Proposed Fourth Lane Widening From


Shah Alam Interchange To Rawang
/lalan Duta Toll Plaza and Nilai To
Seremban
Hazard Identification, Risk Assessment and
Risk Control

SAFETY
MANAGEMENT SYSTEM
Page 1 of 2

HIRARC FORM NUMBER: FLW/GEN/10/2012/03


Company
Process/Location :

PROPEL-FLW
Installation of Gantry for
Package A,B,C D,E

Conducted by
Major (Rtd) Mohd Salahuddin
Yaakob

/; A

VI~ .

Approved by
Hassan Samian

MOHD SALA HUDDIN HJ YAAJ(lOB


SAFETY OFfiCER
PROPEL BHD

Date

:18 Sept 2012


1. Hazard Identification

No

Work
Activity

Hazard

1.

Site
Preparation

Review Date :
2. Risk Analysis

3. Risk Control

Which can
cause/effect

Existin g Risk
Control

Likely
hood

Severity

Risk

Vehicular

Vehicular

Safe work

Recommende
d Control
Measures
TMP stage 1 to

traffic

traffic rammed

practice from

(Mediu

be adhered .

onto.

traffic mgt

m)

plan. Site
preparation to

be carried out
during lane
closer on day
time.

2.

Mobilization

Slow

Traffic

To followMHA

of the

moving

conjunction.

heavy

machineries

machineries
permit able

4 (low)

To adhere with
existing rqmts.

PI

:Vat'&~

YRr;

i~Y~
PROPEL
BERHAD

Proposed Fourth Lane Widening From


Shah Alam Interchange To Rawang
/lalan Duta Toll Plaza and Nilai To
Seremban
Hazard Identification, Risk Assessment and
Risk Control

Work
Activity

Hazard

Page 2 of 2

2. Risk Analysis

1. Hazard Identification
No

SAFETY
MANAGEMENT SYSTEM

Which can
cause/effect

Existing Risk
Control

3. Risk Control

Likely
hood

Severity

Risk

Recommende
d Control
Measures

Emergency
lane and slow

period.

3.

Installation of
machineries on
site

To be

Vehicular

parked on

traffic rammed

parking area

(mediu

emergenc

onto

to be

m)

Machineries

y lane.

protected with

Danger

TMP.

Jane to be

closed.

towards
vehicular
traffic.

4.

To hoist support

-Vehicular

-Vehicular

Machineries

(mediu

m)

column using

Traffic

traffic rammed

parking area

mobile crane

-material

onto

lobe

and sky lift

dropped

protected with
TMP and
temporary Jive

lane closure.

5.

-Machineries

Hoisting main

Mecha

-Damage to

To follow

span

nical

properties

adequate

(mediu

inspection

hazard.

-material

method

m)

-Temporary

dropped

statement

live lane
closure

PIC

~~-

l?R@I!'W

;~
~':;:,:::

PROPEL
BERHAD

Proposed Fourth Lane Widening From


Shah Alam Interchange To Rawang
/lalan Duta Toll Plaza and Nilai To
Seremban
Hazard Identification, Risk Assessment and
Risk Control

Work
Activity

Page 3 of 2

2. Risk Analysis

1.Hazard Identification
No

SAFETY
MANAGEMENT SYSTEM

3. Risk Control

Hazard

Which can
cause/effect

Existing Risk
Control

Likely
hood

Severity

Risk

-Manual

-Muscular pain

- to minimize

handling.

-Traffic accident

manual

Recommended
Control

Measures
6.

Site clearing

-Truck I

handling.

transporter

- EL closer to

to be

adhere with

parked at

TMP.

EL

(low)

PI