Project Formwork and Concrete Costing Tables


Concrete Volume and Cost
Floor

rb

Elements
Slab
Beam
Column
RC Wall

Grade
30
30
30
30
SubTotal

1b

Slab
Beam
Column
RC Wall

30
30
30
30
SubTotal

gb

Slab
Beam
Column
RC Wall

30
30
30
30
SubTotal

Foundation

Pad
Pile

30
30

Volume (m)
0.000
6.724
3.510
0.000
10.234
11.805
9.380
5.400
0.000
26.585
11.227
9.343
5.400
0.000
25.970
17.290
0.000

Raw (RM)
0.00
1,008.60
526.50
0.00
1,535.10
1,770.75
1,407.00
810.00
0.00
3,987.75
1,684.05
1,401.45
810.00
0.00
3,895.50
2,593.50
0.00

Placement (RM)
0.00
1,681.00
877.50
0.00
2,558.50
2,951.25
2,345.00
1,350.00
0.00
6,646.25
2,806.75
2,335.75
1,350.00
0.00
6,492.50
4,322.50
0.00

Lean Concrete Volume and Cost


Floor
rb

1b

gb
Foundation

Elements
Slab
Beam
SubTotal
Slab
Beam
SubTotal
Slab
Beam
SubTotal
Pad
Pile

Lean Concrete (m)


0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.006
0.000

Raw (RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.08
0.00

Placement (RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.14
0.00

Raw (RM)
0.00
2,017.20
1,170.00
0.00

Placement (RM)
0.00
2,420.64
1,404.00
0.00

Formwork Area and Cost (Exclude Opening for RC Wall)


Floor
rb

Elements
Slab
Beam
Column
RC Wall

Formwork Area (m)


0.000
80.688
46.800
0.000

1b

gb

Foundation

SubTotal
Slab
Beam
Column
RC Wall
SubTotal
Slab
Beam
Column
RC Wall
SubTotal
Pad
Pile

127.488
94.441
112.560
72.000
0.000
279.001
90.059
112.116
72.000
0.000
274.175
37.440
0.000

3,187.20
1,888.82
2,814.00
1,800.00
0.00
6,502.82
1,801.18
2,802.90
1,800.00
0.00
6,404.08
936.00
0.00

3,824.64
2,833.23
3,376.80
2,160.00
0.00
8,370.03
2,701.77
3,363.48
2,160.00
0.00
8,225.25
1,123.20
0.00

Project Earth Excavation Costing Tables


Earth Excavation Volume and Cost
Floor
Foundation

Elements
Pad
Pile

Earth Excavation (m)


200.609
0.000

Placement (RM)
3,009.14
0.00

Project Reinforcement Costing Tables


Bar and Cost
Floor
rb

1b

gb

Pad

Diameter
T10
T12
T16
T10
T12
T16
T20
T32
T10
T12
T16
T20
T32
R6
T12

Weight (kg)
430.938
390.167
18.964
2,011.560
536.410
186.394
114.723
75.869
1,963.231
560.355
91.420
174.715
305.197
68.315
1,100.336

Raw (RM)
861.88
780.33
37.93
4,023.12
1,072.82
372.79
229.45
151.74
3,926.46
1,120.71
182.84
349.43
610.39
136.63
2,200.67

Placement (RM)
1,077.34
975.42
47.41
5,028.90
1,341.02
465.98
286.81
189.67
4,908.08
1,400.89
228.55
436.79
762.99
170.79
2,750.84

Fabric and Cost


Floor

Fabric Brand

Fabric Name

Weight (kg)

Raw (RM)

Placement (RM)

Total Project Costing with Pad Foundation


Material
Concrete
Lean Concrete
Formwork
Earth Excavation
Bar
Fabric
Total

Raw (RM)
12,011.85
45.08
17,030.10
16,057.19
0.00
45,144.22

Placement (RM)
20,019.75
75.14
21,543.12
3,009.14
20,071.49
0.00
64,718.63

Total Project Costing with Pile Foundation


Material
Concrete
Lean Concrete
Formwork
Earth Excavation
Bar
Fabric
Total

Raw (RM)
9,418.35
0.00
16,094.10
13,719.89
0.00
39,232.34

Placement (RM)
15,697.25
0.00
20,419.92
0.00
17,149.86
0.00
53,267.03