00Km in the District of Kandhamal under RIDF XXVI Project for the year 2022-23.
SCHEDULE OF WORKS Price component as per arrived analysis Amount
Sl. Description of work No.or Estimated Rate AMOUNT
31( a) (i) Other 31( a) (ii) 31( a) (iii) 31( a) 31( a) 31 ( c) 31 ( d )
No. Qty. Rs. P 31 ( b)Labour Total Check 31( a) (i) Other Material 31( a) (ii) Cement 31( a) (iii) Steel 31( a) (iv)Bitumen 31( a) (v)Pipes 31 ( b)Labour 31 ( c)POL 31 ( d )Machineries Total Check
Unit Material Cement Steel (iv)Bitumen (v)Pipes POL Machineries
Figure Words 1 2 3 4 5 6 7 8 9 10 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20
1 Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth
up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, up to a lead of 57744.00 Sqm 5.96 #NAME? 344046.37 0.06 5.88 0.02 5.96 0.00 3,406.43 - - - - 3,39,306.05 - 1,333.89 3,44,046.37 0.00
1000 metres including removal and disposal of top organic
soil not exceeding 150 mm in thickness. as per approved
Drawing & Technical Specifications and as per Clause - 201
of MoRT&H Specifications for Road & Bridge works (5th
2 Revision).
Dismantling Brick / RR HG work in cement mortar including
T&P and scaffolding wherever necessary sorting the
dismantled material, disposal of,unserviceable material and 434.47 Cum 287.79 125036.12 2.86 235.04 49.89 287.79 0.00 1,241.19 - - - - 1,02,118.52 - 21,676.40 1,25,036.12 0.00
stacking the serviceable material with all lifts and lead of
1000 metres etc.complete as per Clause -202 of MoRT&H
Specifications for Road & Bridge works (5th Revision).
3 Dismantling cement concrete of M-15 and M-20 including
T&P and scaffolding wherever necessary, sorting the
dismantled materials disposal of unserviceable materials
and stacking the serviceable materials with all lifts and lead 73.26 Cum 446.04 32676.89 4.41 391.74 49.89 446.04 0.00 323.25 - - - - 28,698.58 - 3,655.06 32,676.89 0.00
of 1000m etc.complete as per Clause -202 of MoRT&H
Specifications for Road & Bridge works (5th Revision).
4.1 Up to 600 mm dia 180.00 RM 205.83 37049.40 2.04 203.79 205.83 0.00 366.93 - - - - 36,682.47 - - 37,049.40 0.00
5 Excavation for roadwork in soil with hydraulic excavator of
0.9cum bucket capacity including cutting and loading in
tippers, trimming bottom and side slopes, in accordance with 13798.50 Cum 42.46 #NAME? 585884.31 0.42 2.18 39.87 42.46 0.00 5,753.40 - - - - 30,029.83 - 5,50,101.08 5,85,884.31 0.00
requirements of lines, grades and cross sections, and
transporting to the embankment and as per MoRT&H
Specifications etc complete
6 Scarifing the existing bituminous road surface to a depth of
50mm and disposal of scarified material with in all lifts and 49166.25 Sqm 3.60 0.04 0.98 2.58 3.60 0.00 2,110.95 - - - - 48,150.48 - 1,26,737.07 1,76,998.50 0.00
#NAME? 176998.50
lead upto 1000meters
27.1 Direction /place indentification sign(1200x1800)mm 43.20 Sqm 17531.17 757346.54 14758.03 312.30 2196.27 236.82 27.75 17531.17 0.00 6,37,547.04 13,491.18 94,878.86 - - 10,230.77 - 1,198.69 7,57,346.54 0.00
28 Providing and laying Plain cement concrete of grade M-15
in levelling course of CD works etc as levelling coarse
complete as per drawing and technical specification using
High Strength approved quality Cement and coarse granite
aggregate conforming to Table 1000-1 with formwork as per 404.81 Cum 4408.73 1784697.99 2081.65 1588.45 571.84 166.80 4408.73 0.00 8,42,671.10 6,43,018.49 - - - 2,31,485.85 - 67,522.55 17,84,697.99 0.00
Section 900,1000,1500,1700, 2100 & 2200 of specifications
for Road and Bridge works of Ministry of Road Transport &
Highways (4th Revision) & including cost of all materials,
labour, T&P, taxes, royalty etc complete in all respect and as
29 per direction
Providing andoflaying
the Engineer-in-charge.
Plain cement concrete of grade M-15
in foundation of CD works etc as levelling coarse complete
as per drawing and technical specification using High
Strength approved quality Cement and coarse granite
aggregate conforming to Table 1000-1 with formwork as per
1073.47 Cum 4460.07 #NAME? 4787740.19 2132.99 1588.45 571.84 166.80 4460.07 0.00 22,89,691.11 17,05,144.26 - - - 6,13,849.79 - 1,79,055.02 47,87,740.19 0.00
Section 900,1000,1500,1700, 2100 & 2200 of specifications
for Road and Bridge works of Ministry of Road Transport &
Highways (4th Revision) & including cost of all materials,
labour, T&P, taxes, royalty etc complete in all respect and as
per direction of the Engineer-in-charge.
59.0 Painting two coats with synthetic enamel paint over a cote of
primer of approved quality at any elevation on kerb, guard
post and other structures etc for the finished item of work as 1392.30 Sqm 61.38 85459.37 26.82 0.00 - 0.00 0.00 34.56 0.00 0.00 61.38 - 37,348.17 - - - - 48,111.20 - - 85,459.37 0.00
per techinical specifications complete in all irespect as per
section 800 of MoRT&H specification for Road & Bridge
Total estimated cost in Figures 201226504.94
Quoted Amount 201226505.00
Quoted rate in Words