aarvee associates

Rarhu Reservoir Scheme

July 2013
Revision R1

RARHU RESERVOIR SCHEME


DESIGN OF NON-OVER FLOW DAM MAXIMUM SECTION
HYDRAULIC PARTICULARS
1

T.B.L.

336.650

M.W.L.

335.150

F.R.L

332.150

M.D.D.L

281.000

U/s batter of 1 in

D/s slope of 1 (V) to

10

starts at

0.65

starts at

291.000
=

336.650

Road Level (top of dam)

336.650

Top width

Average Ground / Bed level

305.476

261.143

10 Hard rock level

6.00 m

11 Foundation Level

260.143

12 Bottom level of Foundation gallery

263.143

13 Height of dam

=
=

Earthquake Zone
ao

0.02

336.65 - 260.14
76.5 m

I Load Combination 'A' (Dam construction condition - No water in Reservoir)


6.00
Taking Moments about (A)
TBL

+ 336.650

FRL

+ 332.150

+ 336.650

gallery
W5
76.51 m.
W1

+ 291.000

0.65
1

1
10

2.0

30.857

3.0

+ 265.64
W4gallery

W3

2.5
+ 263.14

W2

Foundation level
3.09

6.00

49.730

+ 260.143

58.815

Detailed Project Report

Stability Analysis

32

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Sno Load
1
2
3
4
4

W1
W2
W3
W4(-)
W5(-)

Force

Particulars
6.00
0.5
0.5

x 49.73
x 3.09

2.00
2.00

x 76.51
x 76.51
x 30.86
x 2.50
x 2.50

V
1101.70
4565.59
114.26
-12.00
-12.00

x 2.40
x 2.40
x 2.40
x 2.40
x 2.40

H
-

L.A.

Moment

52.730
33.153
56.758
51.730
51.730

58092.187
151363.171
6485.099
-620.755
-620.755
m

5757.55

214698.949

Lever arm

= 214698.9 /
5757.5
=
37.290 m
Maximum Compressive stress occurs at Heel and Minimum stress occurs at Toe
Eccentricity

37.290 -

7.882 m

Allowable 'e'

58.82
6.00

Maximum stress

5757.55
58.82

Minimum stress

9.803 m

=
=

97.89 x
2
176.61 t/m

97.89 x
2
19.176 t/m

II Load Combination 'B' (Water upto FRL)

58.815
2.0

No tension - HENCE OK

+/-

x
58.815

7.882

+
0.804
(Compressive)
-

0.804

(Compressive)

Normal uplift
6.00

TBL

+ 336.650

+ 336.650

FRL

+ 332.150

gallery

0.65
MDDL

+ 281.000

W1

+ 291.000

72.007
W5

2.0
3.0

+ 265.64
W4gallery

Pw
Ps

2.5
20.857

W3

+ 263.14
W2

3.09

20.86

6.00

49.7

+ 260.143

72.01
58.8

Detailed Project Report

Stability Analysis

33

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

24.002

48.005

Sno Load
1
2
3
4
5
6
7

50.730

U1

U2

U3

Force

Particulars

W Weight of body wall as calculated earlier


W5
0.5
x 3.09
x 30.86
U1(-)
8.09
x 24.00
U2(-)
0.5
x 50.73
x 24.00
U3(-)
0.5
x 8.09
x 48.00
Pw(-)
0.5
x 72.01
x 72.01
Ps(-) 0.36
x 0.50
x 20.86
x 20.86

Lever arm

8.1

x
x
x
x
x

V
5757.55
47.61
-194.08
-608.81
-194.08

1
1
1
1
1
V
=
=

H
-2592.50
-78.303
-2670.81

4808.2

L.A.

Moment

25.100
54.772
33.820
56.120
24.002
6.952

214698.949
1194.954
-10629.990
-20589.900
-10891.530
-62226.146
-544.386
111012.0

111012.0 /
4808.19
23.088 m

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
Eccentricity

=
=

23.088 -

58.815
2.0

6.320 m

allowable Eccentricity 'e'

58.82
6.00

Maximum stress

4808.2
58.82

=
=

81.75078 x
2
134.45 t/m

81.75078 x
2
29.047 t/m

Minimum stress

Detailed Project Report

Stability Analysis

9.803

No tension - HENCE OK

+/-

x
58.815

6.320

+
0.645
(Compressive)
-

0.645

(Compressive)

34

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

III Load Combination 'C' (Water upto MWL) Normal uplift


6.00
TBL

+ 336.650

MWL

+ 335.150

+ 336.650

W6

gallery
0.65
44.15
1
+ 281.000

75.01
+ 291.000

W1
W5
Pw

2.0
3.0

Ps

20.857

30.86

+ 265.64
W4gallery

10
W3

2.5
+ 263.14

W2

3.09

20.86

6.00

+ 260.143

49.7

75.01
58.8
8.086

50.730
U2

25.002

U1

U3
50.005

Sno Load
1
2
3
4
5
6
7
8

W Weight of body wall as calculated earlier


W5
0.5
x 3.09 x 30.857
W6
x 3.09 x 44.150
U1(-)
8.09
x 25.002
U2(-)
0.5
x 50.730 x 25.00
U3(-)
0.5
x 8.09 x 50.005
Pw(-)
0.5
x 75.0
x 75.0
Ps(-) 0.36
x 0.5
x 20.857 x 20.857

Lever arm

Detailed Project Report

Force

Particulars

x
x
x
x
x
x

V
5757.55
47.61
136.23
-202.16
-634.18
-202.16

1
1
1
1
1
1
V

4902.89

=
=

104523.2 /
21.319

Stability Analysis

H
-2813.03
-78.303
-2891.3

L.A.

Moment

25.100
24.750
54.772
33.820
56.120
25.002
6.952

214698.949
1194.954
3371.783
-11072.863
-21447.729
-11345.299
-70332.189
-544.386
104523.219

4902.9

35

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
Eccentricity

21.319 -

8.089

Allowable 'e'

58.815 =
6.000

Maximum stress

9.803

4902.89
58.82

=
=
Minimum stress

58.815
2.0

83.361 x
2
152.15 t/m

83.36086 x

2
14.573 t/m

No tension - HENCE OK

+/-

x
58.815

8.089

+
0.825
(Compressive)
-

0.825

(Compressive)

IV Load Combination 'D' (Load combination A with earthquake )


+ 336.650
Taking Moments about (A)

6.00
TBL
FRL

+ 336.650
+ 332.150

gallery
0.65
GL

+ 291.000

76.51
W1

2.0
3.0
30.857

+ 265.64
W4gallery

1
2.5
10

+ 263.14

W3
3.09

W2

6.00

+ 260.143

49.73
58.82

C.G.of body wall as calculated in combination 'A'


X

Horizontal sesmic coefficient

=
=

( ah )
b

Zone =

Detailed Project Report

5757.5

ao

= a Coefficient depending upon the soil foundation system


(Table 3 of IS 1893-1984)
=
1 (The value of b for all dams shall be taken as 1.0)
(Table 3 of IS 1893-1984)
= a factor depending upon the importance of the structure
=
3
(Table 4 of IS 1893-1984)

ao

= Basic horizontal sesmic coefficient (depends on Zone)


=
0.02
(Table 2 of IS 1893-1984)

ah

=
=
=

ah at top level
av at top level

214698.9 /
37.290 m

Stability Analysis

1
1.5
0.75

x
x
x

3
0.06
0.06

x
=
=

0.02
=
0.09
0.045

0.06

36

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Calculations of CG of NOF above its base


Sno Load
1
2
3
4

W1
W2
W3
W4(-)

Force

Particulars
0.5
0.5
1

6.00
x 49.73
x 3.09
x 2.00

Lever arm

x 76.5
x 76.51
x 30.86
x 2.50

x
x
x
x

2.40
2.40
2.40
2.40

1101.70
4565.59
114.26
-12.00
5769.550

ah @ C.G. Level

= 159701.35 /
=
27.680

5769.5

0.090

27.680 x
76.507
0.033

=
av @ C.G. Level

Moment
42143.912
116433.209
1175.225
-51.000
159701.345

0.045

27.680 x
76.507
0.016

Horizontal Inertia Force (HIF)


Moment

=
=

0.033 x
187.867 x

5769.5
27.680

=
=

187.867 t
5200.16 t-m

Vertical Inertia Force (VIF)


Moment

=
=

0.016 x
93.933 x

5769.5
37.290

=
=

93.933 t
3502.77 t-m

Sl.
Description
No.
1 Load combination "A"
2 VIF
3 HIF

L.A.
38.2535
25.50
10.29
4.25

Vertical

Horizontal

Force(t)
5757.550
93.933

Moment (t.m)

Force(t)
187.87

214698.95
3502.774

Moment (t.m)
5200.16

Case I
V

= V Loading A - V V I F

= Loading A -

M VIF

V
M

=
5757.55 93.933
= 214698.95 3502.8 = 205996.02 t-m
Lever Arm
= 205996.02 /
5663.6
Maximum Compressive stress occurs at Heel and Minimum stress occurs at Toe
Eccentricity 'e'

'e' limit

Maximum stress

=
=
Minimum stress

=
=

Detailed Project Report

Stability Analysis

5663.62 t
5200.16

HIF

36.37 m

36.37 - 58.81525
=
2
58.81525 =
9.803
>
6.00
No tension

6.964 m

5663.616
58.81525

96.295 x
2
164.71 t/m
5663.616
58.81525
96.295 x
2
27.88 t/m

+/-

6.964

x
58.815

6.964

+
0.710
(Compressive)
-

x
58.815

6.964

0.710
(Compressive)

37

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Case II
V

= V Loading A - V V I F

= Loading A -

V
M

M VIF

= 5757.550 93.93
= 214698.95 3502.77
= 216396.33 t-m

=
+

Lever Arm
= 216396.33 /
5663.62
Maximum Compressive stress occurs at Heel and Minimum stress occurs at Toe

eccentricity 'e'

'e' limit

Maximum stress (at heel)

=
=
Minimum stress

=
=

5663.616 t
5200.158

38.21 m

38.21 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
5663.616
1
+/58.81525
96.295 x
2
182.75 t/m

5663.616
58.81525

96.295 x
2
9.84 t/m

HIF

8.801 m
8.801
6

x
58.815

8.801

+
0.898
(Compressive)
-

x
58.815

8.801

0.898
(Compressive)

Case III
V

= V Loading A + V V I F

= Loading A +

M VIF

V
M

= 5757.550 +
= 214698.95 +
= 213001.56 t

93.933
3502.77

=
-

Lever Arm

= 213001.56 /

5851.5

36.40 m

58.82
2
9.803

6.994 m

HIF

5851.483 t
5200.16

Maximum Compressive stress occurs at Heel and Minimum stress occurs at Toe
eccentricity 'e'

36.40 -

'e' limit

58.81525 =
6

5851.483
58.81525

Maximum stress

=
=
Minimum stress

=
=

99.489 x
2
170.47 t/m
5851.483
58.81525
99.489 x
2
28.51 t/m

>
No tension

6.994

+/-

x
58.815

6.994

+
0.713
(Compressive)
-

x
58.815

6.994

0.713
(Compressive)

Case IV

Detailed Project Report

= V Loading A + V V I F

= Loading A +

Stability Analysis

M VIF

HIF

38

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

V
M

= 5757.550 +
= 214698.95 +
= 223401.88 t
= 223401.88 /

M
Lever Arm

93.933
3502.77

=
+

5851.5

5851.483 t
5200.158
38.18 m

Maximum Compressive stress occurs at Heel and Minimum stress occurs at Toe
eccentricity 'e'

'e' limit

Maximum stress (at heel)

38.18 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension

8.771 m

5851.483
58.81525

=
=
Minimum stress

99.489 x
2
188.51 t/m

5851.483
58.81525

99.489 x
2
10.47 t/m

+/-

8.771

x
58.815

8.771

+
0.895
(Compressive)
-

x
58.815

0.895

8.771

(Compressive)

V Load Combination 'E' (Load combination B with earthquake )


6.00
+ 336.650
TBL

+ 336.650

FRL

+ 332.150

gallery
0.65
MDDL

+ 281.000

1
W1

+ 291.000

W5

72.007
2.0
Pw

3.0

+ 265.64
W4gallery

Ps
20.857

10

W3

2.5
+ 263.14

W2

3.09

20.86

6.00

72.01

+ 260.143

49.73
58.82

8.09

50.730
U2

Detailed Project Report

24.002

U1

48.005

U3

Stability Analysis

39

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Hydrodynamic effects due to reservoir

(As per 7.2.1 of IS: 1893 - 1984 )

= Cs ah w h

p
Cs
ah
w

= Hydrodynamic pressure in Kg/m2 at depth 'y'


= Co-eff. Which varies with depth & shape
=
1.5 x
0.06 =
0.09
= 1

Cs

Cm

= Maximum value of Cs obtained from fig.10


for q =
=
0.7
9.9325
= Depth below surface
=
72.0 m

Where

As per cl: 7.2.1.1


Where
for q =

5.7106
(U/s batter)

{ ( ) ( )}

Cm y
y
y
y
2
+
2
2 h
h
h
h

= Depth of reservoir for FRL Condition


=
332.15 260.14
=
72.01 m

Cs

0.7
2
72.0
72.007

72.0
72.01
2

0.35
1.000

Cs

=
=

0.35
0.700

= Cs ah w h

x
x

0.700

4.536

72.0
72.0

72.007
72.007

1.000
1.000

1.000

1.000

1.000

0.09

72.0

72.007

As per cl : 7.2.1.3

Hydrodynamic Shear force (or) Total Horizontal Shear (Vh) = 0.726 p y


=
=

0.726 x
237.15 t

4.536

Moment about C.G due to Hydrodynamic pressure (Mh) = 0.299 Py2


=

Detailed Project Report

Stability Analysis

0.299 x

4.536

72.0 2

40

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

=
Sl.
No.
1
2
3
4

7032.923 tm

Vertical

Description

Horizontal

Magnitude (t)
4808.192
93.933

Load combination : "B"


VIF
HIF
Hydrodynamic force

Moment (t.m)
111011.95
3502.774

Magnitude (t)
187.87
237.15

Moment (t.m)
5200.16
7032.92

Case I
V

V loading"B"

- V VIF

loading"B"

M VIF

HIF

V = 4808.192 93.933
M = 111011.95 3502.77
= 109341.94 t
Lever Arm
= 109341.94 /
4714.26
Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress

=
=
Minimum stress

=
=

+
=
-

4714.259 t
5200.16 +

23.19 m

23.19 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
4714.259
1
+/58.81525
80.154 x
2
130.96 t/m

4714.259
58.81525

7032.92

6.214 m
6.214
6

x
58.815

6.214

+
0.634
(Compressive)

80.154 x
2
29.34 t/m

Hydro-dyna

x
58.815

6.214

0.634
(Compressive)

Case II
V

V loading"B"

- V VIF

loading"B"

M VIF

HIF

V
M

= 4808.192 93.933
= 111011.95 3502.77
= 105676.41 t
Lever Arm
= 105676.41 /
4714.26
Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

=
'e' limit

Maximum compressive stress (at heel)

=
=
Minimum stress (at heel)

=
=

Detailed Project Report

Stability Analysis

=
+

4714.259 t
5200.16 -

22.42 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
4714.259
1
+/58.81525
80.154 x
2
137.32 t/m
4714.259
58.81525
80.154 x
2
22.99 t/m

Hydro-dyna

7032.92

22.42 m

6.991 m
6.991
6

x
58.815

6.991

+
0.713
(Compressive)
-

x
58.815

6.991

0.713
(Compressive)

41

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Case III
V

V loading"B"

loading"B" +

+ V VIF
M VIF

HIF

V
M

= 4808.192 +
93.933
= 111011.95 +
3502.77
= 116347.49 t
Lever Arm
= 116347.49 /
4902.13
Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress (at heel)

=
=
Minimum stress (at heel)

=
=

+
=
-

4902.126 t
5200.16 +

23.73 m

23.73 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
4902.126
1
+/58.81525
83.348 x
2
131.59 t/m

4902.126
58.81525

7032.92

5.674 m
5.674
6

x
58.815

5.674

+
0.579
(Compressive)

83.348 x
2
35.11 t/m

Hydro-dyna

x
58.815

5.674

0.579
(Compressive)

Case IV
V

V loading"B"

loading"B" +

+ V VIF
M VIF

HIF

V
M

= 4808.192 +
93.933
= 111011.95 +
3502.77
= 112681.96 t
Lever Arm
= 112681.96 /
4902.13
Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress (at heel)

=
=
Minimum stress (at heel)

=
=

Detailed Project Report

Stability Analysis

=
+
=

22.99 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
4902.126
1
+/58.81525
83.348 x
2
137.95 t/m
4902.126
58.81525
83.348 x
2
28.75 t/m

Hydro-dyna

4902.13 t
5200.16 -

7032.92

22.99 m

6.421 m
6.421
6

x
58.815

6.421

+
0.655
(Compressive)
-

x
58.815

0.655

6.421

(Compressive)

42

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

VI LOAD COMBINATION 'F'

(C + Extreme uplift)
6.00

TBL

+ 336.650

MWL

+ 335.150

+ 336.650

gallery

44.15
W6

0.65

75.01

+ 281.000

291.000

W1
2.0

Pw

W5
30.86

3.0

+ 265.64
W4gallery

20.857

2.5

Ps

10

W3

+ 263.14
W2

3.09

20.86

6.00

+ 260.143

49.73

75.01
58.82
58.82

75.01

Sno Load
1
2
3
4
5
6

Force

Particulars

W Weight of body wall as calculated earlier


W5
0.5
x 3.09 x 30.857
W6
3.09
x 44.150
U(-)
0.5
x 58.82
x 75.0
Pw(-)
0.5
x 75.0
x 75.0
Ps(-) 0.36
x 0.5
x 20.857 x 20.857

x
x
x
x

V
5757.55
47.61
136.23
-2205.78

1
1
1
1
V

3735.613

H
-2813.03
-78.303
-2891.3

L.A.

Moment

25.100
24.750
39.210
25.002
6.952

214698.949
1194.954
3371.783
-86488.912
-70332.189
-544.386
61900.198

Lever arm

=
61900.2 /
3735.6
=
16.570
Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
Eccentricity

Detailed Project Report

Stability Analysis

16.570 -

58.815
2.0

43

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

12.837

Allowable 'e'

58.815 =
6.000

Maximum stress

3735.61
58.82

=
=

63.51437 x
2
146.69 t/m

63.51437 x
2
-19.664 t/m

Minimum stress

9.803

= 0.02 fc
=
0.02 x
2
=
30 t/m

Maximum allowable tensile stress

Tension devolopes

+/-

x
58.815

12.837

+
1.310
(Compressive)
-

1.310

(Tensile)

1500
2
19.664 t/m

>

Hence ok

VII LOAD COMBINATION 'G' (E + extreme uplift)


6.00
TBL

+ 336.650

FRL

+ 332.150

+ 336.650

W1

0.65
1

+ 281.00
+ 291.000

72.0
W5
30.857

2.0

Pw

3.0

+ 265.64
W4

Ps

20.857

10

W3

2.5
+ 263.14

W2

3.09

20.86

6.00

72.01

+ 260.143

49.73
58.82
58.82

U
72.007

Detailed Project Report

Stability Analysis

44

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Sno Load
1
2
3
4
5

Sl.
No.
1
2
3
4

Particulars

W Weight of body wall as calculated earlier


W5
0.5
x 3.09
x 30.86
U(-)
0.5
x 58.82
x 72.01
Pw(-)
0.5
x 72.0
x 72.0
Ps(-) 0.36
x 0.50
x 20.86
x 20.86

x 1
x 1
x 1

Force
V
H
5757.55
47.61
-2117.55
-2592.50
-78.303
V
3687.6
-2670.8

L.A.

Moment

25.100
39.210
24.002
6.952

214698.949
1194.954
-83029.679
-62226.146
-544.386
70093.7

Vertical

Description

Horizontal

Magnitude (t)
3687.603
93.933

Body wall
VIF
HIF
Hydrodynamic force

Moment (t.m)
70093.69
3502.77

Magnitude (t)
-

Moment (t.m)
-

187.87
237.15

5200.158
7032.923

Case I
V

Vloading B

- V VIF

loading B

Lever Arm

V =
M =
=
=

M VIF

3687.603
70093.69
68423.68
68423.68

93.933
3502.77

=
-

3593.669 t
5200.16 +

3593.67

19.04 m

t
/

HIF

Hydro-dyna

7032.92

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress

=
=
Minimum stress

=
=
Maximum allowable tensile stress

19.04 -

58.81525
=
10.368 m
2
58.81525 =
9.803
<
10.368
6
Tension devolopes
3593.669
1
+/6
x
58.81525
58.815
61.101 x
2
125.72 t/m

3593.669
58.81525
61.101 x
2
-3.52 t/m

= 0.04 fc
=
0.04 x
2
=
60 t/m
Hence ok

10.368

+
1.058
(Compressive)

x
58.815

(Tensile)

1.058

>

2
3.522 t/m

10.368

1500

Case II

V
M
Lever Arm

Vloading B

- V VIF

loading B

M VIF

=
=
=
=

3687.603
70093.69
64758.15
64758.15

t
/

93.933
3502.77

=
+

3593.67

HIF

Hydro-dyna

3593.669 t
5200.16 -

7032.92

18.02 m

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel

Detailed Project Report

Stability Analysis

45

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

eccentricity 'e'

=
'e' limit

Maximum compressive stress (at heel)

=
=
Minimum stress (at heel)

=
=
Maximum allowable tensile stress

18.02 -

58.81525
=
11.388 m
2
58.81525 =
9.803
<
11.388
6
Tension devolopes
3593.669
1
+/6
x
58.81525
58.815
61.101 x
2
132.08 t/m

3593.669
58.81525
61.101 x
2
-9.88 t/m

= 0.04 fc
=
0.04 x
2
=
60 t/m
Hence ok

11.388

+
1.162
(Compressive)

x
58.815

(Tensile)

1.162

>

2
9.880 t/m

11.388

1500

Case III
V

Vloading B

+ V VIF

loading B

M VIF

=
=
=
=

3687.603
70093.69
75429.23
75429.23

+
+
t
/

V
M
Lever Arm

HIF

Hydro-dyna

93.933
3502.77

=
-

3781.536 t
5200.16 +

3781.54

19.95 m

7032.92

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress (at heel)

=
=
Minimum stress

=
=
Maximum allowable tensile stress

Detailed Project Report

19.95 -

58.81525
=
2
58.81525 =
9.803
>
6
No tension
3781.536
1
+/58.81525
64.295 x
2
126.35 t/m
3781.536
58.81525
64.295 x
2
2.24 t/m

= 0.04 fc
=
0.04 x
2
=
60 t/m
Hence ok

Stability Analysis

9.461
6

x
58.815

9.461

+
0.965
(Compressive)

9.461 m

x
58.815

9.461

0.965
(Compressive)

1500
>

2
2.241 t/m

46

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Case IV
V

Vloading B

+ V VIF

loading B

M VIF

=
=
=
=

3687.603
70093.69
71763.70
71763.70

+
+
t
/

93.933
3502.77

=
+

3781.54

V
M
Lever Arm

HIF

Hydro-dyna

3781.54 t
5200.16 -

7032.92

18.98 m

Maximum Compressive stress occurs at Toe and Minimum stress occurs at Heel
eccentricity 'e'

'e' limit

Maximum compressive stress

=
=
Minimum stress

=
=
Maximum allowable tensile stress

Detailed Project Report

18.98 -

58.81525
=
10.430 m
2
58.81525 =
9.803
<
10.430
6
Tension devolopes
3781.536
1
+/6
x
58.81525
58.815
64.295 x
2
132.71 t/m
3781.536
58.81525
64.295 x
2
-4.12 t/m

= 0.04 fc
=
0.04 x
2
=
60 t/m
Hence ok

Stability Analysis

10.430

+
1.064
(Compressive)

x
58.815

(Tensile)

1.064

>

2
4.117 t/m

10.430

1500

47

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

ABSTRACT OF STRESSES ( t/m2)


STRESS (t/m2)

Load
Combination

Permissible tensile stresses

@ Heel

@ Toe

176.61

19.18

OK

fc = 1500 t/Sqm
No-tension @ heel

29.05

134.45

OK

No-tension

14.57

152.15

OK

0.01 fc

D1
D2
D3
D4

164.71
182.75
170.47
188.51

27.88
9.84
28.51
10.47

OK
OK
OK
OK

No-tension @ heel

E1
E2
E3
E4

29.34
22.99
35.11
28.75

130.96
137.32
131.59
137.95

OK
OK
OK
OK

-19.66

146.69

OK

-3.52
-9.88
2.24
-4.12

125.72
132.08
126.35
132.71

OK
OK
OK
OK

15 t/Sqm

F
G
G1
G2
G3
G4

Detailed Project Report

Stresses

0.02 fc

30
30
30
30
30

t/Sqm
t/Sqm
t/Sqm
t/Sqm
t/Sqm

0.02 fc

30 t/Sqm

0.04 fc

60
60
60
60
60

t/Sqm
t/Sqm
t/Sqm
t/Sqm
t/Sqm

38

aarvee associates
Rarhu Reservoir Scheme

July 2013
Revision R1

Factor of Safety against sliding


F = [((w u) tan f ) / Ff) + (C.A./Fc)] / P
F
w
u
tan f
C
A
Ff
Fc
P
C =
f =
A =

=
=
=
=
=
=
=
=
=

Factor of safety against sliding


Total mass of the dam
Total uplift force
Co-efficient of internal friction
Cohesion of the material at the plane considered
Area under consideration for cohesion
Partial factor of safety inrespect of friction
Partial factor of safety inrespect of cohesion and
Total horizontal force
Fq
Tan f =

100 t/m2
28 O
58.81525 Sqm

Allowable factor of Safety =


Load
Combination

W - U

Ff

5757.550

1.5

4808.192

-2670.807

4902.890

1
2
3
4

1
2
3
4

(W - U)Tanf/Ff

Table-1 of IS 6512-1984
0.532
1
Factor
of
safety
OK

FC

CA / FC

2040.896

3.6

1.5

1704.374

3.6

1633.757

1.250

OK

-2891.328

1.5

1737.942

3.6

1633.757

1.166

OK

5663.616
5663.616
5851.483
5851.483

-187.867
187.867
-187.867
187.867

1.2
1.2
1.2
1.2

2509.499
2509.499
2592.741
2592.741

2.4
2.4
2.4
2.4

2450.635
2450.635
2450.635
2450.635

26.402
26.402
26.845
26.845

OK
OK
OK
OK

4714.259
4714.259
4902.126
4902.126

-2621.521
-2720.092
-2621.521
-2720.092

1.2
1.2
1.2
1.2

2088.847
2088.847
2172.089
2172.089

2.4
2.4
2.4
2.4

2450.635
2450.635
2450.635
2450.635

1.732
1.669
1.763
1.699

OK
OK
OK
OK

3735.613

-2891.328

1.0

1986.261

1.2

4901.271

2.382

OK

3593.669
3593.669
3781.536
3781.536

-2621.521
-2720.092
-2621.521
-2720.092

1.0
1.0
1.0
1.0

1910.788
1910.788
2010.678
2010.678

1.2
1.2
1.2
1.2

4901.271
4901.271
4901.271
4901.271

2.599
2.504
2.637
2.541

OK
OK
OK
OK

F
G
1
2
3
4

Detailed Project Report

Sliding-Check

39

RARHU RESERVOIR SCHEME


DESIGN OF REINFORCEMENT AROUND FOUNDATION GALLERY

CRITICAL LOAD:
A loading condition which will produce maximum (or) the most significant stress in the structure under consideration.
As per Table 1 of IS 12966 (part 2) - 1990
For Longitudinal Type Opening, The critical loading condition occurs when the reservoir is in Empty condition
for opening located within 1/3 of U/s of dam

Eccentricity

7.882 m

Maximum stress

2
176.609 t/m

Minimum stress

2
19.176 t/m

CALCULATION OF STRESSES BY APPROXIMATE ANALYTICAL METHOD (AS PER IS 12933 (PART 2) -1990
Symbols used are
B

Pu

=
=
=
=
=

Height of Rectangular Opening


2.50 m
Width of Rectangular Opening
2.0 m
Pressure (Water + silt if any) at the U/s face of dam at the level of consideration

Pd

=
=

0.0 t/m
Pressure (Water + silt if any) at the D/s face of dam at the level of consideration

=
=
=
=
=

0.0 t/m
Total base width of the dam at the level of consideration
58.82
Distance of centre of gallery from toe
55.730 m

Total Horizontal force at the level of consideration

T
x

eP

eW

=
=

eM
syu
syd
sx
sy

0.000 t
Total vertical force at the level of consideration
5757.55 t

=
=
=

Total moment about C.G., of the section of the base of dam


I.e., middle of the section assuming the dam base as 1 m wide strip
5757.55 x 7.882
= 45383.08
t-m

Normal stress on horizontal plane at the U/s face of the dam

Normal stress on horizontal plane at the D/s face of the dam


(calculated by stability analysis at the level of consideration)

Normal stress on Vertical plane

2
176.61 t/m

2
19.18 t/m

(calculated by stability analysis at the level of consideration)

Normal stress on Horizontal plane

Tan f u

U/s slope

0.1

Tan f d

D/s Slope

0.65

Shear stress on xy plane at the up stream face of dam

Shear stress on xy plane at the down stream face of dam

txy u
txy d

Principal stress-check

1. NORMAL STRESS :

sy

As per page no: 8 of IS 12966 (part 2 ) - 1990

sy

=
b

2. SHEAR STRESS :

txy
Calculation of

syd
syu

sy

=
=

168.351 t/m2

tyx

txy d

syd

-2

b1

=
=

Tan f d

19.18 -

0.65

3 x

txy u

-2
58.82

eP

2x

txy d

syu

Pu

Tan f u

=
=

176.61
-17.67

0.1

3 x

0
58.82

-17.67

-0.034
-0.247

0 +

-17.67 +

2 x

eP

c1
c1

T2

Principal stress-check

Pd

12.467

txy u

55.730

b1
b1

Calculation of

2.68 x

a1 + b1 x + c1 x2

Calculation of

19.18

19.18 +

tyx

2
19.18 t/m

syd

176.61 58.82
2.67669

txy ,

a1
a1

a +bx

2x

24.934

txy u

txy d

12.467

3
3459.2

2 x

=
=

0.0009
-0.005

0 +

0
58.82

-17.67

-17.67 +

12.467

12.467

txy
For x = T =

tyx

a1 + b1 x + c1 x2

tyx

a1 + b1 T + c1 T2

txy

12.467 +

-0.247 x

58.82

12.467 +

-14.53 +

-15.61

-17.67

58.82 m

txy

txy u

-0.005 x

3459.23

2
-17.67 t/m

HENCE OK
Hence arrived Constants are correct

Shear stress at the centre of gallery I.e., Instrumentation shaft

txy
For x =

=
a1
55.73 m

txy

+ b1 x + c1 x2

12.467 +

=
=

sx

-14.01

-0.005 x

3105.78

a2 + b2 x + c2 x2+ d2 x3

a1

Tan f d +

12.467

x 0.65 +

8.104

b1

Tan f d

Pd
0

b2
b2

da1
dy
gw
d
dy
da1
dy
dsyd

Principal stress-check

-13.766 +

a2
a2

Calculation of

55.73

sx

3. NORMAL STRESS :

Calculation of

12.467 +
-15.320 t/m2

-0.247 x

=
Tan f d

da1
dy

Tan f d +

dsyd
dy

gw

d
dy

Tan f d

syd

Pd

0 since , there is no Tail water


=

Tan f d

gc

Since

Tan f d is constant

dsyd
dy
+

K3

Tan f u +

K4

Tan f d

eP

dy
gc
K3

T2

=
=

2.4 for concrete

eM

12

T3
=

K3

=
=

K4

12
203456

x 45383 +

2.677
6.006

eM

12

T3
=

dsyd
dy

=
=

2.677
-3.981

gc

x 45383

b2

2
3459.24

Pu

2
58.82

x0

0.000

eW

Pd

4
3459.24

5757.55

6.658

K3

Tan f u +

K4

2.4

4
58.82

x0

Tan f d

6.006 x 0.1

2.4

0.413

Tan f d

=
=

0.65
0.268

b1

0.108

c1

-2.59

x 0.41

Tan f d +

Tan f d +

da1
dy
0.268

-3.981 x

dsyd
dy

-0.247 x 0.65

6
x
3459.24
0.601
+

Principal stress-check

5757.55

3.329

2
T

c2
C2

Calculation of

eW

da1
dy

T2

12
203456

dsyd
dy

2
T2

db1
dy

0.000

eP

0.65

db1
dy

dT
dy

12
T

eP

d txy u
dy

2
T

dT
dy

Tan f u

=
=

0.1
0.75

d eP
dy
d txy d
dy

=
=

d txy u
dy

d syu
dy
K1

K2

Pu

d eP
dy

6
T

d txy d
dy

Pd

0 - 0

0.413

gw

d
dy

=
0
- 0.0

syd

Tan f d

Pd

since there is no tail water


+
0.00

0.268
Tan f u

gw

gc

d
dy
K1

syu

d Tan f u
dy

Tan f u +

K2

Tan f d

syu

Pu -

Pu

4
58.82

=
=

0
-9.334

T
x0

eW

2
x 5757.5
3459.24

eW

4
3459.24

6.657589

3.329
0.652

T
5757.55

x Pd

2
58.82

0.000

eM

12
203456

12
T

x0

x 45383

2.6767

12

eP

6
T

=
=

Principal stress-check

0.65

d syd
dy

K2

4
T

T
K1

txy d

Tan f d

0.65

Tan f d

gw
=

txy u

2.677

eM

12
203456

x 45383

d syu
dy

2.4 +

2.4 +

=
=

=
=

db1
dy

0.750

-0.93

gw

0.1
-0.189

0-

1.89

0.00

-0.012

C2

0.000

x 0.0

-x 0.189

-x 0.189

-0.01

c1

Tan f d +

-0.005 x 0.65

=
=

-0.003
-0.009

-dT
dy

18
T

eP

-0.750

d txy u
dy

18

6
T

T2

1
x
2
-0.006

0.27

0.27

0.000

-0.01

txy d

0.02

0.02

db1
dy
-0.01

x 0.00

dc 1
dy
txy u

6
T

3
T2
6

11966297

x 0.0

3
3459.24

d eP
dy

d txy d
dy
-x 17.670

203455.7

203455.7

Principal stress-check

58.82

d2

3459.24

0.000 + 0.000

3
=

syu

58.82

d2

dc 1
dy

Pu -

0.000

d Tan f u
dy

Calculation of

3459.24

3459.24
0.750

0.65

+ 0.42

203456

syu

d
dy

x 0.000

db1
dy

0.652 x

1.89

Tan f u

12

6
x
3459.24

d txy u
dy

-9.334 x 0.1

12.47

0.268

203455.7
-x 0.189

3
3459.24

-0.750

0.00012

0.00018

0.0000

0.000000

d2

-0.0005 + 0.000

-0.0002

0.000184

0.000

0.000233

-0.009

0.00

3
=

sx
For x =

sx

0.000061

a2 + b2 x + c2 x2+ d2 x3

55.73 m
=

=
=

8.104

8.104

0.11 x 55.73

0.000 x

6.01275 +

3105.8

3105.8

173083.9
-27.24 +

10.6126

2
-2.515 t/m

The values of constants calculated are correct

tx

=
=
=

tzy u

Tan f u
0.100

x
17.670 x
1.7670

The difference is =
=

sx

-2.515 0.748

1.767
t/m2

at centre of gallery where


For x =
55.73 m

sx

=
=

8.104

8.104

0.11 x

6.1E-05 x

6.01275 +

-2.515 t/m2

55.73 +

-0.009

173083.9
-27.244 +

10.613

(Tensile)

CALCULATION OF TOTAL TENSION:

sy
sx

=
=
=

B
A
D

Principal stress-check

2
168.351 t/m
2
-2.515 t/m
2.5
=
2.00

1.25

Distance from the boundary of the opening along the Y- axis

0.00

D/A

0.00
0.04
0.08
0.12
0.16
0.20
0.24
0.28
0.32
0.36
0.40

Principal stress-check

From fig : 3 of IS 12966


(Part2) - 1990

sn1 / sy

sn1

0.91
0.76
0.64
0.53
0.41
0.32
0.27
0.17
0.10
0.06
0.01

153.199
127.946
107.744
89.226
69.024
53.872
45.455
28.620
16.835
10.101
1.684

(tensile)

From fig:4 of IS 12966


(Part2) - 1990

sn2 / sx
1.65
1.64
1.63
1.62
1.60
1.57
1.52
1.50
1.48
1.43
1.38

sn2

-4.149
-4.124
-4.099
-4.074
-4.024
-3.948
-3.823
-3.772
-3.722
-3.596
-3.470

(Comp)

Total Tension

sn1+sn2
157.35
132.07
111.84
93.30
73.05
57.82
49.28
32.39
20.56
13.70
5.15