Subject
Introduction General telecom requirements Civil requirements applicable for all types of buildings Entry box Entry pipes Main telecom room Floor telecom room Roof-top telecom room Risers from main telecom room to individual oors Floor distribution box Flat distribution-from indoor equipment cabinet Villa oor distribution-from indoor equipment cabinet Installation of in-building bre drop cables High-rise buildings Single villas Etisalat telecom requirements Etisalat telecom requirements-Table 1 Etisalat telecom requirements-Table 2 Structured Cabling System (SCS) Cabling & termination Telecommunication cabling Telecommunication socket Accessories Horizontal subsystem (UTP Cables) Cable capacities in trays conduits Indoor equipment cabinet 19 A) Free standing types B) Wall-mounted type cabinets Under-oor systems Main elements of under-oor raceway systems Protection from electromagnetic interference Electrical requirements Important notes List of annexures

Page
2 3 3 3 3 4 4 4 5 5 6 6 6 6 7 7 7 8 9 9 9 9 10 10 11 11 11 12 12 12 13 15 15 16

Index

Design guide

www.etisalat.ae

Introduction
Telecommunication is now an integral part of social, economic and political issues of the world. Networks of the future will be digital and intelligent and will offer high transmission capacity and exible bandwidth; in addition, they will be easily accessed and connected while its services will be personal and tailored to individual needs. These will allow us to interact in ways previously not possible - available at any time and any place. In addition to providing entertainment and business services, networks of the future will provide education, health and other public services. Major advances in communications technology have substantially widened the range of services carried by the network. Satellites, microwave radio, optical cable links, digital switching and transmission, offer a potential for the improvement of quality and for the extension of access to the most remote areas. The pace of technological change is increasing while the magnitude of demands the future will make on our creativity and capacity to adapt is great. Customers will demand more than just stateof-the-art technology; they will want convenience and increased control in their lives that affordable information access can provide. While businesses will look for total telecommunications solutions that will not only enable them to remain productive and compete globally but will also give them a competitive edge. Etisalat can be well-placed to meet these challenges ahead and meet the varied needs of our local and international customers and pave the way for the regions new dynamism in the telecommunications industry well into the 21st century. As technology and mode of transport are changing fast, a broad approach to suit all future type of services will have to be borne in mind, while designing the infrastructures for buildings. A properly designed building with clear Access Path supports the triple play services, viz telephony, data and video services. Also, supports future advanced services, warranting higher speeds and higher bandwidth, planned to be available in near future, for faster provision of services. The present booklet is to provide guidelines for consultants, contractors and the details on the in-building facilities required to be considered at the design stage. The details provided are a general insight and the minimum requirements of Etisalat for the new buildings, primarily to develop and deploy FTTX (Fibre to Home), based on GPON technology.

Introduction

Design guide

www.etisalat.ae

General telecom requirements


To provide telecom services, the internal concealed pipe and other associated requirements vary for the different building types. The various types of buildings are grouped as commercial buildings, residential towers, ware houses, medium high-rise buildings, shopping complexes, retail houses, row houses, independent villas, campus villas, labour camps, mosques, petrol pumps, etc. The building owners, builders, property developers, consultants and contractors are advised to provide the various inbuilding requirements, as applicable, to ensure timely provision of services.

contractors must not deviate from the stipulated location An earth rod must be provided at the entry box. The required earth resistance should not exceed more than 5 ohms For entry box size details please refer to Table No. 1 Entry pipes (Lead-in ducts) The entry pipes are uPVC ducts. These ducts are to be extended from the entry box towards premises and towards Etisalat line plant location. Entry pipes should be laid at a depth of 60 cm from the proposed nished paving level. The entry pipe must be protected with concrete to prevent damages Entry pipe should be extended to the entry box and beyond to the nearest existing Etisalat plant location, or 1 meter from plot limit or as advised by Etisalat The entry pipe should be of uPVC material and of black color The open ends of the entry pipe must be properly sealed, to prevent entry of sub-soil materials and ingress of water Location of entry pipes must be clearly marked, above ground for easy location Building contractors shall be responsible to locate the installed entry pipes on site, if requested by Etisalat No right-angled sharp bends should be installed through out the duct length, except one wide-angle, long radius bend (factory made) at the terminating end of the duct, inside the main telecom room. Alternatively, at the location of the wide angle bend, a cable pull box of minimum size 600(L) x 700(W) x 800(D) mm must be provided

Entry pipes must be assigned, exclusively for Etisalat telecommunication services Entry pipes must be provided with a draw rope made of nylon of minimum 6 mm diameter For the number and size of entry pipes, for the various types of buildings, please refer to Table 1 Main telecom room Main telecom room should be a dedicated room. This is to be provided either on the ground oor or basement or in the rst oor or mezzanine oor of the building for the purpose of terminating telecommunication cables and to house the present & future telecom equipment. The room must be exclusively for Etisalat use The room must be easily accessible to Etisalat Personnel 24 hr./day, (all days including weekends). The room must be clean, dry and free from dust and secured from unauthorized entry Adequate lighting and minimum of four 20 amp and 240 volt A.C. Mains outlet from a dedicated circuit breaker should be provided The room must be air-conditioned and a raised oor of minimum 30 cm should be provided if required, depending on the telecom room usage The room must be provided with a good earth rod of not more than 5 ohms The door opening for the room should swing outwards The oor, roof and surrounding wall of the telecom room, should be free of any concealed water/drainage pipes and air-conditioning ducts passing through The room must be provided with an emergency light, a smoke detector and a re alarm

If the telecom room is proposed in the basement, an automatic sump draining system must be provided to handle water seepages The duct entry to building must be sealed air and water tight For the main telecom room size, please refer Table No. 1 Floor telecom closet Floor telecom closet is a dedicated closet and required on each oor for the purpose of routing and/or terminating telecommunication cables. The room should be exclusively for Etisalat use The closet must readily be accessible to Etisalat personnel and equipment 24 hr./day, all the days, round the clock and the closet, clean dry, and free from dust and secured from unauthorized entry The door opening for the closet should swing outwards, when opened For the oor telecom closet size, please refer Table No. 1 Roof-top telecom room Roof-top telecom room, is a dedicated room to be provided on the roof-top of the proposed multi-storey buildings, exclusively for Etisalat use and secured from unauthorized entry. The minimum roof-top telecom room size should be 3(L) x 3(W) x 3(H) meter The oor loading of this area must be maximum possible, to support future installation of telecommunications equipment An opening of size 60x40 cm to be provided on the wall of the room, facing the terrace, 50 cm below the room ceiling

Civil requirements applicable for all types of buildings


Entry box Entry box is an underground joint box built, exclusively to allow installation of Etisalat underground cable network to the customers premises. The entry box is a reinforced concrete structure, with a heavy duty Ductile Iron Frame and Cover of rating grade A and size is 60x60x80 cm. The cover shall have marking as Telephones The location of the entry box, depends on the location of existing/proposed Etisalat external line plant The entry box should be constructed at a maximum distance of 1 meter from plot line. If it is not practical to install within the plot, then install it outside the plot. Make sure it touches the boundary wall Due to the variables involved, it is essential to consult Etisalat at the design stage, to decide the location of the entry box and entry pipe. The consultants/

Design guide

www.etisalat.ae

The location of the room should be within the vertical structure of the building, with due considerations for load safety provisions and to extend related facilities required such as air-conditioning, 3-phase power (Distribution Board) DB, earthing less than 5 ohms, adequate lighting, one 13 amp 240 v AC power socket and one telephone socket The room must be provided with an emergency light, a smoke detector and a re alarm The room must readily be accessible to Etisalat personnel and equipment 24 hr every day, all the days, round the clock and the room must be clean, dry and free from dust Risers from main telecom room to individual floors The risers are required in multiple-storey buildings for the installation of telecom bre optic cables from main telecom room to other oors, as detailed below: Galvanized slotted iron cable trays (minimum 200x50 mm HDRF (Heavy Duty, Return Flange) should be provided from the main telephone room, to each telephone closet and extended up to the roof telephone room The risers to each oor must be symmetrical and vertically in line with the main telecom room. However, where the main telecom room, oor telephone closet and roof telecom rooms are to be located one below the other in vertical line, a continuous cable trays/ conduits must be provided with pull boxes/access panels at every turning point and at interval of 15 meters each, up to the main telecom room. Right angle or sharp bends are to be avoided If a building consists of more than one tower, all the above specied requirements are required in each tower

The towers must be inter-connected at the main telecom room, by separate cable trays of minimum 2 nos. and size 200x50 mm or through oor raceways passing through a common area between the two buildings. The size of the oor raceways is to be decided at the design stage by Etisalat. The same requirements also apply to mezzanine and penthouse oors. The telecom cable trays should have adequate separation from electrical cable trays. Electrical cable trays should not cross the telecom cable trays. Floor distribution box Floor distribution boxes are metallic boxes, concealed, located on the wall, where the internal conduit from every at is terminated. These empty boxes, should be located close to the risers and can be more than one, depending upon the number of ats and conduits proposed to be terminated. These distribution boxes facilitate to route the bre optic cables to the premises direct and the number of cables corresponds to the number of at/premises. The distribution boxes should be of size not less than 30(L) X 30(H) X 15(D) ush mounted on wall and should be xed inside the telecom closet of each oor. A suitable hinged cover must be provided It should be installed at a height of 120 cm above the nished oor level The conduits leading from the oor distribution box towards at, should not be less than 25 mm diameter Adequate safe working space is to be provided around each location The distribution boxes on a oor, should not be linked to or serve any other oor of the building The distribution boxes location should never be near any electrical junction box or bus bars. Adequate safe working space should be provided in front of each box

A single conduit of at least 25 mm (1 inch) internal dia., black and of uPVC material should be provided from each oor distribution box to the indoor equipment cabinet of each ofce, residence, at and other independent areas in the same oor Etisalat should be consulted to enhance the requirements, if the building is designed for commercial use Flat distribution from indoor equipment cabinet A secured indoor equipment cabinet should be of minimum size 12 U and width 600 mm and depth 515 mm to house the Optical Network Unit (ONU), power sockets and patch panel/IDC modules and battery. The cabinet should be ush mounted on wall. The cabinet should be dedicated to each ofce/residential at and to be sited in a secured place. The location shall be suitable for technicians access, when required The location of the indoor equipment cabinet should be at a common point, where all the internal conduits meet and the Structured Cabling System (SCS) on a star topology can be installed. However, the farthest socket must not exceed 90 m from the cabinet Two power sockets are required, inside the indoor equipment cabinet, for powering the optical network unit and battery rectier The cabinet distribution box location should not be adjacent to any electrical distribution or bus bars The cabinet distribution box should be installed at a height of 120 cm above the nished oor level All internal conduits should be of a diameter not less than 25 mm (1 inch) to extend the structured cables from ONU to SCS socket locations at each room

Villa distribution - from indoor equipment cabinet A secured indoor equipment cabinet, should be of minimum size 12 U and width 600 mm and depth 515 mm to house the Optical Network Unit (ONU), power sockets and patch panel/IDC modules and battery. The cabinet should be ush mounted on wall. The cabinet should be dedicated on each villa and to be sited in a secured place. The location must be suitable for technicians access, when required A secured distribution box of size 30 (L)x30 (H)x15 (W) cm ush mounted on wall is required in every oor of the villa, for distributing SCS, from the indoor cabinet The oor distribution box should be kept at a convenient and easily accessible location where the oor distribution conduits are terminated. It should be installed at a height between 40 cm and 120 cm above the nished oor level The distribution boxes on different oors of a villa should be connected through a PVC conduit, of a 50 mm diameter The distribution box should have one 50 mm (2 inch) conduit to the rooftop of the villa, from the cabinet or from the telephone entry duct location, in order to provide access to cables from the antenna Installation of in-building fibre drop cables High-rise buildings The building owner should install a minimum of 2 core bre drop cables, from the main telecom room ODF location to the indoor cabinet location of each at/premises. Termination of these bres should be by Etisalat on the ONU and ODF. Installer to leave an extra length of 3 m of cable on either end for terminations. The cables must be suitably labeled

accordance with Etisalat advise

route may also be provisioned

route may also be provisioned

route may also be provisioned

route may also be provisioned

Design guide

www.etisalat.ae

Apartment Indoor 12U (H) x 600 mm Distribution Cabinet (W) X 515 mm (D) std 19 Rack ush mounted on wall

12U (H) x 600 mm (W) X 515 mm (D) ush mounted on wall, per villa

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

12U (H) x 600 mm (W) X 515 mm (D) ush mounted on wall

Single villas In the case of single villas, Etisalat will extend and terminate the FO cable, directly in the ONU. In all other cases, the 2 core drop cables should be extended to the ODF location in the telecom room, by the owner.
Bldg Types Single villa Complex of villas Bldgs (G+5) or Building area upto 3000 m2 Bldg oors (G+6) to (G+10) or Bldg of 100 tenants or Bldg area upto 7000 m2

Etisalat telecom requirements


The Table No. 1 below, details the different requirements for the various types of buildings and types.

Bldg Types

Single villa

Complex of villas

Bldgs (G+5) or Building area upto 3000 m2

Telecom Requirements

Bldg oors (G+10) and more or over 100 tenants or Bldg area more than 7000 m2

Shopping malls

Palaces & hospitals

Group of shops & sheds

Telecom Requirements

Bldg oors (G+6) to (G+10) or Bldg of 100 tenants or Bldg area upto 7000 m2

Bldg oors (G+10) and more or over 100 tenants or Bldg area more than 7000 m2

Shopping malls

Palaces & hospitals

Group of shops & sheds

Floor Distribution Box

Entry Box

Size: 60x60x80 cm. Location: Within the compound and at Max 1 m from compound wall line

Size: JRC-4 Joint Box (Etisalat standard) Location: Depends upon the layout

Size: JRC 12 Joint Box (Etisalat standard) Location: Within the property, near plot line. Additional Boxes at all turning points of lead-in

Size: JRC 12 Joint Box (Etisalat standard) Location: Within the property, near plot line. Additional Boxes at all turning points of lead-in

Size: JRC 12 Joint Box (Etisalat standard)

Size: JRC 12 Joint Box (Etisalat standard)

Size: JRC 12 Joint Box (Etisalat standard) Location: Depending on the layout

Size: 60x60x80 cm with Grade A cover Position: Within land plot where lead-in branching to other blocks end at turning points Main Telecom Room

Size: One 30x30 x15 cm box recessed inside the wall for each oor. Location: Convenient location with 1 meter free wall space around and at a height between 40-120 cm above nished oor level.

Per single villa. Size: One 30x30x15 cm box recessed inside the wall for each oor. Location: Convenient location with one meter free wall space around and at a height between 40-120 cm above nished oor level.

Size: One 30x30x15 cm boxes ush to wall Location: To be provided in each oor Telecom Closet

Size: One 30x30x15 cm box ush to wall Location: To be provided in each oor Telecom Closet

Size: One 30x30x15 cm box ush to wall Location: To be provided in each oor Telecom Closet

Size: One 30x30x15 cm box ush to wall Location: To be provided in each oor Telecom Closet

Size: One 30x30x15 cm box ush to wall Location: To be provided in each oor Telecom Closet

Size: One 30x30x15 cm box ush to wall Location: To be provided in each oor Telecom Closet

Location: Location: Within the property, Depending on the near plot line. layout Additional Boxes at all turning points of lead-in

No requirements

Entry Pipes/Duct

A single (2) inch pipes/duct towards the villa & single x (2) inch pipes/ducts to be extended outside the plotline towards Etisalat Network

A single (4) inch pipes/ducts to be extended one meter outside the plot line towards Etisalat Network. Internal Distribution within plot to be in accordance with Etisalat advise

2x (4) inch pipes/ducts towards the building and four x (4) inch pipes/ducts towards the Etisalat Network

2 x (4) inch pipes/ducts towards the building and four x (4) inch pipes/ducts towards the Etisalat Network A diversity entry route may also be provisioned

2 x (4) inch pipes/ducts towards the building and four x (4) inch pipes/ducts towards the Etisalat Network A diversity entry route may also be provisioned

2 x (4) inch pipes/ducts towards the building and four x (4) inch pipes/ducts towards the Etisalat Network A diversity entry route may also be provisioned

2 x (4) inch pipes/ducts towards the building and four x (4) inch pipes/ducts towards the Etisalat Network A diversity entry route may also be provisioned

A single x (4) inch pipes/ducts to be extended one meter outside the plot line towards Etisalat Network. Floor Telecom Closet No requirements

Size: 2x3x3 (LxWxH) meters for villas more than 10 numbers

Size: 2x3x3 (LxWxH) meters Location: In the ground oor common area.

Size: 3x3x3 (LxWxH) meters Location: In the ground oor common area.

Size: 3x4x3 (LxWxH) meters Location: In the ground oor common area.

Size: 3x4x3 (LxWxH) meters Location: In the ground oor common area.

Size: 3x4x3 (LxWxH) meters Location: In the ground oor common area.

Size: 2x3x3 (LxWxH) meters Location: In the ground oor common area.

No requirements

Size: Closet (LxWxD) 100x60x60 cm Location: In common area

Size: Closet (LxWxD) 100x60x60 cm Location: In common areas

Size: Closet (LxWxD) 100x60x60 cm Location: In common areas

Size: Closet (LxWxD) 100x60x60 cm Location: In common area

Size: Closet (LxWxD) 100x60x60 cm Location: In common areas

Size: Closet (LxWxD) 100x60x60 cm Location: In common areas

Apartment Indoor 12U (H) x 600 mm Distribution Cabinet (W) X 515 mm (D) std 19 Rack ush mounted on wall

12U (H) x 600 mm (W) X 515 mm (D) ush mounted on wall, per villa

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

42U (H) x 800 mm (W) X 800 mm (D) Stand alone type 19 equipment Cabinet

12U (H) x 600 mm (W) X 515 mm (D) ush mounted on wall

Riser Cable Trays

No requirements

No requirements

20x5 cm cable trays

20x5 cm cable trays

20x5 cm cable trays

20x5 cm cable trays

20x5 cm cable trays

No requirements

Table 1

Table 1 (Continued)

Bldg Types

Single villa

Complex of villas

Bldgs (G+5) or

Bldg oors (G+6) to (G+10)

Bldg oors (G+10) and more

Shopping malls

Palaces & hospitals

Group of shops & sheds

Design guide

www.etisalat.ae

Structured Cabling System (SCS)


To deliver the services from the ONU, a SCS System on star topology is required. The minimum requirement is standard CAT 6 cable with RJ45 connectivity. A SCS design being project specic, a discussion, with complete details is recommended with system designers and Etisalat. However, the following are the general minimum requirements of structured cabling systems, for provision of service.

Completed SCS should be subject to acceptance by Etisalat. However, the design and performance of the SCS system should be the responsibility of the installer/owner Any upgrading required in the inbuilding facility, telecommunication cables, due to either enhanced demand, change in building status or damage should be provided by building owner The supply and termination of UTP cables on patch panel or IDC modules and sockets locations should be the responsibility of the installers/owners Etisalat would supply and install, main ODFs, mini ODFs and optical network units (ONUs). All jumperings and patchings in the ODFs, patch panels in ONUs would be the responsibility of Etisalat. Building owners/contractors or other technicians are totally prohibited to carry out these functions Telecommunication socket All outlets should be Category 6 performance, outlets mounted in shutters, typically in dual, triple or quad formation in a single or double gang white faceplate. All RJ45 outlets should be tted with spring loaded sliding shutters to prevent the ingress of dirt and dust. Provision for at least one dual socket for telecommunication services should be made in every room including kitchen. Conduit with not less than 25 mm should be connected between the socket locations Every socket must be connected with a minimum of four pair SCS Cat 6 cable, following star topology. In case of hotel buildings, the provision of telecommunication socket should also be extended to the bathrooms Telecommunication sockets, cables and associated facilities within the various rooms and premises are to be provided by the building owner

Accessories All accessory plates should be dual or quad white PVC plated. The use of any special faceplate, which may be specic to any other manufacturers product range, such as brass nish, etc. should be reviewed. The choice of outlets distribution, location and type, either it is single, dual, or quad, the optimum requirements in each area, ultimate number of outlets in every locations, exibility and maximum usage, should be the responsibility of consultants. Horizontal subsystem (UTP Cables) All horizontal cables should be based on the Category 6 performance compliant. All conductors in each cable should be connected to a single RJ45 socket at the work area outlets and patch panel. Each cable should be terminated to maintain the twists in each pair within 5 mm of the termination. Proper strain relief should be provided for the cable at the outlets and patch panel, avoiding strain on the conductors Colour coding for the termination should be as per the following table. Pair 1 2 3 4 Horizontal cabling The physical topology of the horizontal cabling should be congured as a star with each outlet connected directly Tip White White White White Ring Blue Orange Green Brown

to a at/apartment distribution box inside the at or apartment. No looping of cables from outlet to outlet is permitted The horizontal cabling is to be provided to single, dual, triple and quad outlets throughout The length of cable between the farthest telecommunications outlet and the distribution box should not exceed 90 m (295 ft.) A minimum of two telecommunications outlets should be provided for each individual work area. The outlets may be located with one or more faceplates in the work area Horizontal pathways Horizontal pathways (conduits, sleeves, cable trays, etc.) are used for taking the cables from the oor telecommunications room to the telecommunications outlets in the same oor A variety of methods are available and the choice of selection of method should depend on the purpose of the oor area to be served (i.e. general ofce spaces, apartment dwellings, etc.) Conduits The use of conduits as a horizontal raceway system should only be considered when the outlet locations are permanent, the device densities are low and exibility is not required The minimum size of a conduit pipe used as a horizontal pathway from the distribution box to the telecommunications outlet should be 25 mm (1 inch) For the conduits, the inside bending radius should always be at least 10 times the internal diameter

Cabling & termination


Telecommunication cabling The cables used for these wiring must comply with minimum CAT 6 standards The planned SCS cable should meet the designed service requirements within the particular at level and should have built-in exibility, to meet growing needs of the tenants All SCS cables are to be properly labeled and terminated, in the RJ45 sockets and in-patch panel or in CAT 6 compliant IDC modules by the owners Building owner is responsible for replacement of inbuilding cables and other xtures, if these become faulty Cable diagrams must be submitted to Etisalat for approval at the design stage and as-built is required on completion Cables and other accessories required for block wiring may be purchased from any reputable source provided that the material meets standards The name and contact telephone numbers of the SCS installer, should be labeled at appropriate location

10

Design guide

www.etisalat.ae

Minimum of one nylon draw wire must be installed in a conduit Pull boxes should be located such that they are readily accessible at all times. Pull boxes to be spaced at a maximum of 15 m apart to minimize cable stress during installation and to provide serviceability in the future Conduits must be free from sharp edges, to prevent cable damage during and subsequent to pulling Conduits protruding through a oor should be terminated; a minimum of 50 mm from the oor to prevent water or other liquids from owing into the conduits Maximum number of UTP cables inside a conduit, recommended for the installation of a Structured Cabling System is as follows: Conduit trade size 1 1 1 /4 11/2 2 Internal dia (mm) 25.40 34.04 39.88 51.31 No. of Cat 6 cables 7 13 18 30

Cable tray size (mm) 50x50 75x50 100x50 100x50 150x 50 200x50 300x 50 450x50 900x50

Truncking size (mm) 50x50 50x75 50x100 75x75 75x100 100x100 150x150 -

No. of UTP cables 30 45 60 67 90 120 180 360 540

Vertical cable management Bonded to a local earth point B) Wall-mounted type cabinets These are recommended for ats, villas, shops, etc. and should be provided ush with wall, at a common location where all SCS cables, patch panels/IDC modules, bres, power and ONU equipment are proposed to be installed. The cabinet should be exclusive for Etisalat use and no access to others should be allowed. 12U 22U 600 mm wide x 515 mm deep 19 wiring/ equipment cabinet Glass front door with provision for air circulation Vertical cable management Bonded to a local earth point We recommend that the proposed locations of the cabinets have sufcient space around the cabinets to allow access to installation and maintenance and should be located in central locations, where all the terminations of the SCS cables on patch panels/IDC modules and bre termination and ONUs, power socket and battery back up, should be installed. Patching The design of patch frame layouts is critical to create a high level of manageability within a compact cabinet, while maintaining effective operations when used by the customer. We recommend all horizontal UTP cabling should be terminated in a 12 or 24 port patch panel, placed inside the wall or oor cabinet. Alternatively, Cat 6 compliant IDC modules can also be used.

Voice services can be fed from the services patch panel directly to the user outlet using standard 1 pair patch cords. Labeling Label elements All oor outlets, patch frames and horizontal cables should be labeled. A typewritten standard labeling system is recommended. The labeling scheme shall be agreed on with the clients telecom team. Horizontal cable labels Label all horizontal cables at both ends using a selflaminating, wrap around label. User outlet labels Each RJ45 user outlet should be labeled with a unique identier, typically using the agreed scheme. Under-floor systems For general ofce spaces, an under-oor raceway system should be used for maximum exibility In multi-channel layouts, separate raceways must be used for telecommunications and electrical power to reduce electromagnetic interference. The dividers for separation of compartments in the raceway should be bonded to ground

Where a FO cable block wiring is considered, a very careful consideration must be taken, while designing the system. The owner should be responsible for the design, supply and maintenance of all related items.

Indoor equipment cabinet 19


Depending upon the termination and patch panel requirement, and to accommodate other active and passive equipment, a cabinet with standard 19 rack is required, generally complying with the following:A) Free standing types

Cable capacities in trays conduits When the internal cable trays, risers and ladders, etc. are designed, supplied and installed by others, the maximum number of UTP cables, recommended to be installed on a tray as shown; however this need to be reduced in the case of bends and crossovers. The formula applied is that for every 25 mm x 25 mm cross section, 8 cables can be accommodated. No truncking or cable tray should be more than 75% full on installation.

Recommended for high-rise buildings, shopping malls, hospitals, airports, large commercial establishments, etc. The cabinets should be: 42U 800 mm wide x 800 mm deep 19 equipment cabinet Glass front door with provision for air circulation Steel rear door Jacking feet Horizontal cable management

Main elements of under-floor raceway systems


Distribution raceway Distribution raceway provides a pathway for the cables from the feeder raceway to the work areas. The minimum

11

12

Design guide

www.etisalat.ae

size of the distribution raceway should be 30 mm height x 60 mm width of cross-sectional area. The same size must be used for every (multi-channel) layout Feeder raceway Feeder raceway provides a pathway for the cables from the distribution box in the oor telecommunications room to the distribution raceways. The minimum size of the feeder raceway should be 40 mm height x 200 mm width of cross-sectional area. The same size must be used for every (multi-channel) layout The feeder raceways starting point in the oor telecommunications room must be adjacent to the distribution box. The Feeder raceway should end at the last distribution raceway it is serving Access unit The access unit provides access at the point of intersection of the feeder and the distribution raceways Cable trays Cable trays are mostly used for oors with raised tiles or oorings As a general guideline, cable trays that intersect must be provided with a transitional bend radius of 150 mm in all directions Exposed sheet metal edges must be provided with bushings or other means of protection such that cables will not be damaged during or after installation. Since cable trays are usually metallic, all sharp edges, burrs and screw tips that may come into contact with cabling should be removed The minimum access space between the sub-oor and the underside of the oor tile should be minimum 150 mm (6 in)

Etisalat should be consulted in the initial design stage to decide on the requirements if the building is designed for ofce use.

Typical building environment Minimum separation distance from power source <480V Condition Unshielded power lines or electrical equipment in proximity to open or non-metal pathways Unshielded power lines or electrical equipment in proximity to grounded metal conduit pathway Power lines enclosed in a grounded metal conduit (or equivalent shielding in proximity to grounded metal conduit pathway) Transformers and electric motors Fluorescent lighting <2kVA 130 mm 2-5kVA 300 mm 5kVA 600 mm

Room size For up to 100 extensions, the minimum oor space required is 2 m x 3 m For up to 400 extensions, the oor space required is 4 m x 4 m

Protection from electromagnetic interference


The following requirements apply to UTP cabling, as pathways and spaces used to carry or house telecommunications cabling. The proximity of cabling to electrical facilities and equipment that generate high levels of electromagnetic interference (EMI) should be taken into account for metallic cabling Sources of EMI include: power cables, photocopy equipment, electric motors, transformers, uorescent lighting, arc welders and induction heaters, etc. To avoid EMI, the telecommunications pathways, spaces and metallic cables should be installed with the following clearances: 41.2 m (4 ft) from large motors or transformers 40.3 m (1 ft) from conduit and cables used for electrical power distribution 412 cm (5 in) from uorescent lighting Pathways and metallic cables should cross perpendicular to uorescent lighting and electrical power cables or conduits Separation distance from power source During the design stages, separation of power and the Structured Cabling Systems (SCS) must be considered. Unshielded data cables should not be installed near sources of electromagnetism. The guidelines are listed on the next page.

65 mm

155 mm

300 mm

For large systems Etisalat must be consulted at the planning stage The room should have a minimum height of 3 m, be airconditioned, clean, and dry and free from dust Room general requirements

50 mm

155 mm

300 mm The room should be far away from high voltage plant. Other services/utility ducts should not run through this room and it should not be directly under a toilet or bathroom The room should provide ready access to Etisalat personnel and equipment but must be secured from unauthorized entry The room must be properly protected from the risk of ooding if provided in the basement or lower levels In multi-PBX user building, each PBX to have its own room Raised ooring should be provided when required depending on the PBX type For large PBX installations, air-conditioned battery room adjacent to the equipment room will be required. Etisalat will supply details at the design stage. The battery room should be provided with an exhaust fan. Conduit or tray is required between the equipment room and the battery room

1M 300 mm

1M 300 mm

1M 300 mm

Private Branch Exchange (PBX)


In case where communication systems with more than 64 extensions (i.e. PBX system) are required, special facilities need to be provided as follows: Equipment room A room for the exclusive use of Etisalat is needed for the telephone equipment. The room should be accessed by the underground cables and the distribution to the oor cables. The main telecom room can be considered for PABX installation in case of commercial single owner building.

13

14

Design guide

www.etisalat.ae

Direct sunlight should not fall in the PBX room. Curtains/ screens are to be provided for the windows if any Power conduit and telecom cable conduit must be separate Electrical requirements A minimum of two 13 amp 240 v A/C main outlets (via) UPS system should be provided. The actual mains power requirements will depend on the size and type of the PBX The room should be provided with an earth not more than 5 ohms Anti-static ooring should be provided, including the battery room The rooms must be provided with an emergency light, a smoke detector and a re alarm PABX can be installed in the main telecom room in the case of a single owner.

4) Where deviations/comments/amendments are advised on the design, drawings must be corrected and re-submitted for approval. 5) One set of approved As-Built drawings must be submitted along with the building completion certicate, which will be certied by Etisalat. 6) Etisalats responsibility is limited to provision and installation of ODFs, termination of bres, patching/ jumpering works and Optical Network Units (ONUs). 7) The owners are responsible for supply and installation of all internal FO cables from ODF (main telecom room) to ONU (customer premises) locations, provision of wall mounted or stand alone cabinets to accommodate ONU, power, patch panels, etc. and complete structured cabling system. 8) The indoor drop 2 F ber cables, should be from a popular brand and make, conforming to ITU standard G 652 single mode ber standards. 9) On completion of the requirements, any comments and snags advised by Etisalat building inspector, must be attended to by the contractor or owner of the building soon, to avoid delays in the issuance of the building completion certicate.

List of annexures

Annexure I type of entry box (JRC 4 & JRC 12) Annexure II typical examples

Important note
1) This design guide explains in general, all Etisalat requirements that will facilitate the provision of telecommunication services to new buildings, yet the requirements indicated in the NOC (No Objection Certicate) should be fully complied. 2) Architects/consultants/designers must liaise with Etisalat at the design stage and obtain Etisalat approval on the nal design drawings. 3) Minimum two sets of telephone design drawings must be submitted for study and approval, before tendering.

15

16

Design guide

www.etisalat.ae

Annexure 1

17

18

Design guide

www.etisalat.ae

Annexure 1
Typical telecom requirement in villas

Annexure 2

19

20

Design guide

www.etisalat.ae

Typical telecom requirement in multi-storey building

2
TYPICAL TELECOM REQUIREMENT IN VILLAS

Annexure 2

21

22

You might also like