cx25 Sqmm Cu/XLPE/PVC 2 45.8 91.6 14
4Cx10 Sqmm Cu/PVC/PVC 1 38.6 38.6
4Cx6 Sqmm Cu/PVC/PVC 4 36 144
2Cx16 Sqmm Cu/PVC/PVC 1 36.4 36.4
2Cx6 Sqmm Cu/PVC/PVC 2 26.4 52.8
627.4 878.36 100 X 900
Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 4 36 144
(From SDB-GF1 to DBs) 1 32.2 8
2Cx10 Sqmm Cu/PVC/PVC 32.2
2Cx6 Sqmm Cu/PVC/PVC 3 26.4 79.2
255.4 357.56 50 X 450
Cable Tray 4Cx16 Sqmm Cu/PVC/PVC 1 39.6 39.6
(From SDB-GF2 to DBs at GF) 1 38.6
4Cx10 Sqmm Cu/PVC/PVC 38.6
4Cx6 Sqmm Cu/PVC/PVC 4 36 144 8
2Cx10 Sqmm Cu/PVC/PVC 1 32.2 32.2
2Cx6 Sqmm Cu/PVC/PVC 1 26.4 26.4
280.8 393.12 50 X 450
Cable Tray 4Cx6 Sqmm Cu/PVC/PVC 2 36 72
(From SDB-GF2 to DBs at GF-M) 4
2Cx6 Sqmm Cu/PVC/PVC 2 26.4 52.8
124.8 174.72 50 X 200
Cable Tray - 1 4Cx6 Sqmm Cu/PVC/PVC 2 36 72
(From SDB-1F1 to DBs) 4
2Cx6 Sqmm Cu/PVC/PVC 2 26.4 52.8
124.8 174.72 50 X 200
Cable Tray - 2 4Cx16 Sqmm Cu/PVC/PVC 1 39.6 39.6
(From SDB-1F1 to DBs) 2
4Cx25 Sqmm Cu/XLPE/PVC 1 45.8 45.8
85.4 119.56 50 X 150
Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1 45.8 45.8
(From SDB-1F2 to DBs) 1 38.6
4Cx10 Sqmm Cu/PVC/PVC 38.6
7
4Cx6 Sqmm Cu/PVC/PVC 4 36 144
2Cx6 Sqmm Cu/PVC/PVC 1 26.4 26.4
254.8 356.72 50 X 450
Cable Tray 4Cx50 Sqmm Cu/XLPE/PVC 1 57.6 57.6
(From SDB-2F1 to DBs) 1 50.6
4Cx35 Sqmm Cu/XLPE/PVC 50.6
4Cx16 Sqmm Cu/PVC/PVC 3 39.6 118.8 10
4Cx10 Sqmm Cu/PVC/PVC 2 38.6 77.2
2Cx6 Sqmm Cu/PVC/PVC 3 26.4 79.2
383.4 536.76 50 X 600
Cable Tray 4Cx70 Sqmm Cu/XLPE/PVC 1 66.4 66.4
(From SDB-2F2 to DBs at 2F) 2 36 5
4Cx6 Sqmm Cu/PVC/PVC 72
2Cx10 Sqmm Cu/PVC/PVC 2 32.2 64.4
202.8 283.92 50 X 300
Cable Tray 4Cx25 Sqmm Cu/XLPE/PVC 1 45.8 45.8
(From SDB-2F2 to DBs at 2F-M) 1 38.6
4Cx10 Sqmm Cu/PVC/PVC 38.6
4
4Cx6 Sqmm Cu/PVC/PVC 1 36 36
2Cx16 Sqmm Cu/PVC/PVC 1 36.4 36.4
156.8 219.52 50 X 300
Cable Ladder 4Cx240 Sqmm Cu/XLPE/PVC 3 113.4 340.2
(From GENs to Duct) 4
4Cx10 Sqmm Cu/PVC/PVC 1 38.6 38.6
378.8 606.08 100 X 800
Cable Tray 4Cx10 Sqmm Cu/PVC/PVC 1 38.6 38.6 1
(From GDB to MDB)
38.6 54.04 50 X 75
V 400
S 800
Zs 5%
Z 0.010

Transformer Isc (a) 23.09 25


MDB Isc (b) 14.73 16
SMDB Isc (c) 13.17 16
SDB Isc (d) 8.01 10
DB Isc (e) 5.37 6
Max.
Generation per
month Solar hours per system Wp No. of Panel size
day power panels (m2)
(kWh/month)
(kW)
Lighting 12,029.96 4 100.25 545 183.94 2
General power 969.47 8.08 14.82
MEP 154,388.81 1,286.57 2,360.69
TOTAL 167,388.24 1,394.90 2,559.45

635 1,165.14
46%

Customer Category I-2


Time Interval Energy Charge Hours Blended rate
Peak (18.30 - 22.30) 20.50 4 82.00
Day (5.30 - 18.30) 11.00 13 143.00
Off-peak (22.30 - 05.30) 6.35 7 44.45
24 269.45 11.23 LKR/kWh

Bill Estimation
kWh/month LKR Per month
Lighting 12030 135,061.38
General power 969 10,884.36
MEP 154389 1,733,335.98
Total (Cost of energy) 167388 1,879,281.72

Demand Charge 1100 764,507.27

Total bill 2,643,788.99


Total (kVA) 0.8 pf 825.32
Total (kVA) 0.95 pf 695.0