You are on page 1of 8

MONTHLY CONSTRUCTION ACTIVITIES

DATE DESCRIPTION MANPOWER


PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Casting concrete for Lavabo plateform of W.C in 1st Floor (zone A)
2 Steel structure for roof Floor of main building
3 Steel structure for roof Floor of main gate
December 24, 2019

4
MEP WORK
145
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Moulding work for Fence (zone A and B)
5
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Casting concrete for Lavabo plateform of W.C in 1st Floor (zone A)
2 Steel structure for roof Floor of main building
3 Steel structure for roof Floor of main gate
December 25, 2019

4
MEP WORK
142
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Providing wire mesh to plaster outside wall surface of Elevator box for 3rd and 2nd Floor
5 Moulding work for Fence (zone A and B)
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Casting concrete for Lavabo plateform of W.C in 1st, 2nd and 3rd Floor (zone A)
2 Steel structure for roof Floor of main building
3 Steel structure for roof Floor of main gate
December 26, 2019

4
MEP WORK
136
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Providing wire mesh to plaster outside wall surface of Elevator box for 3rd and 2nd Floor
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3

December 27, 2019


MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
129
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3
December 28, 2019

4
MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor 124
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangment for Curb of basement Ramp (zone B)
December 30, 2019

4
MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor 123
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangment for Curb of basement Ramp (zone B)
4 Reinforced bar arrangment for outside stair between Baement and 1st Floor (zone A&B)

January 2, 2020
5
MEP WORK
133
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangment for Curb of basement Ramp (zone B)
4 Reinforced bar arrangment for outside stair between Baement and 1st Floor (zone A&B)
January 3, 2020

5
MEP WORK
144
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangment for Curb of basement Ramp (zone B)
4 Casting concrete for outside Staircase between Basement and 1stFloor (zone A &B)
January 4, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor 146
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd and 3rd Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Casting concrete for Curb of Ramp (zone B)
4 Stripped off the formwork for Curb of Ramp (zone B)

January 6, 2020
MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor 132
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Stripped off the formwork for Curb of Ramp (zone B)
4
January 8, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
141
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangement for Arches beam to tie Glass of Main Entrance
4
January 9, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
152
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangement for Arches beam to tie Glass of Main Entrance
4

January 10, 2020


MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
146
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangement for Arches beam to tie Glass of Main Entrance
4
January 11, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
139
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Rebar arrangement for Arches beam to tie Glass of Main Entrance
4
January 14, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
151
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Interior Plastering for 5th Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Formwork for Arches beam that tie with glass of Main gate
4

January 15, 2020


MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
164
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Formwork for Arches beam that tie with glass of Main gate
4
January 16, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
158
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Casting concrete for Arches Beam of Glass panel in Main Entrance
4
January 17, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
69
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Stripped off the formwork for Arches beam of Main Entrance
4

January 18, 2020


MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
159
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Soil compaction for Landscape and Road access work
PRELIMINARY
1 Demolition the temporary warehouse of Sub-contractor after Structural work completed
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Stripped off the formwork for Arches beam of Main Entrance
4
January 20, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor 156
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Brickwork for 6th Floor (Exterior and Interior Wall)
8 Soil compaction for Landscape and Road access work
PRELIMINARY
1 Demolition the temporary warehouse of Sub-contractor after Structural work completed
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Roof tile for Main gate
4
January 21, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor 159
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Brickwork for 6th Floor (Exterior and Interior Wall)
8
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Roof tile for Main gate
4

January 22, 2020


MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor 145
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Brickwork for 6th Floor (Exterior and Interior Wall)
8
PRELIMINARY
1
2
3
STRUCTURAL WORK
1 Steel structure for roof Floor of main building
2 Steel structure for roof Floor of main gate
3 Roof tile for Main gate
4
January 23, 2020

MEP WORK
1 Installing electrical pipe for electrical system for 1st, 2nd, 3rd, 4th and 5th Floor
2 Water pipe for clean and waste water installing for 1st, 2nd, 3rd, 4th and 5th Floor 110
3 Lighting system instalation for 1st and 2nd Floor
4
ARCHITURAL WORK
1 Railling work for Bacony for 2nd Floor
2 Installing Ceiling structure for 2nd, 3rd and 4th Floor
3 Single coat for Ceiling panel jont using fiber tape of 1st and 2nd Floor
4 Plastering work for outside surface of elevator box for 3rd and 2nd Floor (zone A)
5 Moulding work for Fence (zone A and B) and moulding of column of main entrance
6 Floor tile and wall tile (WC) work of Classroom for 3rd,2nd Floor
7 Brickwork for 6th Floor (Exterior and Interior Wall)