You are on page 1of 6

ESTIMATION OF QUANTITIES

EXCAVATION

(a)

CIRCULAR RAFT

(B)

RECTANGULAR SECTION

HEIGHT =
raft
pcc
rubble soiling
total =

3.7
1.2
0.1
0.23
5.23

radius =
extra
total =

9.6
1
10.6

WIDTH =
wall thickness
total =

4.65
0.3
4.95

RUBBLE SOILING

PCC

RCC

(a)

RAFT SLAB
SLAB

COLUMNS

height =
underground
parapet
total =

20.8
3.7
1.2
25.7

diameter=
no. =

0.75
16

BEAMS
(circular)

width =
depth =
radius =
length =

no. =

BEAMS
(X direction)
centre

length =
RC wall =

9
0.25
8.75

centre
(Y direction)

length =
column =
total =

9
0.75
8.25

beam (a)
(X,Y direction)

0.5
0.6
8.75
54.95
9
45.95
4

chord length = 16.746343


4 columns =
3
total =
13.746343

beam(b)
(X direction)

length =
deduction =
1 column =
total =

6.6174013
3.3
0.75
9.1674013

beam(b)
(Y direction )
(right side)

length =
1 column
total =

16.746343
1.5
15.246343

beam(b)
(Y direction )
(left side)

length =

6.6

REINFORCEMENT

Raft
Column
Beam
Slab

(0.8% of RCC)
(4% of RCC)
(1.5% of RCC)
(0.8% of RCC)

OF QUANTITIES
AREA(m)

L(m)

B(m)

H(m)

QTY(m)

5.23

1845.1984

4.95

5.23

497.0592

447.8504

total =

2342.2576

447.8504

0.23

103.00559

447.8504

0.1

44.78504

289.3824

1.2

347.25888

289.3824

0.2

231.50592

0.4415625

25.7

181.5705

352.8104

19.2

TOTAL AREA=

45.95

0.5

0.6

55.14

8.75

0.5

0.6

10.5

8.25

0.5

0.6

9.9

13.746343

0.5

0.6

65.982446

9.1674013

0.5

0.6

22.001763

15.246343

0.5

0.6

18.295611

6.6

0.5

0.6

7.92

total =

950.07512

Weight(kg)

total steel =

2.778071
7.26282
2.8460973
1.8520474

21807.858
57013.137
22341.864
14538.572

14.739036

115701.43

eight(kg)

115.7014

tons

You might also like