COLD START UP
CONTROL SCHEMATICS
SUPPLEMENTARY FIRING
PRE REQUISITES
FEED WATER
INSTRUMENT AIR
DCS READINESS
GT OPERATION
WATER FILLING
STEAM DRUM VENT
DEAERATOR VENT
VALVES TO BE OPEN
START UP VENT
SUPER HEATER DRAINS
MUWH TO BYPASS MODE
ALL THE DRAINS OF EVAPORATOR,
ECONOMISER & DEAERATOR
VALVES TO BE CLOSE
WATER FILLING
ENSURE ADEQUATE FEED WATER QUANTITY
START FILLING THE EVAPORATOR, ECONOMISER AND
DEAERATOR THROUGH BACK FILLING
FILL STEAM DRUM & LP DRUM UPTO - 75 MM FROM
NWL
CLOSE THE HEADER DRAIN VALVES AND LINEUP FEED
WATER SYSTEM
KEEP READY THE CONDENSATE / MAKE UP WATER PUMP
KEEP READY THE BOILER FEED WATER PUMP
COLD START UP
AUX AIR FANS
Air for flame stabilization
Combustion purposes
Cooling of burner components
Two fans - one auto stand by
Switches:
ON - AUTO - OFF
Start one of the aux air fan and line up
the air system to burners
SAFETY INTERLOCKS
HP Steam Drum level not very low
HP Steam Drum level not very high
Deaerator level not very low
Auxiliary air pressure not very low
Furnace pressure not high
Emergency Stop is not operated
Steam pressure not very high
Boiler interlocks
Gas turbine running
Divertor is open to boiler
Instrument air pressure not low
Fuel Gas pressure not high
Fuel Gas pressure not low
BOILER INTERLOCKS
BMS
BURNER INTERLOCKS
BURNER TRIP INTERLOCKS
COLD START UP
Water filling done
GT is running at considerable load
Auxiliary Air fan is running
Boiler safety interlocks are satisfied
Now DD shall be opened
Throttle the DD opening - slow heating of the pressure part
Cold start up pressurizing curve
COLD START UP
MODULATE THE DD ACCORDING TO THE PRESSURIZATION CURVE
KEEP THE DRUM UP VENT OPEN TILL STEADY STEAM FLOW IS
ESTABLISHED
CLOSE THE SUPERHEATER DRAINS AT 2 BAR PRESSURE
KEEP THE START UP VENT OPEN AND MODULATE AS REQUIRED
MAINTAIN THE DRUM LEVEL AND SELECT INTO TO 1E MODE
KEEP DEAERATOR VENT FULL OPEN AND MAINTAIN LEVEL
KEEP THE MUWH IN BYPASS MODE
START PHOSPHATE DOSING TO STEAM DRUM
START OXYGEN SCAVENGER DOSING TO LP DRUM
COLD STRAT UP
BEFORE CHARGING THE MAIN STEAM LINE, OPEN THE DRAINS
& TRAP STATIONS IN LINE TO STEAM TURBINE
OPEN THE MSSV BY-PASS / PRESSURE EQUALISING VALVE
OPEN THE MAIN STEAM VALVE ONCE THE STEAM LINE IS WARM
AND PRESSURE IS EQUALIZED
CLOSE THE START UP VENT GRADUALLY
OPEN THE DIVERTOR DAMPER AS THE HRSG IS LOADED
SWITCH OVER TO THREE ELEMENT CONTROL ONCE THE
STEAM FLOW IS > 25% MCR
TAKE THE STEAM TEMPERATURE CONTROL INTO AUTO MODE
TAKE THE DEAERATOR PRESSURE & MUWH OUTLET TEMP
CONTROL INTO AUTO MODE ONCE THE DEAERATOR IS
STABILISED
Open the divertor damper after achieving the necessary Safety interlocks
Follow the Warm / Hot start up pressurisation curve
Follow the remaining start up procedure as explained for cold start up
BOILER SHUTDOWN
PLANNED SHUTDOWN:
Sequence of
shutdown:
activities
to
be
followed
during
planned
BOILER SHUTDOWN
till
the
furnace
If the boiler shut down is for more than 8 hours, fuel gas
supply has to be isolated
When the steam drum pressure drops to 2 bar, open the
steam drum and the startup vent. Also, open the super
heater drains
If the shut down is for longer period, keep the boiler
under preservation
CONTROL SCHEMATICS
CONTROL LOOPS:
HP boiler drum level control
LP Drum level control
Deaerator pressure control
HP steam temperature control
Make up water heater outlet temp control
Combustion control