BOP MAINTENANCE

(AHP)

1
Mr. A S Yadav
APNRL 2 X 270 MW FEB MONTH PPT
.
PM SCH MAJOR DEFECTS TOTAL
GEND ATTD RAISED ATTD RAISED ATTD
Nos.
66 61 10 09 76 69
%
92.42 90 90.78
2
MONTH HIGHLIGHTS
PROPER HOUSEKEEPING HAS BEEN ACHIEVED OF ENTIRE ASH
HANDLING SYSTEM INCLUDING ESP-1 & ESP-2
1. Checking of all the 64 nos. ESP hoppers during shutdown of unit-1
2. Proper housekeeping done of ESP-1 & ESP-2
3. Completed all critical breakdowns like vacuum pump, drain pumps and seal water
pumps.

1
ASH GENERATION
6
6
5
9
7

7
2
2
2
5

5
3
4
3
0
.
0
0

6
7
4
7
0
.
0
0

7
4
2
6
0
.
0
0

7
1
1
6
4
.
0
0

4
3
3
8
0
.
0
0

4
7
0
8
6
.
0
0

4
3
7
3
0
.
0
0

4
5
5
7
2
.
0
0

5
5
2
9
0
.
0
0

5
1
1
9
8
.
0
0

6
5
4
5
5
.
0
0

0

5
3
2
7
8

5
7
7
8
0

4
1
1
4
1

5
1
9
5
1

5
7
1
8
0

5
4
7
9
7

3
3
4
0
2

3
6
2
5
6

3
3
6
7
2

3
5
7
9
1

4
4
2
3
2

4
0
9
5
8

5
2
3
6
4

1
3
3
1
9

1
4
4
4
5

1
2
2
8
9

1
5
5
1
8
.
1

1
7
0
8
0

1
6
3
6
7

9
9
7
7
.
4
2

1
0
8
3
0

1
0
0
5
8

9
7
8
1

1
1
0
5
8

1
0
2
4
0

1
3
0
9
1

0
10000
20000
30000
40000
50000
60000
70000
80000
Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14
A
S
H

(
M
T
)

TOTAL ASH
FLY ASH
WET ASH
3
WATER CONSUMPTION : DESIGN Vs ACTUAL
0

0

0

1
9
1
0
0
0

1
9
1
0
0
0

1
9
9
0
0
0

1
9
9
0
0
0

1
0
0
0
0
0

8
5
0
0
0

9
0
9
2
7

9
3
0
6
3

1
0
6
9
3
2

1
0
5
1
0
0

1
0
7
0
0
0

1
4
3
7
2
9

2
4
1
6
8
5

1
9
1
0
0
0

1
7
0
8
9
9

1
9
5
5
9
9
.
8
5

2
1
4
7
2
2

1
8
9
9
1
1

9
4
3
1
1

8
4
1
3
1

8
5
6
3
4

9
3
0
6
3

9
1
5
3
3

9
8
0
0
0

1
0
7
0
0
0

0
50000
100000
150000
200000
250000
300000
W
A
T
E
R

C
O
N
S
U
M
P
T
I
O
N

(
M
3
)

DESIGN WATER CON
ACTUAL WATER CON
4
Sl. No.
MAJOR CONSTRAINTS IMPACT
1
CONSTRUCTION OF PERMANENT ASH DYKE

CAUSES OF FREQUENT CHOCKING OF
CLARIFIER AND ASH SILO
2
FLY ASH DISPOSAL- STORAGE/TRANSPORTATION
(unavailability of cement plant/brick plant/vendor)
CAUSES OF AIR AND SOIL POLLUTION AND
ALSO LEVEL OF ASH SILO INCREASES
FREQUENTLY
3
ORDERING & INSTALLATION OF HCSD SYSTEM TO
MINIMISE WATER CONSUMPTION IN DEASHING
IT WILL REDUCE ALMOST 40% LESS WATER
CONSUPMTION
5
APNRL 2 X 270 MW JUNE MONTH PPT