Surveying Plate 6 ARANDA
Surveying Plate 6 ARANDA
STA 0+ 000
L=0.00 C=0 m R=0 m
0h 1 00 h 20
=
=
h1
10
h2+10
STA 0+ 020
L=.36 mC=.36 m R=.36 m
H 1=.36 m H 2=.36 m
H 1=.73 m H 2=.73 m
H 1=0 H 2=0 m
A=2(
A=0 m2
( 1.5 ( .36 ) +5 )+ 5
2
)(.36)
A=3.79 m2
A=2(
( 1.5 ( .73 ) +5 ) +5
2
)(.73)
A=8.10 m2
EARTHWORK COMPUTATION
STA 0+ 040
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 060
STA 0+ 080
STA 0+ 100
H 1=1.09 m H 2=1.09 m
H 1=1.45 m H 2=1.45 m
H 1=1.2 m H 2=1.2 m
A=2(
( 1.5 ( 1.09 ) +5 ) +5
2
)(1.09)
A=12.68 m2
A=2(
( 1.5 ( 1.45 ) +5 ) +5
2
)(1.45)
( 1.5 ( 1.2 ) +5 ) +5
2
)(1.2)
A=17.65 m2
EARTHWORK COMPUTATION
A=2(
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 120
L=2.18 mC=2.18 m R=2.18 m
H 1=2.18 m H 2=2.18 m
A=2(
( 1.5 ( 2.18 ) +5 ) +5
2
STA 0+ 140
STA 0+ 160
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1. 5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=1.95 m H 2=1.84 m
H 1=2.36 m H 2=2.19 m
( 10C ) + ( H 1+ H 2 )( 5+1.5 ( C ) ] }
A=1/2{
( 10C ) + ( H 1+ H 2 )( 5+1.5 ( C ) ]
A=1/2{
)(2.18)
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 180
STA 0+ 200
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=3.64 m H 2=3.64 m
H 1=3.17 m H 2=2.96 m
A=2(
( 1.5 ( H 1 )+ 5 ) +5
2
STA 0+ 220
L=4 mC=4 m R=4 m
H 1=4 m H 2=4 m
)(C )
A=2(
( 10C ) + ( H 1+ H 2 )( 5+1.5 ( C ) ]
A= 1/2
{
UNIVERSITY OF THE EAST
MANILA
A=56.27 m
PROPOSED 1.5 KM ROAD WAY
( 1.5 ( H 1 )+ 5 ) +5
2
)(C )
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 240
STA 0+ 260
STA 0+ 280
H 1=4.35 m H 2=4.35 m
H 1=4.64 m H 2=4.64 m
H 1=4.85 m H 2=4.85 m
( 1.5 ( H 1 )+ 5 ) +5
A=2(
)(C )
UNIVERSITY
OF THE EAST
2 MANILA
A=2(
PROPOSED 1.5 KM ROAD WAY
( 1.5 ( H 1 )+ 5 ) +5
2
)(C )
( 1.5 ( H 1 )+ 5 ) +5
A=2(
)(C )
EARTHWORK COMPUTATION
2
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 300
L=4.99m C=4.99 m R=4.99 m
H 1=4.99 m H 2=4.99 m
UNIVERSITY OF THE EAST MANILA
A=2(
( 1.5 ( H 1 )+ 5 ) +5
)(C )
STA 0+ 320
STA 0+ 340
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=3.02 m H 2=2.9 m
H 1=2.96 m H 2=2.84 m
EARTHWORK COMPUTATION
PROPOSED 1.5 KM ROAD WAY
ARANDA, EDWARD B.
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
PAGE 43
34
STA 0+ 360
STA 0+ 380
STA 0+ 400
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1C
LC H 2J
KJ
=
;
=
5+ 1.5h 1 105 1.5 H 2+5
5
EARTHWORK COMPUTATION
H 1=2.88 m H 2=2.77 m
COE CIVIL ENGG DEPARTMENT
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
H 1=2.00 m H 2=1.85 m
ENGR. MARK ANTHONY L. ESCOBER
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
PAGE 43
34
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
S TA 0+420
STA 0+ 440
STA 0+ 460
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=2.27 m H 2=2.17 m
H 1=2.03 m H 2=1.93 m
H 1=1.93 m H 2=1.83 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 480
STA 0+ 500
STA 0+ 520
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
h1C
LC H 2C
RC
=
;
=
5+ 1.5h 1 105 1.5 H 2+5
5
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 1=2.09 m H 2=2.23 m
H 1=2.00 m H 2=1.85 m
H 1=1.33 m H 2=1.46 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 540
STA 0+ 560
STA 0+ 580
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 1=.88 m H 2=.98 m
H 1=.47 m H 2=.58 m
H 1=0 m H 2=.1 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 600
STA 0+ 620
STA 0+ 640
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 1=.252m H 2=.16 m
H 1=.54 m H 2=.45 m
H 1=.16 m H 2=.25 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 660
STA 0+ 680
STA 0+ 700
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=.47 m H 2=.6 m
H 1=1.08 m H 2=1.24 m
H 1=1.64 m H 2=1.45 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 720
STA 0+ 740
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=1.82m H 2=1.63 m
H 1=1.89 m H 2=1.69 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
H 1=1.73 m H 2=1.73 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
A=20.32m
EARTHWORK COMPUTATION
STA 0+ 760
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 780
L=1.16 mC=1.16 m R=1.16 m
H 1=1.16 m H 2=1.16 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
A=12.97 m2
STA 0+ 800
L=1.08 mC=1.03 m R=.98 m
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=1.1 m H 2=.97 m
H 1=1.6 m H 2=1.44 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
STA 0+ 820
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 840
STA 0+ 860
STA 0+ 880
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=1.58 m H 2=1.41 m
H 1=1.82m H 2=1.61 m
H 1=2.42 m H 2=2.17 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 900
STA 0+ 920
STA 0+ 940
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=1.96 m H 2=1.75 m
H 1=3.27 m H 2=3.1 m
H 1=3.92 m H 2=3.71 m
( 10 C ) +
( 10 C ) +
1
UNIVERSITY
OF1THE
MANILA
(H1+H2)(5+1.5(C)]}
A=
{ EAST
A= { (H1+H2)(5+1.5(C)]}
2
2
ARANDA, EDWARD B.
PROPOSED 1.5 KM ROAD WAY
COE CIVIL ENGG DEPARTMENT
( 10 C ) +
EARTHWORK
COMPUTATION
1
A= { (H1+H2)(5+1.5(C)]}
2
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 0+ 960
STA 0+ 980
STA 1+000
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1C
LC H 2C
RC
=
;
=
5+ 1.5h 1
5
1.5 H 2+5
5
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=4.58 m H 2=4.14 m
H 1=5.38 m H 2=6.32 m
H 1=5.85 m H 2=4.17 m
( 10 C ) +
10 C ) +
ARANDA, EDWARD B.
PROPOSED 1.5 KM ROAD(WAY
1
1
A=ENGG
{ (H1+H2)(5+1.5(C)]}
A= { (H1+H2)(5+1.5(C)]}
COE CIVIL
DEPARTMENT
2
2
EARTHWORK COMPUTATION
( 10 C ) +
1
(H1+H2)(5+1.5(C)]}
A=
ENGR.{MARK
ANTHONY L. ESCOBER
2
PAGE 43
34
STA 1+020
STA 1+040
STA 1+060
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
H 1=2.17 m H 2=1.81 m
H 1=3.73 m H 2=3.33 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
EARTHWORK COMPUTATION
H 1=2.21 m H 2=1.86 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
ARANDA, EDWARD B.
PAGE 43
34
STA 1+080
STA 1+100
STA 1+120
h1R
LR RH 2
=
=
10+ 1.5h 1
10
1.5 H 2
CH 1 CL CH 2
CR
=
;
=
5+ 1.5h 1
15 5+ 1.5 H 2
5
h1
L
h2
C
= ;
=
1.5 h 1+ X X h 2+10X 5 X
EARTHWORK COMPUTATION
H 1=5.29 m H 2=5.09 m
COE CIVIL ENGG DEPARTMENT
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
C/X =J/5-X
H
1=.01
m H 2=.27
m L. ESCOBER
ENGR.
MARK
ANTHONY
A CUT =1.2987 m2
PAGE 43
34
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+140
STA 1+160
STA 1+180
H 1=.71 m H 2=.71 m
H 1=1.59 m H 2=1.59 m
H 1=2.41 m H 2=2.41 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
A=7.6 m
A=18.43 m
A=29.91m
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+200
STA 1+220
STA 1+240
H 1=3.06 m H 2=3.06 m
H 1=3.50 m H 2=3.50 m
H 1=3.71 m H 2=3.71 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
A=39.96 m2
A=47.25 m2
A=50.86 m2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+260
L=3.69 mC=3.69 m R=3.69 m
H 1=3.69 m H 2=3.69 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
A=50.52 m
STA 1+280
L=6.14 mC=5.83 m R=5.51m
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=6.55 m H 2=5.18 m
H 1=4.79 m H 2=4.56 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
STA 1+300
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+320
L=4.29m C=4.22 m R=4.15 m
ST A 1+340
L=3.67 m C=2.76 m R=2.76 m
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1C LC
=
h 1+5
5
STA 1+360
L=2.99 mC=2.92 m R=2.85 m
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=4.35 m H 2=4.09 m
H 1=4.48 m H 2=2.76 m
H 1=3.03 m H 2=2.81 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+380
STA 1+ 400
STA 1+ 420
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=6.36 m H 2=5.91 m
H 1=5.91m H 2=5.44 m
H 1=5.99 m H 2=5.6 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+ 440
STA 1+ 460
STA 1+ 480
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=5.52m H 2=5.17 m
H 1=4.99 m H 2=4.64 m
H 1=4.31 m H 2=3.98 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+500
STA 1+520
STA 1+540
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=3.63 m H 2=3.32 m
H 1=3 m H 2=2.73 m
H 1=2.66 m H 2=2.42 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+560
STA 1+580
STA 1+600
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=2.32 m H 2=2.12 m
H 1=1.69 m H 2=1.51 m
H 1=.89 m H 2=.72 m
( 10 C ) +
( 10 C ) +
1
UNIVERSITY
OF1THE
MANILA
(H1+H2)(5+(C)]}
A=
{ EAST
A= { (H1+H2)(5+(C)]}
2
2
ARANDA, EDWARD B.
PROPOSED 1.5 KM ROAD WAY
COE CIVIL ENGG DEPARTMENT
( 10 C ) +
EARTHWORK
COMPUTATION
1
A= { (H1+H2)(5+(C)]}
2
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+620
STA 1+640
STA 1+660
I h 1 LR
h2L
=
=
1.5 h 1
10
1.5 h2+10
I h 1 LR
h2L
=
=
1.5 h 1
10
1.5 h2+10
I h 1 LR
h2L
=
=
1.5 h 1
10
1.5 h2+10
H 1=.04 m H 2=.22 m
H 1=.91 m H 2=1.19 m
H 1=.82 m H 2=1.11 m
( 10 C ) +
( 10 C ) +
ARANDA, EDWARD B.
PROPOSED 1.5 KM ROAD WAY
1
1
(H1+H2)(5+1.5(C)]}
(H1+H2)(5+1.5(C)]}
A=ENGG
{ DEPARTMENT
A= {
COE CIVIL
2
2
EARTHWORK COMPUTATION
( 10 C ) +
1
(H1+H2)(5+1.5(C)]}
A=
ENGR.{MARK ANTHONY L. ESCOBER
2
PAGE 43
34
STA 1+680
STA 1+700
STA 1+720
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=3.08 m H 2=2.68 m
H 1=1.26 m H 2=1.06 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
H 1=2.06 m H 2=1.71 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
PROPOSED 1.5 KM ROAD WAY
ARANDA, EDWARD B.
PAGE 43
34
STA 1+740
STA 1+760
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
EARTHWORK COMPUTATION
H 1=.39 m H 2=.68 m
COE CIVIL ENGG DEPARTMENT
STA 1+780
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
H 1=.73 m H 2=1.04 m
ENGR. MARK ANTHONY L. ESCOBER
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
PAGE 43
34
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+800
STA 1+820
STA 1+840
H 2L
RL LH 1
=
=
10+ 1.5h 2
10
1.5 H 1
H 1=2.54 m H 2=2.54 m
H 1R LR RH 2
=
=
h 1+10
10
h2
( 10 C ) +
1
A= { (H1+H2)(5+ C)]}
2
H 1=1.13 m H 2=1.45 m
( 10 C ) +
1
A= { (H1+H2)(5+1.5(C)]}
2
A=31.85 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
H 1=9.29 m H 2=8.46 m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+860
STA 1+880
STA 1+900
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=8.45 m H 2=7.64 m
H 1=7.5 m H 2=6.72 m
H 1=6.46 m H 2=6.14 m
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
( 10 C ) +
1
A= { (H1+H2)(5+(C)]}
2
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
STA 1+920
STA 1+940
STA 1+960
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1R LR RH 2
=
=
h 1+10
10
h2
H 1=3.77 m H 2=3.32 m
H 1=4.72 m H 2=4.06
H 1=3.14 m H 2=2.78 m
( 10 C ) +
1 0+000STATION 0+020
STATION
A= { (H1+H2)(5+(C)]}
2
L=20 m A 1=0 m2 A 2=3.79 m2
( 10 C ) +
1
STATION 0+020STATION
0+040
A= { (H1+H2)(5+(C)]}
2
L=20 mVOLUME
A 1=3.79 m2 ACOMPUTATIONS:
2=8.10 m2
( 10 C ) +
1
STATION 0+040STATION
0+060
A= { (H1+H2)(5+(C)]}
2
L=20 m A 1=8.10 m2 A 2=12.68 m2
C1=0m
C2=.36m
C1=.36m
C2=.73m
C1=.73m
C2=1.09m
D1=10m
D2=11.08m
D1=11.08
D2=12.19m
D1= 12.19m
D2=13.27m
V =VEVC
V =VEVC
V =VEVC
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
20
Vc= ( C 1C 2 )( D 1D 2 )
12
20
Vc=
( C 1C 2 )( D 1D 2 )
PROPOSED 1.5 KM
ROAD
12 WAY
Ve=37.94 m3
EARTHWORK COMPUTATION
20
( C 1C 2 )( D 1D 2 )
ARANDA, EDWARD B. Vc=
12
Ve=118.94 m3
Ve=207.82m3
PAGE 43
34
L=20 m A 1=12.68 m2
L=20 m A 1=17.65 m2
L=20 m A 1=14.16 m2
A 2=17.65 m2
A 2=14.16 m 2
A 2=28.93 m 2
C1=1.09m
C2=1.45m
C1=1.45m
C2=1.20m
C1=1.45m
C2=2.18m
D1= 13.27m
D2=14.35m
D1= 14.35m
D2=13.60m
D1=14.35m
D2=16.54m
V =VEVC
1
UNIVERSITY
MANILA
VE= OF( ATHE
1+ EAST
A 2)(20)
2
20
Vc= ( C 1C 2 )( D 1D 2 )
12
V =VEVC
V =VEVC
1
VE= ( A 1+ A 2)(20)
2
1
VE= (EARTHWORK
A 1+ A 2)(20)COMPUTATION
2
20
Vc= ( C 1C 2 )( D 1D 2 )
12
ARANDA, EDWARD B.
Vc=
20
( C 1C 2 )( D 1D 2 )
12
PAGE 43
34
EARTHWORK COMPUTATION
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
L=20 m A 1=28.93 m
L=20 m A 1=24.38 m
L=20 m A 1=30.44 m
A 2=24.38 m2
A 2=30.44 m 2
A 2=44.71m 2
C1=2.18m
C2=1.90m
C1=1.90m
C2=2.27m
C1=2.27m
C2=3.06m
D1=16.54m
D2=15.69m
D1=15.69m
D2=16.81m
D1=16.81m
D2=19.20m
V =VEVC
V =VE VC
V =VEVC
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
Vc=
20
( C 1C 2 )( D 1D 2 )
12
Vc=
20
( C 1C 2 )( D 1D 2 )
12
20
( C 1C 2 )( D 1D 2 )
12
EARTHWORK COMPUTATION
Vc=
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
L=20 m A 1=44.71 m2
L=20 m A 1=56.27 m2
L=20 m A 1=64 m2
A 2=56.27 m 2
A 2=64 m2
A 2=71.88 m2
C1=3.06m
C2=3.64m
C1=3.64m
C2=4m
C1=4m
C2=4.35m
D1=19.20m
D2=20.92m
D1=20.92m
D2=22m
D1=22m
D2=23.05m
V =VEVC
V =VEVC
V =VEVC
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
1
VE= ( A 1+ A 2)(20)
2
Vc=
20
( C 1C 2 )( D 1D 2 )
12
Vc=
20
( C 1C 2 )( D 1D 2 )
12
20
( C 1C 2 )( D 1D 2 )
12
EARTHWORK COMPUTATION
Vc=
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=4.35m
C2=4.64m
D1=23.05mD2=23.92m
C1=4.64m C2=4.85m
D1=23.92mD2=24.55m
EARTHWORK COMPUTATION
C1=4.85m C2=4.99m
D1=24.55mD2=24.97m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=4.99m
C2=2.96m
D1=24.97mD2=18.88m
C1=2.96m C2=2.9m
D1=18.88mD2=18.7m
EARTHWORK COMPUTATION
C1=2.9m C2=2.82m
D1=18.7mD2=18.46m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=2.82m C2=2.88m
D1=18.46mD2=18.64m
C1=2.88m C2=1.87m
D1=18.64mD2=15.78m
EARTHWORK COMPUTATION
C1=1.87m C2=2.22m
D1=15.78mD2=16.66m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=2.22m C2=1.98m
D1=16.66mD2=15.94m
C1=1.98m C2=1.89m
D1=15.94mD2=15.64m
EARTHWORK COMPUTATION
C1=1.89m C2=2.16m
D1=15.64mD2=16.48m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=2.16m C2=1.72m
D1=16.48mD2=15.41m
C1=1.72m C2=1.4m
D1=15.41mD2=14.19m
EARTHWORK COMPUTATION
C1=1.4m C2=.93m
D1=14.19mD2=12.79m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34
C1=.52m C2=.05m
D1=11.58mD2=10.15m
EARTHWORK COMPUTATION
C1=.05m C2=.2m
D1=10.15mD2=10.41m
ARANDA, EDWARD B.
ENGR. MARK ANTHONY L. ESCOBER
PAGE 43
34