Overlay Widening Overlay Widening

Wearing Course 40 40 40 40
Binder Course 60 60 60 60
ABC 200 200 200 200
Sub Base 175 400 100 250
Geo Grid
Overlay (For 3.75 m) Widening Overlay (For 3.75 m) Widening
Sub Base 1,864,800.00 2,784,768.00 1,065,600.00 1,740,480.00
Geo Grid
REHABILITATION & UPGRADING OF NAULA-ELAHERA-LAGGALA-PALLEGAMA-HETTIPOLA ROAD (B 312) FROM CH 33+500 km TO CH 44+000 km & FROM CH
57+000 km TO CH 59+000 km & HASALAKA-HANDUNGAMUWA ROAD (B 484) FROM CH 20+000 km TO CH 45+000 km / (Contract Package
No:RDA/DW/CP/GOSL/2012/233)
Cost Saving From Pavement design form R&D Division -RDA for B 484 (Hasalaka - Handungamuwa Road)
Thicknesses / mm
21+000 - 22+480
Pavement Design from R&D -RDA Pavement Design from Design Office -RDA
Cost / Rs.
21+000 - 22+480 Cost Saving from
R&D Design for
1.48 km
Cost Saving from
R&D Design for 1km
Pavement Design from R&D -RDA Pavement Design from Design Office -RDA
3,350,128.00 2,263,600.00
- 5,193,616.00
Local failure Sections in existing pavement Over the design pavement Full length