Formwork of Elevated Beams & Elevated Slab

sqm

1526

6%

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

95.4

13-Apr-15

14

12-Apr-15

92%

11-Apr-15

10-Apr-15

Cum

9-Apr-15

Structural Concrete for Columns Upto Elevated Slab (GC35)

8-Apr-15

10

7-Apr-15

92%

6-Apr-15

31

5-Apr-15

sqm

4-Apr-15

Formwork for Columns Upto of Elevated Slab

3-Apr-15

2-Apr-15

89%

1-Apr-15

457

Column Rebars

31-Mar-15

kg

TARGET DATE

31-Mar-15

%
completed

30-Mar-15

Remaning

29-Mar-15

Unit

28-Mar-15

Items

27-Mar-15

S/N

26-Mar-15

UEB-1-Bldg.

880

880

880

880

880

880

880

6-Apr-15
15

Rebars for Elevated Beam&Slab

kg

11408

0%

8-Apr-15

16

Structural Concrete of Elevated Beams&Elevated Slab


Grade-C35

Cum

186

0%

880

880

880

880

880

880

UEB-2-Bldg.

4154.0

0.00

100

12

Formwork for Columns Upto of Elevated Slab

sqm

177.62

163.4

14.21

92

13

Structural Concrete for Columns Upto Elevated Slab


(G-C35)

Cum

20.93

18.2

2.72

87

14

Formwork of Elevated Beams and Elevated Slab

sqm

1623.94

406.0

1217.95

25

15

Rebars for elavated Beam and Slab

kg

11407.70

0.0

11407.70

16

Structural Concrete of Elevated Beams & Slab


Grade-C35

Cum

186.40

0.0

186.40

0.0

124.6

124.6

124.6

3.6

5.8

5.8

5.8

2.7

203.0

224.6

224.6

224.6

224.6

224.6

20-Mar-15

4154.00

Column Rebars

19-Mar-15

kg

11

TARGET DATE

18-Mar-15

% completed

17-Mar-15

Remaning

16-Mar-15

Quantity
Achieved

15-Mar-15

Qty. as / DRW

14-Mar-15

Unit

13-Mar-15

Items

12-Mar-15

s.no

DATE :- 12-MARCH -15

3490.35

0.00

100%

Formwork for Columns Upto of Elevated Slab

sqm

73.70

73.70

0.00

100%

10

Structural Concrete for Columns Upto


Elevated Slab (G-C35)

Cum

7.78

6.38

1.40

82%

14

Formwork of Elevated Beams &Slab

sqm

760.23

0.15

760.08

0%

15

Rebars for elavated Beam &Slab

kg

10122.28

0.00

10122.28

0%

16

Structural Concrete of Elevated Beams&Slab


Grade-C35

Cum

95.63

0.00

95.63

0%

17-Mar-15

18-Mar-15

19-Mar-15

6-Apr-15

22-Mar-15

3490.35

Column Rebars

21-Mar-15

kg

TARGET DATE

20-Mar-15

% completed

19-Mar-15

Remaning

18-Mar-15

Quantity Achieved

17-Mar-15

Qty. as/DRW

16-Mar-15

UM

15-Mar-15

Items

14-Mar-15

S/N

383.9

19.2

HRSG-Bldg.

S/N

Items

UM

Qty. as/DRW

Imported Soil Fill Well Graded Sub Base

Cum

Column Rebars upto Elavated slab

kg

8679

Formwork for Columns Upto of Elevated Slab

sqm

200

10

Structural Concrete for Columns Upto Elevated Slab

Cum

23

11

Formwork of Plinth Beam

sqm

127

12

Plinth Beam Rebars

kg

2159

13

Structural Concrete of Plinth Beams Grade-C35

Cum

17

14

Formwork of Elevated Beams and Elevated Slab

sqm

1525

15

Beam Rebars and Slab Rebars

kg

25913

16

Structural Concrete of Elevated Beams and Elevated Slab


Grade-C35

Cum

212

% completed

0.00

0.00

92

64.22

8614.58

74.00%

1.48

198.67

74.00%

0.20

23.13

86.00%

TARGET DATE

24-Mar-15

Remaning

23-Mar-15

Quantity Achieved

0.00

127.43

0.00%

0.00

2159.37

0.00%

0.00

16.60

0.00%

0.00

1524.65

0.02%

0.00

25912.92

0.00%

0.00

212.47

0.00%

7-Apr-15

6-Apr-15

5-Apr-15

4-Apr-15

3-Apr-15

2-Apr-15

1-Apr-15

31-Mar-15

30-Mar-15

29-Mar-15

28-Mar-15

27-Mar-15

26-Mar-15

25-Mar-15

15-Apr-15

14-Apr-15

13-Apr-15

12-Apr-15

11-Apr-15

10-Apr-15

9-Apr-15

8-Apr-15

Items

Units

Qty. as/DRW

Actual at Site

Excavation of Fnd.s

Cum

1013.96

1149.6416758

Imported Soil Fill Well Graded Sub Base

Cum

556.63

Polythene Sheet 1000 Gauge

sqm

171.63

P.C.C Concrete (C10)

Cum

16.13

ZA

Foundation Rebars

kg

38991.55

Formwork Of Foundations

sqm

299.54

Structural Concrete of Foundations Grade (C35)

Cum

574.68

S/N
A
AA

S/N

Items

UM

Qty. as/DRW

Excavation of Fnd.s

Cum

1013.96

AA

Imported Soil Fill Well Graded Sub Base

Cum

556.63

Polythene Sheet 1000 Gauge

sqm

171.63

P.C.C Concrete (C10)

Cum

16.13

ZA

Foundation Rebars

kg

38991.55

Formwork Of Foundations

sqm

299.54

Structural Concrete of Foundations Grade (C35)

Cum

574.68

Project: Rabab Harweel Power Plant & HRSG Project


Client: Petroleum Development Oman
Contract: C311530

HRSG-Fnd.01
S/N

Items

UM
Qty. as/DRW

Excavation of Fnd.s

Cum

Imported Soil Fill Well Graded Sub Base

Cum

Polythene Sheet 1000 Gauge

sqm

P.C.C Concrete (C10)

Cum

Foundation Rebars

Formwork Of Foundations

kg
sqm

907.95

17949.91

m
e
n
t

Project: Rabab Harweel Power Plant & HRSG Project


Client: Petroleum Development Oman
Contract: C311530

HRSG-Fnd.02
S/N

Items

UM
Qty. as/DRW

Excavation of Fnd.s

Cum

Imported Soil Fill Well Graded Sub Base

Cum

Polythene Sheet 1000 Gauge

sqm

P.C.C Concrete (C10)

Cum

Foundation Rebars

Formwork Of Foundations

sqm

Structural Concrete of Foundations Grade (C35)

Cum

kg

907.95

17949.91

R
e
p
o
r
t

(
C
###
1
0
,
C
2
###
0
,
C
3
5
)

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


DWG NO. RBB 80 102184 CG 2331 00007 0001 5L 03
A

* Excavation of Foundations

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

* Polythene Sheet 1000 Gauge

3.10
3.90
3.50
2.70
2.60
3.10

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

1.85
1.85
1.85
1.85
1.05
1.05

11
2
7
6
2
2
Total =

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

3.10
3.90
3.50
2.70
2.10
2.10

* P.C.C Concrete (C10)

11
2
7
6
2
2
Total =

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)

16 of 237

0.05
0.05
0.05
0.05
0.05
0.05

11
2
7
6
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


Total =
D

* Formwork Of Foundations

sqm

Formwork of Fnd.s (F1)


Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork' of Fnd.s (F4)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

8.00
11.20
9.60
6.40
5.00
6.00

17 of 237

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


E

* S. Concrete of Foundations Grade (C35)

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)

* Formwork of Plinth Beam At El. 99.8 FGL

* S. Concrete of Plinth Beams At 99.8 (TOC) Grade (C35)

6.20
5.60
5.85
6.20
5.60
5.85

0.30
0.30
0.30

6.20
5.60
5.85

0.30
0.30
0.30

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

* Formwork for Columns Upto El.102.00

0.50
0.50
0.50

1
1
1
2
2
2
Total =

Cum

PB1 - (300x500)
PB2 - (300x500)
PB3 - (300x500)

2.00
2.80
2.40
1.60
1.50
2.00

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)

2.00
2.80
2.40
1.60
1.00
1.00

0.50
0.50
0.50

1
1
1
Total =

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)

1.90
1.90

18 of 237

3.40
3.25

5
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

1.90
1.90
2.40
2.40
2.40
1.40
2.40
2.40
2.40
1.40
1.40
1.40
1.40
3.60
4.60

* S. Concrete for Columns Upto El. 102 (G-C35)

3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50
3.50
0.85
0.85

4
3
1
1
1
1
1
1
1
2
1
2
1
2
2
Total =

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.35
0.60
0.60

19 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35
0.60
0.60

3.40
3.25
3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15

5
1
4
3
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

* Formwork of Elevated Beams At El. 102.00 (TOC)


FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)

20 of 237

0.60
0.35
0.35
0.35
0.35
0.30
0.30

0.60
0.35
0.35
0.35
0.35
1.50
2.00

2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

3.15
3.50
3.50
3.50
3.50
0.85
0.85

1
2
1
2
1
2
2
Total =

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)

6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85

21 of 237

0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)

5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50

22 of 237

0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)

0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20

23 of 237

0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)
FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)

5.10
7.45
7.05
2.18
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85

24 of 237

0.30
0.30
0.30
0.30
0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60

1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)

5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70

25 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)

6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63

26 of 237

0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

27 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


K

* S. Concrete of Elevated Beams At El. 102 (TOC) Grade (C35)


FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)

Cum
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33

28 of 237

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)

5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88

29 of 237

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)

5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20

30 of 237

0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

* Formwork of Elevated Slab At El.102.000 (TOC)


Grid from A' to D / 1

31 of 237

6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

1.70

14.38

0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


Grid from A' to D / 1 to 2
Opening D to C / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Opening D to C / 2 to 3
Opening D to C / 2 to 3
Opening B to C / 2 to 3
Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6

5.15
0.90
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00
5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65

32 of 237

18.05
5.33
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00
0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23

1
2
2
2
1
1
1
2
2
2
2
1
1
2
2
2
2
1
1
2
2
2
2
1
1
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

* S. Concrete of Elevated Slab Grade (C35) At El. 102.000(TOC)


Grid from A' to D / 1
Grid from A' to D / 1 to 2
Deduction Opening D to C / 1 to 2
Beams remaining of this opening
Deduction 300 mm THK Slab B to C / 1 to 2
Deduction 300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening B to C / 2 to 3
Deduction Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Deduction Opening B to C / 4 to 5

33 of 237

3.98
4.12
1.70

2.29
0.57
19.55

1.70
5.15
0.90
0.30
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00

14.38
18.05
5.33
1.73
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00

2
1
1
Total =

Cum
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15

1
1
-1
-2
-1
-1
1
1
1
-1
-1
-1
-1
1
1
-1
-1
-1
-1
1
1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

* Formwork for Columns from 102.00 Upto 106.550

1.90
1.90
1.90
1.90
2.40
2.40
2.40
2.40
2.40
0.60
1.40

* Concrete for Columns Upto 106.55 Roof Slab (G-C35)

34 of 237

0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15

-1
-1
-1
1
1
-1
-1
-1
-1
1
1
Total =

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

Cum

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

* Formwork of Elevated Beams At El. 106.550 (TOC)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)

35 of 237

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.60
0.60
0.60
0.35

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)

6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35

36 of 237

0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)
RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)

4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85

37 of 237

0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)

6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35

38 of 237

0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

* S. Concrete of Elevated Beams At El. 106.550 (TOC) Grade (C35)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

Cum
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68

39 of 237

0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30

0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)

5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73

40 of 237

0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35

0.70
0.70
0.70
0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

* Formwork of Elevated Slab At El.106.550 (TOC)

* S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)

41 of 237

0.35
0.35
0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35

5.48
5.70
6.20
5.60
6.43

14.15
15.78
18.35
18.35
18.35

0.70
0.70
0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

Cum

1
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

5.48
5.70
6.20
5.60
6.43

* Formwork of Elevated Petestal above Roof

0.15
0.15
0.15
0.15
0.15

1
1
1
1
1
Total =

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30
0.00

4
4
14
1
1
8
4
1
1
Total =

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30

4
4
14
1
1
8
4
1

sqm

Pedestal-600x600 for Shed


P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700
P8-Hold

14.15
15.78
18.35
18.35
18.35

2.40
2.00
1.60
0.00
8.00
1.60
3.45
3.80
0.00

* S. Concrete of Elevated Pedestal above Roof Slab (C35)


Pedestal-600x600 for Shed
P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700

Cum
0.60
0.50
0.40
0.00
2.00
0.40
1.35
1.20

42 of 237

0.60
0.50
0.40
0.00
2.00
0.40
0.38
0.70

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 1)


P8-Hold

0.00

* Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

32.00
20.65
3.85

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


Long Way (both side)
Short Way (both side)
Short Wall grid 2'&3' (both side)

1
Total =

1.30
1.30
1.30

4
4
2
Total =

1.30
1.30
1.30

2
2
1
Total =

Cum
32.00
20.65
3.85

43 of 237

0.00

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 3 / D to (both side)

0.00

0.13
0.13
0.13

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

195.56
56.28
158.64
80.92
11.47
13.67
516.53

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

48.51
16.82
43.75
17.34
3.52
4.62
134.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.43
0.84
2.19
0.87
0.18
0.23

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

44 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

6.73

0.00

0.00

0.00

0.00%

52.80
19.04
50.40
19.20
3.50
4.20
149.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

45 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

26.40
13.33
30.24
7.68
1.05
1.40
80.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.86
1.68
1.76
6.20
5.60
5.85
22.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.93
0.84
0.88
2.65

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

32.30
6.18

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

46 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

25.84
18.53
8.16
7.80
7.80
4.76
7.80
7.56
7.56
9.80
4.90
9.80
4.90
6.12
7.82
177.62

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.57
0.68
2.86
2.05
1.22
1.17
1.17
0.42
1.17
1.13

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

47 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.13
0.86
0.43
0.86
0.43
0.77
1.02
20.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.62
1.70
1.77
0.70
1.80
2.00
2.21
2.05
2.09
0.60
0.60
0.38
1.90
1.76
1.79
0.60
1.80
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

48 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.17
1.96
2.05
0.51
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.55
0.65
1.80
2.00
2.21
2.05

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.09
0.60
1.90
1.76
1.79
2.00
1.90
0.56
1.55
1.76
1.79
2.17
1.96
2.05
0.44
0.90
2.18
1.38
0.86
2.40
2.26
0.56
1.99
0.76
1.35
2.06
0.76
1.35

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.32
0.63
2.35
2.28
0.56
1.99
2.09
1.86
1.99
1.86
1.99
1.86
1.99
1.58
2.35
2.32
1.10
1.18
1.66
2.46
2.32
1.66
2.46
2.32
1.68
2.46
2.32
0.36

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

51 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.53
2.24
2.12
0.65
2.49
5.65
5.90
2.33
7.21
7.98
8.86
8.19
8.37
2.40
2.40
1.50
7.59
7.02
7.17
2.38
7.21
7.98
8.68
7.84
8.19
2.03
7.59
7.02

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

52 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
6.18
2.59
7.21
7.98
8.86
8.19
8.37
2.38
7.59
7.02
7.17
7.98

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

53 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

7.59
2.25
6.21
7.05
7.17
8.68
7.84
8.19
1.74
3.00
7.28
4.60
3.45
9.59
9.03
2.25
7.95
2.53
4.50
8.25
2.53
4.50
1.26
2.52
9.42
9.14
2.25
7.95

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

54 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

8.37
7.44
7.95
7.44
7.95
7.44
7.95
6.30
9.42
9.28
4.38
4.71
6.65
9.84
9.28
6.65
9.84
9.28
6.72
9.84
9.28
1.44
5.10
7.45
7.05
2.18
865.01

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

55 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.37
0.85
0.89
0.35
1.26
1.40
1.55
1.43
1.46
0.36
0.36
0.23
1.14
1.05
1.08
0.42
1.26
1.40
1.52
1.37
1.43
0.36
1.14
1.05
1.08
1.14

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

56 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
0.93
0.45
1.26
1.40
1.55
1.43
1.46
0.42
1.14
1.05
1.08
1.40
1.14
0.34

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

57 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.93
1.06
1.08
1.52
1.37
1.43
0.26
0.45
1.09
0.69
0.52
1.68
1.58
0.34
1.19
0.38
0.68
1.24
0.38
0.68
0.22
0.44
1.65
1.60
0.34
1.19
1.26
1.12

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

58 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.19
1.12
1.19
1.12
1.19
1.10
1.65
1.62
0.66
0.71
1.16
1.72
1.62
1.16
1.72
1.62
1.18
1.72
1.62
0.22
0.77
1.12
1.06
0.33
111.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

24.44

0.00

0.00

0.00

0.00%

59 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

92.96
9.59
16.53
8.43
5.30
2.70
99.32
9.85
7.34
10.26
3.90
0.88
124.76
3.64
4.80
11.91
1.08
4.28
91.55
10.00
6.44
13.56
26.73
1.71
93.51
3.60
4.65
11.48

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

60 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

18.17
2.33
33.24
758.93

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

3.67
13.94
-0.72
-0.16
-1.24
-0.63
1.59
0.81
14.90
-0.74
-0.55
-0.77
-0.29
0.26
18.71
-0.27
-0.36
-0.89
-0.08
1.29
13.73
-0.75

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

61 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-0.48
-1.02
-2.01
0.51
14.03
-0.27
-0.35
-0.86
-1.36
0.70
4.99
75.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

43.23
8.65
34.58
25.94
10.92
10.92
10.92
10.92
10.92
2.73
12.74
182.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

62 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.78
0.96
3.82
2.87
1.64
1.64
1.64
1.64
1.64
1.64
1.11
23.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.67
1.99
2.18
4.11
3.83
4.01
1.70
1.87
2.06
1.91
2.00
1.99
2.18
2.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

63 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

3.19
3.34
0.70
1.87
2.06
1.91
1.95
1.99
2.06
2.40
2.23
2.34
2.18
2.06
1.91
1.95
2.40
3.10
3.25
2.67
2.53
0.86
2.67
2.53
1.65
2.67
2.53
1.31

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

64 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.31
7.29
4.23
7.71
4.34
0.89
0.74
1.12
1.12
1.11
1.11
0.98
7.10
2.53
2.67
7.95
8.72
9.59
8.93
9.35
6.81
7.47
8.22
7.65
8.01
7.95
8.72
9.59

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

65 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

11.48
12.02
2.79
7.47
8.22
7.65
7.80
7.95
8.23
9.59
8.93
9.35
6.23
8.22
7.65
7.80
9.59
11.16
11.70
10.68
10.12
3.43
10.68
10.12
6.62
10.68
10.12
5.22

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

66 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.35
24.30
9.87
25.70
10.12
3.54
2.94
4.47
4.47
4.44
4.44
3.90
23.65
10.12
626.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.40
1.39
1.53
2.88
2.68
2.80
1.02
1.12
1.23
1.15
1.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

67 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.39
1.53
1.68
2.87
3.00
0.42
1.12
1.23
1.15
1.17
1.39
1.44
1.68
1.56
1.64
1.09
1.23
1.15
1.17
1.68
2.79
2.93
1.87
1.77
0.60
1.87
1.77
1.16

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

68 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.87
1.77
0.78
0.65
7.29
2.96
7.71
3.03
0.53
0.44
0.67
0.67
0.67
0.67
0.59
7.10
1.77
100.89

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

77.47
89.92
113.77
102.76
117.90
501.82

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
#REF!

0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

69 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

11.62
13.49
17.07
15.41
17.68
75.27

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

12.48
10.40
29.12
0.00
10.40
16.64
17.94
4.94
0.00
101.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

1.87
1.30
2.91
0.00
5.20
1.66
2.63
1.09

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

70 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

0.00
16.67

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

166.40
107.38
10.01
283.79

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

10.40
6.71
0.63
17.74

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

71 of 237

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


DWG NO. RBB 80 102184 CG 2331 00007 0001 5L 03
A

* Excavation of Foundations

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

* Polythene Sheet 1000 Gauge

3.10
3.90
3.50
2.70
2.60
3.10

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

1.85
1.85
1.85
1.85
1.05
1.05

11
2
7
6
2
2
Total =

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

3.10
3.90
3.50
2.70
2.10
2.10

* P.C.C Concrete (C10)

11
2
7
6
2
2
Total =

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)

72 of 237

0.05
0.05
0.05
0.05
0.05
0.05

11
2
7
6
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


Total =
D

* Formwork Of Foundations

sqm

Formwork of Fnd.s (F1)


Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork' of Fnd.s (F4)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

8.00
11.20
9.60
6.40
5.00
6.00

73 of 237

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


E

* S. Concrete of Foundations Grade (C35)

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)

* Formwork of Plinth Beam At El. 99.8 FGL

* S. Concrete of Plinth Beams At 99.8 (TOC) Grade (C35)

6.20
5.60
5.85
6.20
5.60
5.85

0.30
0.30
0.30

6.20
5.60
5.85

0.30
0.30
0.30

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

* Formwork for Columns Upto El.102.00

0.50
0.50
0.50

1
1
1
2
2
2
Total =

Cum

PB1 - (300x500)
PB2 - (300x500)
PB3 - (300x500)

2.00
2.80
2.40
1.60
1.50
2.00

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)

2.00
2.80
2.40
1.60
1.00
1.00

0.50
0.50
0.50

1
1
1
Total =

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)

1.90
1.90

74 of 237

3.40
3.25

5
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

1.90
1.90
2.40
2.40
2.40
1.40
2.40
2.40
2.40
1.40
1.40
1.40
1.40
3.60
4.60

* S. Concrete for Columns Upto El. 102 (G-C35)

3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50
3.50
0.85
0.85

4
3
1
1
1
1
1
1
1
2
1
2
1
2
2
Total =

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.35
0.60
0.60

75 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35
0.60
0.60

3.40
3.25
3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15

5
1
4
3
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

* Formwork of Elevated Beams At El. 102.00 (TOC)


FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)

76 of 237

0.60
0.35
0.35
0.35
0.35
0.30
0.30

0.60
0.35
0.35
0.35
0.35
1.50
2.00

2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

3.15
3.50
3.50
3.50
3.50
0.85
0.85

1
2
1
2
1
2
2
Total =

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)

6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85

77 of 237

0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)

5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50

78 of 237

0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)

0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20

79 of 237

0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)
FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)

5.10
7.45
7.05
2.18
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85

80 of 237

0.30
0.30
0.30
0.30
0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60

1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)

5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70

81 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)

6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63

82 of 237

0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

83 of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


K

* S. Concrete of Elevated Beams At El. 102 (TOC) Grade (C35)


FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)

Cum
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33

84 of 237

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)

5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88

85 of 237

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)

5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20

86 of 237

0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

* Formwork of Elevated Slab At El.102.000 (TOC)


Grid from A' to D / 1

87 of 237

6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

1.70

14.38

0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


Grid from A' to D / 1 to 2
Opening D to C / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Opening D to C / 2 to 3
Opening D to C / 2 to 3
Opening B to C / 2 to 3
Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6

5.15
0.90
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00
5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65

88 of 237

18.05
5.33
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00
0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23

1
2
2
2
1
1
1
2
2
2
2
1
1
2
2
2
2
1
1
2
2
2
2
1
1
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

* S. Concrete of Elevated Slab Grade (C35) At El. 102.000(TOC)


Grid from A' to D / 1
Grid from A' to D / 1 to 2
Deduction Opening D to C / 1 to 2
Beams remaining of this opening
Deduction 300 mm THK Slab B to C / 1 to 2
Deduction 300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening B to C / 2 to 3
Deduction Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Deduction Opening B to C / 4 to 5

89 of 237

3.98
4.12
1.70

2.29
0.57
19.55

1.70
5.15
0.90
0.30
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00

14.38
18.05
5.33
1.73
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00

2
1
1
Total =

Cum
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15

1
1
-1
-2
-1
-1
1
1
1
-1
-1
-1
-1
1
1
-1
-1
-1
-1
1
1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

* Formwork for Columns from 102.00 Upto 106.550

1.90
1.90
1.90
1.90
2.40
2.40
2.40
2.40
2.40
0.60
1.40

* Concrete for Columns Upto 106.55 Roof Slab (G-C35)

90 of 237

0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15

-1
-1
-1
1
1
-1
-1
-1
-1
1
1
Total =

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

Cum

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

* Formwork of Elevated Beams At El. 106.550 (TOC)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)

91 of 237

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.60
0.60
0.60
0.35

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)

6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35

92 of 237

0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)
RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)

4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85

93 of 237

0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)

6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35

94 of 237

0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

* S. Concrete of Elevated Beams At El. 106.550 (TOC) Grade (C35)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

Cum
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68

95 of 237

0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30

0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)

5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73

96 of 237

0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35

0.70
0.70
0.70
0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

* Formwork of Elevated Slab At El.106.550 (TOC)

* S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)

97 of 237

0.35
0.35
0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35

5.48
5.70
6.20
5.60
6.43

14.15
15.78
18.35
18.35
18.35

0.70
0.70
0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

Cum

1
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

5.48
5.70
6.20
5.60
6.43

* Formwork of Elevated Petestal above Roof

0.15
0.15
0.15
0.15
0.15

1
1
1
1
1
Total =

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30
0.00

4
4
14
1
1
8
4
1
1
Total =

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30

4
4
14
1
1
8
4
1

sqm

Pedestal-600x600 for Shed


P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700
P8-Hold

14.15
15.78
18.35
18.35
18.35

2.40
2.00
1.60
0.00
8.00
1.60
3.45
3.80
0.00

* S. Concrete of Elevated Pedestal above Roof Slab (C35)


Pedestal-600x600 for Shed
P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700

Cum
0.60
0.50
0.40
0.00
2.00
0.40
1.35
1.20

98 of 237

0.60
0.50
0.40
0.00
2.00
0.40
0.38
0.70

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

Unit Electrical Building (Unit -2)


P8-Hold

0.00

* Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

32.00
20.65
3.85

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


Long Way (both side)
Short Way (both side)
Short Wall grid 2'&3' (both side)

1
Total =

1.30
1.30
1.30

4
4
2
Total =

1.30
1.30
1.30

2
2
1
Total =

Cum
32.00
20.65
3.85

99 of 237

0.00

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 3 / D to (both side)

0.00

0.13
0.13
0.13

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

195.56
56.28
158.64
80.92
11.47
13.67
516.53

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

48.51
16.82
43.75
17.34
3.52
4.62
134.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.43
0.84
2.19
0.87
0.18
0.23

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

6.73

0.00

0.00

0.00

0.00%

52.80
19.04
50.40
19.20
3.50
4.20
149.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

101 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

26.40
13.33
30.24
7.68
1.05
1.40
80.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.86
1.68
1.76
6.20
5.60
5.85
22.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.93
0.84
0.88
2.65

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

32.30
6.18

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

102 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

25.84
18.53
8.16
7.80
7.80
4.76
7.80
7.56
7.56
9.80
4.90
9.80
4.90
6.12
7.82
177.62

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.57
0.68
2.86
2.05
1.22
1.17
1.17
0.42
1.17
1.13

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

103 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.13
0.86
0.43
0.86
0.43
0.77
1.02
20.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.62
1.70
1.77
0.70
1.80
2.00
2.21
2.05
2.09
0.60
0.60
0.38
1.90
1.76
1.79
0.60
1.80
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

104 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.17
1.96
2.05
0.51
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.55
0.65
1.80
2.00
2.21
2.05

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

105 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.09
0.60
1.90
1.76
1.79
2.00
1.90
0.56
1.55
1.76
1.79
2.17
1.96
2.05
0.44
0.90
2.18
1.38
0.86
2.40
2.26
0.56
1.99
0.76
1.35
2.06
0.76
1.35

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

106 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.32
0.63
2.35
2.28
0.56
1.99
2.09
1.86
1.99
1.86
1.99
1.86
1.99
1.58
2.35
2.32
1.10
1.18
1.66
2.46
2.32
1.66
2.46
2.32
1.68
2.46
2.32
0.36

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

107 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.53
2.24
2.12
0.65
2.49
5.65
5.90
2.33
7.21
7.98
8.86
8.19
8.37
2.40
2.40
1.50
7.59
7.02
7.17
2.38
7.21
7.98
8.68
7.84
8.19
2.03
7.59
7.02

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

108 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
6.18
2.59
7.21
7.98
8.86
8.19
8.37
2.38
7.59
7.02
7.17
7.98

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

109 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

7.59
2.25
6.21
7.05
7.17
8.68
7.84
8.19
1.74
3.00
7.28
4.60
3.45
9.59
9.03
2.25
7.95
2.53
4.50
8.25
2.53
4.50
1.26
2.52
9.42
9.14
2.25
7.95

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

110 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

8.37
7.44
7.95
7.44
7.95
7.44
7.95
6.30
9.42
9.28
4.38
4.71
6.65
9.84
9.28
6.65
9.84
9.28
6.72
9.84
9.28
1.44
5.10
7.45
7.05
2.18
865.01

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

111 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.37
0.85
0.89
0.35
1.26
1.40
1.55
1.43
1.46
0.36
0.36
0.23
1.14
1.05
1.08
0.42
1.26
1.40
1.52
1.37
1.43
0.36
1.14
1.05
1.08
1.14

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

112 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
0.93
0.45
1.26
1.40
1.55
1.43
1.46
0.42
1.14
1.05
1.08
1.40
1.14
0.34

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

113 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.93
1.06
1.08
1.52
1.37
1.43
0.26
0.45
1.09
0.69
0.52
1.68
1.58
0.34
1.19
0.38
0.68
1.24
0.38
0.68
0.22
0.44
1.65
1.60
0.34
1.19
1.26
1.12

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

114 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.19
1.12
1.19
1.12
1.19
1.10
1.65
1.62
0.66
0.71
1.16
1.72
1.62
1.16
1.72
1.62
1.18
1.72
1.62
0.22
0.77
1.12
1.06
0.33
111.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

24.44

0.00

0.00

0.00

0.00%

115 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

92.96
9.59
16.53
8.43
5.30
2.70
99.32
9.85
7.34
10.26
3.90
0.88
124.76
3.64
4.80
11.91
1.08
4.28
91.55
10.00
6.44
13.56
26.73
1.71
93.51
3.60
4.65
11.48

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

116 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

18.17
2.33
33.24
758.93

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

3.67
13.94
-0.72
-0.16
-1.24
-0.63
1.59
0.81
14.90
-0.74
-0.55
-0.77
-0.29
0.26
18.71
-0.27
-0.36
-0.89
-0.08
1.29
13.73
-0.75

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

117 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-0.48
-1.02
-2.01
0.51
14.03
-0.27
-0.35
-0.86
-1.36
0.70
4.99
75.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

43.23
8.65
34.58
25.94
10.92
10.92
10.92
10.92
10.92
2.73
12.74
182.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

118 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.78
0.96
3.82
2.87
1.64
1.64
1.64
1.64
1.64
1.64
1.11
23.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.67
1.99
2.18
4.11
3.83
4.01
1.70
1.87
2.06
1.91
2.00
1.99
2.18
2.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

119 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

3.19
3.34
0.70
1.87
2.06
1.91
1.95
1.99
2.06
2.40
2.23
2.34
2.18
2.06
1.91
1.95
2.40
3.10
3.25
2.67
2.53
0.86
2.67
2.53
1.65
2.67
2.53
1.31

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

120 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.31
7.29
4.23
7.71
4.34
0.89
0.74
1.12
1.12
1.11
1.11
0.98
7.10
2.53
2.67
7.95
8.72
9.59
8.93
9.35
6.81
7.47
8.22
7.65
8.01
7.95
8.72
9.59

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

121 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

11.48
12.02
2.79
7.47
8.22
7.65
7.80
7.95
8.23
9.59
8.93
9.35
6.23
8.22
7.65
7.80
9.59
11.16
11.70
10.68
10.12
3.43
10.68
10.12
6.62
10.68
10.12
5.22

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

122 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.35
24.30
9.87
25.70
10.12
3.54
2.94
4.47
4.47
4.44
4.44
3.90
23.65
10.12
626.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.40
1.39
1.53
2.88
2.68
2.80
1.02
1.12
1.23
1.15
1.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

123 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.39
1.53
1.68
2.87
3.00
0.42
1.12
1.23
1.15
1.17
1.39
1.44
1.68
1.56
1.64
1.09
1.23
1.15
1.17
1.68
2.79
2.93
1.87
1.77
0.60
1.87
1.77
1.16

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

124 of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.87
1.77
0.78
0.65
7.29
2.96
7.71
3.03
0.53
0.44
0.67
0.67
0.67
0.67
0.59
7.10
1.77
100.89

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

77.47
89.92
113.77
102.76
117.90
501.82

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
#REF!

0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

125 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

11.62
13.49
17.07
15.41
17.68
75.27

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

12.48
10.40
29.12
0.00
10.40
16.64
17.94
4.94
0.00
101.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

1.87
1.30
2.91
0.00
5.20
1.66
2.63
1.09

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

126 of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

0.00
16.67

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

166.40
107.38
10.01
283.79

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

10.40
6.71
0.63
17.74

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

127 of 237

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


DWG NO. RBB 80 102184 CG 2331 00009 0001 5L 03
A

* Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

* Polythene Sheet 1000 Gauge

* P.C.C Concrete (C10)

2.00
2.35
1.70
2.18
1.10

2.00
2.35
1.70
1.10
2.45

2.00
2.35
1.70
2.18
1.10

2.00
2.35
1.70
1.10
2.45

1.55
1.55
1.55
1.05
1.05

8
6
2
2
1
Total =

8
6
2
2
1
Total =

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)

3.00
3.35
2.70
2.10
3.45

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

3.00
3.35
2.70
3.18
2.10

* Formwork Of Fnd.s

sqm

128 Of 237

0.05
0.05
0.05
0.05
0.05

8
6
2
2
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


Formwork of Fnd.s (F1)
Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

7.60
9.00
6.40
6.15
6.70

* Structure Concrete Grade (C35)

* Formwork of Plinth Beam At El. 99.4 FGL

1.90
2.25
1.60
2.08
1.00

1.90
2.25
1.60
1.00
2.35

0.55
0.65
0.40
0.30
0.30

8
6
2
2
1
Total =

7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73

0.30
0.30
0.30
0.30

7.73

0.30

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)
PB3-Side - (300x500)

8
6
2
2
1
Total =

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)

0.55
0.65
0.40
0.30
0.30

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


PB1 - (300x500)

129 Of 237

0.50
0.50
0.50
0.50

1
1
1
1
2
2
2
2
Total =

Cum
0.50

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


PB2 - (300x500)
PB3 - (300x500)
PB4 - (300x500)

7.15
7.15
7.73

* Formwork for Columns Upto 101.6

1.70
1.40
1.70
1.40
4.75
5.30

* S. Concrete for Columns Upto 101.6 Grade (C35)

1
1
1
Total =

2.30
3.00
1.70
2.55
0.85
0.85

4
5
6
2
2
1
Total =

2.30
3.00
1.70
2.55
0.85
0.85

4
5
6
2
2
1
Total =

Cum

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

0.50
0.50
0.50

sqm

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

0.30
0.30
0.30

* Formwork of Elevated Beams At El. 101.600 (TOC)


FB1 - (350x600)
FB2 - (350x600)
FB3 - (350x700)
FB4 - (350x700)

130 Of 237

0.35
0.35
0.35
0.35
0.30
0.30

0.50
0.35
0.50
0.50
2.08
2.35

3.83
4.70
7.73
7.15

0.35
0.35
0.35
0.35

sqm
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB5 - (350x700)
FB6 - (350x700)
FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)

7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73

131 Of 237

0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB33 - (350x700)
FB34 - (350x700)
FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)
FB1 - (350x600)
FB2 - (350x600)
FB3 - (350x700)
FB4 - (350x700)
FB5 - (350x700)
FB6 - (350x700)

1.78
7.73
7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13
1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67
3.83
4.70
7.73
7.15
7.15
7.73

132 Of 237

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.60
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (350x700)
FB34 - (350x700)

7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73

133 Of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)

7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13
1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67

* S. Concrete of Elevated Beams At El. 101.600 (TOC) Grade (C35)


FB1 - (350x600)
FB2 - (350x600)
FB3 - (350x700)
FB4 - (350x700)
FB5 - (350x700)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

Cum
3.83
4.70
7.73
7.15
7.15

134 Of 237

0.70
0.70
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.60

0.35
0.35
0.35
0.35
0.35

0.60
0.70
0.70
0.70
0.70

1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB6 - (350x700)
FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (350x700)

7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78

135 Of 237

0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35

0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


FB34 - (350x700)
FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)

* Formwork of Elevated Slab At El.101.600 (TOC)


Grid from A to C / 1
Grid from A to C / 1 to 2
Around opening A to C / 1 to 2
Around opening A to C / 1 to 2

136 Of 237

7.73
7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13
1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67

0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

4.97
6.70
7.52
11.65

1.78
7.73
0.15
0.15

0.70
0.70
0.70
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


Around opening A to C / 1 to 2
Grid from A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Grid from A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Grid from A to C / 4 to 5
Around opening A to C / 4 to 5
Around opening A to C / 4 to 5
Around opening A to C / 4 to 5
Grid from A to B / 5 to
Grid from 2 to 3' / C to

* S. Concrete of Elevated Slab Grade (C35) At El. 101.60(TOC)


Grid from A to C / 1
Grid from A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Grid from A to C / 2 to 3

137 Of 237

14.58
6.70
3.78
6.42
14.69
11.66
6.70
6.42
3.83
11.66
14.69
6.70
6.12
11.66
14.54
4.97
8.58

0.15
7.15
0.15
0.15
0.15
0.15
7.15
0.15
0.15
0.15
0.15
7.73
0.15
0.15
0.15
1.75
2.00

4.97
6.70
3.06
5.43
1.76
2.93
0.98
6.70

1.78
7.73
0.90
0.40
1.05
0.48
1.05
7.15

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

Cum
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1
1
-1
-1
-1
-1
-1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


Deduction opening A to C / 2 to 3(Part-1)
Deduction opening A to C / 2 to 3(Part-2)
Deduction opening A to C / 2 to 3
Deduction opening A to C / 2 to 3
Deduction opening A to C / 2 to 3(Part-1)
Deduction opening A to C / 2 to 3(Part-2)
Deduction opening A to C / 2 to 3(Part-3)
Grid from A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4(Part-1)
Deduction opening A to C / 3 to 4(Part-2)
Deduction opening A to C / 3 to 4(Part-3)
Grid from A to C / 4 to 5
Deduction opening A to C / 4 to 5(Part-1)
Deduction opening A to C / 4 to 5(Part-2)
Deduction opening A to C / 4 to 5
Deduction opening A to C / 4 to 5(Part-1)
Deduction opening A to C / 4 to 5(Part-2)
Deduction opening A to C / 4 to 5(Part-3)
Grid from A to B / 5 to
Grid from 2 to 3' / C to

0.59
0.80
2.74
5.43
1.83
0.96
2.93
6.70
2.74
1.56
5.43
1.76
1.21
2.93
6.70
1.46
0.80
5.43
1.76
0.96
2.93
4.97
8.58

* Formwork of Columns from 101.6 to 105.950

0.90
0.70
0.48
0.40
1.05
1.05
0.48
7.15
0.48
0.70
0.40
1.05
1.05
0.48
7.73
0.70
0.90
0.40
1.05
1.05
0.48
1.75
2.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

-1
-1
-1
-1
-1
-1
-1
1
-1
-1
-1
-1
-1
-1
1
-1
-1
-1
-1
-1
-1
1
1
Total =

sqm

C1-F1 - (350x500)
C2-F2 - (350x500)

1.70
1.70

138 Of 237

4.35
4.35

4
6

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


C4-F3 - (350x350)

1.40

* S. Concrete for Columns Upto 105.950 (G-C35)

* Formwork of Elevated Beams At El. 105.950 (TOC)


RB1 - (350x600) bottom of beam
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)

139 Of 237

2
Total =

6.65
6.05
6.90

4
6
2
Total =

Cum

C1-F1 - (350x500)
C2-F2 - (350x500)
C4-F3 - (350x350)

4.35

0.35
0.35
0.35

0.50
0.50
0.50

4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)
RB1 - (350x600) both side of beam
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)

8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55

140 Of 237

0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.60
0.85
0.85
0.85
0.85
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.85
0.85
0.85
0.85
0.85

1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

* S. Concrete of Elevated Beams At El. 105.950 (TOC) Grade (C35)


RB1 - (350x600)
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)

2
2
2
2
2
2
2
2
2
2
Total =

Cum
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15

141 Of 237

0.85
0.85
0.85
0.60
0.85
0.60
0.85
0.85
0.85
0.85

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35

0.60
0.85
0.85
0.85
0.85
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.85
0.85

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

* Formwork of Elevated Slab At El.106.550 (TOC)


Grid from A to C / 1 to 5
Grid from 2' to 3' / C to
RB1 - (350x600) Deduction bottom of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)

142 Of 237

7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

32.15
6.05
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40

9.90
2.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

0.85
0.85
0.85
0.85
0.85
0.85
0.60
0.85
0.60
0.85
0.85
0.85
0.85

1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm
1
1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

* S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)


Grid from A to C / 1 to 5
Grid from 2' to 3' / C to
RB1 - (350x600) Deduction volume of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)

143 Of 237

3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

32.15
6.05
4.70
7.73
7.15
7.15
7.73

9.90
2.35
0.35
0.35
0.35
0.35
0.35

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Total =

Cum
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1
1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

* Formwork of Elevated Petestal above Roof

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Total =

sqm
Total =

144 Of 237

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

GTP Control Building


U

* S. Concrete of Elevated Pedestal above Roof Slab (C35)

Cum
Total =

* Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

32.15
9.90
2.35

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


Long Way (both side)
Short Way (both side)
Short Wall grid 2'&3' (both side)

4
4
4
Total =

1.30
1.30
1.30

2
2
2
Total =

Cum
32.15
9.90
2.35

145 Of 237

1.30
1.30
1.30

0.13
0.13
0.13

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

111.60
104.37
22.60
14.00
7.61
260.18

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

32.00
33.14
5.78
4.79
2.70
78.40

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.60
1.66
0.29
0.24
0.13
3.92

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

146 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

33.44
35.10
5.12
3.69
2.01
79.36

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

15.88
19.74
2.05
1.25
0.71
39.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.32
2.15
2.15
2.32
7.73
7.15
7.15
7.73
38.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.16

0.00

0.00

0.00

0.00%

147 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.07
1.07
1.16
4.46

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

15.64
21.00
17.34
7.14
8.08
4.51
73.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.61
1.84
1.78
0.89
1.06
0.60
7.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.34
1.65
2.70
2.50

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

148 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.50
2.70
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32
0.62
2.70
2.50
2.50
2.70
0.62
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

149 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.62
2.70
2.50
2.50
2.70
0.62
1.70
1.74
1.10
1.74
1.10
0.41
0.62
0.73
1.74
1.10
0.73
1.74
1.10
1.74
1.10
1.70
4.59
6.58
10.82
10.01
10.01
10.82

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

150 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

9.27
8.58
8.58
9.27
9.27
8.58
8.58
9.27
2.49
10.82
10.01
10.01
10.82
2.49
9.27
8.58
8.58
9.27
9.27
8.58
8.58
9.27
9.27
8.58
8.58
9.27
2.49
10.82

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

151 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

10.01
10.01
10.82
2.49
6.80
6.96
4.38
6.96
4.38
1.63
2.49
2.49
6.96
4.38
2.49
6.96
4.38
6.96
4.38
6.80
505.35

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.80
1.15
1.89
1.75
1.75

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

152 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.89
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39
0.43
1.89
1.75
1.75
1.89
0.43
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39
0.43

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

153 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.89
1.75
1.75
1.89
0.43
1.02
1.22
0.77
1.22
0.77
0.28
0.37
0.44
1.22
0.77
0.44
1.22
0.77
1.22
0.77
1.02
65.83

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

8.82
51.76
1.13
1.75

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

154 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

2.19
47.91
0.57
0.96
2.20
1.75
47.91
0.96
0.57
1.75
2.20
51.76
0.92
1.75
2.18
8.70
17.15
254.88

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.32
7.76
-0.41
-0.33
-0.28
-0.21
-0.15
7.19

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

155 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-0.08
-0.08
-0.20
-0.33
-0.29
-0.15
-0.21
7.19
-0.20
-0.16
-0.33
-0.28
-0.19
-0.21
7.76
-0.15
-0.11
-0.33
-0.28
-0.15
-0.21
1.30
2.57
29.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

29.58
44.37

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

156 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

12.18
86.13

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

4.66
6.35
2.42
13.42

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

1.65
2.70
2.50
2.50
2.70
1.11
1.11
1.02
1.02
1.02
1.02
1.11
1.11
2.70
2.50
2.50
2.70
2.99

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

157 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
5.64
13.13
12.16
12.16
13.13
4.43
4.43
4.08
4.08
4.08
4.08
4.43
4.43
13.13
12.16
12.16
13.13
14.54

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

158 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

14.54
14.54
14.54
10.26
14.54
10.26
14.54
14.54
14.54
14.54
356.04

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.99
2.30
2.13
2.13
2.30
0.66
0.66
0.61
0.61
0.61
0.61
0.66
0.66
2.30
2.13

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

159 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

2.13
2.30
2.54
2.54
2.54
2.54
1.80
2.54
1.80
2.54
2.54
2.54
2.54
50.27

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

318.29
14.22
-1.65
-2.70
-2.50
-2.50
-2.70
-1.11
-1.11
-1.02
-1.02
-1.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

160 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-1.02
-1.11
-1.11
-2.70
-2.50
-2.50
-2.70
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
268.61

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

47.74
2.13
-0.25
-0.41
-0.38
-0.38
-0.41

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

161 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-0.17
-0.17
-0.15
-0.15
-0.15
-0.15
-0.17
-0.17
-0.41
-0.38
-0.38
-0.41
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
40.29

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

#REF!

#REF!

0.00%

162 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

0.00

#REF!

#REF!

#REF!

0.00%

167.18
51.48
12.22
230.88

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

10.45
3.22
0.76
14.43

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

163 Of 237

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building

* Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F2A)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F3A)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (F5)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (LF)

2.85
3.15
3.15
3.45
3.45
3.50
2.65
2.10
1.40

* Polythene Sheet 1000 Gauge

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F2A)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F3A)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (F5)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (LF)

RBB 81 102184 CG 2331 00006 0001 5L 04

Cum

164 Of 237

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.05
0.25

11
8
2
4
1
1
6
3
2
Total =

RBB 81 102184 CG 2331 00006 0001 5L 04


1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.10
0.40

* P.C.C Concrete (C10)

2.85
3.15
3.15
3.45
3.45
3.50
2.65
2.90
2.00

1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.90
1.00

RBB 81 102184 CG 2331 00006 0001 5L 04

11
8
2
4
1
1
6
3
2
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


Blinding of Fnd.s (F1)
Blinding of Fnd.s (F2)
Blinding of Fnd.s (F2A)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F3A)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (F5)
Blinding of Fnd.s (SF1)
blinding of Fnd.s (LF)

1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.10
0.40

* Formwork Of Fnd.s

sqm

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F2A)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F3A)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (F5)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (LF)

1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.90
1.00

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F2A)
Concrete of Fnd.s (F3)

0.55
0.65
0.65
0.75
0.75
0.85
0.55
0.30
0.45

11
8
2
4
1
1
6
3
2
Total =

RBB 81 102184 CG 2331 00006 0001 5L 04


1.75
2.05
2.05
2.35

165 Of 237

11
8
2
4
1
1
6
3
2
Total =

RBB 81 102184 CG 2331 00006 0001 5L 04


7.00
8.20
8.20
9.40
9.40
9.60
6.20
5.60
2.40

* Structure Concrete Grade (C35)

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

1.75
2.05
2.05
2.35

0.55
0.65
0.65
0.75

11
8
2
4

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


Concrete of Fnd.s (F3A)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (F5)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (LF)

2.35
2.40
1.55
1.00
0.30

* Formwork of Plinth Beam At El. 100.3 FFL

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)
PB4-Side - (300x500)
PB5-Side - (300x500)

0.75
0.85
0.55
0.30
0.45

1
1
6
3
2
Total =

RBB 81 102184 CG 2331 00006 0001 5L 04


6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04
6.40
5.18
5.12
5.15
4.70

166 Of 237

2.35
2.40
1.55
1.80
0.90

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.50
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


PB6-Side - (300x500)
PB7-Side - (300x500)
PB8-Side - (350x500)
PB9-Side - (350x500)
PB10-Side - (350x500)
PB11-Side - (300x500)
PB12-Side - (350x500)
PB13-Side - (350x500)
PB14-Side - (350x500)
PB15-Side - (350x500)

6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)

Cum

2
2
2
2
2
2
2
2
2
2
Total =

RBB 81 102184 CG 2331 00006 0001 5L 04


6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

167 Of 237

0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


Total =
H

* Formwork for Columns Upto El.102.2

sqm

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)
C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)
C2-F5 -(350x500)
C3-F5 -(600x600)

1.70
1.70
1.70
1.90
1.90
1.90
1.90
1.90
1.90
1.90
2.20
2.20
2.20
2.20
1.40
1.70
1.70

* S. Concrete for Columns Upto 102.2 (G-C35)

3.35
3.35
3.35
3.15
3.15
3.35
3.25
3.25
3.25
3.25
3.25
3.25
3.05
3.15
3.35
3.35
3.35

1
3
7
3
1
2
1
1
1
3
1
1
1
1
4
1
2
Total =

Cum

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)

0.35
0.35
0.35
0.45
0.45

168 Of 237

0.50
0.50
0.50
0.50
0.50

3.35
3.35
3.35
3.15
3.15

1
3
7
3
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)
C2-F5 -(350x500)
C3-F5 -(600x600)

* Formwork of Elevated Beams At El. 102.200 (TOC)


FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)
FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)

169 Of 237

0.45
0.45
0.45
0.45
0.45
0.60
0.60
0.60
0.60
0.35
0.35
0.35

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.60

6.85
5.18
5.12
5.15
4.68
6.05
6.13
5.28
5.22
1.50
6.45
5.20
1.50

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30

3.35
3.25
3.25
3.25
3.25
3.25
3.25
3.05
3.15
3.35
3.35
3.35

2
1
1
1
3
1
1
1
1
4
1
2
Total =

sqm
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)
FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)
FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)

2.88
6.45
5.28
5.22
5.13
4.68
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.20
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.20
5.22
4.68

170 Of 237

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)
FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)
FB67 - (350x950)
FB68 - (300x500)
FB69 - (300x500)

6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.13
4.68
1.50
6.45

171 Of 237

0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)
FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)
FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)

5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.56
6.54

172 Of 237

0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)
FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)
FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)
FB114 - (300x500)
FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)
FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)

7.15
1.65
4.56
6.54
7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93
3.30
3.85
1.93
7.15
2.60
6.10
6.85
5.18
5.12
5.15
4.68
6.05
6.13
5.28
5.22
1.50

173 Of 237

0.30
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.35
0.30
0.35
0.35
0.30
0.30
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.60
0.60
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)
FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)
FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)

6.45
5.20
1.50
2.88
6.45
5.28
5.22
5.13
4.68
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.20
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28

174 Of 237

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)
FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)
FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)

5.20
5.22
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.13

175 Of 237

0.60
0.60
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB67 - (350x950)
FB68 - (300x500)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)
FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)

4.68
1.50
6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.59
6.82
7.43

176 Of 237

0.95
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.00
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)
FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)
FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)
FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)
FB114 - (300x500)

1.65
4.56
6.54
7.15
1.65
4.56
6.54
7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93
3.30
3.85
1.93
7.15
2.60
6.10

* S. Concrete of Elevated Beams At El. 102.200 (TOC) Grade (C35)


FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

Cum
6.85
5.18
5.12
5.15

177 Of 237

0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.75
0.50
0.60
0.00
0.60
0.95
0.95
0.40
0.40
0.40
0.95
0.95
0.50
0.50

0.35
0.35
0.35
0.35

0.75
0.75
0.75
0.75

1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)
FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)
FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)

4.68
6.05
6.13
5.28
5.22
1.50
6.45
5.20
1.50
2.88
6.45
5.28
5.22
5.13
4.68
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.20
4.68
6.05
6.13
1.50

178 Of 237

0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.75
0.95
0.95
0.60
0.60
0.50
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.95
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)
FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)

6.45
5.28
5.22
5.20
6.45
5.28
5.20
5.22
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22

179 Of 237

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)
FB67 - (350x950)
FB68 - (300x500)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)

5.20
1.50
6.45
5.28
5.22
5.13
4.68
1.50
6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59

180 Of 237

0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.00
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)
FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)
FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)
FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)
FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)
FB114 - (300x500)

6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.56
6.54
7.15
1.65
4.56
6.54
7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93
3.30
3.85
1.93
7.15
2.60
6.10

181 Of 237

0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.35
0.30
0.35
0.35
0.30
0.30

0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.75
0.50
0.60
0.00
0.60
0.95
0.95
0.40
0.40
0.40
0.95
0.95
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


L

* Formwork of Elevated Slab At El.102.200 (TOC)

sqm

Grid from A to D / 1 to 5
Grid from B' to D / 5' to 8
Grid from B' to A / 5' to 6
Grid from B' to A / 5 Stair small portion
Grid from A to C' / 1 Out side portion
Grid from D to B' / 8 Out side portion
Dedution Total Beams Area=180.87 M2
Dedution Total Opening Area
No.1 between 1,2/C,B
No.2 between 1,2/C,D
No.3 between 2,3/C,B
No.4 between 2,3/C,D
No.5 between 3,4/C,D
No.6 between 3,4/C,D
No.7 between 3,4/C,B
No.8 between 3,4/C,B
No.9 between 4,5/C,D
No.10 between 4,5/C,D
No.11 between 4,5/B,C
No.11 between 4,5/B,C

* S. Concrete of Elevated Slab Grade (C35) At El. 102.20(TOC)


El. Slab Grade C35 Total Area = 555.25 M2

21.75
10.35
9.60
1.80
18.08
8.70
180.87

23.85
18.23
5.35
2.20
1.83
1.83
1.00

4.90
3.03
5.28
5.28
5.22
3.65
2.40
3.77
2.23
0.83
2.88
3.65

0.85
2.42
0.85
2.42
2.42
0.81
0.66
0.67
2.42
0.66
0.51
0.67

-3
-1
-3
-1
-1
-1
-1
-1
-1
-1
-1
-1
Total =

Cum
555.25

182 Of 237

1
1
1
1
1
1
-1

0.15

1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


N

* Formwork for Columns Upto El.105.950

sqm

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

1.70
1.40
1.70
1.40
4.75
5.30

* S. Concrete for Columns Upto 105.950 (G-C35)

* Formwork of Elevated Beams At El. 105.950 (TOC)


RB1 - (350x600) bottom of beam
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)

183 Of 237

4
5
6
2
2
1
Total =

6.65
3.00
6.05
6.90
0.85
0.85

4
5
6
2
2
1
Total =

Cum

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

6.65
3.00
6.05
6.90
0.85
0.85

0.35
0.35
0.35
0.35
0.30
0.30

0.50
0.35
0.50
0.50
2.08
2.35

4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30

sqm
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)
RB1 - (350x600) both side of beam
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)

3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40

184 Of 237

0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.60
0.85
0.85
0.85
0.85
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

* S. Concrete of Elevated Beams At El. 105.950 (TOC) Grade (C35)


RB1 - (350x600)
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

Cum
4.70
7.73
7.15
7.15
7.73

185 Of 237

0.60
0.60
0.60
0.60
0.60
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.60
0.85
0.60
0.85
0.85
0.85
0.85

0.35
0.35
0.35
0.35
0.35

0.60
0.85
0.85
0.85
0.85

1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

* Formwork of Elevated Slab At El.106.550 (TOC)


Grid from A to C / 1 to 5
Grid from 2' to 3' / C to

186 Of 237

3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

32.15
6.05

9.90
2.35

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.60
0.85
0.60
0.85
0.85
0.85
0.85

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

sqm
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


RB1 - (350x600) Deduction bottom of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

187 Of 237

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


Total =
S

* S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)


Grid from A to C / 1 to 5
Grid from 2' to 3' / C to
RB1 - (350x600) Deduction volume of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)

Cum
32.15
6.05
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55

188 Of 237

9.90
2.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1
1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG Control Building


RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

8.55
8.55
8.55
8.55
8.55

* Formwork of Elevated Petestal above Roof

0.35
0.35
0.35
0.35
0.35

0.15
0.15
0.15
0.15
0.15

-1
-1
-1
-1
-1
Total =

sqm
Total =

* S. Concrete of Elevated Pedestal above Roof Slab (C35)

Cum
Total =

* Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

32.15
9.90
2.35

* S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)


Long Way (both side)
Short Way (both side)
Short Wall grid 2'&3' (both side)

4
4
4
Total =

1.30
1.30
1.30

2
2
2
Total =

Cum
32.15
9.90
2.35

189 Of 237

1.30
1.30
1.30

0.13
0.13
0.13

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

138.49
123.04
30.76
73.80
18.45
18.99
65.31
19.18
1.40
489.41

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

37.65
36.98
9.25
24.01
6.00
6.25
16.34
6.27
0.80
143.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

190 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.88
1.85
0.46
1.20
0.30
0.31
0.82
0.31
0.04
7.18

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

42.35
42.64
10.66
28.20
7.05
8.16
20.46
5.04
2.16
166.72

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

18.53
21.85
5.46
16.57

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

191 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.14
4.90
7.93
1.62
0.24
81.24

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.92
1.55
1.54
1.55
1.41
1.82
1.84
2.12
2.14
2.12
2.14
1.60
2.29
1.60
1.41
6.40
5.18
5.12
5.15
4.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

192 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

6.05
6.13
8.47
8.58
8.47
8.58
6.38
9.16
6.38
5.66
127.43

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.96
0.78
0.77
0.77
0.71
0.91
0.92
1.48
1.50
1.48
1.50
1.12
1.60
1.12
0.99

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

193 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

16.60

0.00

0.00

0.00

0.00%

5.70
17.09
39.87
17.96
5.99
12.73
6.18
6.18
6.18
18.53
7.15
7.15
6.71
6.93
18.76
5.70
11.39
200.15

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.59
1.76
4.10
2.13
0.71

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

194 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

1.51
0.73
0.73
0.73
2.19
0.98
0.98
0.92
0.95
2.35
0.59
1.41
23.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.40
1.81
1.79
1.80
1.64
2.12
1.84
1.58
1.57
0.45
1.94
1.56
0.45

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

195 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.86
1.94
1.58
1.57
1.54
1.40
1.94
1.58
1.57
1.56
0.53
2.26
1.85
1.83
1.82
1.64
2.12
2.14
0.53
1.94
1.58
1.57
1.56
1.94
1.58
1.56
1.57
1.64

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

196 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.12
2.14
0.53
1.94
1.58
1.57
1.56
1.94
1.58
1.57
1.56
0.53
2.22
1.81
1.79
1.80
1.94
1.58
1.57
1.56
0.53
2.26
1.85
1.83
1.79
1.64
0.45
1.94

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

197 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.58
1.83
1.82
0.55
0.57
1.52
2.11
1.18
0.22
0.60
1.60
2.29
2.50
0.60
1.60
2.39
2.60
0.58
1.60
2.04
2.60
0.58
1.60
2.39
2.60
0.58
1.37
1.96

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

198 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

2.15
0.50
1.37
1.96
2.50
0.53
1.11
0.99
1.60
2.29
2.50
0.58
1.16
1.16
0.67
2.50
0.78
1.83
10.28
7.77
7.68
7.73
7.01
11.50
11.64
6.34
6.26
1.50

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

199 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

7.74
6.24
1.80
3.45
7.74
6.34
6.26
6.15
7.01
7.74
6.34
6.26
6.24
2.25
9.68
7.92
7.83
7.80
8.88
11.50
11.64
2.25
7.74
6.34
6.26
6.24
7.74
6.34

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

200 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

6.24
6.26
8.88
11.50
11.64
2.25
7.74
6.34
6.26
6.24
7.74
6.34
6.26
6.24
2.25
9.53
7.77
7.68
7.73
7.74
6.34
6.26
6.24
2.25
9.68
7.92
7.83
7.69

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

201 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

8.88
1.50
6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
0.00
6.84
11.77
12.87
2.59
6.84
12.27
13.37
2.48
6.88
12.27
13.37
2.48
6.88
12.27
13.37

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

202 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

2.48
6.84
9.81
10.73
2.48
8.66
12.43
10.73
1.78
4.44
0.00
5.47
12.43
13.59
1.54
2.64
3.08
3.66
13.59
2.60
6.10
969.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.80
1.36
1.34
1.35

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

203 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.23
2.01
1.75
0.95
0.94
0.23
1.16
0.94
0.27
0.52
1.16
0.95
0.94
0.92
1.05
1.16
0.95
0.94
0.94
0.39
1.69
1.39
1.37
1.37
1.55
2.01
2.04
0.39

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

204 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.16
0.95
0.94
0.94
1.16
0.95
0.94
0.94
1.55
2.01
2.04
0.39
1.16
0.95
0.94
0.94
1.16
0.95
0.94
0.94
0.39
1.67
1.36
1.34
1.35
1.16
0.95
0.94

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

205 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

0.94
0.39
1.69
1.39
1.37
1.35
1.55
0.23
0.97
0.79
0.91
0.91
0.28
0.29
0.76
1.06
0.59
0.11
0.00
1.20
2.06
2.25
0.45
1.20
2.15
2.34
0.43
1.20

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

206 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.84
2.34
0.43
1.20
2.15
2.34
0.43
1.03
1.47
1.61
0.37
1.30
1.86
1.88
0.27
0.67
0.00
0.96
2.17
2.38
0.23
0.46
0.46
0.64
2.38
0.39
0.92
129.18

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

207 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

518.74
188.63
51.36
3.96
33.00
15.88
-180.87

Prev. Month

This Month

Cum. To Date

Progress
%

-12.42
-7.32
-13.38
-12.78
-12.63
-2.95
-1.58
-2.53
-5.38
-0.54
-1.47
-2.45
555.25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

83.29
83.29

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

208 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

45.22
21.00
61.71
19.32
8.08
4.51
159.83

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4.66
1.84
6.35
2.42
1.06
0.60
16.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.65
2.70
2.50
2.50
2.70
1.11
1.11
1.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

209 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

1.02
1.02
1.02
1.11
1.11
2.70
2.50
2.50
2.70
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
5.64
13.13
12.16
12.16
13.13
4.43
4.43
4.08

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

210 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

4.08
4.08
4.08
4.43
4.43
13.13
12.16
12.16
13.13
14.54
14.54
14.54
14.54
10.26
14.54
10.26
14.54
14.54
14.54
14.54
356.04

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.99
2.30
2.13
2.13
2.30

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

211 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

0.66
0.66
0.61
0.61
0.61
0.61
0.66
0.66
2.30
2.13
2.13
2.30
2.54
2.54
2.54
2.54
1.80
2.54
1.80
2.54
2.54
2.54
2.54
50.27

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

318.29
14.22

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

212 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

-1.65
-2.70
-2.50
-2.50
-2.70
-1.11
-1.11
-1.02
-1.02
-1.02
-1.02
-1.11
-1.11
-2.70
-2.50
-2.50
-2.70
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

213 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

268.61

0.00

0.00

0.00

0.00%

47.74
2.13
-0.25
-0.41
-0.38
-0.38
-0.41
-0.17
-0.17
-0.15
-0.15
-0.15
-0.15
-0.17
-0.17
-0.41
-0.38
-0.38
-0.41
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

214 Of 237

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

-0.45
-0.45
-0.45
-0.45
-0.45
40.29

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

#REF!

#REF!

0.00%

0.00

#REF!

#REF!

#REF!

0.00%

167.18
51.48
12.22
230.88

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

10.45
3.22
0.76
14.43

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

215 Of 237

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-1 Foundation

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GAS TURBINE GENERATOR - GTG-1


DWG NO. RBB 80 102184 CG 2331 00015 0001 5L 04
A

* Excavation Of Fnd.

Cum

Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.

AA

* Imported Soil Fill Well Graded Sub Base

* Polythene Sheet 100 Gauge

* P.C.C Concrete (C10)


Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10

4.45
4.45
4.45
4.45

1
1
1
1
Total =

9.49
16.55
2.04
1.64
69.19

4.30
6.60
1.99
0.83
1.00

1.60
1.60
1.60
1.60
4.45

1
1
1
1
1
Total =

9.69
13.32
3.63
1.84
2.24

4.50
7.15
7.15
1.13
2.11

9.49
13.12
3.43
1.64
2.04

4.30
6.95
6.95
0.93
1.91

sqm

Polythene Sheet Sheet 100 Gauge


Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge

5.80
8.10
2.99
2.33

Cum

Well Graded Sub Base Soil


Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil

10.99
18.05
3.54
3.14

1
1
1
1
1
Total =

Cum
0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-1 Foundation

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GAS TURBINE GENERATOR - GTG-1


D

* Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.

sqm
4.30
10.09
13.87
15.32
18.85
23.20

4.19
4.19
3.40
3.40
3.00
1.77

1
2
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-1 Foundation

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Height

NR

NP

GAS TURBINE GENERATOR - GTG-1


E

* Structure Concrete Grade C35


Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35/El.102.220(TOC)
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35

Cum
6.24
0.80
2.45
13.12
2.56
3.43
2.04
1.64

4.30
3.70
4.30
6.95
2.49
6.60
1.91
0.93

4.19
4.19
4.19
3.40
1.77
3.00
3.00
3.00

1
1
1
1
1
1
1
1
Total =

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

283.63
650.71
47.07
32.55
1,013.96

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

65.29
174.80
6.49
2.18
307.88
556.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

43.60
95.26
25.95
2.08
4.74
171.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4.08
9.12
2.38
0.15
0.39
16.13

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

18.03
84.63
47.16
52.09
56.56
41.06
299.54

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

112.57
12.41
44.14
310.10
11.26
67.90
11.72
4.58
574.68

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-2 Foundation

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GAS TURBINE GENERATOR - GTG-2


DWG NO. RBB 80 102184 CG 2331 00015 0001 5L 04
A

* Excavation Of Fnd.

Cum

Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.

AA

* Imported Soil Fill Well Graded Sub Base

* Polythene Sheet 100 Gauge

* P.C.C Concrete (C10)


Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10

4.45
4.45
4.45
4.45

1
1
1
1
Total =

9.49
16.55
2.04
1.64
69.19

4.30
6.60
1.99
0.83
1.00

1.60
1.60
1.60
1.60
4.45

1
1
1
1
1
Total =

9.69
13.32
3.63
1.84
2.24

4.50
7.15
7.15
1.13
2.11

9.49
13.12
3.43
1.64
2.04

4.30
6.95
6.95
0.93
1.91

sqm

Polythene Sheet Sheet 100 Gauge


Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge

5.80
8.10
2.99
2.33

Cum

Well Graded Sub Base Soil


Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil

10.99
18.05
3.54
3.14

1
1
1
1
1
Total =

Cum
0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-2 Foundation

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

GAS TURBINE GENERATOR - GTG-2


D

* Formwork Of Fnd.

sqm

Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
E

* Structure Concrete Grade C35


Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35/El.102.220(TOC)
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35

4.30
10.09
13.87
15.32
18.85
23.20

4.19
4.19
3.40
3.40
3.00
1.77

1
2
1
1
1
1
Total =

4.19
4.19
4.19
3.40
1.77
3.00
3.00
3.00

1
1
1
1
1
1
1
1
Total =

Cum
6.24
0.80
2.45
13.12
2.56
3.43
2.04
1.64

4.30
3.70
4.30
6.95
2.49
6.60
1.91
0.93

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

283.63
650.71
47.07
32.55
1,013.96

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

65.29
174.80
6.49
2.18
307.88
556.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

43.60
95.26
25.95
2.08
4.74
171.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4.08
9.12
2.38
0.15
0.39
16.13

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

Prev. Month

This Month

Cum. To Date

Progress
%

18.03
84.63
47.16
52.09
56.56
41.06
299.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

112.57
12.41
44.14
310.10
11.26
67.90
11.72
4.58
574.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG-Foundation 1

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Height

NR

NP

HRSG - Foundation 1
DWG NO. RBB 81 102184 CG 2331 00016 0002 5L 03
A

* Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (F4A)
Excavation of Fnd.s (F5)
Excavation of Fnd.s (F6)
Excavation of Fnd.s (F7)
Excavation of Fnd.s (F8)
Excavation of Fnd.s (F9)
Excavation of Fnd.s (F10)
Excavation of Fnd.s (F11)
Excavation of Fnd.s (F12)
Excavation of Fnd.s (F13)
Excavation of Fnd.s (F14)
Excavation of Fnd.s (F14A)
Excavation of Fnd.s (F15)
Excavation of Fnd.s (LF1)
Excavation of Fnd.s (SF1)

18.10
10.60
11.10
2.50
2.50
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.10
0.40

226 Of 237

9.10
3.10
7.60
2.50
2.50
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.90
1.00

2.05
2.05
2.05
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.05
0.25

1
1
1
1
1
6
6
6
6
6
6
6
6
6
6
6
6
3
2
Total =

LANT & HRSG PROJECT (CONTRACT NO.C311530)

Petroleum Development Oman (PDO)

Executed Quantities
Qty. as per IFC

337.66
67.36
172.94
9.69
9.69
25.32
25.32
25.32
25.32
25.32
25.32
25.32
25.32
25.32
25.32
25.32
25.32
6.58
0.20
907.95

Prev. Month

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

This Month

Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

227 Of 237

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Remarks

RECONCILIATION REPORT FOR GTG 1 & GTG 2 (LIST OF GOODS


RABAB HARWEEL POWER PLANT PROJECT(E1348)
S/N

UOM

1
2
3
4
5
6
7
8
9
10
11

UPN 10.24x3.54 (260x90)


Length/Lg=359.34 (9127.21)
UPN 10.24x3.54 (260x90)
Length/Lg=120.72 (3066.41)
Angle/Corniere 1.97x1.97x0.2(50x50x5) Length/Lg=154.44 (3922.7)
Angle/Corniere 1.97x1.97x0.2(50x50x5) Length/Lg=140.16 (3560)
Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.94 (100)
Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=9.84 (250)
Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.54 (90)
Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.54 (90)
Plate/Plat 6.69x6.69(170x170) Thickness/Ep.=0.39(10)
Plate/Plat 4.72x2.36(120x60) Thickness/Ep.=0.39(10)
Plate/Plat 3.15x3.15(80x70) Thickness/Ep.=0.35(9)
Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.08(2)
Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.04(1)
Expan. Balt/Cheville expan. HILTI FBR Mo.47-3.94 (12-100)
Screw/vis H - Mo.47x1.57 (12x40)
Nut/Ecrau H - Mo.47(12) 8.8 - A2L
Angle/Corniere 2.36x2.36x0.34 (60x60x6) Length/Lg=7.48(190)
Tapering Pin/ Goupille 0.47(12)
Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=118.95(3021.3)

S235
S235
S235
S235
S235
S235
S235
S235
S235
S235
S235
S235
S235

12
13
14
15
16
17

Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece

ISO 4017
ISO 4032
S235 JR/EN 10025
S235 JR/EN 10025
S235 JR/EN 10025

N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

18

Piece

S235 JR/EN 10025

N 91-036194

19
20
21
22
23
24
25
26
27
28
29
30
31
32

Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece

Folder Sheet / Tole Pliee 7.24x4.72 (184x120) Th/Ep=0.32(8) or / ou Angle bar/Corniere


6.89x2.95x0.35 (175x75x9) Lg=4.72(120)
Plate/Plat 7.68x3.94(195x100) Thickness/Ep.=0.39(10)
Plate/Plat 3.94x3.94(100x100) Thickness/Ep.=0.2(5)
Plate/Plat 4.72x3.94(120x100) Thickness/Ep.=0.2(5)
Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=145.75(3702)
UAP 7.87x2.95(200x75) Length Lg=120.87(3070)
UAP 7.87x2.95(200x75) Length Lg=120.87(3070)
UAP 7.87x2.95(200x75) Length Lg=67.17(1706)
UAP 7.87x2.95(200x75) Length Lg=67.17(1706)
Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=104.33(2650)
Screw/vis H - Mo.47x1.57 (12x40)
Nut/Ecrau H - Mo.47(12) 8.8 - A2L
Steel Plate/Tole acier 6.3x0.39(160x10)/Length Lg=6.3(160)
Steel Plate/Tole acier 6.3x0.39(160x10)/Length Lg=6.3(160)
Steel Plate/Tole acier 6.41x0.39(163x10)/Length Lg=10.55(268)

S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
ISO 4017
ISO 4032
S235 JR/EN
S235 JR/EN
S235 JR/EN

N
N
N
N
N
N
N
N
N
N
N
N
N
N

11A

Designation

Standard
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN

10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025

10025
10025
10025
10025
10025
10025
10025
10025
10025

10025
10025
10025

Drawing #
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194
91-036194

91-036194
91-036194
91-036194
91-036194
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71

Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece

Tapering Pin/ Goupille 0.47(12)


HEB 5.51(140) /Length Lg=79.53(2020)
Steel Plate/Tole acier 7.83x0.39(200x10)/Length Lg=7.87(200)
Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=101.38(2575)
Steel Plate/Tole acier 1.97x0.39(50x10)/Length Lg=1.97(50)
Steel Plate/Tole acier 5.51x0.39(140x10)/Length Lg=17.72(450)
Expan. Balt/Cheville expan. HILTI HSL Mo.47-1.97 (12-50)
Steel Plate/Tole acier 9.450x0.39(240x10)/Length Lg=9.45(240)
Screw/vis H - Mo.47x1.57 (12x40)
Nut/Ecrau H - Mo.47(12) 8.8 - A2L
Angle bar/Corniere 5.91x3.54x0.39 (150x90x10) Length/Lg=12.36(314)
Steel Plate/Tole acier 12.2x0.39(310x10)/Length Lg=12.36(314)
Steel Plate/Tole acier 2.76x0.2(70x5)/Length Lg=2.76(70)
Steel Plate/Tole acier 2.76x0.2(70x5)/Length Lg=4.13(105)
Steel Plate/Tole acier 8.19x0.39(208x10)/Length Lg=12.2(310)
Screw/vis H - Mo.79x4.72 (20x120)
Nut/Ecrau H - Mo.79(20) 8.8 - 2L
UPN 8.66x3.15 (220x80) Length/Lg=176.97(4495)
UPN 8.66x3.15 (220x80) Length/Lg=115.04(2922)
Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=155.87(3959)
UPN 8.66x3.15 (220x80) Length/Lg=115.04(2922)
Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=77.6(1971)
Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=3.35(85)
Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=158.39(4023)
Steel Plate/ 6.69x6.69(170x170)/Thickness Ep=0.39(10)
Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=5.71(145)
Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=6.3(160)
Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=5.91(150)
Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.35(9)
Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.08(2)
Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.04(1)
Plate/Plat 4.72x2.36(120x60) Thickness/Ep.=0.39(10)
Plate/Plat 10.24x3.94(260x100) Thickness/Ep.=0.39(10)
Screw/vis H - Mo.47x1.57 (12x40)
Nut/Ecrau H - Mo.47(12) 8.8 - A2L
Tapering Pin/ Goupille 0.47(12)
Expan. Bolt/cheville expansible HILTI FBR Mo.47x3.94(12-100)
Plate/Plat 10.63x5.91(270x150) Thickness/Ep.=0.39(10)
Screw/vis H - Mo.47x1.97 (12x50)

S235
S235
S235
S235
S235
S235

JR/EN
JR/EN
JR/EN
JR/EN
JR/EN
JR/EN

10025
10025
10025
10025
10025
10025

S235 JR/EN
ISO 4017
ISO 4032
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
ISO 4017
ISO 4032
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
S235 JR/EN
ISO 4017
ISO 4032

10025

10025
10025
10025
10025
10025

10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025
10025

S235 JR/EN 10025


ISO 4017

N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
131E7982
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185
91-027185

72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece

Plate/Plat 2.76x2.76(70x70) Thickness/Ep.=0.2(5)


Plate/Plat 3.94x2.76(100x70) Thickness/Ep.=0.2(5)
G1
Plate/Plat
G2
Plate/Plat
G3
Plate/Plat
G4
Plate/Plat
G5
Plate/Plat
G6
Plate/Plat
G7
Plate/Plat
G8
Plate/Plat
G9
Plate/Plat
G10
Plate/Plat
G11
Plate/Plat
G12
Plate/Plat
G13
Exp.Peg/Cheville Hilti FBR (M12x100)
G14
Tracking Plate / Plat DE Tracage
G15
Tracking Plate / Plat DE Tracage
G16
Tracking Plate / Plat DE Tracage
G17
Tracking Plate / Plat DE Tracage
G18
Jacking Screw / Vis De Reglage
G19
Washer / Rondelle
G20
Strip Locking / Frein Decrou
G21
Setting Plate / Tole De Montage
G22
Foundation Bolt/Boulon DE Foundation
G23
Foundation Bolt/Boulon DE Foundation
G24
Nut / Ecrou H-M2.05 (52) -8-A2L
LG30
Plate/Plat
LG31
Plate/Plat
LG32
Washer / Rondelle
LG33
Jacking Screw / Vis De Reglage
LG34
Strip Locking / Frein Decrou
LG35
Setting Plate / Tole De Montage
LG36
Tracking Plate / Plat DE Tracage
LG37
Tracking Plate / Plat DE Tracage
LG38
Tracking Plate / Plat DE Tracage
LG39
Tracking Plate / Plat DE Tracage
LG40
Tracking Plate / Plat DE Tracage
LG41
Tracking Plate / Plat DE Tracage
T50
Plate/Plat

S235 JR/EN 10025


S235 JR/EN 10025
145B9035-F
145B9035-A
145B9035-B
145B9035-C
145B9035-D
145B9035-E
145B9035-F1
145B9035-A1
145B9035-B1
145B9035-C1
145B9035-D1
145B9035-E1
145B9035-PII
145B9035-PII
145B9035-PII
145B9035-PII
145B9035-P6
145B9035-P7
145B9035-P9
145B9035-P8
145B9035-P12
145B9035-P10
ISO 4032
91-318802-P1
91-318802-P2
91-318802-P4
91-318802-P3
91-318802-P6
91-318802-P5
91-318802-P7
91-318802-P7
91-318802-P7
91-318802-P7
91-318802-P7
91-318802-P7
91-318755-P3

N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

91-027185
91-027185
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880

111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece
Piece

T51
T52
T53
T54
T55
T56
T57
T59
T60
T61
T62
T63
T64
T65
T66
T67
T68
T69
T70
G
G1
H
H1
T9
T10
T11
T12
T13
T14
LG1
LG2
LG3
LG4
LG5
LG6
LG7
LG8
LG9
LG10

Plate/Plat
Plate/Plat
Plate/Plat
Plate/Plat
Plate/Plat
Plate/Plat
Plate/Plat
Washer / Rondelle
Foundation Bolt/Boulon DE Foundation
Jacking Screw / Vis De Reglage
Setting Plate / Tole De Montage
Strip Locking / Frein Decrou
Exp.Peg/ Hilti FBR.47x3.94 (M12x100)
Plate/Plat 1.77x7.87x1.18(45x200x30)
Tracking Plate / Plat DE Tracage
Tracking Plate / Plat DE Tracage
Tracking Plate / Plat DE Tracage
Tracking Plate / Plat DE Tracage
Tracking Plate / Plat DE Tracage
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
Sheet 3 of 3
Sheet 3 of 3
Sheet 3 of 3
Sheet 3 of 3
Sheet 5 of 5
Sheet 5 of 5
Sheet 5 of 5
Sheet 5 of 5
Sheet 5 of 5
Sheet 5 of 5
Sheet 3 of 4
Sheet 3 of 4
Sheet 3 of 4
Sheet 2 of 4

91-318755-P3
91-318755-P3
91-318755-P1
91-318755-P3
91-318755-P3
91-318755-P2
91-318755-P3
91-318755-P5
91-318755-P8
91-318755-P5
91-318755-P6
91-318755-P7

91-318755-P9
91-318755-P9
91-318755-P9
91-318755-P9
91-318755-P9
N 91-208588
N 91-208588
N 91-208588
N 91-208588
N 91-205723
N 91-205723
N 91-205723
N 91-205723
N 91-205723
N 91-205723
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167
N 247C3167

N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880
218D2880

150
151

Piece
Piece

LG11
LG12

Sheet 2 of 4
Sheet 2 of 4

N 247C3167
N 247C3167

152

Piece

LG13

Sheet 2 of 4

N 247C3167

OR GTG 1 & GTG 2 (LIST OF GOODS)


WER PLANT PROJECT(E1348)
Weight(Kg)/ Net Total
Unit
Wt.(Kg)

Qty.As
DRW

Qty./GE/
Received

No.s

Net Total
Qty.

2
2
1
2
3
3
2
2
4
12
12
20
20
12
22

2
2
1
2
3
3

2
2
2
2
2
2

4
4
2
4
6
6

700.000
232.800
14.800
26.800
3.900
11.100

1.300

22
4
36
3

4
12
12
20
20
12
22
22
4
36
3

2
2
2
2
2
2
2
2
2
2
2

8
24
24
40
40
24
44
44
8
72
6

8.000
6.000
4.800
2.000
2.200
0.120
0.220
0.220
4.000
0.360
34.200

18

18

36

1.600

22
18
22
1
1
1
1
1
1
35
35
2
2
4

22
18
22
1

2
2
2
2

44
36
44
2

24.200
5.400
8.800
14.000

1064.8
194.4
387.2
28

67.500

270

37.500

150

1
35
35

2
2
2

2
70
70

10.000
0.100
0.100

20
7
7

3.400

27.2

3.500

28

2800
931.2
29.6
107.2
23.4
66.6
10.4
64
144
115.2
80
88
2.88
9.68
9.68
32
25.92
205.2
57.6

15
4
4
4
2
4
10
4
30
30
6
3
12
12
3
30
60
4
2
2
2
2
2
1
8
2
2
2
8
16
16
8
1
30
50
22
10
4
20

15
4
4
4
2
4
10
4
30
30
6
3
12
12
3
30
60
4
2
2
2
2
2
1
8
2
2
2
8
16
16
8
1
30
50
22
10
4
20

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

30
8
8
8
4
8
20
8
60
60
12
6
24
24
6
60
120
8
4
4
4
4
4
2
16
4
4
4
16
32
32
16
2
60
100
44
20
8
40

0.100
68.200
3.100
9.700
0.200
4.800
0.100
2.300
0.100
0.100
5.600
7.300
0.200
0.200
4.700
0.100
0.083
131.100
86.000
14.900
86.000
7.400
1.000
15.100
1.900
1.900
1.900
1.900
0.300
0.100
0.006
0.500
1.600
0.100
0.100
0.100
0.100
3.100
0.100

3
545.6
24.8
77.6
0.8
38.4
2
18.4
6
6
67.2
43.8
4.8
4.8
28.2
6
10
1048.8
344
59.6
344
29.6
4
30.2
30.4
7.6
7.6
7.6
4.8
3.2
0.2
8
3.2
6
10
4.4
2
24.8
4

12
12
1
1
1
1
1
1
1
1
1
1
1
1
12
1
1
1
1
41
20
23
41
5
19
22
1
1
13
14
13
14
1
1
1
1
1
1
2

12
12
1
1
1
1
1
1
1
1
1
1
1
1
12
1
1
1
1
43
23
24
43
6
20
22
1
1
14
15
14
15
1
1
1
1
1
1
2

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

24
24
2
2
2
2
2
2
2
2
2
2
2
2
24
2
2
2
2
86
46
48
86
12
40
44
2
2
28
30
28
30
2
2
2
2
2
2
4

0.100
0.200
123.000
91.000
250.000
250.000
250.000
250.000
135.000
91.000
250.000
250.000
250.000
250.000
3.500
0.690
0.690
0.690
20.640
0.805
0.061
0.030
0.565
26.000
39.000
0.800
198.000
147.000
1.450
0.427
0.030
0.603
0.690
0.690
0.690
0.690
0.690
0.690
25.000

2.4
4.8
246
182
500
500
500
500
270
182
500
500
500
500
84
1.38
1.38
1.38
41.28
69.23
2.8
1.44
48.59
312
1560
35.2
396
294
40.6
12.8
0.84
18.08
1.38
1.38
1.38
1.38
1.38
1.38
100

2
2
1
2
2
1
2
13
13
44
44
13
11
12
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
1
1
1

2
2
1
2
2
1
2
13
13
44
44
13
11
12
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

4
4
2
4
4
2
4
26
26
88
88
26
22
24
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
2
2
2
2

25.000
25.000
165.000
25.000
25.000
147.000
25.000
1.700
1.700
0.320
0.656
0.107
0.300
3.140
0.170
0.170
0.170
0.170
0.170

100
100
330
100
100
294
100
44.2
44.2
28.12
57.72
2.78
6.6
75.36
0.34
0.34
0.34
0.34
0.34

1
1

1
1

2
2

2
2