INSTITUTION OF SURVEYORS MALAYSIA

BUILDING COST INFORMATION CENTRE


ELEMENTAL COST ANALYSIS - Form 1
JOB TITLE : CLIENT :
LOCATION : TENDER DATE :
Project Details and Site Condition : Contract :

Market Conditions : Competitive
Contract Particulars :
Type of Contract : Cost Fluctuation : Yes RM
(with quantities) No
Basis of Tender Open/Selected Government
Bills of Quantities Competition
Private
Bills of Appr. Quant. Negotiated
Sched. of Rates/ Serials Provisional Sum RM
Spec. & Drawings
Prime Cost Sum RM
Contract Period Stip. by Client : Weeks
Preliminaries RM
Contract Period Offered by Builders : Weeks
Contingencies RM
Number of Tenders Issued :
Contract Sum RM
Number of Tenders Received :
Accomadation and Design Features :
The rectangular shaped building comprising of four storey with six bed room and and four bath room.
Areas: Functional Unit : m2
Percentage of Gross Floor Area
Lower Ground Floor m2
Ground Floor m2 External Wall Area (a) Below Grd. Flr. %
Upper Floor m2 Gross Floor Area
GROSS FLOOR AREA m2 (b) Single Storey %
= Construction
Usable Area m2
Circulation Area (cth corridor) m2 (c) Two-storey %
Ancillary Area (bkn function bgunan) m2 Construction
Internal Division ( m2 Storey Heights :
GROSS FLOOR AREA m2 (d) 3-storey %
Av. below Grd. Floor Construction
Floor Space NOT Enclosed m2
At Ground Floor m (e) 4-storey %
Roof Area m2 Construction
(Structural & Plant Rooms) Above Ground Floor m
Contact Sums RM Functional Unit Costs
Provisional Sums RM excluding external works: #DIV/0! per m2
Prime Cost Sums RM
Preliminaries RM being #DIV/0! of remainder
Contigencies RM being #DIV/0! Contract Sum
Contract Sums RM
(less Contigencies )
-
Design/Shapes
Brief Cost Information
-
-
-
INFORMATION TOTAL PROJECT
Project and Contract Information
Competitive Tender List
Int (Jv)/L
ANALYSIS OF SINGLE BUILDING
Design/Shape Information
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 2
GROSS FLOOR AREA : m2 TENDER DATE :
Total Cost Cost per m2 Element Unit Element Reinforced Reinforce- Formwork
of Element GFA Rate Ratio Concrete ment
RM RM RM per m2 GFA m3 kg m2
1 Substructure
1APiling #DIV/0! m #DIV/0! #DIV/0!
1B Work Below Lowest Floor Finish #DIV/0! m2 #DIV/0! #DIV/0!
Group Element Total #DIV/0!
2 Superstructure
2AFrame #DIV/0! m2 #DIV/0! #DIV/0!
2B Upper Floors #DIV/0! m2 #DIV/0! #DIV/0!
2C Roof #DIV/0! m2 #DIV/0! #DIV/0!
2DStairs #DIV/0! - -
2E External Walls #DIV/0! m2 #DIV/0! #DIV/0!
2F Windows & External Doors #DIV/0! m2 #DIV/0! #DIV/0!
2GInternal Walls & Partitions #DIV/0! m2 #DIV/0! #DIV/0!
2HInternal Doors #DIV/0! m2 #DIV/0! #DIV/0!
Group Element Total #DIV/0!
3 Finishes
3AInternal Wall Finishes #DIV/0! m2 #DIV/0! #DIV/0!
3B Internal Floor Finishes #DIV/0! m2 #DIV/0! #DIV/0!
3C Internal Ceiling Finishes #DIV/0! m2 #DIV/0! #DIV/0!
3DExternal Finishes #DIV/0!
Group Element Total #DIV/0!
4 Fittings and Furnishings #DIV/0! Tendered Sum
Group Element Total #DIV/0!
5 Services
5ASanitary Appliances #DIV/0! No. #DIV/0! #DIV/0!
5B Plumbing Installation #DIV/0! - -
5C Refuse Disposal #DIV/0! - -
5DAir-Conditioning & Ventilation #DIV/0!
System
5E Electrical Installation #DIV/0! - -
5F Fire Protection Installation #DIV/0! - -
5GLift & Conveyor Installation #DIV/0! - -
5HCommunication Installation #DIV/0! - -
5J Special Installation #DIV/0! - -
5KBuilder's Profit & Attendance #DIV/0! - -
on Services
5L Builder's Work in Connection #DIV/0! - -
with Services
Group Element Total #DIV/0!
Sub-total exc. External Works, #DIV/0!
Preliminaries and Contingencies
6 External Works
6ASite Work #DIV/0!
6B Drainage #DIV/0!
6C External Services #DIV/0!
6DAncillary Buildings #DIV/0!
6E Recreational Facilities #DIV/0!
Group Element Total #DIV/0!
Preliminaries #DIV/0!
TOTAL (less Contingencies) #DIV/0!
SUMMARY OF ELEMENT COSTS
Preliminaries Shown Separately
Element
Unit
Quantity
P.C. Sums Allowed
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 3
GROSS FLOOR AREA : m2 TENDER DATE :
ELEMENT
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish
2 Superstructure
2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & External Doors
2G Internal Walls & Partitions
2H Internal Doors
3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings
5 Services
5A Sanitary Appliances
5B Plumbing Installation
5C Refuse Disposal
5D Air-Conditioning & Ventilation
System
5E Electrical Installation
5F Fire Protection Installation
5G Communication Installation
5H Lift & Conveyor Installation
5J Special Installation
5K Builder's Profit & Attendance
on Services
5L Builder's Work in Connection with Services
6 External Works
6A Site Work
6B Drainage
6C External Services
BRIEF SPECIFICATION
SPECIFICATION
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 3
GROSS FLOOR AREA : m2 TENDER DATE :
ELEMENT
BRIEF SPECIFICATION
SPECIFICATION
6D Ancillary Buildings
6E Recreational Facilities