Professional Documents
Culture Documents
PLAN/INST/08
FOLLOWING ACTIVITES ARE PLANNED FOR THE SHUTDOWN OF BF/SP ON DATE 18/01/1014 SR NO DESCRIPTION OF THE PLANNED ACTIVITY SGL PERSON RESPONSIBLE MCK ENG TECH DEPT. RESPONSIBLE PLANNED TIME(HRS ) ACTUAL TIME(HRS) STATUS
1 2 3 4 5 6 7
SR NO
HEAD ESP OIL PRESSURE PT CALIBRATION MAIN SINTER UPS SERVICING LEVEL SWITCH INSTALLATION IN FUEL&FLUX PROPORTIONING REDUNDANT POWER SUPPLY TO BE TAKEN INLINE LEVEL SWITCH CHECKING IN PROPORTIONING LEVEL SWITCH CHECKING IN SCREENING DD
SHRIPAD DESAI
DEPT. RESPONSIBLE
PLANNED TIME(HRS )
ACTUAL TIME(HRS)
STATUS
1 2 3 4 5 6 7
MAIN EXHAUST FAN MONTHLY CHECKLIST BF GAS FLOW ELEMENT CLEANING&CALIBRATION CA FLOW ELEMENT CLEANING&CALIBRATION WEIGH FEEDER #1 CALIBRATION H1,H2 WEIGH SCALE VERIFICATION P7 &C3 WEIGH SCALE VERIFICATION WB INDICATOR CHECKING& ZERO CALIBRATION
SHRIPAD DESAI
SR.
1 2 3 4 5 6 7
PERSONNEL NAME
ANIKET ANUP PARAB MAYANK GOPI RAJESH SHEKHAR SANJAY SGL INSTRUMENTATION
DUTY TIME
8.00AM 8.00AM 8.00AM 8.00AM 8.00AM 8.00AM 8.00AM