Form No.

HIRARC Action Plan Form Attachment 6


Activities: Handling sharp object knife, etc

HIRARC No: Attachment 2

Consider: Hierarchy of Control Measures such as Elimination , Substitution, Engineering Control, Administrative Control (eg: S&H Training; Specific WI to be developed;
Personnel Competency, Enforcement, Regular inspection, etc) and lastly, PPE.

No

Further Control Measures to be taken

Who

Dept.

Due Date

Training/ Briefing

Admin/ Technician

Bio-Engineering

1/12/2014

Install containment for sharp object

Technician

Bio-Engineering

1/12/2014

Sign: ______________

Cost
(Estimated)

Status
(Blank Not
completed)
Completed

RM 100

Prepared By (HIRARC Team Member)

: Name: RAHIZAL BIN RAHIM

Date: 25/10/2014

Reviewed By (HSE Officer)

: Name: SYAINIZAM BIN MD PADOLLAH

Sign: ______________

Date: 25/10/2014

Approved By (HOD)

: Name: ZAINAL ABIDDIN MOHD YUSOF

Sign: ______________

Date: 25/10/2014