Professional Documents
Culture Documents
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Number of Buses:
Number of Branches:
SIANG
MALAM
None
Swing
V-Control
Load
Total
366
367
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
177
189
366
Method of Solution:
Newton-Raphson Method
9999
Precision of Solution:
0.0001000
System Frequency:
50.00 Hz
Unit System:
Metric
Project Filename:
Penyulang_Kangkung_asli
Output Filename:
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Adjustments
Apply
Tolerance
Individual
Adjustments
/Global
Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
No
No
Cable Length:
No
Apply
Individual
Adjustments
/Global
Yes
Individual
Cable Resistance:
Yes
Individual
Temperature Correction
Percent
Degree C
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Bus 1
20.000
Bus 2
20.000
100.0
0.0
100.0
0.0
Bus2
Bus3
0.400
100.0
0.0
20.000
100.0
0.0
Bus 3
Bus 4
20.000
100.0
0.0
0.400
100.0
Bus5
0.400
Bus 5
20.000
Bus6
20.000
Bus 6
Bus 7
Constant kVA
MW
Mvar
0.002
0.001
0.0
0.014
0.008
100.0
0.0
0.009
100.0
0.0
100.0
0.0
20.000
100.0
0.0
20.000
100.0
0.0
Bus7
20.000
100.0
0.0
Bus 8
20.000
100.0
0.0
Bus 9
20.000
100.0
0.0
Bus 10
20.000
100.0
0.0
Bus10
0.400
100.0
0.0
Bus 11
20.000
100.0
0.0
Bus11
20.000
100.0
0.0
Bus 12
20.000
100.0
0.0
Bus12
0.400
100.0
0.0
Bus13
20.000
100.0
0.0
Bus 13
20.000
100.0
0.0
Bus 14
20.000
100.0
0.0
Bus14
0.400
100.0
0.0
Bus 15
20.000
100.0
0.0
Bus15
0.400
100.0
0.0
Bus 16
20.000
100.0
0.0
Bus16
20.000
100.0
0.0
Bus 17
20.000
100.0
0.0
Bus17
20.000
100.0
0.0
Bus18
0.400
100.0
0.0
Bus 18
20.000
100.0
0.0
Bus 19
20.000
100.0
0.0
Bus19
20.000
100.0
0.0
Constant Z
MW
Constant I
Mvar
0.009
0.005
0.000
-1.200
0.054
0.034
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Bus20
0.400
100.0
0.0
Bus 20
20.000
100.0
0.0
Bus21
20.000
100.0
0.0
Bus 21
20.000
100.0
0.0
Bus22
20.000
100.0
0.0
Bus 22
20.000
100.0
0.0
Bus 23
20.000
100.0
0.0
Bus23
0.400
100.0
0.0
Bus 24
20.000
100.0
0.0
Bus24
0.400
100.0
0.0
Bus25
20.000
100.0
0.0
Bus 25
20.000
100.0
0.0
Bus26
20.000
100.0
0.0
Bus 26
20.000
100.0
0.0
Bus27
0.400
100.0
0.0
Bus 27
20.000
100.0
0.0
Bus 28
20.000
100.0
0.0
Bus28
20.000
100.0
0.0
Bus 29
20.000
100.0
0.0
Bus29
20.000
100.0
0.0
Bus30
0.400
100.0
0.0
Bus 30
20.000
100.0
0.0
Bus31
20.000
100.0
0.0
Bus 31
20.000
100.0
0.0
Bus 32
20.000
100.0
0.0
Bus32
0.400
100.0
0.0
Bus 33
20.000
100.0
0.0
Bus33
0.400
100.0
0.0
Bus 34
20.000
100.0
0.0
Bus34
20.000
100.0
0.0
Bus35
20.000
100.0
0.0
Bus 35
20.000
100.0
0.0
Bus 36
20.000
100.0
0.0
Bus36
0.400
100.0
0.0
Bus 37
20.000
100.0
0.0
Bus37
20.000
100.0
0.0
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.009
0.005
0.034
0.021
0.004
0.003
0.017
0.011
0.009
0.005
0.034
0.021
0.004
0.003
0.017
0.011
0.004
0.003
0.017
0.011
0.004
0.003
0.017
0.011
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Bus38
0.400
100.0
0.0
Bus 38
20.000
100.0
0.0
Bus 39
20.000
100.0
0.0
Bus39
20.000
100.0
0.0
Bus40
0.400
100.0
0.0
Bus 40
20.000
100.0
0.0
Bus 41
20.000
100.0
0.0
Bus41
20.000
100.0
0.0
Bus 42
20.000
100.0
0.0
Bus42
0.400
100.0
0.0
Bus43
20.000
100.0
0.0
Bus 43
20.000
100.0
0.0
Bus 44
20.000
100.0
0.0
Bus44
0.400
100.0
0.0
Bus 45
20.000
100.0
0.0
Bus45
0.400
100.0
0.0
Bus 46
20.000
100.0
0.0
Bus46
20.000
100.0
0.0
Bus47
20.000
100.0
0.0
Bus 47
20.000
100.0
0.0
Bus 48
20.000
100.0
0.0
Bus 49
20.000
100.0
0.0
Bus 50
20.000
100.0
0.0
Bus 51
20.000
100.0
0.0
Bus51
0.400
100.0
0.0
Bus52
20.000
100.0
0.0
Bus 52
20.000
100.0
0.0
Bus53
0.400
100.0
0.0
Bus 53
20.000
100.0
0.0
Bus 54
20.000
100.0
0.0
Bus 55
20.000
100.0
0.0
Bus 56
20.000
100.0
0.0
Bus 57
20.000
100.0
0.0
Bus 58
20.000
100.0
0.0
Bus58
0.400
100.0
0.0
Bus 59
20.000
100.0
0.0
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
0.004
0.003
0.017
0.011
0.004
0.003
0.017
0.011
0.004
0.003
0.017
0.011
0.009
0.005
0.034
0.021
0.002
0.001
0.009
0.005
0.002
0.001
0.009
0.005
0.002
0.001
0.009
0.005
0.009
0.005
0.034
0.021
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
Bus59
0.400
100.0
0.0
0.014
0.008
0.054
0.034
Bus60
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus 60
20.000
100.0
0.0
Bus61
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus 61
20.000
100.0
0.0
Bus62
20.000
100.0
0.0
Bus 62
20.000
100.0
0.0
Bus 63
21.000
100.0
0.0
Bus63
20.000
100.0
0.0
Bus 64
20.000
100.0
0.0
Bus64
20.000
100.0
0.0
Bus 65
20.000
100.0
0.0
Bus65
20.000
100.0
0.0
Bus 66
20.000
100.0
0.0
Bus66
20.000
100.0
0.0
Bus 67
20.000
100.0
0.0
Bus67
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus 68
20.000
100.0
0.0
Bus 69
20.000
100.0
0.0
Bus69
20.000
100.0
0.0
Bus70
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus 70
20.000
100.0
0.0
Bus71
20.000
100.0
0.0
Bus 71
20.000
100.0
0.0
Bus72
0.400
100.0
0.0
0.850
0.527
0.850
0.527
Bus 72
20.000
100.0
0.0
Bus73
20.000
100.0
0.0
Bus76
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus77
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus82
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus83
0.400
100.0
0.0
0.014
0.008
0.054
0.034
Bus84
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus85
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus86
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus87
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus88
0.400
100.0
0.0
0.004
0.003
0.017
0.010
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
0.009
Mvar
0.005
Constant Z
MW
0.034
Constant I
Mvar
Bus95
0.400
100.0
0.0
Bus96
20.000
100.0
0.0
0.021
Bus97
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus98
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus102
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus104
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus106
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus108
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus110
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus112
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus113
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus116
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus117
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus118
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus119
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus124
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus125
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus126
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus127
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus128
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus129
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus137
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus139
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus140
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus141
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus142
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus143
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus149
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus150
20.000
100.0
0.0
Bus151
20.000
100.0
0.0
Bus152
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus153
20.000
100.0
0.0
Bus154
20.000
100.0
0.0
Bus155
0.400
100.0
0.0
0.014
0.008
0.054
0.034
Bus156
20.000
100.0
0.0
Bus157
0.400
100.0
0.0
0.004
0.003
0.017
0.011
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
Bus158
20.000
Bus159
20.000
Bus160
Bus161
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
% Mag.
Ang.
Mvar
100.0
0.0
100.0
0.0
0.400
100.0
0.0
0.002
0.001
0.009
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus162
0.400
100.0
0.0
0.014
0.008
0.054
0.034
Bus163
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus164
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus165
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus166
20.000
100.0
0.0
Bus167
20.000
100.0
0.0
Bus168
20.000
100.0
0.0
Bus169
20.000
100.0
0.0
Bus170
20.000
100.0
0.0
Bus171
20.000
100.0
0.0
Bus172
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus173
20.000
100.0
0.0
Bus174
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus175
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus176
20.000
100.0
0.0
Bus177
20.000
100.0
0.0
Bus178
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus179
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus180
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus181
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus182
20.000
100.0
0.0
Bus183
20.000
100.0
0.0
Bus184
20.000
100.0
0.0
Bus185
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus186
20.000
100.0
0.0
Bus187
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus188
20.000
100.0
0.0
Bus189
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus190
20.000
100.0
0.0
Bus191
20.000
100.0
0.0
Bus192
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus193
20.000
100.0
0.0
0.005
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
0.009
Mvar
0.005
Constant Z
MW
0.034
Constant I
Mvar
Bus194
0.400
100.0
0.0
Bus195
20.000
100.0
0.0
0.021
Bus196
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus197
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus198
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus199
20.000
100.0
0.0
Bus200
20.000
100.0
0.0
Bus201
20.000
100.0
0.0
Bus202
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus204
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus208
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus210
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus211
20.000
100.0
0.0
Bus212
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus213
20.000
100.0
0.0
Bus214
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus216
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus218
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus220
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus222
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus224
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus225
20.000
100.0
0.0
Bus226
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus228
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus229
20.000
100.0
0.0
Bus230
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus232
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus233
20.000
100.0
0.0
Bus234
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus236
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus238
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus240
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus242
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus244
20.000
100.0
0.0
Bus247
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus248
20.000
100.0
0.0
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
10
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
Bus250
20.000
100.0
0.0
Bus255
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus256
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus257
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus258
20.000
100.0
0.0
Bus259
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus260
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus261
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus262
20.000
100.0
0.0
Bus263
20.000
100.0
0.0
Bus264
20.000
100.0
0.0
Bus266
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus267
20.000
100.0
0.0
Bus268
20.000
100.0
0.0
Bus270
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus272
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus274
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus276
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus278
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus279
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus280
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus282
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus283
20.000
100.0
0.0
Bus286
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus287
20.000
100.0
0.0
Bus288
20.000
100.0
0.0
Bus290
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus291
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus292
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus293
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus295
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus297
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus298
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus300
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus302
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus303
0.400
100.0
0.0
0.009
0.005
0.034
0.021
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
11
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
Bus308
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus309
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus310
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus311
20.000
100.0
0.0
Bus312
20.000
100.0
0.0
Bus313
20.000
100.0
0.0
Bus314
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus316
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus318
0.400
100.0
0.0
0.017
0.011
0.068
0.042
Bus319
20.000
100.0
0.0
Bus320
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus321
20.000
100.0
0.0
Bus322
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus323
20.000
100.0
0.0
Bus324
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus325
20.000
100.0
0.0
Bus326
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus327
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus328
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus329
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus330
20.000
100.0
0.0
Bus331
20.000
100.0
0.0
Bus332
20.000
100.0
0.0
Bus333
20.000
100.0
0.0
Bus334
20.000
100.0
0.0
Bus336
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus337
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus338
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus339
20.000
100.0
0.0
Bus340
20.000
100.0
0.0
Bus341
20.000
100.0
0.0
Bus342
20.000
100.0
0.0
Bus343
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus344
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus345
20.000
100.0
0.0
Bus346
0.400
100.0
0.0
0.009
0.005
0.034
0.021
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
12
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Constant kVA
MW
Mvar
Constant Z
MW
Constant I
Mvar
Bus348
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus350
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus351
20.000
100.0
0.0
Bus352
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus353
20.000
100.0
0.0
Bus354
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus355
20.000
100.0
0.0
Bus356
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus357
20.000
100.0
0.0
Bus360
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus361
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus362
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus363
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus364
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus365
20.000
100.0
0.0
Bus366
20.000
100.0
0.0
Bus367
20.000
100.0
0.0
Bus368
20.000
100.0
0.0
Bus369
20.000
100.0
0.0
Bus370
20.000
100.0
0.0
Bus371
20.000
100.0
0.0
Bus372
20.000
100.0
0.0
Bus373
20.000
100.0
0.0
Bus374
0.400
100.0
0.0
0.004
0.003
0.017
0.011
Bus375
20.000
100.0
0.0
Bus376
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus377
20.000
100.0
0.0
Bus378
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus379
20.000
100.0
0.0
Bus380
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus381
20.000
100.0
0.0
Bus382
0.400
100.0
0.0
0.002
0.001
0.009
0.005
Bus383
20.000
100.0
0.0
Bus384
0.400
100.0
0.0
0.009
0.005
0.034
0.021
Bus385
20.000
100.0
0.0
Bus386
0.400
100.0
0.0
0.009
0.005
0.034
0.021
MW
Mvar
Generic
MW
Mvar
ETAP
Project:
7.5.0
Location:
Page:
13
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Load
Bus
ID
Constant kVA
Initial Voltage
kV
Sub-sys
% Mag.
Ang.
Bus387
20.000
100.0
0.0
Bus388
0.400
100.0
0.0
Bus389
20.000
100.0
0.0
Bus390
0.400
100.0
0.0
Bus391
20.000
100.0
0.0
Bus392
0.400
100.0
0.0
Bus393
20.000
100.0
0.0
Bus394
0.400
100.0
0.0
Bus395
20.000
100.0
0.0
MW
Generation Bus
ID
Bus 1
kV
20.000
Mvar
MW
Sub-sys
1
Constant I
Mvar
MW
0.004
0.003
0.017
0.011
0.002
0.001
0.009
0.005
0.009
0.005
0.034
0.021
0.013
0.008
0.013
0.008
1.896
1.175
4.994
1.895
Voltage
Type
Swing
Constant Z
Generation
% Mag.
Angle
100.0
0.0
MW
0.000
Mvar
0.000
Generic
Mvar
0.000
MW
0.000
Mvar Limits
% PF
Max
Min
0.000
Mvar
0.000
ETAP
Project:
7.5.0
Location:
Page:
14
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
% Tol.
#/Phase
9150.0
0.0
75
0.252504
0.106000
0.0000786
Line1
157.
1000.0
0.0
75
0.251600
0.359553
0.0000037
Line2
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line3
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line4
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line5
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line6
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line7
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line8
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line9
157.
200.0
0.0
75
0.251600
0.359553
0.0000037
Line10
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line11
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line12
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line13
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line14
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line15
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line16
75.6
200.0
0.0
75
0.524700
0.382241
0.0000034
Line17
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line18
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line19
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line20
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line21
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line22
75.6
200.0
0.0
75
0.524700
0.382241
0.0000034
Line23
157.
2000.0
0.0
75
0.251600
0.359553
0.0000037
Line24
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line27
157.
1340.0
0.0
75
0.251600
0.359553
0.0000037
Line28
157,
1390.0
0.0
75
0.251600
0.359553
0.0000037
Line29
157.
1630.0
0.0
75
0.251600
0.359553
0.0000037
Line30
157.
1460.0
0.0
75
0.251600
0.359553
0.0000037
Line31
157.
1540.0
0.0
75
0.251600
0.359553
0.0000037
Line32
157.
1395.0
0.0
75
0.251600
0.359553
0.0000037
Line33
157.
1590.0
0.0
75
0.251600
0.359553
0.0000037
Line34
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line35
75.6
3480.0
0.0
75
0.524700
0.382241
0.0000034
20NALS3
Size
Adj. (m)
150
Cable3
T (C)
ETAP
Project:
7.5.0
Location:
Page:
15
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
Size
Adj. (m)
% Tol.
#/Phase
T (C)
Line37
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line38
75.6
1800.0
0.0
75
0.524700
0.382241
0.0000034
Line39
75.6
2580.0
0.0
75
0.524700
0.382241
0.0000034
Line40
75.6
2680.0
0.0
75
0.524700
0.382241
0.0000034
Line41
75.6
1800.0
0.0
75
0.524700
0.382241
0.0000034
Line42
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line43
75.6
3300.0
0.0
75
0.524700
0.382241
0.0000034
Line44
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line45
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line46
75.6
1800.0
0.0
75
0.524700
0.382241
0.0000034
Line47
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line48
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line49
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line51
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line52
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line53
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line54
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line55
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line56
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line57
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line58
75.6
800.0
0.0
75
0.524700
0.382241
0.0000034
Line59
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line60
75.6
400.0
0.0
75
0.524700
0.382241
0.0000034
Line61
75.6
750.0
0.0
75
0.524700
0.382241
0.0000034
Line62
75.6
1100.0
0.0
75
0.524700
0.382241
0.0000034
Line63
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line65
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line66
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line67
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line68
75.6
750.0
0.0
75
0.524700
0.382241
0.0000034
Line69
75.6
600.0
0.0
75
0.524700
0.382241
0.0000034
Line70
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line71
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line72
75.6
1400.0
0.0
75
0.524700
0.382241
0.0000034
Line73
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line74
75.6
750.0
0.0
75
0.524700
0.382241
0.0000034
ETAP
Project:
7.5.0
Location:
Page:
16
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
Size
Adj. (m)
% Tol.
#/Phase
T (C)
Line75
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line76
75.6
600.0
0.0
75
0.524700
0.382241
0.0000034
Line77
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line78
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line79
75.6
300.0
0.0
75
0.524700
0.382241
0.0000034
Line80
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line81
157.
900.0
0.0
75
0.251600
0.359553
0.0000037
Line82
157.
19860.0
0.0
75
0.251546
0.359476
0.0000037
Line83
75.6
750.0
0.0
75
0.524700
0.382241
0.0000034
Line84
75.6
2100.0
0.0
75
0.524700
0.382241
0.0000034
Line85
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line86
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line87
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Line88
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line89
75.6
2700.0
0.0
75
0.524700
0.382241
0.0000034
Line91
157.
2700.0
0.0
75
0.251600
0.359553
0.0000037
Line93
157.
21500.0
0.0
75
0.251600
0.359553
0.0000037
Line95
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line96
75.6
800.0
0.0
75
0.524700
0.382241
0.0000034
Line97
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line98
75.6
1500.0
0.0
75
0.524700
0.382241
0.0000034
Line99
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line100
75.6
1400.0
0.0
75
0.524700
0.382241
0.0000034
Line101
75.6
2500.0
0.0
75
0.524700
0.382241
0.0000034
Line102
75.6
1500.0
0.0
75
0.524700
0.382241
0.0000034
Line103
75.6
8000.0
0.0
75
0.524700
0.382241
0.0000034
Line104
157.
1000.0
0.0
75
0.251600
0.359553
0.0000037
Line105
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line107
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line108
75.6
50.0
0.0
75
0.524700
0.382241
0.0000034
Line109
75.6
50.0
0.0
75
0.524700
0.382241
0.0000034
Line110
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line111
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line112
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line113
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line114
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
ETAP
Project:
7.5.0
Location:
Page:
17
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
Size
Adj. (m)
% Tol.
#/Phase
T (C)
Line115
75.6
50.0
0.0
75
0.524700
0.382241
0.0000034
Line116
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line117
75.6
50.0
0.0
75
0.524700
0.382241
0.0000034
Line118
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line119
75.6
50.0
0.0
75
0.524700
0.382241
0.0000034
Line120
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line121
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line122
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line123
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line124
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line125
157.
32000.0
0.0
75
0.251546
0.359476
0.0000037
Line126
157.
200.0
0.0
75
0.251600
0.359553
0.0000037
Line127
157.
1350.0
0.0
75
0.251600
0.359553
0.0000037
Line128
75.6
1100.0
0.0
75
0.524700
0.382241
0.0000034
Line131
75.6
1500.0
0.0
75
0.524700
0.382241
0.0000034
Line132
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line133
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line134
75.6
2700.0
0.0
75
0.524700
0.382241
0.0000034
Line135
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line136
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line137
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line138
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line139
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line140
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line141
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line142
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line143
75.6
800.0
0.0
75
0.524700
0.382241
0.0000034
Line144
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line145
75.6
800.0
0.0
75
0.524700
0.382241
0.0000034
Line146
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line147
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line148
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Line149
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line150
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line151
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line152
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
ETAP
Project:
7.5.0
Location:
Page:
18
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
Size
Adj. (m)
% Tol.
#/Phase
T (C)
Line153
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line155
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line157
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line158
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line160
75.6
1000.0
0.0
75
0.524700
0.382241
0.0000034
Line161
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line162
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line163
75.6
500.0
0.0
75
0.524700
0.382241
0.0000034
Line164
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line165
75.6
100.0
0.0
75
0.524700
0.382241
0.0000034
Line166
75.6
100.0
0.0
75
0.524700
0.382241
0.0000034
Line167
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line168
75.6
700.0
0.0
75
0.524700
0.382241
0.0000034
Line169
157.
300.0
0.0
75
0.251600
0.359553
0.0000037
Line171
157.
300.0
0.0
75
0.251600
0.359553
0.0000037
Line172
157.
300.0
0.0
75
0.251600
0.359553
0.0000037
Line173
157.
1000.0
0.0
75
0.251600
0.359553
0.0000037
Line174
157.
1000.0
0.0
75
0.251600
0.359553
0.0000037
Line175
157.
980.0
0.0
75
0.251600
0.359553
0.0000037
Line177
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line179
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line180
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line181
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line182
157.
1000.0
0.0
75
0.251600
0.359553
0.0000037
Line183
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line185
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line187
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line188
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line189
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line190
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line191
157.
100.0
0.0
75
0.251600
0.359553
0.0000037
Line192
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line195
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line196
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line197
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line198
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
ETAP
Project:
7.5.0
Location:
Page:
19
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Line/Cable
ID
Library
Size
Adj. (m)
% Tol.
#/Phase
T (C)
Line199
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line200
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line201
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line202
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Line203
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Point 1
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Point 2
75.6
2000.0
0.0
75
0.524700
0.382241
0.0000034
Point 3
75.6
1200.0
0.0
75
0.524700
0.382241
0.0000034
Point A
157.
4500.0
0.0
75
0.251600
0.359553
0.0000037
Point B
157.
500.0
0.0
75
0.251600
0.359553
0.0000037
Point C
157.
1350.0
0.0
75
0.251600
0.359553
0.0000037
ETAP
Project:
7.5.0
Location:
Page:
20
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
MG22
0.160
21.000
0.400
4.00
3.09
4.0000
0.000
MG23
0.160
21.000
0.400
4.00
3.09
4.0000
0.000
MG24
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG45
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG68
0.100
20.000
0.400
4.00
2.47
4.0000
0.000
MG76
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG77
0.160
21.000
0.400
4.00
3.09
4.0000
0.000
MG78
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG93
3.300
21.000
0.400
7.00
11.41
7.0000
0.000
MG94
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG117
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG118
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG124
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG126
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG128
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG129
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG130
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG143
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG148
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG166
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG176
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG177
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG178
0.160
21.000
0.400
4.00
3.09
4.0000
0.000
MG190
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG191
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG192
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG193
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG194
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG195
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG196
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG197
0.100
20.000
0.400
4.00
2.47
4.0000
0.000
MG198
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG200
0.025
20.000
0.400
4.00
2.47
4.0000
0.000
MG203
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
ETAP
Project:
7.5.0
Location:
Page:
21
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
MG204
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG215
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG216
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG217
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG218
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG219
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG220
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG221
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG225
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG231
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG238
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG241
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG252
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG269
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG274
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG324
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG325
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG326
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG327
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG328
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG329
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG330
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG331
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG332
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG333
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG334
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG335
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG336
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG337
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG338
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG339
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG340
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
MG365
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG375
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG376
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
MG377
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
ETAP
Project:
7.5.0
Location:
Page:
22
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
MG411
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG412
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG414
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG415
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG416
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG417
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG418
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG419
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
MG428
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP01
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP02
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP02 SISIP
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP03
0.160
21.000
0.400
4.00
3.09
4.0000
0.000
SP4
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP05
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP06
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP7
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP08
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP9
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP10
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP11
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP12
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP15
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP16
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP17
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP18
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP19
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP20
0.050
21.000
0.400
4.00
3.09
4.0000
0.000
SP21
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP22
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP32
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP35
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP36
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP37
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP38
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP39
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
ETAP
Project:
7.5.0
Location:
Page:
23
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
SP44
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP45
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP46
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP47
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP48
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP54
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP58
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP61
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP62
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP63
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
SP66
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP67
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP68
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP72
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
SP74
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
SP75
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG01
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG02
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG03
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG04
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG05
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG06
0.050
20.000
0.400
4.00
2.47
4.0000
0.000
WG07
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG08
0.050
20.000
0.400
4.00
2.47
4.0000
0.000
WG9
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG10
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG11
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG12
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG13
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG14
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG15
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG16
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG17
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG18
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG19
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG20
0.200
21.000
0.400
4.00
3.09
4.0000
0.000
ETAP
Project:
7.5.0
Location:
Page:
24
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
WG21
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG22
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG23
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG24
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG25
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG26
0.050
20.000
0.400
4.00
2.47
4.0000
0.000
WG27
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG28
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG29
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG30
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG31
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG32
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG33
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG34
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG35
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG36
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG37
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG38
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG39
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG40
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG41
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG42
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG43
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG44
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG45
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG46
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG47
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG48
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG49
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG50
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG51
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG52
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
WG53
0.050
21.000
0.400
4.00
2.47
4.0000
0.000
WG54
0.100
21.000
0.400
4.00
2.47
4.0000
0.000
WG55
0.025
21.000
0.400
4.00
2.47
4.0000
0.000
ETAP
Project:
7.5.0
Location:
Page:
25
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Secondary Bus ID
% Min.
Tap
% Max.
Tap
% Step
Regulated Bus ID
%V
kV
ETAP
Project:
7.5.0
Location:
Page:
26
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Branch Connections
CKT/Branch
ID
Connected Bus ID
Type
From Bus
2622.35
2756.25
848.66
2622.35
2756.25
1654.94
4087.70
4410.00
3309.88
8175.40
8820.00
Bus58
1501.08
3707.66
4000.00
Bus 7
Bus82
1654.94
4087.70
4410.00
Bus 8
Bus83
848.66
2622.35
2756.25
2W XFMR
Bus 10
Bus76
1654.94
4087.70
4410.00
MG93
2W XFMR
Bus73
Bus72
20.42
232.97
233.86
MG94
2W XFMR
Bus69
Bus70
1654.94
4087.70
4410.00
MG117
2W XFMR
Bus 12
Bus84
3309.88
8175.40
8820.00
MG118
2W XFMR
Bus 13
Bus85
1654.94
4087.70
4410.00
MG124
2W XFMR
Bus 14
Bus86
3309.88
8175.40
8820.00
MG126
2W XFMR
Bus96
Bus95
1654.94
4087.70
4410.00
MG128
2W XFMR
Bus158
Bus157
3309.88
8175.40
8820.00
MG129
2W XFMR
Bus 15
Bus87
3309.88
8175.40
8820.00
MG130
2W XFMR
Bus 16
Bus88
3309.88
8175.40
8820.00
MG22
2W XFMR
Bus 3
Bus 4
MG23
2W XFMR
Bus64
Bus59
MG24
2W XFMR
Bus66
Bus67
MG45
2W XFMR
Bus63
Bus60
MG68
2W XFMR
Bus65
MG76
2W XFMR
MG77
2W XFMR
MG78
R
848.66
MG143
2W XFMR
Bus 11
Bus77
6619.75
16350.79
17640.00
MG148
2W XFMR
Bus 6
Bus53
6619.75
16350.79
17640.00
MG166
2W XFMR
Bus159
Bus160
6619.75
16350.79
17640.00
MG176
2W XFMR
Bus151
Bus152
1654.94
4087.70
4410.00
MG177
2W XFMR
Bus156
Bus149
1654.94
4087.70
4410.00
MG178
2W XFMR
Bus154
Bus155
848.66
2622.35
2756.25
MG190
2W XFMR
Bus 21
Bus104
1654.94
4087.70
4410.00
MG191
2W XFMR
Bus 20
Bus102
1654.94
4087.70
4410.00
MG192
2W XFMR
Bus 23
Bus108
3309.88
8175.40
8820.00
MG193
2W XFMR
Bus 24
Bus110
1654.94
4087.70
4410.00
MG194
2W XFMR
Bus 26
Bus113
1654.94
4087.70
4410.00
MG195
2W XFMR
Bus 27
Bus116
1654.94
4087.70
4410.00
MG196
2W XFMR
Bus 29
Bus137
3309.88
8175.40
8820.00
MG197
2W XFMR
Bus 18
Bus98
1501.08
3707.66
4000.00
MG198
2W XFMR
Bus 17
Bus97
1654.94
4087.70
4410.00
MG200
2W XFMR
Bus52
Bus51
6004.31
14830.65
16000.00
MG203
2W XFMR
Bus 22
Bus106
6619.75
16350.79
17640.00
MG204
2W XFMR
Bus 25
Bus112
6619.75
16350.79
17640.00
MG215
2W XFMR
Bus 30
Bus117
1654.94
4087.70
4410.00
MG216
2W XFMR
Bus 31
Bus118
1654.94
4087.70
4410.00
ETAP
Project:
7.5.0
Location:
Page:
27
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
ID
Connected Bus ID
Type
From Bus
MG217
2W XFMR
Bus 32
Bus119
1654.94
4087.70
4410.00
MG218
2W XFMR
Bus 34
Bus124
1654.94
4087.70
4410.00
MG219
2W XFMR
Bus 35
Bus125
1654.94
4087.70
4410.00
MG220
2W XFMR
Bus 36
Bus126
3309.88
8175.40
8820.00
MG221
2W XFMR
Bus 37
Bus127
1654.94
4087.70
4410.00
MG225
2W XFMR
Bus62
Bus61
3309.88
8175.40
8820.00
MG231
2W XFMR
Bus 43
Bus266
6619.75
16350.79
17640.00
MG238
2W XFMR
Bus 44
Bus270
6619.75
16350.79
17640.00
MG241
2W XFMR
Bus 45
Bus272
6619.75
16350.79
17640.00
MG252
2W XFMR
Bus 46
Bus274
3309.88
8175.40
8820.00
MG269
2W XFMR
Bus 47
Bus276
3309.88
8175.40
8820.00
MG274
2W XFMR
Bus 48
Bus278
6619.75
16350.79
17640.00
MG324
2W XFMR
Bus 38
Bus282
3309.88
8175.40
8820.00
MG325
2W XFMR
Bus 42
Bus286
3309.88
8175.40
8820.00
MG326
2W XFMR
Bus 49
Bus290
3309.88
8175.40
8820.00
MG327
2W XFMR
Bus 50
Bus128
1654.94
4087.70
4410.00
MG328
2W XFMR
Bus 51
Bus129
3309.88
8175.40
8820.00
MG329
2W XFMR
Bus 52
Bus139
1654.94
4087.70
4410.00
MG330
2W XFMR
Bus 59
Bus140
1654.94
4087.70
4410.00
MG331
2W XFMR
Bus 60
Bus141
1654.94
4087.70
4410.00
MG332
2W XFMR
Bus 61
Bus142
1654.94
4087.70
4410.00
MG333
2W XFMR
Bus 62
Bus143
1654.94
4087.70
4410.00
MG334
2W XFMR
Bus 63
Bus204
1654.94
4087.70
4410.00
MG335
2W XFMR
Bus 64
Bus208
3309.88
8175.40
8820.00
MG336
2W XFMR
Bus 65
Bus214
3309.88
8175.40
8820.00
MG337
2W XFMR
Bus 68
Bus216
3309.88
8175.40
8820.00
MG338
2W XFMR
Bus 39
Bus218
3309.88
8175.40
8820.00
MG339
2W XFMR
Bus 40
Bus220
3309.88
8175.40
8820.00
MG340
2W XFMR
Bus 41
Bus222
3309.88
8175.40
8820.00
MG365
2W XFMR
Bus 69
Bus293
6619.75
16350.79
17640.00
MG375
2W XFMR
Bus 70
Bus295
6619.75
16350.79
17640.00
MG376
2W XFMR
Bus 71
Bus300
6619.75
16350.79
17640.00
MG377
2W XFMR
Bus 72
Bus302
6619.75
16350.79
17640.00
MG411
2W XFMR
Bus 66
Bus226
1654.94
4087.70
4410.00
MG412
2W XFMR
Bus 67
Bus230
1654.94
4087.70
4410.00
MG414
2W XFMR
Bus 53
Bus234
1654.94
4087.70
4410.00
MG415
2W XFMR
Bus 54
Bus236
1654.94
4087.70
4410.00
MG416
2W XFMR
Bus 55
Bus238
1654.94
4087.70
4410.00
MG417
2W XFMR
Bus 56
Bus240
1654.94
4087.70
4410.00
ETAP
Project:
7.5.0
Location:
Page:
28
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
ID
Connected Bus ID
Type
From Bus
MG418
2W XFMR
Bus 57
Bus242
1654.94
4087.70
4410.00
MG419
2W XFMR
Bus 58
Bus303
1654.94
4087.70
4410.00
MG428
2W XFMR
Bus 33
Bus308
3309.88
8175.40
8820.00
SP01
2W XFMR
Bus166
Bus165
1654.94
4087.70
4410.00
SP02
2W XFMR
Bus168
Bus163
1654.94
4087.70
4410.00
SP02 SISIP
2W XFMR
Bus258
Bus257
1654.94
4087.70
4410.00
SP03
2W XFMR
Bus169
Bus162
848.66
2622.35
2756.25
SP4
2W XFMR
Bus34
Bus33
3309.88
8175.40
8820.00
SP05
2W XFMR
Bus167
Bus164
6619.75
16350.79
17640.00
SP06
2W XFMR
Bus395
Bus179
3309.88
8175.40
8820.00
SP7
2W XFMR
Bus262
Bus261
1654.94
4087.70
4410.00
SP08
2W XFMR
Bus177
Bus174
1654.94
4087.70
4410.00
SP9
2W XFMR
Bus381
Bus382
1654.94
4087.70
4410.00
SP10
2W XFMR
Bus244
Bus202
6619.75
16350.79
17640.00
SP11
2W XFMR
Bus176
Bus175
6619.75
16350.79
17640.00
SP12
2W XFMR
Bus377
Bus378
6619.75
16350.79
17640.00
SP15
2W XFMR
Bus379
Bus380
6619.75
16350.79
17640.00
SP16
2W XFMR
Bus385
Bus386
1654.94
4087.70
4410.00
SP17
2W XFMR
Bus173
Bus172
6619.75
16350.79
17640.00
SP18
2W XFMR
Bus375
Bus376
6619.75
16350.79
17640.00
SP19
2W XFMR
Bus391
Bus392
1654.94
4087.70
4410.00
SP20
2W XFMR
Bus393
Bus394
2715.70
8391.51
8820.00
SP21
2W XFMR
Bus31
Bus30
1654.94
4087.70
4410.00
SP22
2W XFMR
Bus170
Bus161
3309.88
8175.40
8820.00
SP32
2W XFMR
Bus28
Bus27
3309.88
8175.40
8820.00
SP35
2W XFMR
Bus41
Bus40
3309.88
8175.40
8820.00
SP36
2W XFMR
Bus43
Bus42
3309.88
8175.40
8820.00
SP37
2W XFMR
Bus47
Bus44
1654.94
4087.70
4410.00
SP38
2W XFMR
Bus389
Bus390
6619.75
16350.79
17640.00
SP39
2W XFMR
Bus37
Bus36
3309.88
8175.40
8820.00
SP44
2W XFMR
Bus39
Bus38
3309.88
8175.40
8820.00
SP45
2W XFMR
Bus6
Bus5
1654.94
4087.70
4410.00
SP46
2W XFMR
Bus11
Bus10
1654.94
4087.70
4410.00
SP47
2W XFMR
Bus13
Bus12
1654.94
4087.70
4410.00
SP48
2W XFMR
Bus17
Bus14
1654.94
4087.70
4410.00
SP54
2W XFMR
Bus19
Bus18
1654.94
4087.70
4410.00
SP58
2W XFMR
Bus387
Bus388
3309.88
8175.40
8820.00
SP61
2W XFMR
Bus383
Bus384
1654.94
4087.70
4410.00
SP62
2W XFMR
Bus188
Bus178
3309.88
8175.40
8820.00
ETAP
Project:
7.5.0
Location:
Page:
29
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
ID
Connected Bus ID
Type
From Bus
SP63
2W XFMR
Bus46
Bus45
6619.75
16350.79
17640.00
SP66
2W XFMR
Bus21
Bus20
1654.94
4087.70
4410.00
SP67
2W XFMR
Bus25
Bus24
1654.94
4087.70
4410.00
SP68
2W XFMR
Bus26
Bus23
1654.94
4087.70
4410.00
SP72
2W XFMR
Bus35
Bus32
3309.88
8175.40
8820.00
SP74
2W XFMR
Bus16
Bus15
1654.94
4087.70
4410.00
SP75
2W XFMR
Bus7
Bus2
6619.75
16350.79
17640.00
WG01
2W XFMR
Bus199
Bus198
1654.94
4087.70
4410.00
WG02
2W XFMR
Bus193
Bus194
1654.94
4087.70
4410.00
WG03
2W XFMR
Bus190
Bus189
3309.88
8175.40
8820.00
WG04
2W XFMR
Bus191
Bus192
1654.94
4087.70
4410.00
WG05
2W XFMR
Bus201
Bus196
3309.88
8175.40
8820.00
WG06
2W XFMR
Bus182
Bus181
3002.16
7415.33
8000.00
WG07
2W XFMR
Bus183
Bus180
1654.94
4087.70
4410.00
WG08
2W XFMR
Bus184
Bus185
3002.16
7415.33
8000.00
WG9
2W XFMR
Bus200
Bus197
6619.75
16350.79
17640.00
WG10
2W XFMR
Bus311
Bus310
1654.94
4087.70
4410.00
WG11
2W XFMR
Bus288
Bus291
6619.75
16350.79
17640.00
WG12
2W XFMR
Bus213
Bus212
6619.75
16350.79
17640.00
WG13
2W XFMR
Bus339
Bus336
6619.75
16350.79
17640.00
WG14
2W XFMR
Bus229
Bus228
6619.75
16350.79
17640.00
WG15
2W XFMR
Bus233
Bus232
6619.75
16350.79
17640.00
WG16
2W XFMR
Bus264
Bus260
3309.88
8175.40
8820.00
WG17
2W XFMR
Bus345
Bus344
1654.94
4087.70
4410.00
WG18
2W XFMR
Bus225
Bus224
6619.75
16350.79
17640.00
WG19
2W XFMR
Bus319
Bus324
3309.88
8175.40
8820.00
WG20
2W XFMR
Bus319
Bus318
678.92
2097.88
2205.00
WG21
2W XFMR
Bus340
Bus337
6619.75
16350.79
17640.00
WG22
2W XFMR
Bus283
Bus280
1654.94
4087.70
4410.00
WG23
2W XFMR
Bus186
Bus292
3309.88
8175.40
8820.00
WG24
2W XFMR
Bus341
Bus338
1654.94
4087.70
4410.00
WG25
2W XFMR
Bus287
Bus298
3309.88
8175.40
8820.00
WG26
2W XFMR
Bus373
Bus374
3002.16
7415.33
8000.00
WG27
2W XFMR
Bus263
Bus259
6619.75
16350.79
17640.00
WG28
2W XFMR
Bus211
Bus210
3309.88
8175.40
8820.00
WG29
2W XFMR
Bus323
Bus322
3309.88
8175.40
8820.00
WG30
2W XFMR
Bus248
Bus247
6619.75
16350.79
17640.00
WG31
2W XFMR
Bus195
Bus256
6619.75
16350.79
17640.00
WG32
2W XFMR
Bus3
Bus297
6619.75
16350.79
17640.00
ETAP
Project:
7.5.0
Location:
Page:
30
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
WG33
2W XFMR
Bus371
Bus346
1654.94
4087.70
4410.00
WG34
2W XFMR
Bus351
Bus350
1654.94
4087.70
4410.00
WG35
2W XFMR
Bus353
Bus352
3309.88
8175.40
8820.00
WG36
2W XFMR
Bus355
Bus354
3309.88
8175.40
8820.00
WG37
2W XFMR
Bus369
Bus360
1654.94
4087.70
4410.00
WG38
2W XFMR
Bus367
Bus362
1654.94
4087.70
4410.00
WG39
2W XFMR
Bus366
Bus363
1654.94
4087.70
4410.00
WG40
2W XFMR
Bus365
Bus364
1654.94
4087.70
4410.00
WG41
2W XFMR
Bus357
Bus356
6619.75
16350.79
17640.00
WG42
2W XFMR
Bus342
Bus343
6619.75
16350.79
17640.00
WG43
2W XFMR
Bus331
Bus314
1654.94
4087.70
4410.00
WG44
2W XFMR
Bus330
Bus326
1654.94
4087.70
4410.00
WG45
2W XFMR
Bus325
Bus316
1654.94
4087.70
4410.00
WG46
2W XFMR
Bus332
Bus327
3309.88
8175.40
8820.00
WG47
2W XFMR
Bus333
Bus328
1654.94
4087.70
4410.00
WG48
2W XFMR
Bus334
Bus329
1654.94
4087.70
4410.00
WG49
2W XFMR
Bus250
Bus255
6619.75
16350.79
17640.00
WG50
2W XFMR
Bus372
Bus348
6619.75
16350.79
17640.00
WG51
2W XFMR
Bus321
Bus320
6619.75
16350.79
17640.00
WG52
2W XFMR
Bus368
Bus361
6619.75
16350.79
17640.00
WG53
2W XFMR
Bus267
Bus187
3309.88
8175.40
8820.00
WG54
2W XFMR
Bus312
Bus309
1654.94
4087.70
4410.00
WG55
2W XFMR
Bus268
Bus279
6619.75
16350.79
17640.00
Cable3
Cable
Bus 1
Bus 2
57.76
24.25
62.64
0.2876760
Line1
Line
Bus171
Bus7
6.29
8.99
10.97
0.0014649
Line2
Line
Bus7
Bus6
3.15
4.49
5.49
0.0007325
Line3
Line
Bus6
Bus11
3.15
4.49
5.49
0.0007325
Line4
Line
Bus11
Bus13
3.15
4.49
5.49
0.0007325
Line5
Line
Bus13
Bus17
3.15
4.49
5.49
0.0007325
Line6
Line
Bus17
Bus16
3.15
4.49
5.49
0.0007325
Line7
Line
Bus13
Bus19
3.15
4.49
5.49
0.0007325
Line8
Line
Bus19
Bus21
3.15
4.49
5.49
0.0007325
Line9
Line
Bus22
Bus21
1.26
1.80
2.19
0.0002930
Line10
Line
Bus25
Bus22
3.15
4.49
5.49
0.0007325
Line11
Line
Bus22
Bus26
3.15
4.49
5.49
0.0007325
Line12
Line
Bus29
Bus28
13.12
9.56
16.23
0.0013592
Line13
Line
Bus28
Bus31
13.12
9.56
16.23
0.0013592
Line14
Line
Bus31
Bus169
6.56
4.78
8.11
0.0006796
Line15
Line
Bus173
Bus34
6.56
4.78
8.11
0.0006796
ETAP
Project:
7.5.0
Location:
Page:
31
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line16
Line
Bus34
Bus35
2.62
1.91
3.25
0.0002718
Line17
Line
Bus170
Bus37
6.56
4.78
8.11
0.0006796
Line18
Line
Bus39
Bus262
6.56
4.78
8.11
0.0006796
Line19
Line
Bus41
Bus39
6.56
4.78
8.11
0.0006796
Line20
Line
Bus43
Bus41
6.56
4.78
8.11
0.0006796
Line21
Line
Bus41
Bus46
6.56
4.78
8.11
0.0006796
Line22
Line
Bus46
Bus47
2.62
1.91
3.25
0.0002718
Line23
Line
Bus 3
Bus 5
12.58
17.98
21.94
0.0029298
Line24
Line
Bus 72
Bus 71
13.12
9.56
16.23
0.0013592
Line27
Line
Bus52
Bus62
8.43
12.05
14.70
0.0019630
Line28
Line
Bus71
Bus63
8.74
12.49
15.25
0.0020362
Line29
Line
Bus63
Bus64
10.25
14.65
17.88
0.0023878
Line30
Line
Bus64
Bus65
9.18
13.12
16.02
0.0021388
Line31
Line
Bus65
Bus66
9.69
13.84
16.90
0.0022560
Line32
Line
Bus 5
Bus52
8.77
12.54
15.30
0.0020435
Line33
Line
Bus66
Bus69
10.00
14.29
17.44
0.0023292
Line34
Line
Bus62
Bus71
3.15
4.49
5.49
0.0007325
Line35
Line
Bus73
Bus71
45.65
33.25
56.48
0.0047300
Line37
Line
Bus 11
Bus 10
26.24
19.11
32.46
0.0027184
Line38
Line
Bus 10
Bus 9
23.61
17.20
29.21
0.0024465
Line39
Line
Bus 8
Bus 7
33.84
24.65
41.87
0.0035067
Line40
Line
Bus 7
Bus 6
35.15
25.61
43.49
0.0036426
Line41
Line
Bus 16
Bus 15
23.61
17.20
29.21
0.0024465
Line42
Line
Bus 15
Bus 14
15.74
11.47
19.48
0.0016310
Line43
Line
Bus 14
Bus 13
43.29
31.53
53.56
0.0044853
Line44
Line
Bus 13
Bus 12
15.74
11.47
19.48
0.0016310
Line45
Line
Bus 12
Bus 11
13.12
9.56
16.23
0.0013592
Line46
Line
Bus 9
Bus 8
23.61
17.20
29.21
0.0024465
Line47
Line
Bus96
Bus 9
15.74
11.47
19.48
0.0016310
Line48
Line
Bus 18
Bus 17
26.24
19.11
32.46
0.0027184
Line49
Line
Bus 17
Bus 16
26.24
19.11
32.46
0.0027184
Line51
Line
Bus 20
Bus 19
26.24
19.11
32.46
0.0027184
Line52
Line
Bus 19
Bus 21
26.24
19.11
32.46
0.0027184
Line53
Line
Bus 23
Bus 19
15.74
11.47
19.48
0.0016310
Line54
Line
Bus 21
Bus 22
15.74
11.47
19.48
0.0016310
Line55
Line
Bus 24
Bus 23
15.74
11.47
19.48
0.0016310
Line56
Line
Bus 26
Bus 25
6.56
4.78
8.11
0.0006796
Line57
Line
Bus 25
Bus 24
13.12
9.56
16.23
0.0013592
Line58
Line
Bus 27
Bus 26
10.49
7.64
12.98
0.0010873
ETAP
Project:
7.5.0
Location:
Page:
32
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line59
Line
Bus 32
Bus 31
13.12
9.56
Line60
Line
Bus 31
Bus 30
5.25
Line61
Line
Bus 28
Bus 27
9.84
Line62
Line
Bus 51
Bus 50
Line63
Line
Bus 50
Bus 49
Line65
Line
Bus 36
Bus 35
6.56
Line66
Line
Bus 35
Bus 34
26.24
Line67
Line
Bus 34
Bus 32
15.74
Line68
Line
Bus 30
Bus 28
9.84
Line69
Line
Bus 28
Bus 29
7.87
Line70
Line
Bus 62
Bus 61
26.24
Line71
Line
Bus 61
Bus 60
15.74
Line72
Line
Bus 60
Bus 59
Line73
Line
Bus 59
Line74
Line
Bus 52
Line75
Line
Line76
16.23
0.0013592
3.82
6.49
0.0005437
7.17
12.17
0.0010194
14.43
10.51
17.85
0.0014951
13.12
9.56
16.23
0.0013592
4.78
8.11
0.0006796
19.11
32.46
0.0027184
11.47
19.48
0.0016310
7.17
12.17
0.0010194
5.73
9.74
0.0008155
19.11
32.46
0.0027184
11.47
19.48
0.0016310
18.36
13.38
22.72
0.0019029
Bus 52
9.18
6.69
11.36
0.0009514
Bus 51
9.84
7.17
12.17
0.0010194
Bus153
Bus151
13.12
9.56
16.23
0.0013592
Line
Bus151
Bus150
7.87
5.73
9.74
0.0008155
Line77
Line
Bus69
Bus153
3.15
4.49
5.49
0.0007325
Line78
Line
Bus150
Bus154
13.12
9.56
16.23
0.0013592
Line79
Line
Bus156
Bus150
3.94
2.87
4.87
0.0004078
Line80
Line
Bus159
Bus158
3.15
4.49
5.49
0.0007325
Line81
Line
Bus153
Bus159
5.66
8.09
9.87
0.0013184
Line82
Line
Bus158
Bus171
124.89
178.48
217.84
0.0290868
Line83
Line
Bus171
Bus166
9.84
7.17
12.17
0.0010194
Line84
Line
Bus166
Bus167
27.55
20.07
34.08
0.0028543
Line85
Line
Bus167
Bus258
13.12
9.56
16.23
0.0013592
Line86
Line
Bus168
Bus29
15.74
11.47
19.48
0.0016310
Line87
Line
Bus169
Bus170
26.24
19.11
32.46
0.0027184
Line88
Line
Bus267
Bus186
13.12
9.56
16.23
0.0013592
Line89
Line
Bus170
Bus262
35.42
25.80
43.82
0.0036698
Line91
Line
Bus176
Bus177
16.98
24.27
29.62
0.0039552
Line93
Line
Bus373
Bus176
135.24
193.26
235.88
0.0314954
Line95
Line
Bus393
Bus395
3.15
4.49
5.49
0.0007325
Line96
Line
Bus186
Bus3
10.49
7.64
12.98
0.0010873
Line97
Line
Bus191
Bus264
6.56
4.78
8.11
0.0006796
Line98
Line
Bus190
Bus263
19.68
14.33
24.34
0.0020388
Line99
Line
Bus193
Bus250
13.12
9.56
16.23
0.0013592
Line100
Line
Bus195
Bus190
18.36
13.38
22.72
0.0019029
Line101
Line
Bus201
Bus195
32.79
23.89
40.57
0.0033980
ETAP
Project:
7.5.0
Location:
Page:
33
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line102
Line
Bus199
Bus233
19.68
14.33
24.34
0.0020388
Line103
Line
Bus200
Bus201
104.94
76.45
129.83
0.0108735
Line104
Line
Bus188
Bus381
6.29
8.99
10.97
0.0014649
Line105
Line
Bus 63
Bus 62
13.12
9.56
16.23
0.0013592
Line107
Line
Bus 64
Bus 63
13.12
9.56
16.23
0.0013592
Line108
Line
Bus211
Bus200
0.66
0.48
0.81
0.0000680
Line109
Line
Bus213
Bus211
0.66
0.48
0.81
0.0000680
Line110
Line
Bus 65
Bus 64
13.12
9.56
16.23
0.0013592
Line111
Line
Bus 68
Bus 65
13.12
9.56
16.23
0.0013592
Line112
Line
Bus 39
Bus 38
13.12
9.56
16.23
0.0013592
Line113
Line
Bus 40
Bus 39
13.12
9.56
16.23
0.0013592
Line114
Line
Bus 41
Bus 40
13.12
9.56
16.23
0.0013592
Line115
Line
Bus225
Bus213
0.66
0.48
0.81
0.0000680
Line116
Line
Bus 66
Bus 65
13.12
9.56
16.23
0.0013592
Line117
Line
Bus229
Bus225
0.66
0.48
0.81
0.0000680
Line118
Line
Bus 67
Bus 66
13.12
9.56
16.23
0.0013592
Line119
Line
Bus233
Bus229
0.66
0.48
0.81
0.0000680
Line120
Line
Bus 53
Bus 52
13.12
9.56
16.23
0.0013592
Line121
Line
Bus 54
Bus 53
13.12
9.56
16.23
0.0013592
Line122
Line
Bus 55
Bus 54
13.12
9.56
16.23
0.0013592
Line123
Line
Bus 56
Bus 55
13.12
9.56
16.23
0.0013592
Line124
Line
Bus 57
Bus 56
13.12
9.56
16.23
0.0013592
Line125
Line
Bus 2
Bus 3
201.24
287.58
351.00
0.0468669
Line126
Line
Bus244
Bus383
1.26
1.80
2.19
0.0002930
Line127
Line
Bus248
Bus183
8.49
12.13
14.81
0.0019776
Line128
Line
Bus250
Bus195
14.43
10.51
17.85
0.0014951
Line131
Line
Bus263
Bus191
19.68
14.33
24.34
0.0020388
Line132
Line
Bus258
Bus168
13.12
9.56
16.23
0.0013592
Line133
Line
Bus264
Bus186
6.56
4.78
8.11
0.0006796
Line134
Line
Bus262
Bus173
35.42
25.80
43.82
0.0036698
Line135
Line
Bus268
Bus267
6.56
4.78
8.11
0.0006796
Line136
Line
Bus 43
Bus 42
15.74
11.47
19.48
0.0016310
Line137
Line
Bus283
Bus268
6.56
4.78
8.11
0.0006796
Line138
Line
Bus 44
Bus 43
15.74
11.47
19.48
0.0016310
Line139
Line
Bus 45
Bus 44
15.74
11.47
19.48
0.0016310
Line140
Line
Bus 46
Bus 45
15.74
11.47
19.48
0.0016310
Line141
Line
Bus 47
Bus 46
15.74
11.47
19.48
0.0016310
Line142
Line
Bus 48
Bus 47
15.74
11.47
19.48
0.0016310
Line143
Line
Bus3
Bus287
10.49
7.64
12.98
0.0010873
ETAP
Project:
7.5.0
Location:
Page:
34
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line144
Line
Bus 38
Bus 37
15.74
11.47
19.48
0.0016310
Line145
Line
Bus287
Bus288
10.49
7.64
12.98
0.0010873
Line146
Line
Bus 42
Bus 38
15.74
11.47
19.48
0.0016310
Line147
Line
Bus313
Bus182
9.18
6.69
11.36
0.0009514
Line148
Line
Bus 49
Bus 48
15.74
11.47
19.48
0.0016310
Line149
Line
Bus311
Bus287
13.12
9.56
16.23
0.0013592
Line150
Line
Bus 69
Bus 68
13.12
9.56
16.23
0.0013592
Line151
Line
Bus 70
Bus 69
13.12
9.56
16.23
0.0013592
Line152
Line
Bus312
Bus311
13.12
9.56
16.23
0.0013592
Line153
Line
Bus 71
Bus 70
13.12
9.56
16.23
0.0013592
Line155
Line
Bus 58
Bus 57
13.12
9.56
16.23
0.0013592
Line157
Line
Bus 32
Bus 33
13.12
9.56
16.23
0.0013592
Line158
Line
Bus288
Bus313
9.18
6.69
11.36
0.0009514
Line160
Line
Bus325
Bus313
13.12
9.56
16.23
0.0013592
Line161
Line
Bus319
Bus321
6.56
4.78
8.11
0.0006796
Line162
Line
Bus321
Bus323
6.56
4.78
8.11
0.0006796
Line163
Line
Bus313
Bus319
6.56
4.78
8.11
0.0006796
Line164
Line
Bus325
Bus332
9.18
6.69
11.36
0.0009514
Line165
Line
Bus330
Bus331
1.31
0.96
1.62
0.0001359
Line166
Line
Bus332
Bus330
1.31
0.96
1.62
0.0001359
Line167
Line
Bus332
Bus333
9.18
6.69
11.36
0.0009514
Line168
Line
Bus333
Bus334
9.18
6.69
11.36
0.0009514
Line169
Line
Bus182
Bus339
1.89
2.70
3.29
0.0004395
Line171
Line
Bus339
Bus340
1.89
2.70
3.29
0.0004395
Line172
Line
Bus340
Bus341
1.89
2.70
3.29
0.0004395
Line173
Line
Bus342
Bus345
6.29
8.99
10.97
0.0014649
Line174
Line
Bus183
Bus342
6.29
8.99
10.97
0.0014649
Line175
Line
Bus345
Bus184
6.16
8.81
10.75
0.0014356
Line177
Line
Bus372
Bus357
0.63
0.90
1.10
0.0001465
Line179
Line
Bus351
Bus371
0.63
0.90
1.10
0.0001465
Line180
Line
Bus353
Bus351
0.63
0.90
1.10
0.0001465
Line181
Line
Bus355
Bus353
0.63
0.90
1.10
0.0001465
Line182
Line
Bus370
Bus355
6.29
8.99
10.97
0.0014649
Line183
Line
Bus357
Bus184
0.63
0.90
1.10
0.0001465
Line185
Line
Bus369
Bus370
0.63
0.90
1.10
0.0001465
Line187
Line
Bus365
Bus366
0.63
0.90
1.10
0.0001465
Line188
Line
Bus366
Bus367
0.63
0.90
1.10
0.0001465
Line189
Line
Bus367
Bus368
0.63
0.90
1.10
0.0001465
Line190
Line
Bus368
Bus369
0.63
0.90
1.10
0.0001465
ETAP
Project:
7.5.0
Location:
Page:
35
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line191
Line
Bus371
Bus372
0.63
0.90
1.10
0.0001465
Line192
Line
Bus184
Bus373
3.15
4.49
5.49
0.0007325
Line195
Line
Bus383
Bus377
3.15
4.49
5.49
0.0007325
Line196
Line
Bus375
Bus379
3.15
4.49
5.49
0.0007325
Line197
Line
Bus379
Bus381
3.15
4.49
5.49
0.0007325
Line198
Line
Bus381
Bus383
3.15
4.49
5.49
0.0007325
Line199
Line
Bus387
Bus385
3.15
4.49
5.49
0.0007325
Line200
Line
Bus377
Bus387
3.15
4.49
5.49
0.0007325
Line201
Line
Bus177
Bus389
3.15
4.49
5.49
0.0007325
Line202
Line
Bus385
Bus391
3.15
4.49
5.49
0.0007325
Line203
Line
Bus391
Bus393
3.15
4.49
5.49
0.0007325
Point 1
Line
Bus 6
Bus 5
26.24
19.11
32.46
0.0027184
Point 2
Line
Bus 19
Bus 18
26.24
19.11
32.46
0.0027184
Point 3
Line
Bus 37
Bus 36
15.74
11.47
19.48
0.0016310
Point A
Line
Bus395
Bus171
28.31
40.45
49.37
0.0065921
Point B
Line
Bus389
Bus375
3.15
4.49
5.49
0.0007325
Point C
Line
Bus341
Bus248
8.49
12.13
14.81
0.0019776
ETAP
Project:
7.5.0
Location:
Page:
36
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
Voltage
Generation
Load
Load Flow
XFMR
kV
% Mag.
* Bus 1
20.000
100.000
0.0
5.251
3.078
Bus 2
5.251
3.078
175.7
86.3
Bus 2
20.000
96.188
0.3
Bus 1
-5.032
-3.263
180.0
83.9
Bus 3
5.032
3.262
180.0
83.9
Bus7
-0.005
-0.003
14.7
85.0
ID
Ang.
MW
Mvar
MW
Mvar
ID
Bus2
0.400
61.351
-10.0
0.005
0.003
Bus3
20.000
60.264
-11.2
Bus 3
20.000
76.280
-5.8
Bus 4
0.400
71.341
-6.7
Bus5
0.400
61.334
-10.1
Bus 5
20.000
74.918
-6.2
Bus6
Bus 6
Bus 7
Bus7
Bus 8
Bus 9
Bus 10
20.000
20.000
20.000
20.000
20.000
20.000
20.000
65.793
74.342
73.575
65.811
72.852
72.367
71.892
-9.2
-6.2
-6.3
-9.2
-6.3
-6.4
-6.4
0.000
-0.698
MW
Mvar
Amp
% PF
Bus186
0.180
0.105
10.0
86.4
Bus287
-0.184
-0.108
10.2
86.4
Bus297
0.005
0.003
0.3
84.1
Bus 5
4.205
2.847
192.2
82.8
Bus 2
-4.247
-2.175
180.6
89.0
Bus 4
0.042
0.027
1.9
84.2
0.041
0.026
Bus 3
-0.041
-0.026
98.3
85.0
0.021
0.013
Bus6
-0.021
-0.013
58.9
85.0
Bus 3
-4.149
-2.769
192.2
83.2
Bus52
3.008
2.080
140.9
82.3
Bus 6
1.141
0.689
51.3
85.6
Bus7
-0.194
-0.122
10.0
84.7
Bus11
0.172
0.108
8.9
84.8
Bus5
0.022
0.014
1.1
84.2
Bus 7
1.126
0.681
51.1
85.6
Bus 5
-1.132
-0.685
51.4
85.6
Bus53
0.006
0.004
0.3
84.3
Bus 8
1.090
0.659
50.0
85.6
Bus 6
-1.115
-0.675
51.1
85.6
Bus82
0.025
0.016
1.2
84.2
Bus171
-0.199
-0.125
10.3
84.7
84.7
Bus6
0.194
0.121
10.0
Bus2
0.005
0.003
0.3
84.2
Bus 7
-1.080
-0.653
50.0
85.6
Bus 9
1.041
0.628
48.2
85.6
Bus83
0.039
0.025
1.8
84.2
Bus 10
1.010
0.610
47.1
85.6
Bus 8
-1.034
-0.625
48.2
85.6
Bus96
0.024
0.015
1.1
85.6
Bus 11
0.980
0.591
45.9
85.6
Bus 9
-1.004
-0.607
47.1
85.6
Bus76
0.024
0.015
1.1
84.2
% Tap
ETAP
Project:
7.5.0
Location:
Page:
37
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus10
0.400
61.320
-10.1
0.021
0.013
Bus11
-0.021
-0.013
58.9
85.0
Bus 11
20.000
71.377
-6.4
Bus 10
-0.973
-0.588
46.0
85.6
Bus 12
0.967
0.584
45.7
85.6
Bus11
Bus 12
20.000
20.000
65.778
71.121
-9.2
-6.5
Bus77
0.006
0.004
0.3
84.2
Bus6
-0.172
-0.108
8.9
84.7
Bus13
0.151
0.094
7.8
84.8
Bus10
0.022
0.014
1.1
84.2
Bus 13
0.952
0.575
45.1
85.6
Bus 11
-0.964
-0.582
45.7
85.6
Bus84
0.012
0.008
0.6
84.2
Bus12
0.400
61.307
-10.1
0.021
0.013
Bus13
-0.021
-0.013
58.9
85.0
Bus13
20.000
65.764
-9.2
Bus11
-0.151
-0.095
7.8
84.7
Bus17
0.043
0.027
2.2
84.7
Bus19
0.086
0.054
4.5
84.8
Bus12
0.022
0.014
1.1
84.2
Bus 13
Bus 14
20.000
20.000
70.818
70.004
-6.5
-6.5
Bus 14
0.924
0.557
44.0
85.6
Bus 12
-0.948
-0.573
45.1
85.6
Bus85
0.024
0.015
1.1
84.2
Bus 15
0.903
0.545
43.5
85.6
85.6
Bus 13
-0.914
-0.552
44.1
Bus86
0.012
0.007
0.6
84.2
Bus14
0.400
61.303
-10.1
0.021
0.013
Bus17
-0.021
-0.013
58.9
85.0
Bus 15
20.000
69.712
-6.6
Bus 16
0.888
0.536
42.9
85.6
85.6
Bus 14
-0.899
-0.543
43.5
Bus87
0.012
0.007
0.6
84.2
Bus15
0.400
61.301
-10.1
0.021
0.013
Bus16
-0.021
-0.013
58.9
85.0
Bus 16
20.000
69.279
-6.6
Bus 15
-0.882
-0.533
43.0
85.6
85.6
Bus16
Bus 17
Bus17
Bus18
20.000
20.000
20.000
0.400
65.758
68.804
65.760
61.299
-9.2
-6.6
-9.2
-10.1
0.021
0.013
Bus 17
0.871
0.526
42.4
Bus88
0.012
0.007
0.6
84.2
Bus17
-0.022
-0.014
1.1
84.2
Bus15
0.022
0.014
1.1
84.2
Bus 18
0.842
0.508
41.3
85.6
Bus 16
-0.865
-0.523
42.4
85.6
Bus97
0.023
0.015
1.1
84.2
Bus13
-0.043
-0.027
2.2
84.5
84.7
Bus16
0.022
0.013
1.1
Bus14
0.022
0.014
1.1
84.2
Bus19
-0.021
-0.013
58.9
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
38
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus 18
Bus 19
Bus19
Voltage
kV
% Mag.
20.000
68.342
20.000
20.000
67.892
65.756
Generation
Ang.
-6.7
-6.7
-9.2
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus 17
-0.837
-0.506
41.3
85.6
Bus 19
0.813
0.490
40.1
85.6
Bus98
0.024
0.015
1.2
84.2
Bus 20
0.022
0.013
1.1
86.3
Bus 21
0.028
0.016
1.4
86.9
Bus 23
0.757
0.459
37.7
85.5
Bus 18
-0.808
-0.488
40.1
85.6
Bus13
-0.086
-0.054
4.5
84.6
Bus21
0.065
0.040
3.3
84.8
Bus18
0.022
0.014
1.1
84.2
Bus20
0.400
61.294
-10.1
0.021
0.013
Bus21
-0.021
-0.013
58.9
85.0
Bus 20
20.000
67.880
-6.7
Bus 19
-0.022
-0.014
1.1
84.2
Bus102
0.022
0.014
1.1
84.2
Bus19
-0.065
-0.041
3.3
84.6
Bus22
0.043
0.027
2.2
84.9
Bus21
Bus 21
Bus22
20.000
20.000
20.000
65.750
67.877
65.749
-9.2
-6.7
-9.2
Bus 22
20.000
67.875
-6.7
Bus 23
20.000
67.639
-6.7
Bus20
0.022
0.014
1.1
84.2
Bus 19
-0.028
-0.017
1.4
85.2
Bus 22
0.006
0.003
0.3
89.2
Bus104
0.022
0.014
1.1
84.2
Bus21
-0.043
-0.027
2.2
84.7
Bus25
0.022
0.013
1.1
84.7
Bus26
0.022
0.013
1.1
84.7
Bus 21
-0.006
-0.004
0.3
84.2
Bus106
0.006
0.004
0.3
84.2
Bus 19
-0.755
-0.458
37.7
85.5
Bus 24
0.744
0.450
37.1
85.5
Bus108
0.011
0.007
0.6
84.2
Bus23
0.400
61.290
-10.1
0.021
0.013
Bus26
-0.021
-0.013
58.9
85.0
Bus 24
20.000
67.390
-6.7
Bus 23
-0.741
-0.449
37.1
85.5
Bus 25
0.719
0.435
36.0
85.6
Bus110
0.022
0.014
1.1
84.2
Bus24
0.400
61.290
-10.1
0.021
0.013
Bus25
-0.021
-0.013
58.9
85.0
Bus25
20.000
65.747
-9.2
Bus22
-0.022
-0.014
1.1
84.2
Bus24
0.022
0.014
1.1
84.2
Bus 26
0.711
0.431
35.7
85.5
85.5
Bus 25
Bus26
20.000
20.000
67.188
65.747
-6.7
-9.2
Bus 24
-0.717
-0.434
36.0
Bus112
0.006
0.004
0.3
84.2
Bus22
-0.022
-0.014
1.1
84.2
% Tap
ETAP
Project:
7.5.0
Location:
Page:
39
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus 26
Voltage
kV
% Mag.
20.000
67.088
Generation
Ang.
-6.7
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus23
0.022
0.014
1.1
84.2
Bus 25
-0.710
-0.430
35.7
85.5
Bus 27
0.688
0.416
34.6
85.6
Bus113
0.022
0.014
1.1
84.2
Bus27
0.400
60.951
-10.1
0.011
0.007
Bus28
-0.011
-0.007
29.4
85.0
Bus 27
20.000
66.933
-6.8
Bus 26
-0.687
-0.416
34.6
85.6
Bus 28
0.665
0.401
33.5
85.6
Bus 28
Bus28
20.000
20.000
66.792
65.389
-6.8
-9.2
Bus 29
20.000
66.790
-6.8
Bus29
20.000
65.445
-9.2
Bus116
0.022
0.014
1.1
84.2
Bus 27
-0.663
-0.401
33.5
85.6
Bus 30
0.652
0.394
32.9
85.6
Bus 29
0.011
0.007
0.6
85.5
Bus29
-0.194
-0.118
10.0
85.5
Bus31
0.184
0.111
9.5
85.6
Bus27
0.011
0.007
0.6
84.2
Bus 28
-0.011
-0.007
0.6
84.2
Bus137
0.011
0.007
0.6
84.2
Bus28
0.195
0.117
10.0
85.7
Bus168
-0.195
-0.117
10.0
85.7
-0.021
-0.013
58.9
85.0
Bus30
0.400
60.900
-10.1
0.021
0.013
Bus31
Bus 30
20.000
66.654
-6.8
Bus 31
0.629
0.380
31.8
85.6
Bus 28
-0.651
-0.394
33.0
85.6
Bus117
0.022
0.014
1.1
84.2
Bus28
-0.184
-0.111
9.5
85.5
Bus31
Bus 31
Bus 32
20.000
20.000
20.000
65.336
66.582
66.410
-9.2
-6.8
-6.8
Bus169
0.162
0.098
8.4
85.7
Bus30
0.021
0.014
1.1
84.2
Bus 32
0.607
0.366
30.7
85.7
Bus 30
-0.629
-0.380
31.8
85.6
Bus118
0.022
0.014
1.1
84.2
Bus 31
-0.605
-0.365
30.7
85.6
Bus 34
0.573
0.345
29.1
85.7
Bus 33
0.011
0.006
0.5
86.3
Bus119
0.022
0.014
1.1
84.2
Bus32
0.400
60.706
-10.1
0.011
0.007
Bus35
-0.011
-0.007
29.4
85.0
Bus 33
20.000
66.407
-6.8
Bus 32
-0.011
-0.007
0.6
84.2
Bus308
0.011
0.007
0.6
84.2
Bus33
0.400
60.707
-10.1
0.011
0.007
Bus34
-0.011
-0.007
29.4
85.0
Bus 34
20.000
66.215
-6.8
Bus 35
0.549
0.330
27.9
85.7
Bus 32
-0.571
-0.344
29.1
85.6
% Tap
ETAP
Project:
7.5.0
Location:
Page:
40
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus34
Bus35
Bus 35
Bus 36
Voltage
kV
% Mag.
20.000
65.131
20.000
20.000
20.000
65.131
65.902
65.827
Generation
Ang.
-9.2
-9.2
-6.8
-6.8
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus124
0.022
0.014
1.1
84.2
Bus173
-0.021
-0.014
1.1
84.4
Bus35
0.011
0.007
0.6
84.6
Bus33
0.011
0.007
0.6
84.2
Bus34
-0.011
-0.007
0.6
84.2
Bus32
0.011
0.007
0.6
84.2
Bus 36
0.525
0.316
26.8
85.7
85.6
Bus 34
-0.547
-0.330
28.0
Bus125
0.022
0.014
1.1
84.2
Bus 35
-0.525
-0.316
26.9
85.7
Bus 37
0.514
0.309
26.3
85.7
Bus126
0.011
0.007
0.6
84.2
Bus36
0.400
60.807
-10.1
0.011
0.007
Bus37
-0.011
-0.007
29.4
85.0
Bus 37
20.000
65.650
-6.9
Bus 38
0.491
0.295
25.2
85.7
Bus 36
-0.513
-0.309
26.3
85.7
Bus127
0.021
0.014
1.1
84.2
Bus170
-0.011
-0.007
0.6
84.2
0.007
0.6
84.2
-0.007
29.4
85.0
0.019
1.6
86.2
-0.295
25.2
85.7
Bus37
20.000
65.237
-9.2
Bus36
0.011
Bus38
0.400
60.721
-10.1
0.011
0.007
Bus39
-0.011
Bus 38
20.000
65.480
-6.9
Bus 39
0.032
Bus 37
-0.490
Bus 42
0.447
0.269
23.0
85.7
Bus282
0.011
0.007
0.6
84.2
Bus 38
-0.032
-0.019
1.7
85.6
Bus 40
0.021
0.013
1.1
86.2
Bus218
0.011
0.007
0.6
84.2
Bus262
-0.059
-0.037
3.1
84.8
85.0
Bus 39
Bus39
20.000
20.000
65.471
65.147
-6.9
-9.2
Bus41
0.048
0.030
2.5
Bus38
0.011
0.007
0.6
84.2
Bus40
0.400
60.714
-10.1
0.011
0.007
Bus41
-0.011
-0.007
29.4
85.0
Bus 40
20.000
65.465
-6.9
Bus 39
-0.021
-0.013
1.1
85.2
86.2
Bus 41
Bus41
20.000
20.000
65.462
65.140
-6.9
-9.2
Bus 41
0.011
0.006
0.5
Bus220
0.011
0.007
0.6
84.2
Bus 40
-0.011
-0.007
0.6
84.2
Bus222
0.011
0.007
0.6
84.2
Bus39
-0.048
-0.030
2.5
84.7
Bus43
0.011
0.007
0.6
85.2
Bus46
0.027
0.017
1.4
84.8
Bus40
0.011
0.007
0.6
84.2
% Tap
ETAP
Project:
7.5.0
Location:
Page:
41
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus 42
Voltage
kV
% Mag.
20.000
65.326
Generation
Ang.
-6.9
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus 43
0.435
0.262
22.5
85.7
Bus 38
-0.446
-0.269
23.0
85.6
Bus286
0.011
0.007
0.6
84.2
Bus42
0.400
60.713
-10.1
0.011
0.007
Bus43
-0.011
-0.007
29.4
85.0
Bus43
20.000
65.138
-9.2
Bus41
-0.011
-0.007
0.6
84.2
Bus42
0.011
0.007
0.6
84.2
Bus 42
-0.434
-0.262
22.5
85.6
85.7
Bus 43
Bus 44
20.000
20.000
65.175
65.026
-6.9
-6.9
Bus 44
0.429
0.259
22.2
Bus266
0.005
0.003
0.3
84.2
Bus 43
-0.428
-0.259
22.2
85.6
Bus 45
0.423
0.255
21.9
85.6
Bus270
0.005
0.003
0.3
84.2
Bus44
0.400
60.710
-10.1
0.021
0.013
Bus47
-0.021
-0.013
58.8
85.0
Bus 45
20.000
64.878
-6.9
Bus 44
-0.422
-0.255
21.9
85.6
Bus 46
0.417
0.252
21.7
85.6
Bus272
0.005
0.003
0.3
84.2
Bus45
0.400
60.711
-10.1
0.005
0.003
Bus46
-0.005
-0.003
14.7
85.0
Bus 46
20.000
64.732
-6.9
Bus 45
-0.416
-0.252
21.7
85.5
85.6
Bus46
Bus47
Bus 47
Bus 48
Bus 49
Bus 50
Bus 51
20.000
20.000
20.000
20.000
20.000
20.000
20.000
65.136
65.135
64.590
64.452
64.315
64.205
64.090
-9.2
-9.2
-6.9
-6.9
-7.0
-7.0
-7.0
Bus 47
0.405
0.245
21.1
Bus274
0.011
0.007
0.6
84.2
Bus41
-0.027
-0.017
1.4
84.3
Bus47
0.021
0.014
1.1
84.4
Bus45
0.005
0.003
0.3
84.2
Bus46
-0.021
-0.014
1.1
84.2
Bus44
0.021
0.014
1.1
84.2
Bus 46
-0.404
-0.245
21.1
85.5
85.5
Bus 48
0.394
0.238
20.6
Bus276
0.011
0.007
0.6
84.2
Bus 47
-0.393
-0.239
20.6
85.5
Bus 49
0.388
0.235
20.3
85.5
Bus278
0.005
0.003
0.3
84.2
Bus 50
0.377
0.229
19.8
85.5
Bus 48
-0.387
-0.235
20.3
85.5
Bus290
0.010
0.007
0.6
84.2
Bus 51
0.355
0.215
18.7
85.5
Bus 49
-0.376
-0.229
19.8
85.4
Bus128
0.021
0.013
1.1
84.2
Bus 50
-0.354
-0.215
18.7
85.5
% Tap
ETAP
Project:
7.5.0
Location:
Page:
42
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus 52
0.344
0.209
18.1
85.5
Bus129
0.010
0.007
0.6
84.2
-0.007
-0.004
15.5
85.0
Bus51
0.400
72.826
-7.2
0.007
0.004
Bus52
Bus52
20.000
74.217
-6.4
Bus62
2.981
2.047
140.6
82.4
Bus 5
-2.988
-2.051
141.0
82.4
Bus51
0.007
0.004
0.3
84.3
Bus 59
0.198
0.119
10.4
85.8
85.5
Bus 52
20.000
64.013
-7.0
Bus53
0.400
69.433
-7.0
0.006
0.004
Bus 53
20.000
63.976
-7.0
Bus 54
Bus 55
Bus 56
Bus 57
20.000
20.000
20.000
20.000
63.945
63.921
63.902
63.890
-7.0
-7.0
-7.0
-7.0
Bus 51
-0.344
-0.209
18.1
Bus 53
0.125
0.077
6.6
85.2
Bus139
0.021
0.013
1.1
84.2
Bus 6
-0.006
-0.004
15.2
85.0
Bus 52
-0.125
-0.077
6.6
85.0
Bus 54
0.104
0.064
5.5
85.2
Bus234
0.021
0.013
1.1
84.2
Bus 53
-0.104
-0.065
5.5
85.0
Bus 55
0.083
0.051
4.4
85.2
Bus236
0.021
0.013
1.1
84.2
Bus 54
-0.083
-0.052
4.4
84.9
Bus 56
0.062
0.038
3.3
85.2
Bus238
0.021
0.013
1.1
84.2
Bus 55
-0.062
-0.039
3.3
84.8
Bus 57
0.042
0.026
2.2
85.2
Bus240
0.021
0.013
1.1
84.2
Bus 56
-0.042
-0.026
2.2
84.7
Bus 58
0.021
0.013
1.1
85.2
Bus242
0.021
0.013
1.1
84.2
-0.021
-0.013
1.1
84.2
Bus 58
20.000
63.883
-7.0
Bus 57
Bus303
0.021
0.013
1.1
84.2
Bus58
0.400
70.663
-7.9
0.025
0.016
Bus65
-0.025
-0.016
61.2
85.0
Bus 59
20.000
63.973
-7.0
Bus 60
0.177
0.106
9.3
85.9
Bus 52
-0.198
-0.119
10.4
85.7
Bus140
0.021
0.013
1.1
84.2
Bus59
0.400
67.707
-7.8
0.039
0.024
Bus64
-0.039
-0.024
96.7
85.0
Bus60
0.400
68.071
-7.6
0.012
0.008
Bus63
-0.012
-0.008
30.3
85.0
Bus 60
20.000
63.900
-7.0
Bus 61
0.156
0.093
8.2
85.9
85.7
Bus61
0.400
68.681
-7.4
0.012
0.008
Bus 59
-0.177
-0.106
9.3
Bus141
0.021
0.013
1.1
84.2
Bus62
-0.012
-0.008
30.3
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
43
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus 61
Bus62
Bus 62
Bus 63
Bus63
Bus 64
Bus64
Bus 65
Bus65
Bus 66
Bus66
Voltage
kV
% Mag.
20.000
63.845
20.000
20.000
21.000
20.000
20.000
20.000
20.000
20.000
20.000
20.000
73.547
63.765
60.697
72.903
63.704
72.443
63.679
72.040
63.667
71.622
Generation
Ang.
-7.0
-6.6
-7.0
-7.0
-6.8
-7.0
-6.9
-7.0
-7.1
-7.0
-7.2
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus 62
0.135
0.080
7.1
86.0
Bus 60
-0.156
-0.093
8.2
85.8
Bus142
0.021
0.013
1.1
84.2
Bus52
-2.961
-2.019
140.7
82.6
Bus71
2.948
2.011
140.1
82.6
Bus61
0.012
0.008
0.6
84.2
Bus 61
-0.135
-0.081
7.1
85.7
Bus 63
0.114
0.068
6.0
86.0
Bus143
0.021
0.013
1.1
84.2
Bus 62
-0.114
-0.068
6.0
85.8
Bus 64
0.093
0.055
4.9
86.2
Bus204
0.021
0.013
1.1
84.2
Bus71
-1.688
-1.126
80.3
83.2
Bus64
1.675
1.118
79.7
83.2
Bus60
0.012
0.008
0.6
84.2
Bus 63
-0.093
-0.055
4.9
86.0
Bus 65
0.083
0.049
4.4
86.2
Bus208
0.010
0.007
0.6
84.2
Bus63
-1.668
-1.108
79.8
83.3
83.3
Bus65
1.629
1.083
77.9
Bus59
0.039
0.025
1.8
84.2
Bus 64
-0.083
-0.049
4.4
85.9
Bus 68
0.031
0.017
1.6
87.5
Bus 66
0.041
0.025
2.2
85.2
Bus214
0.010
0.007
0.6
84.2
Bus64
-1.622
-1.074
78.0
83.4
Bus66
1.596
1.058
76.7
83.4
Bus58
0.026
0.016
1.2
84.3
Bus 65
-0.041
-0.026
2.2
84.7
Bus 67
0.021
0.013
1.1
85.2
Bus226
0.021
0.013
1.1
84.2
Bus65
-1.589
-1.049
76.8
83.5
Bus69
1.565
1.034
75.6
83.4
Bus67
0.024
0.015
1.1
84.2
-0.021
-0.013
1.1
84.2
Bus 67
20.000
63.661
-7.0
Bus 66
Bus230
0.021
0.013
1.1
84.2
Bus67
0.400
66.858
-8.0
0.024
0.015
Bus66
-0.024
-0.015
60.2
85.0
Bus 68
20.000
63.670
-7.0
Bus 65
-0.031
-0.018
1.6
86.8
Bus 69
0.021
0.011
1.1
88.2
% Tap
ETAP
Project:
7.5.0
Location:
Page:
44
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus 69
Bus69
Voltage
kV
% Mag.
20.000
63.664
20.000
71.197
Generation
Ang.
-7.0
-7.3
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus216
0.010
0.007
0.6
84.2
Bus 68
-0.021
-0.012
1.1
87.2
Bus 70
0.016
0.008
0.8
88.2
Bus293
0.005
0.003
0.3
84.2
Bus66
-1.559
-1.025
75.6
83.5
Bus153
1.535
1.010
74.5
83.5
Bus70
0.024
0.015
1.1
84.2
Bus70
0.400
66.456
-8.2
0.024
0.015
Bus69
-0.024
-0.015
60.1
85.0
Bus 70
20.000
63.660
-7.0
Bus 69
-0.016
-0.009
0.8
86.8
Bus 71
0.010
0.006
0.5
88.2
Bus295
0.005
0.003
0.3
84.2
Bus71
Bus 71
20.000
20.000
73.298
63.657
-6.7
-7.0
Bus63
1.694
1.134
80.3
83.1
Bus62
-2.941
-2.001
140.1
82.7
Bus73
1.247
0.867
59.8
82.1
Bus 72
0.005
0.003
0.3
88.2
Bus 70
-0.010
-0.006
0.5
86.2
Bus300
0.005
0.003
0.3
84.2
Bus72
0.400
65.827
-9.8
1.218
0.755
Bus73
-1.218
-0.755
3142.6
85.0
Bus 72
20.000
63.655
-7.0
Bus 71
-0.005
-0.003
0.3
84.2
Bus73
20.000
72.128
-6.7
Bus302
0.005
0.003
0.3
84.2
Bus71
-1.227
-0.855
59.9
82.0
Bus72
1.227
0.855
59.9
82.0
Bus76
0.400
67.114
-7.2
0.024
0.015
Bus 10
-0.024
-0.015
60.3
85.0
Bus77
0.400
66.626
-7.3
0.006
0.004
Bus 11
-0.006
-0.004
15.0
85.0
Bus82
0.400
68.707
-7.1
0.025
0.015
Bus 7
-0.025
-0.015
60.7
85.0
Bus83
0.400
68.095
-7.2
0.039
0.024
Bus 8
-0.039
-0.024
96.8
85.0
Bus84
0.400
66.384
-7.3
0.012
0.007
Bus 12
-0.012
-0.007
30.0
85.0
Bus85
0.400
66.096
-7.3
0.023
0.014
Bus 13
-0.023
-0.014
60.0
85.0
Bus86
0.400
65.325
-7.4
0.012
0.007
Bus 14
-0.012
-0.007
29.9
85.0
Bus87
0.400
65.049
-7.4
0.011
0.007
Bus 15
-0.011
-0.007
29.9
85.0
Bus88
0.400
64.624
-7.4
0.011
0.007
Bus 16
-0.011
-0.007
30.1
85.0
Bus95
0.400
67.556
-7.2
0.024
0.015
Bus96
-0.024
-0.015
60.4
85.0
Bus96
20.000
72.359
-6.4
Bus 9
-0.024
-0.016
1.1
84.2
Bus95
0.024
0.016
1.1
84.2
Bus97
0.400
64.188
-7.5
0.023
0.014
Bus 17
-0.023
-0.014
59.5
85.0
Bus98
0.400
66.987
-7.5
0.024
0.015
Bus 18
-0.024
-0.015
60.2
85.0
Bus102
0.400
63.312
-7.5
0.022
0.014
Bus 20
-0.022
-0.014
59.3
85.0
Bus104
0.400
63.309
-7.5
0.022
0.014
Bus 21
-0.022
-0.014
59.3
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
45
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus106
0.400
63.308
-7.5
0.006
0.003
Bus 22
-0.006
-0.003
14.8
85.0
Bus108
0.400
63.084
-7.6
0.011
0.007
Bus 23
-0.011
-0.007
29.6
85.0
Bus110
0.400
62.848
-7.6
0.022
0.014
Bus 24
-0.022
-0.014
59.2
85.0
Bus112
0.400
62.657
-7.6
0.005
0.003
Bus 25
-0.005
-0.003
14.8
85.0
Bus113
0.400
62.562
-7.6
0.022
0.014
Bus 26
-0.022
-0.014
59.2
85.0
Bus116
0.400
62.415
-7.6
0.022
0.013
Bus 27
-0.022
-0.013
59.2
85.0
Bus117
0.400
62.150
-7.7
0.022
0.013
Bus 30
-0.022
-0.013
59.1
85.0
Bus118
0.400
62.082
-7.7
0.022
0.013
Bus 31
-0.022
-0.013
59.1
85.0
Bus119
0.400
61.919
-7.7
0.022
0.013
Bus 32
-0.022
-0.013
59.1
85.0
Bus124
0.400
61.734
-7.7
0.021
0.013
Bus 34
-0.021
-0.013
59.0
85.0
Bus125
0.400
61.437
-7.7
0.021
0.013
Bus 35
-0.021
-0.013
59.0
85.0
Bus126
0.400
61.366
-7.7
0.011
0.007
Bus 36
-0.011
-0.007
29.5
85.0
Bus127
0.400
61.198
-7.7
0.021
0.013
Bus 37
-0.021
-0.013
58.9
85.0
Bus128
0.400
59.827
-7.9
0.021
0.013
Bus 50
-0.021
-0.013
58.7
85.0
Bus129
0.400
59.718
-7.9
0.010
0.006
Bus 51
-0.010
-0.006
29.3
85.0
Bus137
0.400
62.279
-7.6
0.011
0.007
Bus 29
-0.011
-0.007
29.6
85.0
Bus139
0.400
59.646
-7.9
0.021
0.013
Bus 52
-0.021
-0.013
58.6
85.0
Bus140
0.400
59.607
-7.9
0.021
0.013
Bus 59
-0.021
-0.013
58.6
85.0
Bus141
0.400
59.538
-7.9
0.021
0.013
Bus 60
-0.021
-0.013
58.6
85.0
Bus142
0.400
59.486
-7.9
0.021
0.013
Bus 61
-0.021
-0.013
58.6
85.0
Bus143
0.400
59.410
-7.9
0.020
0.013
Bus 62
-0.020
-0.013
58.6
85.0
Bus149
0.400
66.298
-8.2
0.023
0.015
Bus156
-0.023
-0.015
60.0
85.0
Bus150
20.000
71.033
-7.4
Bus151
-0.062
-0.039
3.0
84.7
84.8
Bus151
20.000
71.043
-7.4
Bus154
0.038
0.024
1.8
Bus156
0.024
0.015
1.1
84.6
Bus153
-0.085
-0.053
4.1
84.8
Bus150
0.062
0.038
2.9
85.0
Bus152
0.024
0.015
1.1
84.2
Bus152
0.400
66.309
-8.2
0.023
0.015
Bus151
-0.023
-0.015
60.0
85.0
Bus153
20.000
71.066
-7.4
Bus151
0.085
0.053
4.1
85.1
Bus69
-1.533
-1.008
74.5
83.6
Bus159
1.447
0.955
70.4
83.5
Bus154
20.000
71.023
-7.4
Bus150
-0.038
-0.024
1.8
84.2
Bus155
0.038
0.024
1.8
84.2
Bus155
0.400
66.362
-8.3
0.038
0.023
Bus154
-0.038
-0.023
96.1
85.0
Bus156
20.000
71.031
-7.4
Bus150
-0.024
-0.015
1.1
84.2
Bus149
0.024
0.015
1.1
84.2
Bus158
-0.012
-0.007
30.0
85.0
Bus157
0.400
66.001
-8.3
0.012
0.007
% Tap
ETAP
Project:
7.5.0
Location:
Page:
46
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus158
Bus159
Voltage
kV
% Mag.
20.000
70.718
20.000
70.842
Generation
Ang.
-7.5
-7.4
MW
Load
Mvar
0
MW
0
Bus160
0.400
66.119
-8.3
Bus161
0.400
60.808
-10.1
Bus162
0.400
60.949
-10.2
Bus163
0.400
61.068
-10.1
Bus164
0.400
61.192
Bus165
0.400
61.331
Bus166
20.000
65.790
Bus167
Bus168
Bus169
Bus170
Bus171
20.000
20.000
20.000
20.000
20.000
65.643
65.512
65.312
65.239
65.847
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus159
-1.436
-0.945
70.2
83.5
Bus171
1.424
0.937
69.6
83.5
Bus157
0.012
0.008
0.6
84.2
Bus158
1.438
0.947
70.2
83.5
Bus153
-1.444
-0.951
70.4
83.5
Bus160
0.006
0.004
0.3
84.2
-0.006
-0.004
15.0
85.0
0.006
0.004
Bus159
0.011
0.007
Bus170
-0.011
-0.007
29.4
85.0
0.034
0.021
Bus169
-0.034
-0.021
94.2
85.0
0.021
0.013
Bus168
-0.021
-0.013
58.9
85.0
-10.1
0.005
0.003
Bus167
-0.005
-0.003
14.7
85.0
-10.0
0.021
0.013
Bus166
-0.021
-0.013
58.9
85.0
-9.2
Bus171
-0.265
-0.160
13.6
85.7
Bus167
0.244
0.146
12.5
85.8
-9.2
-9.2
-9.2
-9.2
-9.2
Bus172
0.400
60.710
-10.1
0.005
0.003
Bus173
20.000
65.135
-9.2
Bus165
0.022
0.014
1.1
84.2
Bus166
-0.243
-0.147
12.5
85.6
Bus258
0.238
0.143
12.2
85.7
Bus164
0.005
0.003
0.3
84.2
Bus29
0.195
0.117
10.0
85.8
Bus258
-0.216
-0.130
11.1
85.6
Bus163
0.021
0.014
1.1
84.2
Bus31
-0.162
-0.098
8.4
85.6
86.0
Bus170
0.128
0.076
6.6
Bus162
0.034
0.022
1.8
84.1
Bus37
0.011
0.007
0.6
85.2
Bus169
-0.128
-0.077
6.6
85.7
Bus262
0.107
0.064
5.5
85.9
Bus161
0.011
0.007
0.6
84.2
Bus7
0.199
0.124
10.3
84.8
Bus158
-1.351
-0.846
69.9
84.7
Bus166
0.266
0.159
13.6
85.7
Bus395
0.886
0.563
46.0
84.4
Bus173
-0.005
-0.003
14.7
85.0
Bus34
0.021
0.013
1.1
84.9
84.7
Bus262
-0.027
-0.017
1.4
Bus172
0.005
0.003
0.3
84.2
Bus174
0.400
59.939
-10.6
0.021
0.013
Bus177
-0.021
-0.013
58.7
85.0
Bus175
0.400
59.604
-10.8
0.005
0.003
Bus176
-0.005
-0.003
14.7
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
47
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus176
Bus177
Voltage
kV
% Mag.
20.000
63.969
20.000
64.323
Generation
Ang.
-9.9
-9.7
MW
Load
Mvar
0
MW
0
Bus178
0.400
60.196
-10.5
Bus179
0.400
60.696
-10.3
Bus180
0.400
56.614
-12.0
Bus181
0.400
59.192
-12.1
Bus182
20.000
60.509
-11.2
Bus183
Bus184
20.000
20.000
60.820
61.099
-11.1
-11.0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus177
-0.704
-0.440
37.5
84.8
Bus373
0.699
0.437
37.2
84.8
Bus175
0.005
0.003
0.3
84.2
Bus176
0.707
0.443
37.4
84.7
Bus389
-0.728
-0.456
38.5
84.7
Bus174
0.021
0.013
1.1
84.2
-0.010
-0.006
29.4
85.0
0.010
0.006
Bus188
0.011
0.007
Bus395
-0.011
-0.007
29.4
85.0
0.019
0.012
Bus183
-0.019
-0.012
58.2
85.0
0.010
0.006
Bus182
-0.010
-0.006
29.3
85.0
Bus313
0.410
0.248
22.8
85.6
Bus339
-0.420
-0.254
23.4
85.5
Bus181
0.010
0.007
0.6
84.2
Bus248
0.456
0.277
25.3
85.5
Bus342
-0.475
-0.289
26.4
85.4
Bus180
0.020
0.013
1.1
84.1
Bus345
0.502
0.306
27.8
85.4
Bus357
0.153
0.097
8.6
84.4
Bus373
-0.665
-0.410
36.9
85.1
Bus185
0.010
0.007
0.6
84.2
Bus185
0.400
59.780
-11.9
0.010
0.006
Bus184
-0.010
-0.006
29.3
85.0
Bus186
20.000
60.219
-11.2
Bus267
0.034
0.021
1.9
85.2
86.4
-0.180
-0.105
10.0
Bus264
Bus3
0.136
0.078
7.5
86.8
Bus292
0.010
0.006
0.6
84.1
Bus187
0.400
56.034
-12.2
0.010
0.006
Bus267
-0.010
-0.006
29.0
85.0
Bus188
20.000
64.593
-9.6
Bus381
-0.011
-0.007
0.6
84.2
Bus178
0.011
0.007
0.6
84.2
Bus189
0.400
55.914
-12.2
0.010
0.006
Bus190
-0.010
-0.006
29.0
85.0
Bus190
20.000
60.083
-11.3
Bus263
-0.102
-0.058
5.6
87.0
87.3
Bus191
20.000
60.179
-11.3
Bus195
0.092
0.051
5.1
Bus189
0.010
0.006
0.6
84.1
Bus264
-0.126
-0.072
7.0
86.9
Bus263
0.107
0.059
5.9
87.3
Bus192
0.019
0.012
1.1
84.1
Bus192
0.400
56.006
-12.2
0.019
0.012
Bus191
-0.019
-0.012
58.1
85.0
Bus193
20.000
60.029
-11.3
Bus250
-0.019
-0.012
1.1
84.1
Bus194
0.019
0.012
1.1
84.1
% Tap
ETAP
Project:
7.5.0
Location:
Page:
48
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus194
0.400
55.863
-12.2
0.019
0.012
Bus193
-0.019
-0.012
58.1
85.0
Bus195
20.000
60.043
-11.3
Bus190
-0.092
-0.052
5.1
87.0
Bus201
0.063
0.034
3.4
87.7
Bus250
0.024
0.015
1.4
85.7
Bus256
0.005
0.003
0.3
84.1
Bus196
0.400
55.831
-12.2
0.010
0.006
Bus201
-0.010
-0.006
29.0
85.0
Bus197
0.400
55.705
-12.2
0.005
0.003
Bus200
-0.005
-0.003
14.5
85.0
Bus198
0.400
55.693
-12.2
0.019
0.012
Bus199
-0.019
-0.012
58.1
85.0
Bus199
20.000
59.850
-11.3
Bus233
-0.019
-0.012
1.1
84.1
Bus198
0.019
0.012
1.1
84.1
Bus201
-0.053
-0.033
3.0
84.7
Bus211
0.048
0.030
2.7
84.8
Bus197
0.005
0.003
0.3
84.1
Bus195
-0.063
-0.036
3.5
87.0
Bus200
Bus201
20.000
20.000
59.862
59.995
-11.3
-11.3
Bus200
0.053
0.029
2.9
87.5
Bus196
0.010
0.006
0.6
84.1
Bus202
0.400
60.265
-10.5
0.005
0.003
Bus244
-0.005
-0.003
14.7
85.0
Bus204
0.400
59.378
-7.9
0.020
0.013
Bus 63
-0.020
-0.013
58.6
85.0
Bus208
0.400
59.352
-7.9
0.010
0.006
Bus 64
-0.010
-0.006
29.3
85.0
Bus210
0.400
55.704
-12.2
0.010
0.006
Bus211
-0.010
-0.006
29.0
85.0
Bus211
20.000
59.861
-11.3
Bus200
-0.048
-0.030
2.7
84.8
Bus213
0.039
0.024
2.2
84.9
Bus210
0.010
0.006
0.6
84.1
Bus212
0.400
55.703
-12.2
0.005
0.003
Bus213
-0.005
-0.003
14.5
85.0
Bus213
20.000
59.861
-11.3
Bus211
-0.039
-0.024
2.2
84.9
Bus225
0.034
0.021
1.9
85.0
Bus212
0.005
0.003
0.3
84.1
Bus214
0.400
59.329
-7.9
0.010
0.006
Bus 65
-0.010
-0.006
29.3
85.0
Bus216
0.400
59.320
-7.9
0.010
0.006
Bus 68
-0.010
-0.006
29.3
85.0
Bus218
0.400
61.029
-7.8
0.011
0.007
Bus 39
-0.011
-0.007
29.4
85.0
Bus220
0.400
61.023
-7.8
0.011
0.007
Bus 40
-0.011
-0.007
29.4
85.0
Bus222
0.400
61.020
-7.8
0.011
0.007
Bus 41
-0.011
-0.007
29.4
85.0
Bus224
0.400
55.703
-12.2
0.005
0.003
Bus225
-0.005
-0.003
14.5
85.0
Bus225
20.000
59.860
-11.3
Bus213
-0.034
-0.021
1.9
85.0
Bus229
0.029
0.018
1.6
85.1
Bus224
0.005
0.003
0.3
84.1
Bus226
0.400
59.317
-7.9
0.020
0.013
Bus 66
-0.020
-0.013
58.6
85.0
Bus228
0.400
55.702
-12.2
0.005
0.003
Bus229
-0.005
-0.003
14.5
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
49
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus229
Voltage
kV
% Mag.
20.000
59.860
Generation
Ang.
-11.3
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus225
-0.029
-0.018
1.6
85.1
Bus233
0.024
0.015
1.4
85.3
Bus228
0.005
0.003
0.3
84.1
Bus230
0.400
59.311
-7.9
0.020
0.013
Bus 67
-0.020
-0.013
58.6
85.0
Bus232
0.400
55.702
-12.2
0.005
0.003
Bus233
-0.005
-0.003
14.5
85.0
Bus233
20.000
59.859
-11.3
Bus199
0.019
0.012
1.1
85.6
85.3
Bus229
-0.024
-0.015
1.4
Bus232
0.005
0.003
0.3
84.1
Bus234
0.400
59.611
-7.9
0.021
0.013
Bus 53
-0.021
-0.013
58.6
85.0
Bus236
0.400
59.581
-7.9
0.021
0.013
Bus 54
-0.021
-0.013
58.6
85.0
Bus238
0.400
59.558
-7.9
0.021
0.013
Bus 55
-0.021
-0.013
58.6
85.0
Bus240
0.400
59.540
-7.9
0.021
0.013
Bus 56
-0.021
-0.013
58.6
85.0
Bus242
0.400
59.528
-7.9
0.021
0.013
Bus 57
-0.021
-0.013
58.6
85.0
Bus244
20.000
64.666
-9.6
Bus383
-0.005
-0.003
0.3
84.1
Bus202
0.005
0.003
0.3
84.2
Bus247
0.400
56.501
-12.1
0.005
0.003
Bus248
-0.005
-0.003
14.5
85.0
Bus248
20.000
60.701
-11.1
Bus183
-0.455
-0.277
25.3
85.5
Bus341
0.450
0.273
25.0
85.5
Bus247
0.005
0.003
0.3
84.1
Bus193
0.019
0.012
1.1
85.1
Bus195
-0.024
-0.015
1.4
84.9
Bus255
0.005
0.003
0.3
84.1
Bus250
20.000
60.035
-11.3
Bus255
0.400
55.869
-12.2
0.005
0.003
Bus250
-0.005
-0.003
14.5
85.0
Bus256
0.400
55.877
-12.2
0.005
0.003
Bus195
-0.005
-0.003
14.5
85.0
Bus257
0.400
61.127
-10.1
0.021
0.013
Bus258
-0.021
-0.013
58.9
85.0
Bus258
20.000
65.575
-9.2
Bus167
-0.238
-0.144
12.2
85.6
Bus168
0.216
0.130
11.1
85.7
Bus257
0.021
0.014
1.1
84.2
Bus259
0.400
55.959
-12.2
0.005
0.003
Bus263
-0.005
-0.003
14.5
85.0
Bus260
0.400
56.024
-12.2
0.010
0.006
Bus264
-0.010
-0.006
29.0
85.0
Bus261
0.400
60.729
-10.1
0.021
0.013
Bus262
-0.021
-0.013
58.8
85.0
Bus262
20.000
65.155
-9.2
Bus39
0.059
0.036
3.1
85.0
Bus170
-0.106
-0.065
5.5
85.3
Bus173
0.027
0.015
1.4
87.0
Bus261
0.021
0.014
1.1
84.2
Bus263
20.000
60.130
-11.3
Bus190
0.102
0.057
5.6
87.2
Bus191
-0.107
-0.060
5.9
87.1
Bus259
0.005
0.003
0.3
84.1
% Tap
ETAP
Project:
7.5.0
Location:
Page:
50
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus264
Voltage
kV
% Mag.
20.000
60.198
Generation
Ang.
-11.2
MW
Load
Mvar
0
MW
0
Load Flow
Mvar
ID
0
MW
XFMR
Mvar
Amp
% PF
Bus191
0.126
0.072
7.0
86.9
Bus186
-0.136
-0.078
7.5
86.7
Bus260
0.010
0.006
0.6
84.1
Bus266
0.400
60.748
-7.8
0.005
0.003
Bus 43
-0.005
-0.003
14.7
85.0
Bus267
20.000
60.209
-11.2
Bus186
-0.034
-0.021
1.9
84.7
Bus268
0.024
0.015
1.4
84.9
Bus187
0.010
0.006
0.6
84.1
Bus267
-0.024
-0.015
1.4
84.5
Bus283
0.019
0.012
1.1
84.6
Bus279
0.005
0.003
0.3
84.1
Bus268
20.000
60.205
-11.2
Bus270
0.400
60.606
-7.8
0.005
0.003
Bus 44
-0.005
-0.003
14.7
85.0
Bus272
0.400
60.466
-7.8
0.005
0.003
Bus 45
-0.005
-0.003
14.7
85.0
Bus274
0.400
60.328
-7.8
0.010
0.006
Bus 46
-0.010
-0.006
29.4
85.0
Bus276
0.400
60.193
-7.8
0.010
0.006
Bus 47
-0.010
-0.006
29.4
85.0
Bus278
0.400
60.062
-7.8
0.005
0.003
Bus 48
-0.005
-0.003
14.7
85.0
Bus279
0.400
56.030
-12.2
0.005
0.003
Bus268
-0.005
-0.003
14.5
85.0
Bus280
0.400
56.027
-12.2
0.019
0.012
Bus283
-0.019
-0.012
58.1
85.0
Bus282
0.400
61.038
-7.8
0.011
0.007
Bus 38
-0.011
-0.007
29.4
85.0
Bus283
20.000
60.202
-11.2
Bus268
-0.019
-0.012
1.1
84.1
Bus280
0.019
0.012
1.1
84.1
Bus 42
-0.011
-0.007
29.4
85.0
Bus286
0.400
60.891
-7.8
0.011
0.007
Bus287
20.000
60.310
-11.2
Bus288
20.000
60.368
-11.2
Bus290
0.400
59.932
-7.9
Bus291
0.400
56.185
-12.2
Bus292
0.400
56.044
Bus293
0.400
59.315
Bus295
0.400
Bus297
Bus298
Bus3
0.185
0.107
10.2
86.4
Bus288
-0.233
-0.138
13.0
86.1
Bus311
0.039
0.024
2.2
85.1
Bus298
0.010
0.006
0.6
84.1
Bus287
0.233
0.137
13.0
86.2
Bus313
-0.238
-0.141
13.2
86.1
Bus291
0.005
0.003
0.3
84.1
0.010
0.006
Bus 49
-0.010
-0.006
29.3
85.0
0.005
0.003
Bus288
-0.005
-0.003
14.5
85.0
-12.2
0.010
0.006
Bus186
-0.010
-0.006
29.0
85.0
-7.9
0.005
0.003
Bus 69
-0.005
-0.003
14.6
85.0
59.311
-7.9
0.005
0.003
Bus 70
-0.005
-0.003
14.6
85.0
0.400
56.086
-12.2
0.005
0.003
Bus3
-0.005
-0.003
14.5
85.0
0.400
56.130
-12.2
0.010
0.006
Bus287
-0.010
-0.006
29.1
85.0
Bus300
0.400
59.308
-7.9
0.005
0.003
Bus 71
-0.005
-0.003
14.6
85.0
Bus302
0.400
59.306
-7.9
0.005
0.003
Bus 72
-0.005
-0.003
14.6
85.0
Bus303
0.400
59.522
-7.9
0.021
0.013
Bus 58
-0.021
-0.013
58.6
85.0
% Tap
ETAP
Project:
7.5.0
Location:
Page:
51
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus308
0.400
61.916
-7.7
0.011
0.007
Bus 33
-0.011
-0.007
29.5
85.0
Bus309
0.400
56.112
-12.2
0.019
0.012
Bus312
-0.019
-0.012
58.1
85.0
Bus310
0.400
56.118
-12.2
0.019
0.012
Bus311
-0.019
-0.012
58.1
85.0
Bus311
20.000
60.297
-11.2
Bus287
-0.039
-0.025
2.2
84.6
Bus312
0.019
0.012
1.1
85.1
Bus310
0.019
0.013
1.1
84.1
Bus311
-0.019
-0.013
1.1
84.1
Bus309
0.019
0.013
1.1
84.1
Bus182
-0.409
-0.248
22.8
85.5
Bus288
0.239
0.140
13.2
86.2
Bus312
Bus313
20.000
20.000
60.291
60.419
-11.2
-11.2
Bus325
0.107
0.067
6.0
84.7
Bus319
0.063
0.040
3.6
84.5
Bus314
0.400
56.182
-12.2
0.019
0.012
Bus331
-0.019
-0.012
58.1
85.0
Bus316
0.400
56.202
-12.2
0.019
0.012
Bus325
-0.019
-0.012
58.1
85.0
Bus318
0.400
56.294
-12.3
0.039
0.024
Bus319
-0.039
-0.024
116.3
85.0
Bus319
20.000
60.409
-11.2
Bus321
0.015
0.009
0.8
85.4
Bus313
-0.063
-0.040
3.6
84.4
Bus324
0.010
0.006
0.6
84.1
Bus318
0.039
0.025
2.2
84.0
Bus320
0.400
56.222
-12.2
0.005
0.003
Bus321
-0.005
-0.003
14.5
85.0
Bus321
20.000
60.407
-11.2
Bus319
-0.015
-0.009
0.8
84.8
Bus323
0.010
0.006
0.5
85.1
Bus320
0.005
0.003
0.3
84.1
Bus322
0.400
56.221
-12.2
0.010
0.006
Bus323
-0.010
-0.006
29.1
85.0
Bus323
20.000
60.406
-11.2
Bus321
-0.010
-0.006
0.6
84.1
Bus322
0.010
0.006
0.6
84.1
Bus324
0.400
56.225
-12.2
0.010
0.006
Bus319
-0.010
-0.006
29.1
85.0
Bus325
20.000
60.386
-11.2
Bus313
-0.107
-0.068
6.1
84.5
Bus332
0.088
0.055
5.0
84.6
Bus316
0.019
0.013
1.1
84.1
Bus326
0.400
56.182
-12.2
0.019
0.012
Bus330
-0.019
-0.012
58.1
85.0
Bus327
0.400
56.183
-12.2
0.010
0.006
Bus332
-0.010
-0.006
29.1
85.0
Bus328
0.400
56.175
-12.2
0.019
0.012
Bus333
-0.019
-0.012
58.1
85.0
Bus329
0.400
56.171
-12.2
0.019
0.012
Bus334
-0.019
-0.012
58.1
85.0
Bus330
20.000
60.365
-11.2
Bus331
0.019
0.012
1.1
84.2
Bus332
-0.039
-0.025
2.2
84.2
Bus326
0.019
0.013
1.1
84.1
Bus330
-0.019
-0.013
1.1
84.1
Bus331
20.000
60.364
-11.2
% Tap
ETAP
Project:
7.5.0
Location:
Page:
52
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Bus332
Bus333
Voltage
kV
% Mag.
20.000
60.366
20.000
60.357
Ang.
-11.2
-11.2
Generation
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus314
0.019
0.013
1.1
84.1
Bus325
-0.088
-0.056
5.0
84.5
Bus330
0.039
0.025
2.2
84.2
Bus333
0.039
0.024
2.2
84.8
Bus327
0.010
0.006
0.6
84.1
Bus332
-0.039
-0.025
2.2
84.5
Bus334
0.019
0.012
1.1
84.8
Bus328
0.019
0.013
1.1
84.1
Bus334
20.000
60.353
-11.2
Bus333
-0.019
-0.013
1.1
84.1
Bus329
0.019
0.013
1.1
84.1
Bus336
0.400
56.342
-12.2
0.005
0.003
Bus339
-0.005
-0.003
14.5
85.0
Bus337
0.400
56.366
-12.1
0.005
0.003
Bus340
-0.005
-0.003
14.5
85.0
Bus338
0.400
56.390
-12.1
0.019
0.012
Bus341
-0.019
-0.012
58.1
85.0
Bus339
20.000
60.533
-11.2
Bus182
0.420
0.254
23.4
85.5
Bus340
-0.425
-0.258
23.7
85.5
Bus336
0.005
0.003
0.3
84.1
Bus339
0.425
0.258
23.7
85.5
Bus341
-0.430
-0.261
24.0
85.5
Bus337
0.005
0.003
0.3
84.1
Bus340
Bus341
Bus342
20.000
20.000
20.000
60.558
60.583
60.912
-11.2
-11.2
-11.1
Bus340
0.430
0.261
24.0
85.5
Bus248
-0.449
-0.273
25.1
85.4
Bus338
0.020
0.013
1.1
84.1
Bus345
-0.481
-0.293
26.7
85.4
Bus183
0.476
0.290
26.4
85.4
Bus343
0.005
0.003
0.3
84.1
Bus343
0.400
56.702
-12.0
0.005
0.003
Bus342
-0.005
-0.003
14.5
85.0
Bus344
0.400
56.790
-12.0
0.019
0.012
Bus345
-0.019
-0.012
58.2
85.0
Bus345
20.000
61.004
-11.0
Bus342
0.481
0.293
26.7
85.4
Bus184
-0.501
-0.306
27.8
85.4
Bus344
0.020
0.013
1.1
84.1
Bus346
0.400
56.871
-11.9
0.019
0.012
Bus371
-0.019
-0.012
58.2
85.0
Bus348
0.400
56.874
-11.9
0.005
0.003
Bus372
-0.005
-0.003
14.6
85.0
Bus350
0.400
56.869
-11.9
0.019
0.012
Bus351
-0.019
-0.012
58.2
85.0
Bus351
20.000
61.088
-11.0
Bus371
-0.123
-0.078
6.9
84.4
84.5
Bus353
0.104
0.066
5.8
Bus350
0.020
0.013
1.1
84.1
Bus352
0.400
56.867
-11.9
0.010
0.006
Bus353
-0.010
-0.006
29.1
85.0
Bus353
20.000
61.086
-11.0
Bus351
-0.104
-0.066
5.8
84.4
% Tap
ETAP
Project:
7.5.0
Location:
Page:
53
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Ang.
Generation
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus355
0.094
0.059
5.2
84.5
Bus352
0.010
0.006
0.6
84.1
Bus354
0.400
56.865
-11.9
0.010
0.006
Bus355
-0.010
-0.006
29.1
85.0
Bus355
20.000
61.084
-11.0
Bus353
-0.094
-0.059
5.2
84.4
Bus370
0.084
0.053
4.7
84.5
Bus354
0.010
0.006
0.6
84.1
-0.005
-0.003
14.6
85.0
Bus356
0.400
56.877
-11.9
0.005
0.003
Bus357
Bus357
20.000
61.096
-11.0
Bus372
0.148
0.094
8.3
84.4
Bus184
-0.153
-0.097
8.6
84.4
Bus356
0.005
0.003
0.3
84.1
Bus360
0.400
56.848
-11.9
0.019
0.012
Bus369
-0.019
-0.012
58.2
85.0
Bus361
0.400
56.847
-11.9
0.005
0.003
Bus368
-0.005
-0.003
14.6
85.0
Bus362
0.400
56.846
-11.9
0.019
0.012
Bus367
-0.019
-0.012
58.2
85.0
Bus363
0.400
56.845
-11.9
0.019
0.012
Bus366
-0.019
-0.012
58.2
85.0
Bus364
0.400
56.845
-11.9
0.019
0.012
Bus365
-0.019
-0.012
58.2
85.0
Bus365
20.000
61.062
-11.0
Bus366
-0.020
-0.013
1.1
84.1
Bus364
0.020
0.013
1.1
84.1
Bus365
0.020
0.013
1.1
84.2
84.2
Bus366
Bus367
Bus368
Bus369
20.000
20.000
20.000
20.000
61.063
61.064
61.065
61.066
-11.0
-11.0
-11.0
-11.0
Bus370
20.000
61.068
-11.0
Bus371
20.000
61.090
-11.0
Bus372
Bus373
20.000
20.000
61.093
61.164
-11.0
-11.0
Bus367
-0.039
-0.025
2.2
Bus363
0.020
0.013
1.1
84.1
Bus366
0.039
0.025
2.2
84.2
Bus368
-0.059
-0.038
3.3
84.2
Bus362
0.020
0.013
1.1
84.1
Bus367
0.059
0.038
3.3
84.2
Bus369
-0.064
-0.041
3.6
84.2
Bus361
0.005
0.003
0.3
84.1
Bus370
-0.084
-0.054
4.7
84.2
Bus368
0.064
0.041
3.6
84.2
Bus360
0.020
0.013
1.1
84.1
Bus355
-0.084
-0.054
4.7
84.2
Bus369
0.084
0.054
4.7
84.2
Bus351
0.123
0.078
6.9
84.4
Bus372
-0.143
-0.091
8.0
84.4
Bus346
0.020
0.013
1.1
84.1
Bus357
-0.148
-0.094
8.3
84.4
Bus371
0.143
0.091
8.0
84.4
Bus348
0.005
0.003
0.3
84.1
Bus176
-0.676
-0.417
37.5
85.1
% Tap
ETAP
Project:
7.5.0
Location:
Page:
54
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus184
0.665
0.410
36.9
85.1
Bus374
0.010
0.007
0.6
84.2
Bus374
0.400
59.844
-11.8
0.010
0.006
Bus373
-0.010
-0.006
29.3
85.0
Bus375
20.000
64.458
-9.7
Bus379
-0.739
-0.464
39.1
84.7
Bus389
0.734
0.461
38.8
84.7
Bus376
0.005
0.003
0.3
84.2
-0.005
-0.003
14.7
85.0
Bus376
0.400
60.068
-10.6
0.005
0.003
Bus375
Bus377
20.000
64.738
-9.6
Bus383
0.789
0.496
41.6
84.7
Bus387
-0.794
-0.499
41.8
84.7
Bus378
0.005
0.003
0.3
84.2
-0.005
-0.003
14.7
85.0
Bus378
0.400
60.334
-10.5
0.005
0.003
Bus377
Bus379
20.000
64.526
-9.6
Bus375
0.740
0.465
39.1
84.7
Bus381
-0.745
-0.468
39.4
84.7
Bus380
0.005
0.003
0.3
84.2
-0.005
-0.003
14.7
85.0
Bus380
0.400
60.133
-10.5
0.005
0.003
Bus379
Bus381
20.000
64.595
-9.6
Bus188
0.011
0.006
0.5
86.4
Bus379
0.746
0.468
39.4
84.7
Bus383
-0.762
-0.478
40.2
84.7
Bus382
0.005
0.003
0.3
84.8
Bus382
0.400
61.189
-9.8
0.005
0.003
Bus381
-0.005
-0.003
14.7
85.0
Bus383
20.000
64.666
-9.6
Bus244
0.005
0.003
0.3
85.0
Bus377
-0.788
-0.495
41.6
84.7
Bus381
0.762
0.478
40.2
84.7
Bus384
0.021
0.014
1.1
84.2
Bus384
0.400
60.265
-10.5
0.021
0.013
Bus383
-0.021
-0.013
58.7
85.0
Bus385
20.000
64.886
-9.5
Bus387
0.806
0.507
42.4
84.6
84.6
Bus391
-0.828
-0.521
43.5
Bus386
0.021
0.014
1.1
84.2
Bus386
0.400
60.474
-10.4
0.021
0.013
Bus385
-0.021
-0.013
58.8
85.0
Bus387
20.000
64.812
-9.5
Bus385
-0.806
-0.507
42.4
84.7
84.7
Bus377
0.795
0.500
41.8
Bus388
0.011
0.007
0.6
84.2
Bus388
0.400
60.403
-10.4
0.010
0.006
Bus387
-0.010
-0.006
29.4
85.0
Bus389
20.000
64.390
-9.7
Bus177
0.728
0.457
38.5
84.7
84.7
Bus375
-0.733
-0.460
38.8
Bus390
0.005
0.003
0.3
84.2
Bus390
0.400
60.003
-10.6
0.005
0.003
Bus389
-0.005
-0.003
14.7
85.0
Bus391
20.000
64.962
-9.5
Bus385
0.828
0.522
43.5
84.6
% Tap
ETAP
Project:
7.5.0
Location:
Page:
55
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
Voltage
kV
% Mag.
Generation
Ang.
MW
Load
Mvar
MW
Load Flow
Mvar
ID
MW
XFMR
Mvar
Amp
% PF
Bus393
-0.849
-0.535
44.6
84.6
Bus392
0.021
0.014
1.1
84.2
Bus392
0.400
60.546
-10.4
0.021
0.013
Bus391
-0.021
-0.013
58.8
85.0
Bus393
20.000
65.040
-9.5
Bus395
-0.868
-0.548
45.5
84.6
Bus391
0.850
0.536
44.6
84.6
Bus394
0.018
0.012
0.9
83.5
-0.017
-0.011
49.1
85.0
Bus394
0.400
59.841
-11.1
0.017
0.011
Bus393
Bus395
20.000
65.120
-9.4
Bus393
0.869
0.548
45.5
84.6
Bus171
-0.879
-0.555
46.1
84.6
Bus179
0.011
0.007
0.6
84.2
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
% Tap
ETAP
Project:
7.5.0
Location:
Page:
56
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
0
Constant Z
Mvar
Bus 1
20.000
Bus 2
20.000
Bus2
0.400
0.002
0.001
Bus3
20.000
Bus 3
20.000
Bus 4
0.400
Bus5
Bus 5
Bus6
Bus 6
MW
0
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
6.087
86.3
175.7
5.997
83.9
180.0
0.003
0.002
0.006
85.0
14.7
0.214
86.4
10.2
-0.698
5.128
82.8
194.0
0.014
0.008
0.028
0.017
0.049
85.0
98.3
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
20.000
4.988
83.2
192.2
20.000
0.229
84.7
10.0
20.000
1.323
85.6
51.4
Bus 7
20.000
1.303
85.6
51.1
Bus7
20.000
0.235
84.7
10.3
Bus 8
20.000
1.262
85.6
50.0
Bus 9
20.000
1.208
85.6
48.2
Bus 10
20.000
1.173
85.6
47.1
Bus10
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 11
20.000
1.137
85.6
46.0
Bus11
20.000
0.203
84.7
8.9
Bus 12
20.000
1.126
85.6
45.7
Bus12
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus13
20.000
0.178
84.7
7.8
Bus 13
20.000
1.108
85.6
45.1
Bus 14
20.000
1.068
85.6
44.1
Bus14
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 15
20.000
1.050
85.6
43.5
Bus15
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 16
20.000
1.031
85.6
43.0
Bus16
20.000
0.026
84.2
1.1
Bus 17
20.000
1.011
85.6
42.4
Bus17
20.000
0.051
84.5
2.2
Bus18
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 18
20.000
0.978
85.6
41.3
Bus 19
20.000
0.944
85.6
40.1
Bus19
20.000
0.102
84.6
4.5
Bus20
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 20
20.000
0.027
84.2
1.1
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
57
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus21
20.000
0.076
84.6
3.3
Bus 21
20.000
0.033
85.2
1.4
Bus22
20.000
0.051
84.7
2.2
Bus 22
20.000
0.007
84.2
0.3
Bus 23
20.000
0.883
85.5
37.7
Bus23
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 24
20.000
0.867
85.5
37.1
Bus24
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus25
20.000
0.026
84.2
1.1
Bus 25
20.000
0.838
85.5
36.0
Bus26
20.000
0.026
84.2
1.1
Bus 26
20.000
0.830
85.5
35.7
Bus27
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 27
20.000
0.803
85.6
34.6
Bus 28
20.000
0.775
85.6
33.5
Bus28
20.000
0.227
85.5
10.0
Bus 29
20.000
0.013
84.2
0.6
Bus29
20.000
0.227
85.7
10.0
Bus30
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus 30
20.000
0.761
85.6
33.0
Bus31
20.000
0.215
85.5
9.5
Bus 31
20.000
0.734
85.6
31.8
Bus 32
20.000
0.707
85.6
30.7
Bus32
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 33
20.000
0.013
84.2
0.6
Bus33
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 34
20.000
0.667
85.6
29.1
Bus34
20.000
0.025
84.4
1.1
Bus35
20.000
0.013
84.2
0.6
Bus 35
20.000
0.639
85.6
28.0
Bus 36
20.000
0.612
85.7
26.9
Bus36
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 37
20.000
0.598
85.7
26.3
Bus37
20.000
0.013
84.2
0.6
Bus38
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 38
20.000
0.572
85.7
25.2
Bus 39
20.000
0.038
85.6
1.7
Bus39
20.000
0.069
84.8
3.1
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
58
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus40
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus 40
20.000
0.025
85.2
1.1
Bus 41
20.000
0.013
84.2
0.6
Bus41
20.000
0.057
84.7
2.5
Bus 42
20.000
0.521
85.6
23.0
Bus42
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus43
20.000
0.013
84.2
0.6
Bus 43
20.000
0.507
85.6
22.5
Bus 44
20.000
0.500
85.6
22.2
Bus44
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.8
Bus 45
20.000
0.493
85.6
21.9
Bus45
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus 46
20.000
0.486
85.5
21.7
Bus46
20.000
0.032
84.3
1.4
Bus47
20.000
0.025
84.2
1.1
Bus 47
20.000
0.473
85.5
21.1
Bus 48
20.000
0.460
85.5
20.6
Bus 49
20.000
0.453
85.5
20.3
Bus 50
20.000
0.440
85.4
19.8
Bus 51
20.000
0.415
85.5
18.7
Bus51
0.400
0.002
0.001
0.005
0.003
0.008
85.0
15.5
Bus52
20.000
3.624
82.4
141.0
Bus 52
20.000
0.402
85.5
18.1
Bus53
0.400
0.002
0.001
0.004
0.003
0.007
85.0
15.2
Bus 53
20.000
0.147
85.0
6.6
Bus 54
20.000
0.122
85.0
5.5
Bus 55
20.000
0.098
84.9
4.4
Bus 56
20.000
0.074
84.8
3.3
Bus 57
20.000
0.049
84.7
2.2
Bus 58
20.000
0.025
84.2
1.1
Bus58
0.400
0.008
0.005
0.017
0.011
0.030
85.0
61.2
Bus 59
20.000
0.231
85.7
10.4
Bus59
0.400
0.014
0.008
0.025
0.015
0.045
85.0
96.7
Bus60
0.400
0.004
0.003
0.008
0.005
0.014
85.0
30.3
Bus 60
20.000
0.206
85.7
9.3
Bus61
0.400
0.004
0.003
0.008
0.005
0.014
85.0
30.3
Bus 61
20.000
0.182
85.8
8.2
Bus62
20.000
3.584
82.6
140.7
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
59
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus 62
20.000
0.157
85.7
Bus 63
21.000
0.133
85.8
7.1
6.0
Bus63
20.000
2.029
83.2
80.3
Bus 64
20.000
0.108
86.0
4.9
Bus64
20.000
2.002
83.3
79.8
Bus 65
20.000
0.096
85.9
4.4
Bus65
20.000
1.946
83.4
78.0
Bus 66
20.000
0.049
84.7
2.2
Bus66
20.000
1.905
83.5
76.8
Bus 67
20.000
0.025
84.2
1.1
Bus67
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.2
Bus 68
20.000
0.036
86.8
1.6
Bus 69
20.000
0.024
87.2
1.1
Bus69
20.000
1.866
83.5
75.6
Bus70
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.1
Bus 70
20.000
0.018
86.8
0.8
Bus71
20.000
3.557
82.7
140.1
Bus 71
20.000
0.012
86.2
0.5
Bus72
0.400
0.850
0.527
0.368
0.228
1.433
85.0
3142.6
Bus 72
20.000
0.006
84.2
0.3
Bus73
20.000
1.496
82.0
59.9
Bus76
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.3
Bus77
0.400
0.002
0.001
0.004
0.002
0.007
85.0
15.0
Bus82
0.400
0.008
0.005
0.016
0.010
0.029
85.0
60.7
Bus83
0.400
0.014
0.008
0.025
0.016
0.046
85.0
96.8
Bus84
0.400
0.004
0.003
0.007
0.005
0.014
85.0
30.0
Bus85
0.400
0.008
0.005
0.015
0.009
0.027
85.0
60.0
Bus86
0.400
0.004
0.003
0.007
0.004
0.014
85.0
29.9
Bus87
0.400
0.004
0.003
0.007
0.004
0.013
85.0
29.9
Bus88
0.400
0.004
0.003
0.007
0.004
0.013
85.0
30.1
Bus95
0.400
0.008
0.005
0.016
0.010
0.028
85.0
60.4
Bus96
20.000
0.029
84.2
1.1
Bus97
0.400
0.008
0.005
0.014
0.009
0.026
85.0
59.5
Bus98
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.2
Bus102
0.400
0.008
0.005
0.014
0.008
0.026
85.0
59.3
Bus104
0.400
0.008
0.005
0.014
0.008
0.026
85.0
59.3
Bus106
0.400
0.002
0.001
0.003
0.002
0.007
85.0
14.8
Bus108
0.400
0.004
0.003
0.007
0.004
0.013
85.0
29.6
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
60
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus110
0.400
0.008
0.005
0.013
0.008
0.026
85.0
59.2
Bus112
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.8
Bus113
0.400
0.008
0.005
0.013
0.008
0.026
85.0
59.2
Bus116
0.400
0.008
0.005
0.013
0.008
0.026
85.0
59.2
Bus117
0.400
0.008
0.005
0.013
0.008
0.025
85.0
59.1
Bus118
0.400
0.008
0.005
0.013
0.008
0.025
85.0
59.1
Bus119
0.400
0.008
0.005
0.013
0.008
0.025
85.0
59.1
Bus124
0.400
0.008
0.005
0.013
0.008
0.025
85.0
59.0
Bus125
0.400
0.008
0.005
0.013
0.008
0.025
85.0
59.0
Bus126
0.400
0.004
0.003
0.006
0.004
0.013
85.0
29.5
Bus127
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus128
0.400
0.008
0.005
0.012
0.008
0.024
85.0
58.7
Bus129
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus137
0.400
0.004
0.003
0.007
0.004
0.013
85.0
29.6
Bus139
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus140
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus141
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus142
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus143
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus149
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.0
Bus150
20.000
0.073
84.7
3.0
Bus151
20.000
0.101
84.8
4.1
Bus152
0.400
0.008
0.005
0.015
0.009
0.028
85.0
60.0
Bus153
20.000
1.834
83.6
74.5
Bus154
20.000
0.045
84.2
1.8
Bus155
0.400
0.014
0.008
0.024
0.015
0.044
85.0
96.1
Bus156
20.000
0.028
84.2
1.1
Bus157
0.400
0.004
0.003
0.007
0.005
0.014
85.0
30.0
Bus158
20.000
1.719
83.5
70.2
Bus159
20.000
1.729
83.5
70.4
Bus160
0.400
0.002
0.001
0.004
0.002
0.007
85.0
15.0
Bus161
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus162
0.400
0.014
0.008
0.020
0.013
0.040
85.0
94.2
Bus163
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus164
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus165
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus166
20.000
0.310
85.7
13.6
Bus167
20.000
0.284
85.6
12.5
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
61
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus168
20.000
0.252
85.6
11.1
Bus169
20.000
0.189
85.6
8.4
Bus170
20.000
0.149
85.7
6.6
Bus171
20.000
1.595
84.7
69.9
Bus172
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus173
20.000
0.031
84.7
1.4
Bus174
0.400
0.008
0.005
0.012
0.008
0.024
85.0
58.7
Bus175
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus176
20.000
0.830
84.8
37.5
Bus177
20.000
0.859
84.7
38.5
Bus178
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus179
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus180
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus181
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus182
20.000
0.491
85.5
23.4
Bus183
20.000
0.557
85.4
26.4
Bus184
20.000
0.781
85.1
36.9
Bus185
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus186
20.000
0.208
86.4
10.0
Bus187
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Bus188
20.000
0.013
84.2
0.6
Bus189
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Bus190
20.000
0.117
87.0
5.6
Bus191
20.000
0.145
86.9
7.0
Bus192
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus193
20.000
0.023
84.1
1.1
Bus194
0.400
0.008
0.005
0.011
0.007
0.022
85.0
58.1
Bus195
20.000
0.106
87.0
5.1
Bus196
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Bus197
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus198
0.400
0.008
0.005
0.011
0.007
0.022
85.0
58.1
Bus199
20.000
0.023
84.1
1.1
Bus200
20.000
0.063
84.7
3.0
Bus201
20.000
0.072
87.0
3.5
Bus202
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus204
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus208
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus210
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
62
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus211
20.000
0.057
84.8
2.7
Bus212
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus213
20.000
0.045
84.9
2.2
Bus214
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus216
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus218
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus220
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus222
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus224
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus225
20.000
0.040
85.0
1.9
Bus226
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus228
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus229
20.000
0.034
85.1
1.6
Bus230
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus232
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus233
20.000
0.028
85.3
1.4
Bus234
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus236
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus238
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus240
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus242
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus244
20.000
0.006
84.2
0.3
Bus247
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus248
20.000
0.533
85.5
25.3
Bus250
20.000
0.028
84.9
1.4
Bus255
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus256
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus257
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.9
Bus258
20.000
0.278
85.6
12.2
Bus259
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus260
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Bus261
0.400
0.008
0.005
0.013
0.008
0.025
85.0
58.8
Bus262
20.000
0.125
85.3
5.5
Bus263
20.000
0.122
87.1
5.9
Bus264
20.000
0.157
86.7
7.5
Bus266
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus267
20.000
0.040
84.7
1.9
Bus268
20.000
0.029
84.5
1.4
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
63
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus270
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus272
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus274
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus276
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus278
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus279
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus280
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus282
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus283
20.000
0.023
84.1
1.1
Bus286
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus287
20.000
0.271
86.1
13.0
Bus288
20.000
0.277
86.1
13.2
Bus290
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus291
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus292
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.0
Bus293
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus295
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus297
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus298
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus300
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus302
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus303
0.400
0.008
0.005
0.012
0.007
0.024
85.0
58.6
Bus308
0.400
0.004
0.003
0.007
0.004
0.013
85.0
29.5
Bus309
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus310
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus311
20.000
0.046
84.6
2.2
Bus312
20.000
0.023
84.1
1.1
Bus313
20.000
0.478
85.5
22.8
Bus314
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus316
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus318
0.400
0.017
0.011
0.022
0.013
0.045
85.0
116.3
Bus319
20.000
0.075
84.4
3.6
Bus320
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus321
20.000
0.017
84.8
0.8
Bus322
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus323
20.000
0.012
84.1
0.6
Bus324
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus325
20.000
0.127
84.5
6.1
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
64
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus326
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus327
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus328
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus329
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus330
20.000
0.046
84.2
2.2
Bus331
20.000
0.023
84.1
1.1
Bus332
20.000
0.104
84.5
5.0
Bus333
20.000
0.046
84.5
2.2
Bus334
20.000
0.023
84.1
1.1
Bus336
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus337
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus338
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.1
Bus339
20.000
0.497
85.5
23.7
Bus340
20.000
0.503
85.5
24.0
Bus341
20.000
0.526
85.4
25.1
Bus342
20.000
0.563
85.4
26.7
Bus343
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.5
Bus344
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus345
20.000
0.587
85.4
27.8
Bus346
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus348
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus350
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus351
20.000
0.146
84.4
6.9
Bus352
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus353
20.000
0.123
84.4
5.8
Bus354
0.400
0.004
0.003
0.005
0.003
0.011
85.0
29.1
Bus355
20.000
0.111
84.4
5.2
Bus356
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus357
20.000
0.181
84.4
8.6
Bus360
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus361
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.6
Bus362
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus363
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus364
0.400
0.008
0.005
0.011
0.007
0.023
85.0
58.2
Bus365
20.000
0.023
84.1
1.1
Bus366
20.000
0.047
84.2
2.2
Bus367
20.000
0.070
84.2
3.3
Bus368
20.000
0.076
84.2
3.6
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
65
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Bus
ID
kV
Rated Amp
MW
Constant Z
Mvar
MW
Constant I
Mvar
MW
Generic
Mvar
MW
Mvar
MVA
% PF
Amp
Bus369
20.000
0.100
84.2
4.7
Bus370
20.000
0.100
84.2
4.7
Bus371
20.000
0.170
84.4
8.0
Bus372
20.000
0.175
84.4
8.3
Bus373
20.000
0.794
85.1
37.5
Bus374
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.3
Bus375
20.000
0.873
84.7
39.1
Bus376
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus377
20.000
0.938
84.7
41.8
Bus378
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus379
20.000
0.880
84.7
39.4
Bus380
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus381
20.000
0.899
84.7
40.2
Bus382
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus383
20.000
0.931
84.7
41.6
Bus384
0.400
0.008
0.005
0.012
0.008
0.025
85.0
58.7
Bus385
20.000
0.978
84.6
43.5
Bus386
0.400
0.008
0.005
0.012
0.008
0.025
85.0
58.8
Bus387
20.000
0.952
84.7
42.4
Bus388
0.400
0.004
0.003
0.006
0.004
0.012
85.0
29.4
Bus389
20.000
0.866
84.7
38.8
Bus390
0.400
0.002
0.001
0.003
0.002
0.006
85.0
14.7
Bus391
20.000
1.004
84.6
44.6
Bus392
0.400
0.008
0.005
0.012
0.008
0.025
85.0
58.8
Bus393
20.000
1.026
84.6
45.5
Bus394
0.400
0.013
0.008
0.005
0.003
0.020
85.0
49.1
Bus395
20.000
1.040
84.6
46.1
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Percent
Loading
ETAP
Project:
7.5.0
Location:
Page:
66
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
MG22
Transformer
0.160
0.049
30.9
0.049
30.4
MG23
Transformer
0.160
0.046
28.9
0.045
28.3
MG24
Transformer
0.100
0.028
28.4
0.028
27.9
MG45
Transformer
0.050
0.015
29.1
0.014
28.5
MG68
Transformer
0.100
0.031
30.6
0.030
30.0
MG76
Transformer
0.100
0.029
29.5
0.029
28.9
MG77
Transformer
0.160
0.047
29.1
0.046
28.5
MG78
Transformer
0.100
0.029
28.6
0.028
28.0
MG93
Transformer
3.300
1.496
45.3
1.433
43.4
MG94
Transformer
0.100
0.028
28.2
0.028
27.7
MG117
Transformer
0.050
0.014
28.2
0.014
27.6
MG118
Transformer
0.100
0.028
28.0
0.027
27.5
MG124
Transformer
0.050
0.014
27.6
0.014
27.1
MG126
Transformer
0.100
0.029
28.8
0.028
28.3
MG128
Transformer
0.050
0.014
28.0
0.014
27.4
MG129
Transformer
0.050
0.014
27.5
0.013
26.9
MG130
Transformer
0.050
0.014
27.6
0.013
27.0
MG143
Transformer
0.025
0.007
28.3
0.007
27.8
MG148
Transformer
0.025
0.007
29.9
0.007
29.3
MG166
Transformer
0.025
0.007
28.0
0.007
27.5
MG176
Transformer
0.100
0.028
28.1
0.028
27.6
MG177
Transformer
0.100
0.028
28.1
0.028
27.6
MG178
Transformer
0.160
0.045
28.1
0.044
27.6
MG190
Transformer
0.050
0.027
53.2
0.026
52.1
MG191
Transformer
0.100
0.027
26.6
0.026
26.0
MG192
Transformer
0.050
0.013
26.5
0.013
25.9
MG193
Transformer
0.100
0.026
26.3
0.026
25.8
MG194
Transformer
0.100
0.026
26.2
0.026
25.7
MG195
Transformer
0.100
0.026
26.1
0.026
25.6
MG196
Transformer
0.050
0.013
26.1
0.013
25.5
MG197
Transformer
0.100
0.029
28.5
0.028
27.9
MG198
Transformer
0.100
0.027
27.0
0.026
26.5
MG200
Transformer
0.025
0.008
31.8
0.008
31.2
ETAP
Project:
7.5.0
Location:
Page:
67
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
MG203
Transformer
0.025
0.007
26.6
0.007
26.0
MG204
Transformer
0.025
0.007
26.2
0.006
25.7
MG215
Transformer
0.100
0.026
26.0
0.025
25.4
MG216
Transformer
0.100
0.026
26.0
0.025
25.4
MG217
Transformer
0.100
0.026
25.9
0.025
25.3
MG218
Transformer
0.100
0.026
25.8
0.025
25.2
MG219
Transformer
0.100
0.026
25.6
0.025
25.1
MG220
Transformer
0.050
0.013
25.6
0.013
25.1
MG221
Transformer
0.100
0.026
25.5
0.025
25.0
MG225
Transformer
0.050
0.015
29.4
0.014
28.9
MG231
Transformer
0.100
0.006
6.3
0.006
6.2
MG238
Transformer
0.100
0.006
6.3
0.006
6.2
MG241
Transformer
0.100
0.006
6.3
0.006
6.2
MG252
Transformer
0.100
0.013
12.5
0.012
12.3
MG269
Transformer
0.100
0.013
12.5
0.012
12.2
MG274
Transformer
0.100
0.006
6.2
0.006
6.1
MG324
Transformer
0.100
0.013
12.7
0.012
12.5
MG325
Transformer
0.100
0.013
12.7
0.012
12.4
MG326
Transformer
0.100
0.012
12.5
0.012
12.2
MG327
Transformer
0.100
0.025
24.9
0.024
24.3
MG328
Transformer
0.050
0.012
24.8
0.012
24.3
MG329
Transformer
0.100
0.025
24.8
0.024
24.2
MG330
Transformer
0.100
0.025
24.7
0.024
24.2
MG331
Transformer
0.100
0.025
24.7
0.024
24.2
MG332
Transformer
0.100
0.025
24.7
0.024
24.2
MG333
Transformer
0.100
0.025
24.7
0.024
24.1
MG334
Transformer
0.100
0.025
24.6
0.024
24.1
MG335
Transformer
0.100
0.012
12.3
0.012
12.0
MG336
Transformer
0.100
0.012
12.3
0.012
12.0
MG337
Transformer
0.100
0.012
12.3
0.012
12.0
MG338
Transformer
0.100
0.013
12.7
0.012
12.4
MG339
Transformer
0.100
0.013
12.7
0.012
12.4
MG340
Transformer
0.100
0.013
12.7
0.012
12.4
MG365
Transformer
0.100
0.006
6.2
0.006
6.0
MG375
Transformer
0.100
0.006
6.2
0.006
6.0
MG376
Transformer
0.100
0.006
6.2
0.006
6.0
ETAP
Project:
7.5.0
Location:
Page:
68
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
MG377
Transformer
0.100
0.006
6.2
0.006
6.0
MG411
Transformer
0.100
0.025
24.6
0.024
24.1
MG412
Transformer
0.100
0.025
24.6
0.024
24.1
MG414
Transformer
0.100
0.025
24.7
0.024
24.2
MG415
Transformer
0.100
0.025
24.7
0.024
24.2
MG416
Transformer
0.100
0.025
24.7
0.024
24.2
MG417
Transformer
0.100
0.025
24.7
0.024
24.2
MG418
Transformer
0.100
0.025
24.7
0.024
24.2
MG419
Transformer
0.100
0.025
24.7
0.024
24.2
MG428
Transformer
0.100
0.013
12.9
0.013
12.7
SP01
Transformer
0.100
0.026
25.6
0.025
25.0
SP02
Transformer
0.100
0.025
25.5
0.025
24.9
SP02 SISIP
Transformer
0.100
0.025
25.5
0.025
24.9
SP03
Transformer
0.160
0.041
25.4
0.040
24.9
SP4
Transformer
0.050
0.013
25.3
0.012
24.7
SP05
Transformer
0.025
0.006
25.5
0.006
25.0
SP06
Transformer
0.050
0.013
25.3
0.012
24.7
SP7
Transformer
0.100
0.025
25.3
0.025
24.7
SP08
Transformer
0.100
0.025
24.9
0.024
24.4
SP9
Transformer
0.100
0.006
6.3
0.006
6.2
SP10
Transformer
0.025
0.006
25.1
0.006
24.5
SP11
Transformer
0.025
0.006
24.7
0.006
24.2
SP12
Transformer
0.025
0.006
25.1
0.006
24.6
SP15
Transformer
0.025
0.006
25.0
0.006
24.5
SP16
Transformer
0.100
0.025
25.2
0.025
24.6
SP17
Transformer
0.025
0.006
25.3
0.006
24.7
SP18
Transformer
0.025
0.006
25.0
0.006
24.4
SP19
Transformer
0.100
0.025
25.2
0.025
24.7
SP20
Transformer
0.500
0.021
4.2
0.020
4.1
SP21
Transformer
0.100
0.025
25.4
0.025
24.8
SP22
Transformer
0.050
0.013
25.3
0.012
24.8
SP32
Transformer
0.050
0.013
25.4
0.012
24.9
SP35
Transformer
0.050
0.013
25.3
0.012
24.7
SP36
Transformer
0.050
0.013
25.3
0.012
24.7
SP37
Transformer
0.100
0.025
25.3
0.025
24.7
SP38
Transformer
0.025
0.006
24.9
0.006
24.4
ETAP
Project:
7.5.0
Location:
Page:
69
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
SP39
Transformer
0.050
0.013
Loading (output)
MVA
25.3
0.012
%
24.8
SP44
Transformer
0.050
0.013
25.3
0.012
24.7
* SP45
Transformer
0.025
0.026
102.3
0.025
100.2
SP46
Transformer
0.100
0.026
25.6
0.025
25.0
SP47
Transformer
0.100
0.026
25.6
0.025
25.0
SP48
Transformer
0.100
0.026
25.6
0.025
25.0
SP54
Transformer
0.100
0.026
25.6
0.025
25.0
SP58
Transformer
0.050
0.013
25.1
0.012
24.6
SP61
Transformer
0.100
0.025
25.1
0.025
24.5
SP62
Transformer
0.050
0.013
25.0
0.012
24.5
SP63
Transformer
0.025
0.006
25.3
0.006
24.7
SP66
Transformer
0.100
0.026
25.6
0.025
25.0
SP67
Transformer
0.100
0.026
25.6
0.025
25.0
SP68
Transformer
0.100
0.026
25.6
0.025
25.0
SP72
Transformer
0.050
0.013
25.3
0.012
24.7
SP74
Transformer
0.100
0.026
25.6
0.025
25.0
SP75
Transformer
0.025
0.006
25.6
0.006
25.1
WG01
Transformer
0.100
0.023
22.9
0.022
22.4
WG02
Transformer
0.100
0.023
23.0
0.022
22.5
WG03
Transformer
0.050
0.012
23.0
0.011
22.5
WG04
Transformer
0.100
0.023
23.1
0.023
22.5
WG05
Transformer
0.050
0.011
23.0
0.011
22.5
WG06
Transformer
0.050
0.012
24.5
0.012
24.0
WG07
Transformer
0.100
0.023
23.3
0.023
22.8
WG08
Transformer
0.050
0.012
24.8
0.012
24.3
WG9
Transformer
0.025
0.006
22.9
0.006
22.4
WG10
Transformer
0.100
0.023
23.1
0.023
22.6
WG11
Transformer
0.025
0.006
23.1
0.006
22.6
WG12
Transformer
0.025
0.006
22.9
0.006
22.4
WG13
Transformer
0.025
0.006
23.2
0.006
22.7
WG14
Transformer
0.025
0.006
22.9
0.006
22.4
WG15
Transformer
0.025
0.006
22.9
0.006
22.4
WG16
Transformer
0.050
0.012
23.1
0.011
22.6
WG17
Transformer
0.100
0.023
23.4
0.023
22.9
WG18
Transformer
0.025
0.006
22.9
0.006
22.4
ETAP
Project:
7.5.0
Location:
Page:
70
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
WG19
Transformer
0.050
0.012
23.2
0.011
22.6
WG20
Transformer
0.200
0.046
23.2
0.045
22.7
WG21
Transformer
0.025
0.006
23.2
0.006
22.7
WG22
Transformer
0.100
0.023
23.1
0.023
22.6
WG23
Transformer
0.050
0.012
23.1
0.011
22.6
WG24
Transformer
0.100
0.023
23.2
0.023
22.7
WG25
Transformer
0.050
0.012
23.1
0.011
22.6
WG26
Transformer
0.050
0.012
24.9
0.012
24.3
WG27
Transformer
0.025
0.006
23.0
0.006
22.5
WG28
Transformer
0.050
0.011
22.9
0.011
22.4
WG29
Transformer
0.050
0.012
23.2
0.011
22.6
WG30
Transformer
0.025
0.006
23.3
0.006
22.8
WG31
Transformer
0.025
0.006
23.0
0.006
22.5
WG32
Transformer
0.025
0.006
23.1
0.006
22.6
WG33
Transformer
0.100
0.023
23.5
0.023
22.9
WG34
Transformer
0.100
0.023
23.5
0.023
22.9
WG35
Transformer
0.050
0.012
23.5
0.011
22.9
WG36
Transformer
0.050
0.012
23.5
0.011
22.9
WG37
Transformer
0.100
0.023
23.5
0.023
22.9
WG38
Transformer
0.100
0.023
23.4
0.023
22.9
WG39
Transformer
0.100
0.023
23.4
0.023
22.9
WG40
Transformer
0.100
0.023
23.4
0.023
22.9
WG41
Transformer
0.025
0.006
23.5
0.006
22.9
WG42
Transformer
0.025
0.006
23.4
0.006
22.9
WG43
Transformer
0.100
0.023
23.1
0.023
22.6
WG44
Transformer
0.100
0.023
23.1
0.023
22.6
WG45
Transformer
0.100
0.023
23.2
0.023
22.6
WG46
Transformer
0.050
0.012
23.1
0.011
22.6
WG47
Transformer
0.100
0.023
23.1
0.023
22.6
WG48
Transformer
0.100
0.023
23.1
0.023
22.6
WG49
Transformer
0.025
0.006
23.0
0.006
22.5
WG50
Transformer
0.025
0.006
23.5
0.006
22.9
WG51
Transformer
0.025
0.006
23.2
0.006
22.6
WG52
Transformer
0.025
0.006
23.5
0.006
22.9
WG53
Transformer
0.050
0.012
23.1
0.011
22.6
WG54
Transformer
0.100
0.023
23.1
0.023
22.6
ETAP
Project:
7.5.0
Location:
Page:
71
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Transformer
CKT / Branch
ID
WG55
Ampacity
(Amp)
Transformer
Loading
Amp
Capability
(MVA)
0.025
Loading (input)
MVA
0.006
Loading (output)
%
23.1
MVA
0.006
%
22.6
ETAP
Project:
7.5.0
Location:
Page:
72
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
kW
% Bus Voltage
Vd
% Drop
in Vmag
kvar
From
To
Cable3
5.251
3.078
-5.032
-3.263
219.2
-184.9
100.0
96.2
3.81
Line125
5.032
3.262
-4.247
-2.175
785.3
1087.0
96.2
76.3
19.91
SP75
Mvar
Losses
-0.005
-0.003
0.005
0.003
0.1
0.2
61.4
65.8
1.33
Line96
0.180
0.105
-0.180
-0.105
0.1
-0.3
60.3
60.2
0.04
Line143
-0.184
-0.108
0.185
0.107
0.1
-0.3
60.3
60.3
0.05
WG32
0.005
0.003
-0.005
-0.003
0.1
0.2
60.3
56.1
1.37
Line23
4.205
2.847
-4.149
-2.769
55.8
78.0
76.3
74.9
1.36
MG22
0.042
0.027
-0.041
-0.026
0.4
1.1
76.3
71.3
1.37
SP45
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line32
3.008
2.080
-2.988
-2.051
20.9
28.8
74.9
74.2
0.70
Point 1
1.141
0.689
-1.132
-0.685
8.3
4.5
74.9
74.3
0.58
Line2
-0.194
-0.122
0.194
0.121
0.0
-0.3
65.8
65.8
0.02
Line3
0.172
0.108
-0.172
-0.108
0.0
-0.3
65.8
65.8
0.02
Line40
1.126
0.681
-1.115
-0.675
11.0
6.0
74.3
73.6
0.77
MG148
0.006
0.004
-0.006
-0.004
0.1
0.2
74.3
69.4
1.44
Line39
1.090
0.659
-1.080
-0.653
10.2
5.5
73.6
72.9
0.72
MG76
0.025
0.016
-0.025
-0.015
0.3
0.7
73.6
68.7
1.43
Line1
-0.199
-0.125
0.199
0.124
0.1
-0.5
65.8
65.8
0.04
Line46
1.041
0.628
-1.034
-0.625
6.6
3.5
72.9
72.4
0.49
MG77
0.039
0.025
-0.039
-0.024
0.3
1.1
72.9
68.1
1.35
Line38
1.010
0.610
-1.004
-0.607
6.3
3.3
72.4
71.9
0.47
Line47
0.024
0.015
-0.024
-0.016
0.0
-0.9
72.4
72.4
0.01
Line37
0.980
0.591
-0.973
-0.588
6.6
3.4
71.9
71.4
0.51
MG78
0.024
0.015
-0.024
-0.015
0.3
0.6
71.9
67.1
1.42
SP46
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line45
0.967
0.584
-0.964
-0.582
3.3
1.7
71.4
71.1
0.26
MG143
0.006
0.004
-0.006
-0.004
0.1
0.2
71.4
66.6
1.42
Line4
0.151
0.094
-0.151
-0.095
0.0
-0.3
65.8
65.8
0.01
Line44
0.952
0.575
-0.948
-0.573
3.8
2.0
71.1
70.8
0.30
MG117
0.012
0.008
-0.012
-0.007
0.1
0.3
71.1
66.4
1.42
SP47
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line5
0.043
0.027
-0.043
-0.027
0.0
-0.3
65.8
65.8
0.00
Line7
0.086
0.054
-0.086
-0.054
0.0
-0.3
65.8
65.8
0.01
Line43
0.924
0.557
-0.914
-0.552
10.1
5.1
70.8
70.0
0.81
MG118
0.024
0.015
-0.023
-0.014
0.3
0.6
70.8
66.1
1.42
ETAP
Project:
7.5.0
Location:
Page:
73
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
Line42
MG124
MW
MW
0.903
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
0.545
-0.899
-0.543
3.6
1.8
70.0
69.7
0.29
0.012
0.007
-0.012
-0.007
0.1
0.3
70.0
65.3
1.41
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line41
0.888
0.536
-0.882
-0.533
5.2
2.6
69.7
69.3
0.43
MG129
0.012
0.007
-0.011
-0.007
0.1
0.3
69.7
65.0
1.41
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line49
0.871
0.526
-0.865
-0.523
5.7
2.8
69.3
68.8
0.47
MG130
0.012
0.007
-0.011
-0.007
0.1
0.3
69.3
64.6
1.42
Line6
-0.022
-0.014
0.022
0.013
0.0
-0.3
65.8
65.8
0.00
Line48
0.842
0.508
-0.837
-0.506
5.4
2.6
68.8
68.3
0.46
MG198
0.023
0.015
-0.023
-0.014
0.3
0.6
68.8
64.2
1.41
SP48
SP74
SP54
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Point 2
0.813
0.490
-0.808
-0.488
5.1
2.4
68.3
67.9
0.45
MG197
0.024
0.015
-0.024
-0.015
0.3
0.6
68.3
67.0
1.35
Line51
0.022
0.013
-0.022
-0.014
0.0
-1.2
67.9
67.9
0.01
Line52
0.028
0.016
-0.028
-0.017
0.0
-1.2
67.9
67.9
0.02
Line53
0.757
0.459
-0.755
-0.458
2.7
1.2
67.9
67.6
0.25
Line8
0.065
0.040
-0.065
-0.041
0.0
-0.3
65.8
65.8
0.01
SP66
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
MG191
0.022
0.014
-0.022
-0.014
0.3
0.6
67.9
63.3
1.40
Line9
0.043
0.027
-0.043
-0.027
0.0
-0.1
65.8
65.7
0.00
Line54
0.006
0.003
-0.006
-0.004
0.0
-0.8
67.9
67.9
0.00
MG190
0.022
0.014
-0.022
-0.014
0.3
0.6
67.9
63.3
1.40
Line10
0.022
0.013
-0.022
-0.014
0.0
-0.3
65.7
65.7
0.00
Line11
0.022
0.013
-0.022
-0.014
0.0
-0.3
65.7
65.7
0.00
MG203
0.006
0.004
-0.006
-0.003
0.1
0.2
67.9
63.3
1.40
Line55
0.744
0.450
-0.741
-0.449
2.6
1.2
67.6
67.4
0.25
MG192
0.011
0.007
-0.011
-0.007
0.1
0.3
67.6
63.1
1.40
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.7
1.33
0.719
0.435
-0.717
-0.434
2.0
0.9
67.4
67.2
0.20
SP68
Line57
MG193
0.022
0.014
-0.022
-0.014
0.3
0.6
67.4
62.8
1.40
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.7
1.33
Line56
0.711
0.431
-0.710
-0.430
1.0
0.4
67.2
67.1
0.10
MG204
0.006
0.004
-0.005
-0.003
0.1
0.2
67.2
62.7
1.40
Line58
0.688
0.416
-0.687
-0.416
1.5
0.6
67.1
66.9
0.16
SP67
MG194
0.022
0.014
-0.022
-0.014
0.3
0.6
67.1
62.6
1.40
SP32
-0.011
-0.007
0.011
0.007
0.1
0.3
61.0
65.4
1.32
ETAP
Project:
7.5.0
Location:
Page:
74
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
Line61
0.665
0.401
-0.663
-0.401
1.3
0.5
66.9
66.8
0.14
MG195
0.022
0.014
-0.022
-0.013
0.3
0.6
66.9
62.4
1.40
Line68
0.652
0.394
-0.651
-0.394
1.3
0.5
66.8
66.7
0.14
Line69
0.011
0.007
-0.011
-0.007
0.0
-0.4
66.8
66.8
0.00
Line12
-0.194
-0.118
0.195
0.117
0.2
-0.5
65.4
65.4
0.06
Line13
0.184
0.111
-0.184
-0.111
0.1
-0.5
65.4
65.3
0.05
MG196
0.011
0.007
-0.011
-0.007
0.1
0.3
66.8
62.3
1.40
Line86
-0.195
-0.117
0.195
0.117
0.2
-0.6
65.4
65.5
0.07
SP21
-0.021
-0.013
0.021
0.014
0.2
0.6
60.9
65.3
1.32
Line60
0.629
0.380
-0.629
-0.380
0.6
0.2
66.7
66.6
0.07
MG215
0.022
0.014
-0.022
-0.013
0.3
0.6
66.7
62.1
1.40
Line14
0.162
0.098
-0.162
-0.098
0.1
-0.2
65.3
65.3
0.02
Line59
0.607
0.366
-0.605
-0.365
1.5
0.5
66.6
66.4
0.17
MG216
0.022
0.014
-0.022
-0.013
0.3
0.6
66.6
62.1
1.40
Line67
0.573
0.345
-0.571
-0.344
1.6
0.4
66.4
66.2
0.20
Line157
0.011
0.006
-0.011
-0.007
0.0
-0.6
66.4
66.4
0.00
MG217
0.022
0.014
-0.022
-0.013
0.3
0.6
66.4
61.9
1.39
SP72
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
0.011
0.007
-0.011
-0.007
0.1
0.3
66.4
61.9
1.39
SP4
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
Line66
0.549
0.330
-0.547
-0.330
2.5
0.6
66.2
65.9
0.31
MG218
0.022
0.014
-0.021
-0.013
0.3
0.6
66.2
61.7
1.39
Line15
-0.021
-0.014
0.021
0.013
0.0
-0.3
65.1
65.1
0.00
Line16
0.011
0.007
-0.011
-0.007
0.0
-0.1
65.1
65.1
0.00
Line65
0.525
0.316
-0.525
-0.316
0.6
0.1
65.9
65.8
0.08
MG219
0.022
0.014
-0.021
-0.013
0.3
0.6
65.9
61.4
1.39
Point 3
0.514
0.309
-0.513
-0.309
1.3
0.2
65.8
65.6
0.18
MG428
MG220
0.011
0.007
-0.011
-0.007
0.1
0.3
65.8
61.4
1.39
SP39
-0.011
-0.007
0.011
0.007
0.1
0.3
60.8
65.2
1.32
Line144
0.491
0.295
-0.490
-0.295
1.2
0.2
65.6
65.5
0.17
MG221
0.021
0.014
-0.021
-0.013
0.3
0.6
65.6
61.2
1.39
Line17
-0.011
-0.007
0.011
0.007
0.0
-0.3
65.2
65.2
0.00
SP44
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
Line112
0.032
0.019
-0.032
-0.019
0.0
-0.6
65.5
65.5
0.01
Line146
0.447
0.269
-0.446
-0.269
1.0
0.0
65.5
65.3
0.15
MG324
0.011
0.007
-0.011
-0.007
0.1
0.3
65.5
61.0
1.39
Line113
0.021
0.013
-0.021
-0.013
0.0
-0.6
65.5
65.5
0.01
ETAP
Project:
7.5.0
Location:
Page:
75
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
MG338
0.011
0.007
-0.011
-0.007
0.1
0.3
65.5
61.0
1.39
Line18
-0.059
-0.037
0.059
0.036
0.0
-0.3
65.1
65.2
0.01
Line19
0.048
0.030
-0.048
-0.030
0.0
-0.3
65.1
65.1
0.01
SP35
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
Line114
0.011
0.006
-0.011
-0.007
0.0
-0.6
65.5
65.5
0.00
MG339
0.011
0.007
-0.011
-0.007
0.1
0.3
65.5
61.0
1.39
MG340
0.011
0.007
-0.011
-0.007
0.1
0.3
65.5
61.0
1.39
Line20
0.011
0.007
-0.011
-0.007
0.0
-0.3
65.1
65.1
0.00
Line21
0.027
0.017
-0.027
-0.017
0.0
-0.3
65.1
65.1
0.00
Line136
0.435
0.262
-0.434
-0.262
1.0
0.0
65.3
65.2
0.15
MG325
0.011
0.007
-0.011
-0.007
0.1
0.3
65.3
60.9
1.39
SP36
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
Line138
0.429
0.259
-0.428
-0.259
0.9
0.0
65.2
65.0
0.15
MG231
0.005
0.003
-0.005
-0.003
0.1
0.2
65.2
60.7
1.39
Line139
0.423
0.255
-0.422
-0.255
0.9
0.0
65.0
64.9
0.15
MG238
0.005
0.003
-0.005
-0.003
0.1
0.2
65.0
60.6
1.39
-0.021
-0.013
0.021
0.014
0.2
0.6
60.7
65.1
1.32
Line140
0.417
0.252
-0.416
-0.252
0.9
0.0
64.9
64.7
0.15
MG241
0.005
0.003
-0.005
-0.003
0.1
0.2
64.9
60.5
1.39
-0.005
-0.003
0.005
0.003
0.1
0.2
60.7
65.1
1.32
Line141
0.405
0.245
-0.404
-0.245
0.8
-0.1
64.7
64.6
0.14
MG252
0.011
0.007
-0.010
-0.006
0.1
0.3
64.7
60.3
1.39
Line22
0.021
0.014
-0.021
-0.014
0.0
-0.1
65.1
65.1
0.00
Line142
0.394
0.238
-0.393
-0.239
0.8
-0.1
64.6
64.5
0.14
MG269
0.011
0.007
-0.010
-0.006
0.1
0.3
64.6
60.2
1.39
Line148
0.388
0.235
-0.387
-0.235
0.8
-0.1
64.5
64.3
0.14
MG274
0.005
0.003
-0.005
-0.003
0.1
0.2
64.5
60.1
1.39
Line63
0.377
0.229
-0.376
-0.229
0.6
-0.1
64.3
64.2
0.11
MG326
0.010
0.007
-0.010
-0.006
0.1
0.3
64.3
59.9
1.39
Line62
0.355
0.215
-0.354
-0.215
0.6
-0.2
64.2
64.1
0.12
MG327
0.021
0.013
-0.021
-0.013
0.2
0.6
64.2
59.8
1.39
Line74
0.344
0.209
-0.344
-0.209
0.4
-0.1
64.1
64.0
0.08
SP37
SP63
MG328
0.010
0.007
-0.010
-0.006
0.1
0.3
64.1
59.7
1.39
MG200
-0.007
-0.004
0.007
0.004
0.1
0.2
72.8
74.2
1.39
Line27
2.981
2.047
-2.961
-2.019
20.0
27.5
74.2
73.5
0.67
Line73
0.198
0.119
-0.198
-0.119
0.1
-0.3
64.0
64.0
0.04
Line120
0.125
0.077
-0.125
-0.077
0.1
-0.5
64.0
64.0
0.04
ETAP
Project:
7.5.0
Location:
Page:
76
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
MG329
0.021
0.013
-0.021
-0.013
0.2
0.6
64.0
59.6
1.39
Line121
0.104
0.064
-0.104
-0.065
0.0
-0.5
64.0
63.9
0.03
MG414
0.021
0.013
-0.021
-0.013
0.2
0.6
64.0
59.6
1.39
Line122
0.083
0.051
-0.083
-0.052
0.0
-0.5
63.9
63.9
0.02
MG415
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.6
1.38
Line123
0.062
0.038
-0.062
-0.039
0.0
-0.5
63.9
63.9
0.02
MG416
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.6
1.38
Line124
0.042
0.026
-0.042
-0.026
0.0
-0.5
63.9
63.9
0.01
MG417
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.5
1.38
Line155
0.021
0.013
-0.021
-0.013
0.0
-0.6
63.9
63.9
0.01
MG418
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.5
1.38
MG419
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.5
1.38
MG68
-0.025
-0.016
0.026
0.016
0.3
0.7
70.7
72.0
1.38
Line72
0.177
0.106
-0.177
-0.106
0.2
-0.6
64.0
63.9
0.07
MG330
0.021
0.013
-0.021
-0.013
0.2
0.6
64.0
59.6
1.39
MG23
-0.039
-0.024
0.039
0.025
0.3
1.1
67.7
72.4
1.29
MG45
-0.012
-0.008
0.012
0.008
0.1
0.3
68.1
72.9
1.36
Line71
0.156
0.093
-0.156
-0.093
0.1
-0.6
63.9
63.8
0.06
MG331
0.021
0.013
-0.021
-0.013
0.2
0.6
63.9
59.5
1.38
MG225
-0.012
-0.008
0.012
0.008
0.1
0.3
68.7
73.5
1.36
Line70
0.135
0.080
-0.135
-0.081
0.2
-1.0
63.8
63.8
0.08
MG332
0.021
0.013
-0.021
-0.013
0.2
0.6
63.8
59.5
1.38
Line34
2.948
2.011
-2.941
-2.001
7.4
10.2
73.5
73.3
0.25
Line105
0.114
0.068
-0.114
-0.068
0.1
-0.5
63.8
60.7
0.03
MG333
0.021
0.013
-0.020
-0.013
0.2
0.6
63.8
59.4
1.38
Line107
0.093
0.055
-0.093
-0.055
0.0
-0.5
60.7
63.7
0.03
MG334
0.021
0.013
-0.020
-0.013
0.2
0.6
60.7
59.4
1.32
Line28
-1.688
-1.126
1.694
1.134
6.8
8.6
72.9
73.3
0.40
Line29
1.675
1.118
-1.668
-1.108
7.8
9.9
72.9
72.4
0.46
Line110
0.083
0.049
-0.083
-0.049
0.0
-0.5
63.7
63.7
0.02
MG335
0.010
0.007
-0.010
-0.006
0.1
0.3
63.7
59.4
1.38
Line30
1.629
1.083
-1.622
-1.074
6.7
8.5
72.4
72.0
0.40
Line111
0.031
0.017
-0.031
-0.018
0.0
-0.5
63.7
63.7
0.01
Line116
0.041
0.025
-0.041
-0.026
0.0
-0.5
63.7
63.7
0.01
MG336
0.010
0.007
-0.010
-0.006
0.1
0.3
63.7
59.3
1.38
Line31
1.596
1.058
-1.589
-1.049
6.8
8.6
72.0
71.6
0.42
Line118
0.021
0.013
-0.021
-0.013
0.0
-0.5
63.7
63.7
0.01
ETAP
Project:
7.5.0
Location:
Page:
77
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
MG411
0.021
0.013
-0.020
-0.013
0.2
0.6
63.7
59.3
1.38
Line33
1.565
1.034
-1.559
-1.025
6.9
8.6
71.6
71.2
0.42
MG24
0.024
0.015
-0.024
-0.015
0.3
0.6
71.6
66.9
1.42
MG412
0.021
0.013
-0.020
-0.013
0.2
0.6
63.7
59.3
1.38
Line150
0.021
0.011
-0.021
-0.012
0.0
-0.5
63.7
63.7
0.01
MG337
0.010
0.007
-0.010
-0.006
0.1
0.3
63.7
59.3
1.38
Line151
0.016
0.008
-0.016
-0.009
0.0
-0.6
63.7
63.7
0.00
MG365
0.005
0.003
-0.005
-0.003
0.1
0.2
63.7
59.3
1.38
Line77
1.535
1.010
-1.533
-1.008
2.1
2.6
71.2
71.1
0.13
MG94
0.024
0.015
-0.024
-0.015
0.3
0.6
71.2
66.5
1.42
Line153
0.010
0.006
-0.010
-0.006
0.0
-0.6
63.7
63.7
0.00
MG375
0.005
0.003
-0.005
-0.003
0.1
0.2
63.7
59.3
1.38
Line35
1.247
0.867
-1.227
-0.855
19.6
11.8
73.3
72.1
1.17
Line24
0.005
0.003
-0.005
-0.003
0.0
-0.6
63.7
63.7
0.00
MG376
0.005
0.003
-0.005
-0.003
0.1
0.2
63.7
59.3
1.38
MG93
-1.218
-0.755
1.227
0.855
8.8
100.2
65.8
72.1
2.87
MG377
0.005
0.003
-0.005
-0.003
0.1
0.2
63.7
59.3
1.38
MG126
-0.024
-0.015
0.024
0.016
0.3
0.6
67.6
72.4
1.36
MG177
-0.023
-0.015
0.024
0.015
0.3
0.6
66.3
71.0
1.35
Line76
-0.062
-0.039
0.062
0.038
0.0
-0.4
71.0
71.0
0.01
Line78
0.038
0.024
-0.038
-0.024
0.0
-0.7
71.0
71.0
0.01
Line79
0.024
0.015
-0.024
-0.015
0.0
-0.2
71.0
71.0
0.00
Line75
-0.085
-0.053
0.085
0.053
0.0
-0.7
71.0
71.1
0.02
MG176
0.024
0.015
-0.023
-0.015
0.3
0.6
71.0
66.3
1.42
Line81
1.447
0.955
-1.444
-0.951
3.4
4.2
71.1
70.8
0.22
MG178
0.038
0.024
-0.038
-0.023
0.3
1.1
71.0
66.4
1.34
MG128
-0.012
-0.007
0.012
0.008
0.1
0.3
66.0
70.7
1.35
Line80
-1.436
-0.945
1.438
0.947
1.9
2.3
70.7
70.8
0.12
Line82
1.424
0.937
-1.351
-0.846
72.9
90.7
70.7
65.8
4.87
MG166
0.006
0.004
-0.006
-0.004
0.1
0.2
70.8
66.1
1.42
SP22
-0.011
-0.007
0.011
0.007
0.1
0.3
60.8
65.2
1.32
SP03
-0.034
-0.021
0.034
0.022
0.3
1.0
60.9
65.3
1.25
SP02
-0.021
-0.013
0.021
0.014
0.2
0.6
61.1
65.5
1.32
SP05
-0.005
-0.003
0.005
0.003
0.1
0.2
61.2
65.6
1.33
SP01
-0.021
-0.013
0.022
0.014
0.3
0.6
61.3
65.8
1.33
Line83
-0.265
-0.160
0.266
0.159
0.2
-0.3
65.8
65.8
0.06
Line84
0.244
0.146
-0.243
-0.147
0.5
-0.9
65.8
65.6
0.15
ETAP
Project:
7.5.0
Location:
Page:
78
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
Line85
0.238
0.143
-0.238
-0.144
0.2
-0.4
65.6
65.6
0.07
Line132
-0.216
-0.130
0.216
0.130
0.2
-0.4
65.5
65.6
0.06
Line87
0.128
0.076
-0.128
-0.077
0.1
-1.1
65.3
65.2
0.07
Line89
0.107
0.064
-0.106
-0.065
0.1
-1.5
65.2
65.2
0.08
Point A
0.886
0.563
-0.879
-0.555
7.2
7.5
65.8
65.1
0.73
SP17
-0.005
-0.003
0.005
0.003
0.1
0.2
60.7
65.1
1.32
Line134
-0.027
-0.017
0.027
0.015
0.0
-1.6
65.1
65.2
0.02
SP08
-0.021
-0.013
0.021
0.013
0.2
0.6
59.9
64.3
1.32
SP11
-0.005
-0.003
0.005
0.003
0.1
0.2
59.6
64.0
1.32
Line91
-0.704
-0.440
0.707
0.443
2.9
2.5
64.0
64.3
0.35
Line93
0.699
0.437
-0.676
-0.417
22.6
20.0
64.0
61.2
2.81
Line201
-0.728
-0.456
0.728
0.457
0.6
0.5
64.3
64.4
0.07
SP62
-0.010
-0.006
0.011
0.007
0.1
0.3
60.2
64.6
1.32
SP06
-0.011
-0.007
0.011
0.007
0.1
0.3
60.7
65.1
1.32
WG07
-0.019
-0.012
0.020
0.013
0.2
0.6
56.6
60.8
1.31
WG06
-0.010
-0.006
0.010
0.007
0.1
0.3
59.2
60.5
1.32
Line147
0.410
0.248
-0.409
-0.248
0.6
0.1
60.5
60.4
0.09
Line169
-0.420
-0.254
0.420
0.254
0.1
0.0
60.5
60.5
0.02
Line127
0.456
0.277
-0.455
-0.277
0.7
0.2
60.8
60.7
0.12
Line174
-0.475
-0.289
0.476
0.290
0.5
0.2
60.8
60.9
0.09
Line175
0.502
0.306
-0.501
-0.306
0.6
0.3
61.1
61.0
0.09
Line183
0.153
0.097
-0.153
-0.097
0.0
0.0
61.1
61.1
0.00
Line192
-0.665
-0.410
0.665
0.410
0.5
0.5
61.1
61.2
0.06
WG08
0.010
0.007
-0.010
-0.006
0.1
0.3
61.1
59.8
1.32
Line88
0.034
0.021
-0.034
-0.021
0.0
-0.5
60.2
60.2
0.01
Line133
0.136
0.078
-0.136
-0.078
0.0
-0.2
60.2
60.2
0.02
WG23
0.010
0.006
-0.010
-0.006
0.1
0.3
60.2
56.0
1.37
WG53
-0.010
-0.006
0.010
0.006
0.1
0.3
56.0
60.2
1.31
Line104
-0.011
-0.007
0.011
0.006
0.0
-0.6
64.6
64.6
0.00
WG03
-0.010
-0.006
0.010
0.006
0.1
0.3
55.9
60.1
1.31
Line98
-0.102
-0.058
0.102
0.057
0.1
-0.7
60.1
60.1
0.05
Line100
0.092
0.051
-0.092
-0.052
0.1
-0.6
60.1
60.0
0.04
Line97
-0.126
-0.072
0.126
0.072
0.0
-0.2
60.2
60.2
0.02
Line131
0.107
0.059
-0.107
-0.060
0.1
-0.7
60.2
60.1
0.05
WG04
0.019
0.012
-0.019
-0.012
0.2
0.6
60.2
56.0
1.37
Line99
-0.019
-0.012
0.019
0.012
0.0
-0.5
60.0
60.0
0.01
WG02
0.019
0.012
-0.019
-0.012
0.2
0.6
60.0
55.9
1.37
ETAP
Project:
7.5.0
Location:
Page:
79
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
Line101
0.063
0.034
-0.063
-0.036
0.0
-1.2
60.0
60.0
0.05
Line128
0.024
0.015
-0.024
-0.015
0.0
-0.5
60.0
60.0
0.01
WG31
0.005
0.003
-0.005
-0.003
0.1
0.2
60.0
55.9
1.37
WG05
-0.010
-0.006
0.010
0.006
0.1
0.3
55.8
60.0
1.31
WG9
-0.005
-0.003
0.005
0.003
0.1
0.1
55.7
59.9
1.31
WG01
-0.019
-0.012
0.019
0.012
0.2
0.6
55.7
59.8
1.31
Line102
-0.019
-0.012
0.019
0.012
0.0
-0.7
59.8
59.9
0.01
Line103
-0.053
-0.033
0.053
0.029
0.1
-3.8
59.9
60.0
0.13
Line108
0.048
0.030
-0.048
-0.030
0.0
0.0
59.9
59.9
0.00
SP10
-0.005
-0.003
0.005
0.003
0.1
0.2
60.3
64.7
1.32
WG28
-0.010
-0.006
0.010
0.006
0.1
0.3
55.7
59.9
1.31
0.039
0.024
-0.039
-0.024
0.0
0.0
59.9
59.9
0.00
-0.005
-0.003
0.005
0.003
0.1
0.1
55.7
59.9
1.31
0.034
0.021
-0.034
-0.021
0.0
0.0
59.9
59.9
0.00
-0.005
-0.003
0.005
0.003
0.1
0.1
55.7
59.9
1.31
0.029
0.018
-0.029
-0.018
0.0
0.0
59.9
59.9
0.00
-0.005
-0.003
0.005
0.003
0.1
0.1
55.7
59.9
1.31
Line109
WG12
Line115
WG18
Line117
WG14
Line119
0.024
0.015
-0.024
-0.015
0.0
0.0
59.9
59.9
0.00
WG15
-0.005
-0.003
0.005
0.003
0.1
0.1
55.7
59.9
1.31
Line126
-0.005
-0.003
0.005
0.003
0.0
-0.1
64.7
64.7
0.00
WG30
-0.005
-0.003
0.005
0.003
0.1
0.2
56.5
60.7
1.31
Point C
0.450
0.273
-0.449
-0.273
0.6
0.2
60.7
60.6
0.12
WG49
0.005
0.003
-0.005
-0.003
0.1
0.2
60.0
55.9
1.37
SP02 SISIP
-0.021
-0.013
0.021
0.014
0.2
0.6
61.1
65.6
1.33
WG27
-0.005
-0.003
0.005
0.003
0.1
0.2
56.0
60.1
1.31
WG16
-0.010
-0.006
0.010
0.006
0.1
0.3
56.0
60.2
1.31
SP7
-0.021
-0.013
0.021
0.014
0.2
0.6
60.7
65.2
1.32
Line135
0.024
0.015
-0.024
-0.015
0.0
-0.2
60.2
60.2
0.00
Line137
0.019
0.012
-0.019
-0.012
0.0
-0.2
60.2
60.2
0.00
WG55
0.005
0.003
-0.005
-0.003
0.1
0.2
60.2
56.0
1.37
WG22
-0.019
-0.012
0.019
0.012
0.2
0.6
56.0
60.2
1.31
Line145
-0.233
-0.138
0.233
0.137
0.2
-0.2
60.3
60.4
0.06
Line149
0.039
0.024
-0.039
-0.025
0.0
-0.5
60.3
60.3
0.01
WG25
0.010
0.006
-0.010
-0.006
0.1
0.3
60.3
56.1
1.37
Line158
-0.238
-0.141
0.239
0.140
0.2
-0.2
60.4
60.4
0.05
WG11
0.005
0.003
-0.005
-0.003
0.1
0.2
60.4
56.2
1.37
WG54
-0.019
-0.012
0.019
0.013
0.2
0.6
56.1
60.3
1.31
ETAP
Project:
7.5.0
Location:
Page:
80
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
WG10
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
-0.019
-0.012
0.019
0.013
0.2
0.6
56.1
60.3
1.31
Line152
0.019
0.012
-0.019
-0.013
0.0
-0.5
60.3
60.3
0.01
Line160
0.107
0.067
-0.107
-0.068
0.1
-0.5
60.4
60.4
0.03
Line163
0.063
0.040
-0.063
-0.040
0.0
-0.2
60.4
60.4
0.01
WG43
-0.019
-0.012
0.019
0.013
0.2
0.6
56.2
60.4
1.31
WG45
-0.019
-0.012
0.019
0.013
0.2
0.6
56.2
60.4
1.31
WG20
-0.039
-0.024
0.039
0.025
0.4
1.2
56.3
60.4
1.24
0.015
0.009
-0.015
-0.009
0.0
-0.2
60.4
60.4
0.00
Line161
WG19
0.010
0.006
-0.010
-0.006
0.1
0.3
60.4
56.2
1.37
WG51
-0.005
-0.003
0.005
0.003
0.1
0.2
56.2
60.4
1.31
Line162
0.010
0.006
-0.010
-0.006
0.0
-0.2
60.4
60.4
0.00
-0.010
-0.006
0.010
0.006
0.1
0.3
56.2
60.4
1.31
0.088
0.055
-0.088
-0.056
0.0
-0.3
60.4
60.4
0.02
WG44
-0.019
-0.012
0.019
0.013
0.2
0.6
56.2
60.4
1.31
WG46
-0.010
-0.006
0.010
0.006
0.1
0.3
56.2
60.4
1.31
WG47
-0.019
-0.012
0.019
0.013
0.2
0.6
56.2
60.4
1.31
WG48
-0.019
-0.012
0.019
0.013
0.2
0.6
56.2
60.4
1.31
WG29
Line164
Line165
0.019
0.012
-0.019
-0.013
0.0
0.0
60.4
60.4
0.00
Line166
-0.039
-0.025
0.039
0.025
0.0
0.0
60.4
60.4
0.00
Line167
0.039
0.024
-0.039
-0.025
0.0
-0.3
60.4
60.4
0.01
Line168
0.019
0.012
-0.019
-0.013
0.0
-0.3
60.4
60.4
0.00
WG13
-0.005
-0.003
0.005
0.003
0.1
0.2
56.3
60.5
1.31
WG21
-0.005
-0.003
0.005
0.003
0.1
0.2
56.4
60.6
1.31
WG24
-0.019
-0.012
0.020
0.013
0.2
0.6
56.4
60.6
1.31
Line171
-0.425
-0.258
0.425
0.258
0.1
0.0
60.5
60.6
0.02
Line172
-0.430
-0.261
0.430
0.261
0.1
0.0
60.6
60.6
0.02
Line173
-0.481
-0.293
0.481
0.293
0.5
0.2
60.9
61.0
0.09
WG42
0.005
0.003
-0.005
-0.003
0.1
0.2
60.9
56.7
1.37
WG17
-0.019
-0.012
0.020
0.013
0.2
0.6
56.8
61.0
1.31
WG33
-0.019
-0.012
0.020
0.013
0.2
0.6
56.9
61.1
1.31
WG50
-0.005
-0.003
0.005
0.003
0.1
0.2
56.9
61.1
1.31
WG34
-0.019
-0.012
0.020
0.013
0.2
0.6
56.9
61.1
1.31
Line179
-0.123
-0.078
0.123
0.078
0.0
0.0
61.1
61.1
0.00
Line180
0.104
0.066
-0.104
-0.066
0.0
-0.1
61.1
61.1
0.00
-0.010
-0.006
0.010
0.006
0.1
0.3
56.9
61.1
1.31
0.094
0.059
-0.094
-0.059
0.0
-0.1
61.1
61.1
0.00
-0.010
-0.006
0.010
0.006
0.1
0.3
56.9
61.1
1.31
WG35
Line181
WG36
ETAP
Project:
7.5.0
Location:
Page:
81
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
CKT / Branch
ID
Line182
MW
MW
Mvar
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
0.084
0.053
-0.084
-0.054
0.0
-0.5
61.1
61.1
0.02
-0.005
-0.003
0.005
0.003
0.1
0.2
56.9
61.1
1.31
0.148
0.094
-0.148
-0.094
0.0
0.0
61.1
61.1
0.00
WG37
-0.019
-0.012
0.020
0.013
0.2
0.6
56.8
61.1
1.31
WG52
-0.005
-0.003
0.005
0.003
0.1
0.2
56.8
61.1
1.31
WG38
-0.019
-0.012
0.020
0.013
0.2
0.6
56.8
61.1
1.31
WG39
-0.019
-0.012
0.020
0.013
0.2
0.6
56.8
61.1
1.31
WG40
-0.019
-0.012
0.020
0.013
0.2
0.6
56.8
61.1
1.31
Line187
-0.020
-0.013
0.020
0.013
0.0
-0.1
61.1
61.1
0.00
Line188
-0.039
-0.025
0.039
0.025
0.0
-0.1
61.1
61.1
0.00
Line189
-0.059
-0.038
0.059
0.038
0.0
-0.1
61.1
61.1
0.00
Line190
-0.064
-0.041
0.064
0.041
0.0
-0.1
61.1
61.1
0.00
Line185
-0.084
-0.054
0.084
0.054
0.0
-0.1
61.1
61.1
0.00
Line191
-0.143
-0.091
0.143
0.091
0.0
0.0
61.1
61.1
0.00
0.010
0.007
-0.010
-0.006
0.1
0.3
61.2
59.8
1.32
Line196
-0.739
-0.464
0.740
0.465
0.6
0.5
64.5
64.5
0.07
Point B
0.734
0.461
-0.733
-0.460
0.6
0.5
64.5
64.4
0.07
SP18
0.005
0.003
-0.005
-0.003
0.1
0.2
64.5
60.1
1.39
Line195
0.789
0.496
-0.788
-0.495
0.7
0.6
64.7
64.7
0.07
Line200
-0.794
-0.499
0.795
0.500
0.7
0.6
64.7
64.8
0.07
0.005
0.003
-0.005
-0.003
0.1
0.2
64.7
60.3
1.39
-0.745
-0.468
0.746
0.468
0.6
0.5
64.5
64.6
0.07
WG41
Line177
WG26
SP12
Line197
SP15
0.005
0.003
-0.005
-0.003
0.1
0.2
64.5
60.1
1.39
-0.762
-0.478
0.762
0.478
0.6
0.6
64.6
64.7
0.07
SP9
0.005
0.003
-0.005
-0.003
0.0
0.0
64.6
61.2
0.35
SP61
0.021
0.014
-0.021
-0.013
0.2
0.6
64.7
60.3
1.39
Line199
0.806
0.507
-0.806
-0.507
0.7
0.7
64.9
64.8
0.07
Line202
Line198
-0.828
-0.521
0.828
0.522
0.7
0.7
64.9
65.0
0.08
SP16
0.021
0.014
-0.021
-0.013
0.2
0.6
64.9
60.5
1.39
SP58
0.011
0.007
-0.010
-0.006
0.1
0.3
64.8
60.4
1.39
0.005
0.003
-0.005
-0.003
0.1
0.2
64.4
60.0
1.39
-0.849
-0.535
0.850
0.536
0.8
0.8
65.0
65.0
0.08
SP38
Line203
SP19
Line95
SP20
0.021
0.014
-0.021
-0.013
0.2
0.6
65.0
60.5
1.39
-0.868
-0.548
0.869
0.548
0.8
0.8
65.0
65.1
0.08
0.018
0.012
-0.017
-0.011
0.3
0.9
65.0
59.8
2.21
1452.6
1421.7
ETAP
Project:
7.5.0
Location:
Page:
82
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical
Loading
Bus
100.0
95.0
Cable
100.0
95.0
Reactor
100.0
95.0
Line
100.0
95.0
Transformer
100.0
95.0
Panel
100.0
95.0
Protective Device
100.0
95.0
Generator
100.0
95.0
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
OverExcited (Q Max.)
100.0
95.0
UnderExcited (Q Min.)
100.0
Bus Voltage
Generator Excitation
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus 10
Bus
Under Voltage
20.000
kV
14.378
71.9
3-Phase
Bus 11
Bus
Under Voltage
20.000
kV
14.275
71.4
3-Phase
Bus 12
Bus
Under Voltage
20.000
kV
14.224
71.1
3-Phase
Bus 13
Bus
Under Voltage
20.000
kV
14.164
70.8
3-Phase
Bus 14
Bus
Under Voltage
20.000
kV
14.001
70.0
3-Phase
Bus 15
Bus
Under Voltage
20.000
kV
13.942
69.7
3-Phase
Bus 16
Bus
Under Voltage
20.000
kV
13.856
69.3
3-Phase
Bus 17
Bus
Under Voltage
20.000
kV
13.761
68.8
3-Phase
Bus 18
Bus
Under Voltage
20.000
kV
13.668
68.3
3-Phase
Bus 19
Bus
Under Voltage
20.000
kV
13.578
67.9
3-Phase
Bus 20
Bus
Under Voltage
20.000
kV
13.576
67.9
3-Phase
Bus 21
Bus
Under Voltage
20.000
kV
13.575
67.9
3-Phase
Bus 22
Bus
Under Voltage
20.000
kV
13.575
67.9
3-Phase
Bus 23
Bus
Under Voltage
20.000
kV
13.528
67.6
3-Phase
Bus 24
Bus
Under Voltage
20.000
kV
13.478
67.4
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
83
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus 25
Bus
Under Voltage
20.000
kV
13.438
67.2
3-Phase
Bus 26
Bus
Under Voltage
20.000
kV
13.418
67.1
3-Phase
Bus 27
Bus
Under Voltage
20.000
kV
13.387
66.9
3-Phase
Bus 28
Bus
Under Voltage
20.000
kV
13.358
66.8
3-Phase
Bus 29
Bus
Under Voltage
20.000
kV
13.358
66.8
3-Phase
Bus 3
Bus
Under Voltage
20.000
kV
15.256
76.3
3-Phase
Bus 30
Bus
Under Voltage
20.000
kV
13.331
66.7
3-Phase
Bus 31
Bus
Under Voltage
20.000
kV
13.316
66.6
3-Phase
Bus 32
Bus
Under Voltage
20.000
kV
13.282
66.4
3-Phase
Bus 33
Bus
Under Voltage
20.000
kV
13.281
66.4
3-Phase
Bus 34
Bus
Under Voltage
20.000
kV
13.243
66.2
3-Phase
Bus 35
Bus
Under Voltage
20.000
kV
13.180
65.9
3-Phase
Bus 36
Bus
Under Voltage
20.000
kV
13.165
65.8
3-Phase
Bus 37
Bus
Under Voltage
20.000
kV
13.130
65.6
3-Phase
Bus 38
Bus
Under Voltage
20.000
kV
13.096
65.5
3-Phase
Bus 39
Bus
Under Voltage
20.000
kV
13.094
65.5
3-Phase
Bus 4
Bus
Under Voltage
0.400
kV
0.285
71.3
3-Phase
Bus 40
Bus
Under Voltage
20.000
kV
13.093
65.5
3-Phase
Bus 41
Bus
Under Voltage
20.000
kV
13.092
65.5
3-Phase
Bus 42
Bus
Under Voltage
20.000
kV
13.065
65.3
3-Phase
Bus 43
Bus
Under Voltage
20.000
kV
13.035
65.2
3-Phase
Bus 44
Bus
Under Voltage
20.000
kV
13.005
65.0
3-Phase
Bus 45
Bus
Under Voltage
20.000
kV
12.976
64.9
3-Phase
Bus 46
Bus
Under Voltage
20.000
kV
12.947
64.7
3-Phase
Bus 47
Bus
Under Voltage
20.000
kV
12.918
64.6
3-Phase
Bus 48
Bus
Under Voltage
20.000
kV
12.890
64.5
3-Phase
Bus 49
Bus
Under Voltage
20.000
kV
12.863
64.3
3-Phase
Bus 5
Bus
Under Voltage
20.000
kV
14.983
74.9
3-Phase
Bus 50
Bus
Under Voltage
20.000
kV
12.841
64.2
3-Phase
Bus 51
Bus
Under Voltage
20.000
kV
12.818
64.1
3-Phase
Bus 52
Bus
Under Voltage
20.000
kV
12.803
64.0
3-Phase
Bus 53
Bus
Under Voltage
20.000
kV
12.795
64.0
3-Phase
Bus 54
Bus
Under Voltage
20.000
kV
12.789
63.9
3-Phase
Bus 55
Bus
Under Voltage
20.000
kV
12.784
63.9
3-Phase
Bus 56
Bus
Under Voltage
20.000
kV
12.780
63.9
3-Phase
Bus 57
Bus
Under Voltage
20.000
kV
12.778
63.9
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
84
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus 58
Bus
Under Voltage
20.000
kV
12.777
63.9
3-Phase
Bus 59
Bus
Under Voltage
20.000
kV
12.795
64.0
3-Phase
Bus 6
Bus
Under Voltage
20.000
kV
14.868
74.3
3-Phase
Bus 60
Bus
Under Voltage
20.000
kV
12.780
63.9
3-Phase
Bus 61
Bus
Under Voltage
20.000
kV
12.769
63.8
3-Phase
Bus 62
Bus
Under Voltage
20.000
kV
12.753
63.8
3-Phase
Bus 63
Bus
Under Voltage
21.000
kV
12.746
60.7
3-Phase
Bus 64
Bus
Under Voltage
20.000
kV
12.741
63.7
3-Phase
Bus 65
Bus
Under Voltage
20.000
kV
12.736
63.7
3-Phase
Bus 66
Bus
Under Voltage
20.000
kV
12.733
63.7
3-Phase
Bus 67
Bus
Under Voltage
20.000
kV
12.732
63.7
3-Phase
Bus 68
Bus
Under Voltage
20.000
kV
12.734
63.7
3-Phase
Bus 69
Bus
Under Voltage
20.000
kV
12.733
63.7
3-Phase
Bus 7
Bus
Under Voltage
20.000
kV
14.715
73.6
3-Phase
Bus 70
Bus
Under Voltage
20.000
kV
12.732
63.7
3-Phase
Bus 71
Bus
Under Voltage
20.000
kV
12.731
63.7
3-Phase
Bus 72
Bus
Under Voltage
20.000
kV
12.731
63.7
3-Phase
Bus 8
Bus
Under Voltage
20.000
kV
14.570
72.9
3-Phase
Bus 9
Bus
Under Voltage
20.000
kV
14.473
72.4
3-Phase
Bus10
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus102
Bus
Under Voltage
0.400
kV
0.253
63.3
3-Phase
Bus104
Bus
Under Voltage
0.400
kV
0.253
63.3
3-Phase
Bus106
Bus
Under Voltage
0.400
kV
0.253
63.3
3-Phase
Bus108
Bus
Under Voltage
0.400
kV
0.252
63.1
3-Phase
Bus11
Bus
Under Voltage
20.000
kV
13.156
65.8
3-Phase
Bus110
Bus
Under Voltage
0.400
kV
0.251
62.8
3-Phase
Bus112
Bus
Under Voltage
0.400
kV
0.251
62.7
3-Phase
Bus113
Bus
Under Voltage
0.400
kV
0.250
62.6
3-Phase
Bus116
Bus
Under Voltage
0.400
kV
0.250
62.4
3-Phase
Bus117
Bus
Under Voltage
0.400
kV
0.249
62.1
3-Phase
Bus118
Bus
Under Voltage
0.400
kV
0.248
62.1
3-Phase
Bus119
Bus
Under Voltage
0.400
kV
0.248
61.9
3-Phase
Bus12
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus124
Bus
Under Voltage
0.400
kV
0.247
61.7
3-Phase
Bus125
Bus
Under Voltage
0.400
kV
0.246
61.4
3-Phase
Bus126
Bus
Under Voltage
0.400
kV
0.245
61.4
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
85
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus127
Bus
Under Voltage
0.400
kV
0.245
61.2
3-Phase
Bus128
Bus
Under Voltage
0.400
kV
0.239
59.8
3-Phase
Bus129
Bus
Under Voltage
0.400
kV
0.239
59.7
3-Phase
Bus13
Bus
Under Voltage
20.000
kV
13.153
65.8
3-Phase
Bus137
Bus
Under Voltage
0.400
kV
0.249
62.3
3-Phase
Bus139
Bus
Under Voltage
0.400
kV
0.239
59.6
3-Phase
Bus14
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus140
Bus
Under Voltage
0.400
kV
0.238
59.6
3-Phase
Bus141
Bus
Under Voltage
0.400
kV
0.238
59.5
3-Phase
Bus142
Bus
Under Voltage
0.400
kV
0.238
59.5
3-Phase
Bus143
Bus
Under Voltage
0.400
kV
0.238
59.4
3-Phase
Bus149
Bus
Under Voltage
0.400
kV
0.265
66.3
3-Phase
Bus15
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus150
Bus
Under Voltage
20.000
kV
14.207
71.0
3-Phase
Bus151
Bus
Under Voltage
20.000
kV
14.209
71.0
3-Phase
Bus152
Bus
Under Voltage
0.400
kV
0.265
66.3
3-Phase
Bus153
Bus
Under Voltage
20.000
kV
14.213
71.1
3-Phase
Bus154
Bus
Under Voltage
20.000
kV
14.205
71.0
3-Phase
Bus155
Bus
Under Voltage
0.400
kV
0.265
66.4
3-Phase
Bus156
Bus
Under Voltage
20.000
kV
14.206
71.0
3-Phase
Bus157
Bus
Under Voltage
0.400
kV
0.264
66.0
3-Phase
Bus158
Bus
Under Voltage
20.000
kV
14.144
70.7
3-Phase
Bus159
Bus
Under Voltage
20.000
kV
14.168
70.8
3-Phase
Bus16
Bus
Under Voltage
20.000
kV
13.152
65.8
3-Phase
Bus160
Bus
Under Voltage
0.400
kV
0.264
66.1
3-Phase
Bus161
Bus
Under Voltage
0.400
kV
0.243
60.8
3-Phase
Bus162
Bus
Under Voltage
0.400
kV
0.244
60.9
3-Phase
Bus163
Bus
Under Voltage
0.400
kV
0.244
61.1
3-Phase
Bus164
Bus
Under Voltage
0.400
kV
0.245
61.2
3-Phase
Bus165
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus166
Bus
Under Voltage
20.000
kV
13.158
65.8
3-Phase
Bus167
Bus
Under Voltage
20.000
kV
13.129
65.6
3-Phase
Bus168
Bus
Under Voltage
20.000
kV
13.102
65.5
3-Phase
Bus169
Bus
Under Voltage
20.000
kV
13.062
65.3
3-Phase
Bus17
Bus
Under Voltage
20.000
kV
13.152
65.8
3-Phase
Bus170
Bus
Under Voltage
20.000
kV
13.048
65.2
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
86
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus171
Bus
Under Voltage
20.000
kV
13.169
65.8
3-Phase
Bus172
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus173
Bus
Under Voltage
20.000
kV
13.027
65.1
3-Phase
Bus174
Bus
Under Voltage
0.400
kV
0.240
59.9
3-Phase
Bus175
Bus
Under Voltage
0.400
kV
0.238
59.6
3-Phase
Bus176
Bus
Under Voltage
20.000
kV
12.794
64.0
3-Phase
Bus177
Bus
Under Voltage
20.000
kV
12.865
64.3
3-Phase
Bus178
Bus
Under Voltage
0.400
kV
0.241
60.2
3-Phase
Bus179
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus18
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus180
Bus
Under Voltage
0.400
kV
0.226
56.6
3-Phase
Bus181
Bus
Under Voltage
0.400
kV
0.237
59.2
3-Phase
Bus182
Bus
Under Voltage
20.000
kV
12.102
60.5
3-Phase
Bus183
Bus
Under Voltage
20.000
kV
12.164
60.8
3-Phase
Bus184
Bus
Under Voltage
20.000
kV
12.220
61.1
3-Phase
Bus185
Bus
Under Voltage
0.400
kV
0.239
59.8
3-Phase
Bus186
Bus
Under Voltage
20.000
kV
12.044
60.2
3-Phase
Bus187
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus188
Bus
Under Voltage
20.000
kV
12.919
64.6
3-Phase
Bus189
Bus
Under Voltage
0.400
kV
0.224
55.9
3-Phase
Bus19
Bus
Under Voltage
20.000
kV
13.151
65.8
3-Phase
Bus190
Bus
Under Voltage
20.000
kV
12.017
60.1
3-Phase
Bus191
Bus
Under Voltage
20.000
kV
12.036
60.2
3-Phase
Bus192
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus193
Bus
Under Voltage
20.000
kV
12.006
60.0
3-Phase
Bus194
Bus
Under Voltage
0.400
kV
0.223
55.9
3-Phase
Bus195
Bus
Under Voltage
20.000
kV
12.009
60.0
3-Phase
Bus196
Bus
Under Voltage
0.400
kV
0.223
55.8
3-Phase
Bus197
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus198
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus199
Bus
Under Voltage
20.000
kV
11.970
59.8
3-Phase
Bus2
Bus
Under Voltage
0.400
kV
0.245
61.4
3-Phase
Bus20
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus200
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus201
Bus
Under Voltage
20.000
kV
11.999
60.0
3-Phase
Bus202
Bus
Under Voltage
0.400
kV
0.241
60.3
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
87
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus204
Bus
Under Voltage
0.400
kV
0.238
59.4
3-Phase
Bus208
Bus
Under Voltage
0.400
kV
0.237
59.4
3-Phase
Bus21
Bus
Under Voltage
20.000
kV
13.150
65.8
3-Phase
Bus210
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus211
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus212
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus213
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus214
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus216
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus218
Bus
Under Voltage
0.400
kV
0.244
61.0
3-Phase
Bus22
Bus
Under Voltage
20.000
kV
13.150
65.7
3-Phase
Bus220
Bus
Under Voltage
0.400
kV
0.244
61.0
3-Phase
Bus222
Bus
Under Voltage
0.400
kV
0.244
61.0
3-Phase
Bus224
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus225
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus226
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus228
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus229
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus23
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus230
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus232
Bus
Under Voltage
0.400
kV
0.223
55.7
3-Phase
Bus233
Bus
Under Voltage
20.000
kV
11.972
59.9
3-Phase
Bus234
Bus
Under Voltage
0.400
kV
0.238
59.6
3-Phase
Bus236
Bus
Under Voltage
0.400
kV
0.238
59.6
3-Phase
Bus238
Bus
Under Voltage
0.400
kV
0.238
59.6
3-Phase
Bus24
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus240
Bus
Under Voltage
0.400
kV
0.238
59.5
3-Phase
Bus242
Bus
Under Voltage
0.400
kV
0.238
59.5
3-Phase
Bus244
Bus
Under Voltage
20.000
kV
12.933
64.7
3-Phase
Bus247
Bus
Under Voltage
0.400
kV
0.226
56.5
3-Phase
Bus248
Bus
Under Voltage
20.000
kV
12.140
60.7
3-Phase
Bus25
Bus
Under Voltage
20.000
kV
13.149
65.7
3-Phase
Bus250
Bus
Under Voltage
20.000
kV
12.007
60.0
3-Phase
Bus255
Bus
Under Voltage
0.400
kV
0.223
55.9
3-Phase
Bus256
Bus
Under Voltage
0.400
kV
0.224
55.9
3-Phase
Bus257
Bus
Under Voltage
0.400
kV
0.245
61.1
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
88
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus258
Bus
Under Voltage
20.000
kV
13.115
65.6
3-Phase
Bus259
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus26
Bus
Under Voltage
20.000
kV
13.149
65.7
3-Phase
Bus260
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus261
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus262
Bus
Under Voltage
20.000
kV
13.031
65.2
3-Phase
Bus263
Bus
Under Voltage
20.000
kV
12.026
60.1
3-Phase
Bus264
Bus
Under Voltage
20.000
kV
12.040
60.2
3-Phase
Bus266
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus267
Bus
Under Voltage
20.000
kV
12.042
60.2
3-Phase
Bus268
Bus
Under Voltage
20.000
kV
12.041
60.2
3-Phase
Bus27
Bus
Under Voltage
0.400
kV
0.244
61.0
3-Phase
Bus270
Bus
Under Voltage
0.400
kV
0.242
60.6
3-Phase
Bus272
Bus
Under Voltage
0.400
kV
0.242
60.5
3-Phase
Bus274
Bus
Under Voltage
0.400
kV
0.241
60.3
3-Phase
Bus276
Bus
Under Voltage
0.400
kV
0.241
60.2
3-Phase
Bus278
Bus
Under Voltage
0.400
kV
0.240
60.1
3-Phase
Bus279
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus28
Bus
Under Voltage
20.000
kV
13.078
65.4
3-Phase
Bus280
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus282
Bus
Under Voltage
0.400
kV
0.244
61.0
3-Phase
Bus283
Bus
Under Voltage
20.000
kV
12.040
60.2
3-Phase
Bus286
Bus
Under Voltage
0.400
kV
0.244
60.9
3-Phase
Bus287
Bus
Under Voltage
20.000
kV
12.062
60.3
3-Phase
Bus288
Bus
Under Voltage
20.000
kV
12.074
60.4
3-Phase
Bus29
Bus
Under Voltage
20.000
kV
13.089
65.4
3-Phase
Bus290
Bus
Under Voltage
0.400
kV
0.240
59.9
3-Phase
Bus291
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus292
Bus
Under Voltage
0.400
kV
0.224
56.0
3-Phase
Bus293
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus295
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus297
Bus
Under Voltage
0.400
kV
0.224
56.1
3-Phase
Bus298
Bus
Under Voltage
0.400
kV
0.225
56.1
3-Phase
Bus3
Bus
Under Voltage
20.000
kV
12.053
60.3
3-Phase
Bus30
Bus
Under Voltage
0.400
kV
0.244
60.9
3-Phase
Bus300
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
89
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus302
Bus
Under Voltage
0.400
kV
0.237
59.3
3-Phase
Bus303
Bus
Under Voltage
0.400
kV
0.238
59.5
3-Phase
Bus308
Bus
Under Voltage
0.400
kV
0.248
61.9
3-Phase
Bus309
Bus
Under Voltage
0.400
kV
0.224
56.1
3-Phase
Bus31
Bus
Under Voltage
20.000
kV
13.067
65.3
3-Phase
Bus310
Bus
Under Voltage
0.400
kV
0.224
56.1
3-Phase
Bus311
Bus
Under Voltage
20.000
kV
12.059
60.3
3-Phase
Bus312
Bus
Under Voltage
20.000
kV
12.058
60.3
3-Phase
Bus313
Bus
Under Voltage
20.000
kV
12.084
60.4
3-Phase
Bus314
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus316
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus318
Bus
Under Voltage
0.400
kV
0.225
56.3
3-Phase
Bus319
Bus
Under Voltage
20.000
kV
12.082
60.4
3-Phase
Bus32
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus320
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus321
Bus
Under Voltage
20.000
kV
12.081
60.4
3-Phase
Bus322
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus323
Bus
Under Voltage
20.000
kV
12.081
60.4
3-Phase
Bus324
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus325
Bus
Under Voltage
20.000
kV
12.077
60.4
3-Phase
Bus326
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus327
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus328
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus329
Bus
Under Voltage
0.400
kV
0.225
56.2
3-Phase
Bus33
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus330
Bus
Under Voltage
20.000
kV
12.073
60.4
3-Phase
Bus331
Bus
Under Voltage
20.000
kV
12.073
60.4
3-Phase
Bus332
Bus
Under Voltage
20.000
kV
12.073
60.4
3-Phase
Bus333
Bus
Under Voltage
20.000
kV
12.071
60.4
3-Phase
Bus334
Bus
Under Voltage
20.000
kV
12.071
60.4
3-Phase
Bus336
Bus
Under Voltage
0.400
kV
0.225
56.3
3-Phase
Bus337
Bus
Under Voltage
0.400
kV
0.225
56.4
3-Phase
Bus338
Bus
Under Voltage
0.400
kV
0.226
56.4
3-Phase
Bus339
Bus
Under Voltage
20.000
kV
12.107
60.5
3-Phase
Bus34
Bus
Under Voltage
20.000
kV
13.026
65.1
3-Phase
Bus340
Bus
Under Voltage
20.000
kV
12.112
60.6
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
90
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus341
Bus
Under Voltage
20.000
kV
12.117
60.6
3-Phase
Bus342
Bus
Under Voltage
20.000
kV
12.182
60.9
3-Phase
Bus343
Bus
Under Voltage
0.400
kV
0.227
56.7
3-Phase
Bus344
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus345
Bus
Under Voltage
20.000
kV
12.201
61.0
3-Phase
Bus346
Bus
Under Voltage
0.400
kV
0.227
56.9
3-Phase
Bus348
Bus
Under Voltage
0.400
kV
0.227
56.9
3-Phase
Bus35
Bus
Under Voltage
20.000
kV
13.026
65.1
3-Phase
Bus350
Bus
Under Voltage
0.400
kV
0.227
56.9
3-Phase
Bus351
Bus
Under Voltage
20.000
kV
12.218
61.1
3-Phase
Bus352
Bus
Under Voltage
0.400
kV
0.227
56.9
3-Phase
Bus353
Bus
Under Voltage
20.000
kV
12.217
61.1
3-Phase
Bus354
Bus
Under Voltage
0.400
kV
0.227
56.9
3-Phase
Bus355
Bus
Under Voltage
20.000
kV
12.217
61.1
3-Phase
Bus356
Bus
Under Voltage
0.400
kV
0.228
56.9
3-Phase
Bus357
Bus
Under Voltage
20.000
kV
12.219
61.1
3-Phase
Bus36
Bus
Under Voltage
0.400
kV
0.243
60.8
3-Phase
Bus360
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus361
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus362
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus363
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus364
Bus
Under Voltage
0.400
kV
0.227
56.8
3-Phase
Bus365
Bus
Under Voltage
20.000
kV
12.212
61.1
3-Phase
Bus366
Bus
Under Voltage
20.000
kV
12.213
61.1
3-Phase
Bus367
Bus
Under Voltage
20.000
kV
12.213
61.1
3-Phase
Bus368
Bus
Under Voltage
20.000
kV
12.213
61.1
3-Phase
Bus369
Bus
Under Voltage
20.000
kV
12.213
61.1
3-Phase
Bus37
Bus
Under Voltage
20.000
kV
13.047
65.2
3-Phase
Bus370
Bus
Under Voltage
20.000
kV
12.214
61.1
3-Phase
Bus371
Bus
Under Voltage
20.000
kV
12.218
61.1
3-Phase
Bus372
Bus
Under Voltage
20.000
kV
12.219
61.1
3-Phase
Bus373
Bus
Under Voltage
20.000
kV
12.233
61.2
3-Phase
Bus374
Bus
Under Voltage
0.400
kV
0.239
59.8
3-Phase
Bus375
Bus
Under Voltage
20.000
kV
12.892
64.5
3-Phase
Bus376
Bus
Under Voltage
0.400
kV
0.240
60.1
3-Phase
Bus377
Bus
Under Voltage
20.000
kV
12.948
64.7
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
91
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus378
Bus
Under Voltage
0.400
kV
0.241
60.3
3-Phase
Bus379
Bus
Under Voltage
20.000
kV
12.905
64.5
3-Phase
Bus38
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus380
Bus
Under Voltage
0.400
kV
0.241
60.1
3-Phase
Bus381
Bus
Under Voltage
20.000
kV
12.919
64.6
3-Phase
Bus382
Bus
Under Voltage
0.400
kV
0.245
61.2
3-Phase
Bus383
Bus
Under Voltage
20.000
kV
12.933
64.7
3-Phase
Bus384
Bus
Under Voltage
0.400
kV
0.241
60.3
3-Phase
Bus385
Bus
Under Voltage
20.000
kV
12.977
64.9
3-Phase
Bus386
Bus
Under Voltage
0.400
kV
0.242
60.5
3-Phase
Bus387
Bus
Under Voltage
20.000
kV
12.962
64.8
3-Phase
Bus388
Bus
Under Voltage
0.400
kV
0.242
60.4
3-Phase
Bus389
Bus
Under Voltage
20.000
kV
12.878
64.4
3-Phase
Bus39
Bus
Under Voltage
20.000
kV
13.029
65.1
3-Phase
Bus390
Bus
Under Voltage
0.400
kV
0.240
60.0
3-Phase
Bus391
Bus
Under Voltage
20.000
kV
12.992
65.0
3-Phase
Bus392
Bus
Under Voltage
0.400
kV
0.242
60.5
3-Phase
Bus393
Bus
Under Voltage
20.000
kV
13.008
65.0
3-Phase
Bus394
Bus
Under Voltage
0.400
kV
0.239
59.8
3-Phase
Bus395
Bus
Under Voltage
20.000
kV
13.024
65.1
3-Phase
Bus40
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus41
Bus
Under Voltage
20.000
kV
13.028
65.1
3-Phase
Bus42
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus43
Bus
Under Voltage
20.000
kV
13.028
65.1
3-Phase
Bus44
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus45
Bus
Under Voltage
0.400
kV
0.243
60.7
3-Phase
Bus46
Bus
Under Voltage
20.000
kV
13.027
65.1
3-Phase
Bus47
Bus
Under Voltage
20.000
kV
13.027
65.1
3-Phase
Bus5
Bus
Under Voltage
0.400
kV
0.245
61.3
3-Phase
Bus51
Bus
Under Voltage
0.400
kV
0.291
72.8
3-Phase
Bus52
Bus
Under Voltage
20.000
kV
14.843
74.2
3-Phase
Bus53
Bus
Under Voltage
0.400
kV
0.278
69.4
3-Phase
Bus58
Bus
Under Voltage
0.400
kV
0.283
70.7
3-Phase
Bus59
Bus
Under Voltage
0.400
kV
0.271
67.7
3-Phase
Bus6
Bus
Under Voltage
20.000
kV
13.159
65.8
3-Phase
Bus60
Bus
Under Voltage
0.400
kV
0.272
68.1
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
92
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
Critical Report
Device ID
Type
Condition
Rating/Limit
Unit
Operating
% Operating
Phase Type
Bus61
Bus
Under Voltage
0.400
kV
0.275
68.7
3-Phase
Bus62
Bus
Under Voltage
20.000
kV
14.709
73.5
3-Phase
Bus63
Bus
Under Voltage
20.000
kV
14.581
72.9
3-Phase
Bus64
Bus
Under Voltage
20.000
kV
14.489
72.4
3-Phase
Bus65
Bus
Under Voltage
20.000
kV
14.408
72.0
3-Phase
Bus66
Bus
Under Voltage
20.000
kV
14.324
71.6
3-Phase
Bus67
Bus
Under Voltage
0.400
kV
0.267
66.9
3-Phase
Bus69
Bus
Under Voltage
20.000
kV
14.239
71.2
3-Phase
Bus7
Bus
Under Voltage
20.000
kV
13.162
65.8
3-Phase
Bus70
Bus
Under Voltage
0.400
kV
0.266
66.5
3-Phase
Bus71
Bus
Under Voltage
20.000
kV
14.660
73.3
3-Phase
Bus72
Bus
Under Voltage
0.400
kV
0.263
65.8
3-Phase
Bus73
Bus
Under Voltage
20.000
kV
14.426
72.1
3-Phase
Bus76
Bus
Under Voltage
0.400
kV
0.268
67.1
3-Phase
Bus77
Bus
Under Voltage
0.400
kV
0.267
66.6
3-Phase
Bus82
Bus
Under Voltage
0.400
kV
0.275
68.7
3-Phase
Bus83
Bus
Under Voltage
0.400
kV
0.272
68.1
3-Phase
Bus84
Bus
Under Voltage
0.400
kV
0.266
66.4
3-Phase
Bus85
Bus
Under Voltage
0.400
kV
0.264
66.1
3-Phase
Bus86
Bus
Under Voltage
0.400
kV
0.261
65.3
3-Phase
Bus87
Bus
Under Voltage
0.400
kV
0.260
65.0
3-Phase
Bus88
Bus
Under Voltage
0.400
kV
0.258
64.6
3-Phase
Bus95
Bus
Under Voltage
0.400
kV
0.270
67.6
3-Phase
Bus96
Bus
Under Voltage
20.000
kV
14.472
72.4
3-Phase
Bus97
Bus
Under Voltage
0.400
kV
0.257
64.2
3-Phase
Bus98
Bus
Under Voltage
0.400
kV
0.268
67.0
3-Phase
SP45
Transformer
Overload
0.025
MVA
0.026
102.3
3-Phase
Marginal Report
Device ID
Bus 2
Type
Bus
Condition
Under Voltage
Rating/Limit
20.000
Unit
kV
Operating
19.238
% Operating
96.2
Phase Type
3-Phase
ETAP
Project:
7.5.0
Location:
Page:
93
Date:
26-08-2014
Contract:
SN:
12345678
Engineer:
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
Penyulang_Kangkung_asli
MW
Mvar
MVA
% PF
5.251
3.078
6.087
0.000
0.000
0.000
Total Demand:
5.251
3.078
6.087
86.27 Lagging
1.895
1.175
2.230
85.00 Lagging
1.903
0.481
1.963
96.95 Lagging
0.000
0.000
0.000
0.000
0.000
0.000
Apparent Losses:
1.453
1.422
System Mismatch:
0.002
0.000
Number of Iterations: 4
86.27 Lagging