You are on page 1of 2

TAS ENGINEERING (PVf) LTD.

PLUMBING CONSULTANT AND ENGINEERlNG CONTRACTORS

1B, DODAMGAHAHENA ROAD, GOTHAUWA NEW TOWN. TEL: 2410917 FAX : 2411001 E-MAIL:

taseng@sltn et.lk

Ref: OJ/1 2!EI12012

Mr. andasena

Sile Manager

03/12/20L

Nawaloka Construction Co. Ltd.

115, Sir .Iames Peiris Mawatha,

Colombo 0_.
Deill' Sir.

OUOTATTON FOR

FI TTINGS AT
SECRETARI AT 3UILDING
AT DENZIL KOBBAKAPUIilA MW. BATTARAM'ULLA STAGE II
SAIT~~Y

THE PROPOSED CONSTRUCTION OF

~I GHWAYS

ITEM

DESCRIPTION

Q/138

Supply and install centrifugal electrical water pump fix ing


close to the sum p with approved quality gate valves, non
return valves including float switch control panel (one duty
ont:roIhd by)

QTY

UNIT

I rem

I nit

Rate

AMOUNT

RATE

731,3 2 1.30

TOTAL

QIl38

73 J ,321.30
731,321.30

Rate Break down for Centrifugall'ump


Description

Qty

Amount

Jinasena Dn20013

Nos

98509.82

2.00

.197,019.64

2" Gate Val e (PEX)

2" NRV Valve (PEX)

2" Barrel Ni pple

2" Rubber Flex ible Union Type (China)

Pressure Gauge

1/2" Ballcock Valve (PEX)

2" Valve Socket ( National)

2" Strainer ( Kitz )

2" Foot Valve (Jinascna)

1/2 " Barrel N ipple

A uto R I ase Valve

20 Faucet socket ( Nati onal )

63x20 RcduceTee ( National )

63 Equal fee ( National)

Starter (Jinasena)

Pump Header ( PVC P ipes )

Consumab le

Labour

Bracket-GI(Tools)

Control Panel

Nos

7,840.00
12,450. 00
65 0.00
4,200.00
3,500.00
1.900.00
13 7.50
12,61 0.00
2,446.00
250.00
4.5 00.00
19.5 0
148.50
220.00
31.663.39
6,000.00
5,000.00
15,000.00
10,000.00
160.000.00

4.00
4.00
\6.0
4.00
100
2.00
8.00
2.00
2.00
2.00
1.00
2.00
2.00
4.00
2.00
1.00
1.00
1.00
1.00
1 00

3 1,360.00
49,800 00
10,400.00
16,800.00
3. 500.00
3,800.00
1,100.00
25,220.00
4,892.00
500.00
4.500 .00
39.00
297.00
880.00
63,3 26.78
6.000.00
5,000.00
15.000.00
10,000 .00
160.000.00
609,434.42
121.886.88
73],321.30

P&O 20%
Grand Total For Water Supply Pump

Nos
os
Nos
N os
Nos
os
as
Nos
, os
Nos
Nos
No.
Nos
Nos
It m
It m
Item

Item
Item

AU Civi l Work Such as Concreti ng and etc. Done by Main Contractor

**

Payment condition:

1. With the con(irmation and prior to the construction 30% of total value has to be pay.
2. Balance of pay ment has to be pay by interim valuation.
3.A bove pri ces are .:xcludi ng Vat. At the stage of billing the cliem hould pay,

necessw) Vat and other necessary ta'\.es

Vahdily of th is quotation is 30 days frum the date Ihis quotation..

If you need any furt her clari fication please contact under signed.
Ihanldng You,
Yours f'ni lhfully.

rf~

~;mu(~~

Managing Director)

(!

--~