Please find the following (18) wells that are recommended for the Jebel field
SBHP survey for year 2008, in order to monitor the water injection and evaluate
the reservoir performance:
P07-6, P10-6, P11-6, P22-6, P24-6, P26-6, P27-6, P29-6, P30-6, P39-6, P46-6,
P47-6, P48-6, P50-6, P51-6, P54-6, P63-6, P67-6.
The producing wells should be shut-in for 72 hours prior to the survey.
The recommended procedure for running the pressure survey is as follows:
Tag bottom and record on service report.
RIH with high accuracy electronic memory gauges.
All depth measurement should be recorded from one reference point.
The attached table lists the stops depth and duration time required for the 18
wells are mentioned above.
A. M. Jelli, Superintendent
Reservoir Engineering Division
\ & \ Himeda
QAF-05-03-04 E Rev. No. : 0