This analysis based report is done for the readers of my previous report 1MW Utility Scale SPV
Power Plant, mainly for the readers from South region of INDIA as they are asking repeatedly
about the probability and feasibility-technical & Financial-of a SPV power plant in their region.
At the same time it s not possible for me to design a report for each and every state from South
India, so I took Chennai city. Also the previous report was not so detail, was very basic and
meant to the readers who want to get an overview on how a utility scale power plant works.
Now, in this report, I discuss about in depth. From panel s selection to CB sizing all are
presented in very detail. Hope, this time you get a strong knowledge on designing and
estimation of 1MW solar PV power plant. Unlike the previous report, the financial aspect
discussed at the end of the paper. In this paper, the financial assessment has done in very detail
and considering the current scenario of SPV market including the cost of solar PV modules,
inverters cost, cable, transformer etc. prices and the funding, interest rate.
And if you have any queries or need clarification, please contact at info@renewpowerzone.in or
amrit.mandal0191@gmail.com .
Disclaimer
The presented data here are NOT TAKEN from any copyright materials and not showing under
my name. The meteo data collected from NASA website and NREL database which is free over
the internet. Designing of PV system is totally based on the practical experience of the author.
www.renewpowerzone.in
Page 1
Queries@ info@renewpowerzone.in
Site consideration: this design has been done by considering the PV modules & array will be
ground-mounted and the site-elevation angle taken 30 .
Cost Estimation: 1MW Solar PV power plant cost estimation has done considering the current
PV market scenario (Sept-Dec 2013), so after few months the cost may vary according the
market.
CAD design & layout: I have not uploaded/attached the CAD design. If anybody interested in
setting up the plant then only contact at the given e-mail ids to get the design file.
Transmission & wheeling losses: Here, in this report, while doing the technical assessment, the
distance from nearest substation to the 1MW solar PV power plant taken within 1.5 KM and so
the wheeling losses considered as 3% of total power transmission. And in the financial
assessment, no wheeling charges have been considered.
Design Criteria: While designing & estimating the technical components & solutions, all the
required/applicable standard design codes have been considered. Mainly the IEC (International
Electrotechnical Commission) Codes, IS codes from BIS have been considered thoroughly.
www.renewpowerzone.in
Page 2
Contents
Queries@ info@renewpowerzone.in
1) Introduction
2) Project details
3) Location metrological details
4) Determination of optimum tilt angle
5) Solar power plant overview
6) Module selection & sizing
7) Inverter selection & sizing
8) Transformer selection
9) Other protective devices including switch gear details
10)
Cable sizing & selection
11)
Civil works details
12)
Performance analysis & simulation
13)
Timeline of the project
14)
Operation & maintenance structure of the plant
15)
Financial calculation, estimation of NCF, Payback period
16)
Guide on selection of various components
17)
Conclusion
18)
About the Author
www.renewpowerzone.in
4
5
6
7
8
9
11
12
13
14
16
17
21
22
23
27
28
28
Page 3
Queries@ info@renewpowerzone.in
India is densely populated and has high solar insolation, an ideal combination for using solar power in
India. India is already a leader in wind power generation. In the solar energy sector, some large projects
have been proposed, and a 35,000 km2 area of the Thar Desert has been set aside for solar power
projects, sufficient to generate 700 GW to 2,100 GW. Also India's Ministry of New and Renewable
Energy has released the JNNSM Phase 2 Draft Policy, by which the Government aims to install 10GW of
Solar Power and of this 10 GW target, 4 GW would fall under the central scheme and the remaining 6
GW under various State specific schemes.
The Electricity Act, 2003, paves way for an innovative approach to solve our country s power problems.
It has paved the way for a competitive environment; open access to existing transmission and
distribution network to transmit electricity across regions; de-licensing of generation, captive power and
dedicated transmission lines; licensing of distribution and supply companies and the restructuring of
State Electricity Boards.
The Ministry of Power has mandated to promote cogeneration and renewable sources for Power
generation under Nodal agencies and hence it will play a major role in mainstreaming renewable energy
sector. The advantage or renewable resources includes their capacity to produce energy without
producing carbon-based warming and polluting agents into the atmosphere. The financial cost of its
applications is not always cheap but if the environmental costs of using fossil are accounted for,
renewable energy wins hands-down. There are also indirect savings on health and its costs as there are
no harmful emissions.
In the above backdrop, YOUR COMPANY NAME has decided to set up a 1/1000 MW/KW Solar Power
Plant. This Detailed Project Report (DPR) brings out all technical details and overall costs justifying the
selection of the project. The total power generation is envisaged to be 1050KW from Solar Photovoltaic
Cell. It is a very important document that is required for Environmental Impact Assessment (EIA) studies,
fixation of tariff, finalizing Power Purchase Agreement (PPA) and also for submission to Financial
Institutions for obtaining project funding. The total project cost is expected to be Rs ___ Crores and the
average cost of generation is expected to be Rs. 7.5/kWh (ASSUMED).
For this project, poly-crystalline technology based 3rd generation Solar PV modules will be used. Along
with this, highly efficient, photon-tested string inverters going to be integrated to the system. These
technologies are the best in the industry. So, It s clear that our project is not compromising with the
quality of the materials and or the components which obviously led this project to success.
www.renewpowerzone.in
Page 4
Country
Location
Contact id
ABC@XYZ.COM
company
ABCXYZ
abc
Purpose
Ambient
0
Temperature( C)
Relative humidity
Earth temperature
Height from sea level
Max
28.5
Average
27.2
72.5%
Min
25.5
100.1 kPA
Max
29.6
India
CHENNAI
Contact Person
Location coordinates
Queries@ info@renewpowerzone.in
2.7 m/s
Average
28.8
10m
Min
26.4
Project Details
Type of installation
Ground-mounted
Shading consideration
Shade-free
Phase connection
3-phase
Available/required area
20000 m2(apprx)
Grid frequency
Safety level
1100KWp
11KV
50Hz
IP65
Site Location/Layout
www.renewpowerzone.in
Page 5
Queries@ info@renewpowerzone.in
Solar Irradiation
6
Solar Irradiation
KWh/m2/day
5
4
3
2
1
0
31
30
29
28
27
Air temperature
earth temperature
26
25
24
23
www.renewpowerzone.in
Page 6
Queries@ info@renewpowerzone.in
Feb
26
Mar
13
Apr
0
May
11
Jun
14
Jul
12
Aug
5
Sep
6
Oct
19
Nov
29
Dec
35
56 angle
Summer
Spring/Autumn
104angle
80angle
On the 21st December, the sun will rise 87 east of due south and set 87 west of due south.
On the 21st March/21st September, the sun will rise 91 east of due south and set 91 west of due
south.
On the 21st June, the sun will rise 95 east of due south and set 95 west of due south.
100
5.04
5.98
6.51
5.76
5.78
5.28
4.99
5.09
5.33
4.67
4.27
4.5
5.26
250
5.35
6.16
6.41
5.39
5.65
5.22
4.9
4.9
5.14
4.69
4.44
4.78
5.25
120
5.41
6.16
6.52
5.85
5.78
5.29
4.99
5.1
5.34
4.71
4.45
4.84
5.36
* Here, 120 angle at AM1.5 has been chosen as fixed south faced model for the project
www.renewpowerzone.in
Page 7
Queries@ info@renewpowerzone.in
1082KWp
206
Series
20KW MPPT based 3 phase string Inverter
MPPT & Transformer Less
53
4/1
Modular Components
Components
Solar PV modules
Specification
Non-Modular Components
Components
Inverters
Transformer
SCADA/Monitoring
System
Circuit Breaker
DC Disconnect
Switch Gear
Distribution Panel
Isolator
Cables
Electrical Specification
Quantity
Make
Quantity
Make
4326
53
1
1
53
1
Rated voltage=12KV;
Rated main busbar
current(Max)=1250A;
SC withstand capacity = 25KA/3s
Dynamic capacity= 50KA
1000V,20Amps
206
NA
Vmax= 12KV;
Max cont. current=1250A
DC Side= 10 mm2
AC Side=LT: 16mm2 & HT:
185mm2
www.renewpowerzone.in
Page 8
Queries@ info@renewpowerzone.in
IEC-61853-1
Watt Peak
250Wp
VOC
Maximum System
Voltage (IEC)
Maximum Fuse Rating
37.20V
VMPP
30.10V
ISC
Limiting Reverse
Current
Operating Temp
Range
Max Static Loadfront(Snow+Wind)
Max Static LoadRear(wind)
8.87A
IMPP
8.30A
Module
Efficiency/module area
Power Tolerance
15%
2%
Technology
Si-Poly
No. of cells
1000V
15A
15A
(-10 to 60) C
0
5500PA
2500PA
60 cells in series
Model design parameters
Module Efficiency
(%/ C)
(%/ C)
45 2 C
(%/ C)
o
-0.07 0.01
-0.43 0.05
-0.34 0.05
0.065 0.05
R shunt
250 ohm
R shunt (G=0)
2100 ohm
R series model
0.29 ohm
R series max
0.37 ohm
R series apparent
0.47 ohm
249.8.2W
37.2V
30.1V
8.87A
8.31A
15.54%
-0.43%/0C
200.6 W
36.8 V
30.2 V
6.64A
7.10A
15.32%
-0.43%/0C
@ 400 W/m2
100.00
35.8V
30.1V
3.55A
3.33A
15.27%
-0.44%/0C
www.renewpowerzone.in
Page 9
1100 KWp
1082KWp
250Wp
4326
Queries@ info@renewpowerzone.in
206
21
206
21
Series
609V
8.87A/8.3A
Parallel
780V/635V
1830A/1710A
Series
630V
9.51A/8.82A
Parallel
750V/620V
1960A/1816A
www.renewpowerzone.in
Page 10
Queries@ info@renewpowerzone.in
Max. Power
Max absolute Input Voltage
Start Voltage
Nominal MPP voltage range
Max Input Current per string
Nos. of Independent MPP inputs/strings
per MPP inputs
23KW
20000W
20000VA
20W
3/N/PE;230/460V
50Hz
3x29A
1
3/3
Max. Efficiency
98.7%
DC Disconnect
DC Surge Arrester
Protection Class
Total harmonic distortion
Operating Temperature range
Noise Emission
Self Consumption
Cooling option
Protection type
Remote Monitoring System
User Interference & Communication
Available
Available
I (as per IEC 62103)
53
4
Parallel
Parallel into Cu busbar
Provided
INPUT (DC)
OUTPUT (AC)
Efficiency
Protection Details
1000V
350V
490V-800V
41.5A
1/6
<1.8%
-25 -60 C
<35dB
<25W
Forced Air-cooled
IP65 (as per En 60529)
With RS-485/Ethernet
Available
Available
Available
Available
www.renewpowerzone.in
Page 11
Queries@ info@renewpowerzone.in
IS-2026 / IEC-60076
Power transformer, core type with oil-immersed ;
650C winding temp rise
ONAN(Oil Natural Air Natural)
1250KVA
11000V
460V
4.7%
7.5%
1250A
20KA/3s
DELTA
Wye
50Hz
5% of full load capacity
Cooling type
Rated KVA
High Voltage rating
Low Voltage Rating
Nominal impedance
Impedance tolerance
Nominal secondary amps
Max SC withstand current
HV connection
LV connection
Operating frequency
Tap changer
Protective devices
components
Specification
Quantity
Switch gear
Rated voltage=12KV;
Rated main busbar current(Max)=1250A;
SC withstand capacity = 25KA/3s
Dynamic capacity= 50KA
IP55
Inverter to Busbar= 60A 3p;
busbar/Panel box to transformer= A 3p;
DC Disconnects
IS-9921/IEC-129
11KV
Operating frequency
50hz 3%
12KV
2500A
40KA
206
53
1
63.5KA
To earth and
isolating poles
To earth and
isolating poles
170
195
75
85
320mm
www.renewpowerzone.in
Page 12
Queries@ info@renewpowerzone.in
Cable Sizing
DC Side Cables (strings to inverter)
Design criteria
Cable material
Single cable length per string to inverter
Cross section per string
Voltage drop
Relative power loss reference to Max DC power
Max withstand temp.
Max withstand current capacity
Conductor type
Insulation material
Normal condition
900C
L1
L2
L3
2KA/1sec
Stranded
PVC
Short-circuited
condition
2500C
IEC-60502
Al
25 ft
185mm2
1.37V
1.37V
1.37V
0.57%
11KV(UE), heavy duty
26KA @1s
XLPE
www.renewpowerzone.in
Page 13
DC Side
8120 ft
4 mm2
Queries@ info@renewpowerzone.in
AC Side
3070 ft
16 mm2 +185 mm2
Total
5 KW
11180 ft
4 mm2 +16 mm2 +185
mm2
40KW
0.76%
0.83%
Main busbar
Auxilury busbar
Copper
Busbar insulation
Al alloy E91 E
grade
Fully insulated
Busbar length
Main
Aux
3.5mt
0.75mt x 52
GS (IEEE std. 80/IEC-60439-1)
Design Criteria
IEEE Standard-80
Grounding System
Placing of earth
electrode
Earth Pit
Design criteria
Placing
Dimension
As per IEC-62305
On the highest panel of array
40mm dia with 3m height (vertical air
termination)
Material
Min depth of earth pit
Components grounding
Lightning Protection
www.renewpowerzone.in
Page 14
Queries@ info@renewpowerzone.in
Live Loads estimation of control room + admin building (as per IS 875:1987)
parameters
Roof load
Ground floor load
Piping load
Electrical + HVAC
Seismic load
details
1750 kg/ m2
Control room
18000kg/m2
Office
5000kg/ m2
50 kg/ m2
26 kg/ m2
Roof drainage
Construction details
Interwall
Cement : Sand
Interwall thickness
Parapet walls
Cement : Sand
thickness
Steel work
Remarks
As per IS-456
As per IS-456
IS-456
As per IS-456
As per IS-456
As per IS-456
6
1:6
230mm
1:4
115mm
5 acres
www.renewpowerzone.in
Page 15
Queries@ info@renewpowerzone.in
Page 16
Queries@ info@renewpowerzone.in
www.renewpowerzone.in
Page 17
Queries@ info@renewpowerzone.in
www.renewpowerzone.in
Page 18
Queries@ info@renewpowerzone.in
www.renewpowerzone.in
Page 19
Land
acquisition
PPA
DPR
finance
Queries@ info@renewpowerzone.in
Power Purchase Agreement(PPA) with private power purchaser need to be finalized at a feasible rate.
Required time is 15 working days
Preparation of Detailed Project Report including technical feasibility of the project prepared.
Time required 6 working days.
Arrangement of finance/fund for the project from nationalized or private financing agency with significant interest rate
and equity share will be finalized.
Required time for this stage is 1 month.
procurement
After finalizing PPA and arrangement of fund for the project, procurement work starts including preparation & finalizing of
vendor selection, BOM, BOQ, order placing, follow-ups of delivery to site/warehouse.
Estimated time for this step is 1 month.
construction
After the processing of procurement, first civil construction at the site starts for PV mounting structure set-up and
control-room, administrative building. Finishing the civil works, PV installation & all electrical construction works including
the Grid Evacuation will be processed.
Estimated time for this whole work is 2 months.
commission
ing
Commissioning of the plant by authorized govt. body or certified 3 rd party will be done followed by Completion of project
execution.
required time for this step is 6 working days.
www.renewpowerzone.in
Page 20
Queries@ info@renewpowerzone.in
operation
manager
Plant manager
maintenance
Engineer
(Mech)
Maintenance
engineer(E&IE)
Technician1
Technician2
skilled labour1
skilled labour2
control room
technician
Skilled labour1
Supply chain
executive
Accounts
executive
skilled labour2
www.renewpowerzone.in
Page 21
Queries@ info@renewpowerzone.in
Components/services
Total cost
(in INR)
1.
2.
3.
4.
5.
Solar PV modules
Solar inverters
Transformer
Protective devices
Wires/Cables
6.
7.
8.
9.
SCADA/RMS
Project execution & commissioning
Construction works
Grid evacuation
1,000,000
2,000,000
4,000,000
1,000,000 (assumed)
10.
1,000,000
45,100,000
11,660,000
2,940,000
1,200,000
1,000,000
Remarks
41rs/Watt peak
11rs/Watt peak
From international vendor
From international vendor
Considering IEC codes & ISO
certified
Total expenses over the year for plant O&M and staffing = 2,000,000
This expense is considered for regular maintenance cleaning of PV array, checking the status of
inverter, cable-fault checking, emergency maintenance & replacement of components and
annual salaries of O&M team of the plant.
Loan Interest rate is @12% over 70% of total project cost which shall be completed within next
7 years (the rest 30% as equity shares).
Estimated time period
Total Loan amount
Interest rate
EMI
Monthly interest
total Interest paid
7 years
49,630,000
12%
876,110
285,270
23,962,830
10 years
49,630,000
12%
712,050
298,460
35,815,600
www.renewpowerzone.in
Page 22
Queries@ info@renewpowerzone.in
Installments
EMI
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
0
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
Monthly principle
0
379,805
383,603
387,439
391,314
395,227
399,179
403,171
407,203
411,275
415,387
419,541
423,737
427,974
432,254
436,576
440,942
445,351
449,805
454,303
458,846
463,434
468,069
472,749
477,477
482,252
487,074
491,945
496,864
501,833
506,851
511,920
517,039
522,210
527,432
532,706
538,033
543,413
548,847
554,336
Monthly Interest
0
496,300
492,502
488,666
484,792
480,878
476,926
472,934
468,903
464,831
460,718
456,564
452,369
448,131
443,851
439,529
435,163
430,754
426,300
421,802
417,259
412,671
408,036
403,356
398,628
393,853
389,031
384,160
379,241
374,272
369,254
364,185
359,066
353,896
348,674
343,399
338,072
332,692
327,258
321,769
www.renewpowerzone.in
Page 23
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
876,105
559,879
565,478
571,133
576,844
582,613
588,439
594,323
600,266
606,269
612,332
618,455
624,640
630,886
637,195
643,567
650,002
656,502
663,068
669,698
676,395
683,159
689,991
696,891
703,860
710,898
718,007
725,187
732,439
739,763
747,161
754,633
762,179
769,801
777,499
785,274
793,127
801,058
809,068
817,159
825,331
833,584
841,920
850,339
858,842
867,431
Queries@ info@renewpowerzone.in
316,226
310,627
304,972
299,261
293,492
287,666
281,782
275,839
269,836
263,773
257,650
251,466
245,219
238,910
232,538
226,103
219,603
213,038
206,407
199,710
192,946
186,114
179,214
172,246
165,207
158,098
150,918
143,666
136,342
128,944
121,472
113,926
106,304
98,606
90,831
82,979
75,047
67,037
58,946
50,774
42,521
34,185
25,766
17,263
8,674
www.renewpowerzone.in
Page 24
Queries@ info@renewpowerzone.in
1000000
900000
800000
700000
600000
Installment
EMI
500000
Monthly Principle
400000
Monthly Interest
300000
200000
100000
0
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85
Page 25
Queries@ info@renewpowerzone.in
1
2
3
4
5
6
7
8
9
10
19,779,094.62
17,973,082.68
16,341,144.18
14,861,519.94
13,512,450.78
12,272,177.52
11,162,459.34
92,145,357.80
83,660,898.56
76,162,987.84
www.renewpowerzone.in
Page 26
Queries@ info@renewpowerzone.in
Inverter
Transformer
Switch gear
DC Disconnect
Circuit breaker
SCADA/RMS
Cables
Isolator
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
1.
2.
1.
1.
2.
Vikram Solar
Waaree Energies
Sova Power
Canadian Solar
Trina Solar
First Solar
Power One
SMA
Smart Power
REFusol
Delta
Schneider Electric
ABB
Schneider Electric
Ascott transformer
Voltech
Schneider Electric
Megawin
Schneider Electric
Megawin
ABB
1.
1.
2.
3.
4.
1.
2.
3.
Draker
Havells
Finolex cables
RR Kabels
Anchors
ABB
Schneider Electric
Megawin
www.renewpowerzone.in
Page 27
Queries@ info@renewpowerzone.in
I d like to thank you for reading the whole paper. Hope you have got clear view on design &
estimation of 1MW utility scale Solar PV Power Plant. Though I have discussed about the
technical part as well as the financial part in detail, I might have been forgot to add anything
more important. So, you are most welcome to give your valuable feedback & suggestion on this
report. At the end, I discussed about some companies for the components. I have chosen these
companies because their products are fulfilling my design criteria. It is not that I m representing
these companies and their products.
About Myself: I m a Solar PV professional currently working with a solar EPC company as
Project Engineer. I ve done B.Tech in Electrical Engineering & holding a PG certificate in
Advanced Solar Energy from delft Technical University, Netherlands.
Personally I provide technical consulting including site survey, technical design, CAD design,
preparation of DPR, guide in procurement & Construction.
http://www.linkedin.com/pub/amrit-mandal/55/667/a3
Read solar PV related articles & learn about new technologies at- www.renewpowerzone.in
Contact me or send your queries at- amrit.mandal0191@gmail.com , info@renewpowerzone.in
THANK YOU
www.renewpowerzone.in
Page 28