Professional Documents
Culture Documents
(AHP)
1
Mr. A S Yadav
APNRL 2 X 270 MW FEB MONTH PPT
.
PM SCH MAJOR DEFECTS TOTAL
GEND ATTD RAISED ATTD RAISED ATTD
Nos.
66 61 10 09 76 69
%
92.42 90 90.78
2
MONTH HIGHLIGHTS
PROPER HOUSEKEEPING HAS BEEN ACHIEVED OF ENTIRE ASH
HANDLING SYSTEM INCLUDING ESP-1 & ESP-2
1. Checking of all the 64 nos. ESP hoppers during shutdown of unit-1
2. Proper housekeeping done of ESP-1 & ESP-2
3. Completed all critical breakdowns like vacuum pump, drain pumps and seal water
pumps.
1
ASH GENERATION
6
6
5
9
7
7
2
2
2
5
5
3
4
3
0
.
0
0
6
7
4
7
0
.
0
0
7
4
2
6
0
.
0
0
7
1
1
6
4
.
0
0
4
3
3
8
0
.
0
0
4
7
0
8
6
.
0
0
4
3
7
3
0
.
0
0
4
5
5
7
2
.
0
0
5
5
2
9
0
.
0
0
5
1
1
9
8
.
0
0
6
5
4
5
5
.
0
0
0
5
3
2
7
8
5
7
7
8
0
4
1
1
4
1
5
1
9
5
1
5
7
1
8
0
5
4
7
9
7
3
3
4
0
2
3
6
2
5
6
3
3
6
7
2
3
5
7
9
1
4
4
2
3
2
4
0
9
5
8
5
2
3
6
4
1
3
3
1
9
1
4
4
4
5
1
2
2
8
9
1
5
5
1
8
.
1
1
7
0
8
0
1
6
3
6
7
9
9
7
7
.
4
2
1
0
8
3
0
1
0
0
5
8
9
7
8
1
1
1
0
5
8
1
0
2
4
0
1
3
0
9
1
0
10000
20000
30000
40000
50000
60000
70000
80000
Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14
A
S
H
(
M
T
)
TOTAL ASH
FLY ASH
WET ASH
3
WATER CONSUMPTION : DESIGN Vs ACTUAL
0
0
0
1
9
1
0
0
0
1
9
1
0
0
0
1
9
9
0
0
0
1
9
9
0
0
0
1
0
0
0
0
0
8
5
0
0
0
9
0
9
2
7
9
3
0
6
3
1
0
6
9
3
2
1
0
5
1
0
0
1
0
7
0
0
0
1
4
3
7
2
9
2
4
1
6
8
5
1
9
1
0
0
0
1
7
0
8
9
9
1
9
5
5
9
9
.
8
5
2
1
4
7
2
2
1
8
9
9
1
1
9
4
3
1
1
8
4
1
3
1
8
5
6
3
4
9
3
0
6
3
9
1
5
3
3
9
8
0
0
0
1
0
7
0
0
0
0
50000
100000
150000
200000
250000
300000
W
A
T
E
R
C
O
N
S
U
M
P
T
I
O
N
(
M
3
)
DESIGN WATER CON
ACTUAL WATER CON
4
Sl. No.
MAJOR CONSTRAINTS IMPACT
1
CONSTRUCTION OF PERMANENT ASH DYKE
CAUSES OF FREQUENT CHOCKING OF
CLARIFIER AND ASH SILO
2
FLY ASH DISPOSAL- STORAGE/TRANSPORTATION
(unavailability of cement plant/brick plant/vendor)
CAUSES OF AIR AND SOIL POLLUTION AND
ALSO LEVEL OF ASH SILO INCREASES
FREQUENTLY
3
ORDERING & INSTALLATION OF HCSD SYSTEM TO
MINIMISE WATER CONSUMPTION IN DEASHING
IT WILL REDUCE ALMOST 40% LESS WATER
CONSUPMTION
5
APNRL 2 X 270 MW JUNE MONTH PPT