This document is a pre-arrival crude oil washing checklist for the M/T NICOPOLIS at the Port of La Pampilla Peru on September 28, 1997. It contains 13 items to be checked, including notifying the terminal, testing oxygen analyzing equipment, isolating tank washing systems, checking valves and pressure gauges, and developing operation and communication plans. The completed checklist is signed by Chief Officer Konstantinos Motzakis.
This document is a pre-arrival crude oil washing checklist for the M/T NICOPOLIS at the Port of La Pampilla Peru on September 28, 1997. It contains 13 items to be checked, including notifying the terminal, testing oxygen analyzing equipment, isolating tank washing systems, checking valves and pressure gauges, and developing operation and communication plans. The completed checklist is signed by Chief Officer Konstantinos Motzakis.
This document is a pre-arrival crude oil washing checklist for the M/T NICOPOLIS at the Port of La Pampilla Peru on September 28, 1997. It contains 13 items to be checked, including notifying the terminal, testing oxygen analyzing equipment, isolating tank washing systems, checking valves and pressure gauges, and developing operation and communication plans. The completed checklist is signed by Chief Officer Konstantinos Motzakis.