ON-SITE PERFORMANCE EVALUATION SHEET

ULTRASONIC TESTING METHOD


OPERATORS NAME: OVERALL REMARKS:
1. Satisfact!".
#. F$!t%&! t!ai'i'( !&)$i!&* '+".
,. F$!t%&! t!ai'i'(- !&-&.a/i'ati' 0
R&c&!tificati'
1. R&23& c&!tificat&.
ID:
Dat& f Ass&ss/&'t:
Lcati':
FIELD ASSESSMENT POINTS 4&s 5'. R&/a!3s
1. Whether the technician is having the proper procedure with
him for performing the job?
2. Does he have understanding of the applicability of the
procedure & acceptance standards?
3. Does he carry a copy of valid evel !! certificate with him?
". #re all the steps ade$uately followed during the e%amination
as instructed in the procedure?
&. Does he carry the e$uipment calibration certificate copy'
batch certificates with him?
(. Does he chec) the surface preparation prior to start of the test?
*. Does he have ade$uate )nowledge about the test variables?
+. Does he receive the actual weld' job configuration prior to
start of job from client?
,. -as he chec)ed the instrument for linearity prior to start of
test? -ow often he chec)s the instrument linearity during the
e%amination period?
1.. -as he chec)ed the probes' cables for any damage or
variation in probe angle' inde% point'internal reflections'noise
etc.?
11. -as he prepared proper scan plan or carry instruction sheet
how to do the scanning to ensure complete coverage?
12. /an he be able to discriminate between relevant and non0
relevant indications?
13. /an he answer all relevant $uestions as)ed by #!'12#?
1". 3ood house)eeping is maintained?
1&. !s he aware of the ethics' 4uality policy of !5627/?
1(. Does he follow all the safety rules e%isting at the wor) site?
1*. #re the individual8s interpretation'evaluation s)ills ade$uate?
1+. !s he preparing reports in compliance with the approved
procedures?
G&'&!a+ C//&'ts 6if a'"7:
Ass&ss/&'t 8":
Na/&:
L&2&+:
D&si('ati':