You are on page 1of 1

WORK PROGRESS REPORT OF INSTALLATION OF DG RADIATOR CANVAS

QAP / CL / HTIPL / GMM/SYN / DG&HSD - 059



PROJECT: HUAWEI ZONE/BUILDING: SERVICE BLOCK DG ROOM
FLOOR/LEVEL: Ground Floor
GRID: NIL
DATE:02
ND
MAY 2014

NAME OF THE SUPPLIER: GMMCO LTD
Approved Drawing No. Ref. : SD-HTIPL-DG-LD-2275/2000-001
CHECK POINTS Vendor PMC CLIENT
Sl# Description NA Y N Sign Y N Sign Y N Sign
1
Check the Material accordance
with specification and approved
drawings

2
Check the Gap Between the
Radiator & Ducting

3
Check the Double Layer Canvas
Cloth, if any damages

4
Check the opening provided for
radiator drain valve

5
Check the Canvas, if any excess,
for aesthetic view

6
Check the Basic primer &
Painting before installing the
canvas.

Installation Details

Double Layer Canvas for DG Radiator Duct 7 DG Sets.
(4 x 2275 KVA HT DG SETS & 3 x 2000 KVA LT DG SETS)


COMMENTS / CORRECTIVE ACTION PROPOSED:



Documents Attached: Photography Report.

Vendor Rep Signature: SYNERGY Civil / Services Rep Signature:
NAME: NAME:
DATE: DATE:

Consultant Rep Signature: Client Rep Signature (Not Mandatory):
NAME: NAME:
DATE: DATE: