You are on page 1of 1

ANALIZA NR

2.310
SUVATIM I BRENDSHEM
NR

PERSHKIMI I PUNIMEVE

NJESIA

SASIA

CMIMI

VLERA

PUNTORI

0.P

1,55
16,70%

180

279,0
46,6

Shuma1

325,6

1200
2800
10
Shuma2
25
Shuma3

6,0
84,0
66,0

II

MATERIALE
RERE
LLAC GELGERE
CIMENTO

M3
M3
MG

0,005
0,03
6,6

III

TRANSPORT

T/KM

0,38

IV

MAKINERI
Vinc

V
VI
VII
VIII
IX

O.P.

SHPENZIME TE DREJTPERDREJTA 1-4


SHPENZIME TE PERGJITHSHME
SHUMA
FITIMI
CMIMI

0,13

280
Shuma4

156
9,5

9,5
36,4

36,4
527,5
42,2
580,0
58,0
638

8%
10,00%

ANALIZA NR 5
GERMIM DHEU ME KRAH
1

PUNETORI
SPECIALIST + PUNTORE
SIGURACION

OP
%

7,8
41,9

140

SHPENZIME PLOTESUESE

SHUMA (5+6)

FITIMI

TOTALI

11

1092
457
1549
170,39
1719,39

10

171,939
1891,329