You are on page 1of 2

M.N.

DASTUR & COMPANY (P) LIMITED, CHENNAI

C & I Tag Numbering System:


==========================
To identify every control and instrumentation items in
the plant uniquely, tag numbering system shall be used. The plant
consists of two phases namely Phase-I and Phase-II. First phase
shall have two units namely Unit-1 and Unit-2. The second phase
is considered as part of the future expansion.
The tag numbering system to be adopted for Control &
Instrumentation items shall be as given below:
ABCCCDDEEEF

Where,
A

Phase code (Refer table-1 below)

Unit code (Refer table-2 below)

CCC

Instrument Type (TE, TT, TIC, TI etc.., as


per ISA codes)

DD

Section code (Refer table-3 below)

EEE

Instrument Serial No (000 to 999)

Suffi x A, B & C (for redundancy)

In general, the tag numbering should start in sequence as


per the process flow directions for each type of instruments (PT,
PG, TT, TI etc).
For closed loops, all sensing devices (PT, FT, TT, LT) with its
controller (PIC, FIC, TIC, LIC) and its final control element should
be represented with the instrument serial number.
The same numbering system will be adopted for local
Instruments (PG, TG and LG) and analytical Instruments also.
Example:
Dual redundant level transmitter at Cold water fore bay of phase-1
common for both unit-1 & 2 will be tagged as:
10LT10001A, 10LT10001B

M.N.DASTUR & COMPANY (P) LIMITED, CHENNAI

- Facilities in Phase-I.

- Facilities common to both Unit-I & Unit-II.

LT
10
001
A/B

Table-1

Instrument type.
Section code for RCW system.
Instrument sequence no.
For redundancy.

Plant Phase Codes (A)


Description

Facilities common to both Phase-I & Phase-II


Facilities in Phase-I
Facilities in Phase-II

Table-2

Plant Unit Codes (B)


Description

Facilities common to both Unit-I & Unit-II


Facilities in Unit-I
Facilities in Unit-II

Table-3

Phase code
0
1
2

Unit code
0
1
2

Plant Section Codes (DD)


Section
code

Description
Steam generator (SG)
Turbo generator (TG)
RCW system
Coal & Lime stone handling system
Ash handling system
DM plant
Pre-treatment plant
Fire water pumping system
Sea water intake pumping system
CW chlorination system
Sea water chlorination system
Compressed air system
Air conditioning & Ventilation system
Fire protection & detection system
Electrical power distribution system
Switchyard

01
02
10
11
12
13
14
15
16
17
18
19
20
21
22