CORPORATION

CALCULATIONS AND SKETCHES

DATE: June 11, 2015

CONTRACT NO.
BY:
SHEET NO.:
DOC NO.

Client: KILTON MOTORS


Project: PROPOSED GENSET HOUSE
Subject: FOUNDATION SIZING

CHKD:
REV:

DATA:
F = 1800 rpm
WP = 32, 408 lbs. (14, 700 kg)
BD = 46 in.
BS = 106 in.
BL = 239 in.
db = in.

Speed
Total Weight
Bolt distance along width
Width
Length
Anchor Bolt diameter

SOIL PARAMETER:
g = 3.13 ksf = 150 kPa
k = 75 pci (assumed coefficient of subgrade reaction)
FOOTING SIZING:
3000mm (118.18in) = 21.65 ft.

6600mm = 259.84 in. = 9.85 ft


Wfdn = 0.15(B)(D)(L) = 0.15 (9.85)(21.65)(3.61) = 115.42 kips
Wfdn/Wp = 115.42/32.41 = 3.65 > 3.0 .: OK!

SOIL BEARING CHECK:


g =

115.42+32.41

9.85 X 21.65

) = 0.693 ksf < 3.13

.: OK, SAFE!

SPEED CHECK:
10k

Fmin = 815

= 815

10(75)

0.693(1000)

= 848 rpm < 1800 .:OK, SAFE!