WORK PROGRESS REPORT OF INSTALLATION OF DG RADIATOR CANVAS
QAP / CL / HTIPL / GMM/SYN / DG&HSD - 059
PROJECT: HUAWEI ZONE/BUILDING: SERVICE BLOCK DG ROOM FLOOR/LEVEL: Ground Floor GRID: NIL DATE:02 ND MAY 2014
NAME OF THE SUPPLIER: GMMCO LTD Approved Drawing No. Ref. : SD-HTIPL-DG-LD-2275/2000-001 CHECK POINTS Vendor PMC CLIENT Sl# Description NA Y N Sign Y N Sign Y N Sign 1 Check the Material accordance with specification and approved drawings
2 Check the Gap Between the Radiator & Ducting
3 Check the Double Layer Canvas Cloth, if any damages
4 Check the opening provided for radiator drain valve
5 Check the Canvas, if any excess, for aesthetic view
6 Check the Basic primer & Painting before installing the canvas.
Installation Details
Double Layer Canvas for DG Radiator Duct 7 DG Sets. (4 x 2275 KVA HT DG SETS & 3 x 2000 KVA LT DG SETS)