You are on page 1of 1

M/T NICOPOLIS

ANDROS 539

DATE:28 Sept 1997


Port of: La Pampilla Peru

PRE - ARRIVAL CRUDE OIL WASHING CHECK LIST


1.

HAS TERMINAL BEEN NOTIFIED

_________

2.

IS OXYGEN ANALYSING EQUIPMENT TESTED AND


WORKING SATISFACTORILY

_________

IS TANK WASHING PIPELINE SYSTEM ISOLATED FROM HEATER


AND ENGINE ROOM

_________

4.

ARE ALL HYDRANT VALVES ON TANK WASHING LINE BLANKED

_________

5.

ARE ALL VALVES TO FIXED COW MACHINES SHUTT

_________

HAVE TANK CLEANING LINES BEEN PRESSURIZE AND


LEAKAGES MADE GOOD.

_________

HAVE PORTABLE DRIVING UNITS FOR FIXED COW MACHINES


BEEN TESTED.

___N/A__

HAVE PRESSURE GAUGES ON TOP DISCHARGE LINE, MANIFOLD


AND TANK CLEANING MAIN BEEN CHECKED.

_________

9.

HAS STRIPPING MONITORING EQUIPMENT BEEN CHECKED.

_________

10.

HAS THE COMMUNICATION SYSTEM BEEN CHECKED AND TESTED

_________

11.

HAS THE ORGANIZATION PLAN BEEN DRAWN UP AND POSTED


WITH DUTIES AND RESPONSIBILITIES DEFINED.

_________

3.

7.
8.

12.

HAVE THE DISCHARGE / CRUDE OIL WASHING OPERATION BEEN


DRAWN UP AND POSTED.
_________

13.

IN CASES WERE THE TERMINAL HAS A STANDARD RADIO


CHECKLIST, HAS THIS BEEN COMPLETED AND TRANSMITTED
CHIEF OFFICER
__Konstantinos Motzakis__

Completed on
at :

28 Sep 97
10:00

_________

You might also like