JOB METHOD STATEMENT

Project Title: Engineering, Procurement, Construction and Commissioning or MEO Project


Contract No: Com)an*: M!N"#P!M#$%#$&&'#&&(% A+,+NMAS Sdn- B.d(REV: 1)

/-

OBJECT+0E The purpose of this method statement is to ensure a safe working method for 10 water pipe re-routing tie-in work.

$-

TOO!S AND E12+PMENT The equipment and tool to be used are as follows:i. ii. iii. i'. '. Welding Set Chain lo!k "#$gen%&!et$lene (le!tri!al )and *rill (le!tri!al +rinder 'i. 'ii. 'iii. i#. (#tension Wire )and Tools ,obile Crane % -orr$ Crane .ire (#tinguisher

3-

METHOD STATEMENT The method statements are des!ribed on the following pages. 3-/ Pre)aration 4or5 /.1.1 /.1.1 /.1./ /.1.6 /.1.8 /.1.: Site 0isit to familiar the lo!ation and s!ope of works%suppl$. Submit Shop *rawing2 3)& and other ne!essar$ do!uments for appro'al. 4repare all ne!essar$ equipment and materials. Completed prefabri!ation pipe spool will be e#e!uted at &ikinmas 5ard with all ne!essar$ inspe!tion. Site sur'e$ for mobili7ation works. &ll work area will be marked. Send (le!tri!al tools%equipment to ,-9+ workshop for inspe!tion *eli'er the materials on site b$ lorr$. &ll material needed must be ;6ead* to +nstall at work site

3-$

/&7 )i)e 8al8e isolation 4or5 /.1.1 /.1.1 /.1./ /.1.6 To get !learan!e and permission from ,-9+ prior isolation of related 'al'e. <solate 3 no9s o 'al'e =lo!ation indi!ate in the atta!hed drawing> a!!ordingl$2 to release an$ 'ent or drain pipe 'al'e to stabili7e the pressure and drain out all water &ll 'al'e related to plant operation shall be operated b$ ,-9+ "4S To ensure all 'al'es are turned off with a blank insert for positi'e isolation and !onfirm b$ ,-9+ representati'e.

3-3

/&7 e:isting )i)e cutting # )re;assem<le 4or5s /./.1 /./.1 /././ /./.6 /./.8 /./.: Temporar$ support will be installed at marked area to pre'ent !ut pipe spool from falling apart at both side. Cut the e#isting line at S1 and S1 = ?efer atta!hed drawing > @se !rane to remo'e the !ut portion of the pipe from site. (nsure all water drained out from the e#isting pipe. @se !rane to fit up and assemble new pipe spool to the e#isting pipe. 4ro'ide temporar$ support to the new pipe spool at both sides before welding work !arried out.

3-=

/&7 )i)e >elding 4or5s /.6.1 4roperl$ barri!ade and shield the work area /.6.1 (nsure the pipe spool is in !orre!t position and adequate !learan!e prior fit-up. /.6./ Welding work !ommen!e.

3-?

4elding +ns)ection 4or5 /.8.1 /.8.1 <nspe!tion will be !arried out as per ,-9+ standard % instru!tion =@T> ?esult and re!ord will be submitted to ,-9+ to re'iew.

3-(

@inal touc. u) )ainting 4or5 /.:.1 4repare surfa!e preparation as per (9+-C<0-01 4rote!ti'e Coatings A -ining or 4TS Standard /.:.1 4aint the affe!ted area b$ using roller brush. House5ee)ing /.:.1 &ll debris2 unused item will be !lear from site.

3-%

Pre)ared and Su<mitted B*:

6e8ie>ed A Agreed B*:

9ame: 4osition:

9ame: 4osition:
2

*ate:

*ate: