The document outlines different approval codes and their meanings used in reviewing engineering documents for a power plant project: A - approved without exception, AC - approved with comments to be incorporated, RT - returned for correction due to insufficient information and resubmission required, RJ - complete redesign required, I - returned without comments, IC - returned with comments. The approval or comments do not relieve contractual obligations of the contractor.
The document outlines different approval codes and their meanings used in reviewing engineering documents for a power plant project: A - approved without exception, AC - approved with comments to be incorporated, RT - returned for correction due to insufficient information and resubmission required, RJ - complete redesign required, I - returned without comments, IC - returned with comments. The approval or comments do not relieve contractual obligations of the contractor.
The document outlines different approval codes and their meanings used in reviewing engineering documents for a power plant project: A - approved without exception, AC - approved with comments to be incorporated, RT - returned for correction due to insufficient information and resubmission required, RJ - complete redesign required, I - returned without comments, IC - returned with comments. The approval or comments do not relieve contractual obligations of the contractor.
APPROVED WITH COMMENTS AC Approved Subject to Incorporation of comments RETURNED FOR CORRECTION RT Insufficient Information/ Detail Resubmit for Approval REJECTED RJ Complete redesign required RECEIVED FOR INFORMATION I Returned without comments RECEIVED FOR INFORMATION IC Returned with comments any obligations covered under contract Engineer: Discipline: Date: Note: Approval or comments does not relieve the Contractor of Pyry Energy TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT W.Tritschler C&I