LEGEND / NOTES:

02

1. FOR GENERAL NOTES REFER TO DRAWING 422-C120-FD-S-00XX00-003003


2. ALL STEEL COVERING PLATE WILL BE (20mm PLATE + CHQ 5/6)
3. ALL VOIDES SHOULD BE CHECKED WITH ALL OTHER DISCIPLINES

CLOUDED VOIDS HAVE BEEN SHIFTED FOR BETTER BEAM


ARRANGEMENTS FROM ITS ORIGINAL LOCATION IN
ARCHITECTURAL DRAWINGS.

- REFERENCE DRAWINGS:
- 422-C120-FD-S-00XX00-003003-D Load Centre B General Notes.
- 422-C120-FD-S-01B109-001001-D Load Centre BFoundation plan base level.
- 422-C120-FD-S-02GF09-001001-D Load Centre B Ground floor level.
- 422-C120-FD-S-02M009-001001-D Load Centre B Mezzanine level.
- 422-C120-FD-S-03R109-001001-C Load Centre B Roof plan.
- 422-C120-FD-S-04XX09-001001-B Load Centre B Details.
- 422-C120-FD-S-05XX09-001002-C Load Centre B Structural sections sheet1 of 2.
- 422-C120-FD-S-05XX09-002002-C Load Centre B Structural sections sheet 2 of 2.
- 422-C120-FD-S-06XX09-001001-C Load Centre B Structural elevations.
- 422-C120-FD-A-01B109-001001-BLoad Centre B Architectural Basement plan.
- 422-C120-FD-A-01GF09-001002-DLoad Centre B Architectural Ground floor plan.
- 422-C120-FD-A-01GF09-002002-DLoad Centre B Architectural Switchgear plan.
- 422-C120-FD-A-05GF09-001001-B Load Centre B Ground floor plan internal
- 422-C120-FD-A-05M009-001001-B Load Centre B Mezzanine level internal
- 422-C120-FD-A-03XX09-001001-BLoad Centre B Architectural Sections.
- 422-C120-FD-A-06XX09-002005-CLoad Centre B Architectural Louver
& Fan detail External stairs to Mezzanine.
- 422-C120-FD-A-06XX09-005005-BLoad Centre B Architectural Internal access
stairs & escape ladder.
- 422-C120-FD-A-01XX09-001001-BLoad Centre B Architectural Extent of potable
water pumping station facilities plan.

AK
KA
H

NORTH

KEYPLAN

LOAD CENTRE 'B'

PROJECT
NORTH

REVISION:

REV.

DATE

DESCRIPTION OF REVISION

APP.

(dd/mm/yyyy)

DRAWN BY:

DESIGNED BY:

CHECKED BY:

APPROVED BY:

DATE:
(dd/mm/yyyy)

24/05/2014
ARCH

CIVIL

STRC

PAVN

ELEC

MECH

ETLN

DATE

APPROVED AS SUBMITTED
APPROVED WITH IND. CHANGES
DISAPPROVED RESUBMIT

CLIENT:

CONSTRUCTION MANAGER:

CONTRACTOR:

SUB CONTRACTOR:

SAUDI BINLADIN GROUP


PHASE & DISCIPLINE:

FINAL DESIGN
STEEL STRUCTURAL

PROJECT
NORTH
NORTH

DRAWING TITLE:

LOAD CENTRE B
POTABLE WATER PUMPING STATION
GENERAL PLAN
PROJECT NUMBER
MAKKAH

DRAWING NUMBER

J-10-422-PF-0
SCALE (A0)

1:100

SHEET REV
001

422-C12I-FD-R-01-GF0001

008