Dogleg severity has become a major concern for wells that may be produced by electric submersible pumps
(ESPs). In general, any artificial lift type can be significantly impacted based upon wellbore trajectory. In an
efforttoclarifytheimpacttoESPs,arecommendedguidelineisbeingestablished.Asabackground,thestandard
rulesofthumbintheESPindustryhavebeen:
MaxDoglegSeverity:6degrees/100feet
TangentSectionforESPOperation:1degree/100feetwithanoverallminimumlengthof150feet
Industry experience is that these are very conservative values and do not consider casing size/weight or ESP
diameter.
InwellsthatareexpectedtogeneratehighGOR(GLR)ratios,pumpsubmergenceisimportanttoobtainmaximize
production.Ahighdegreedoglegcanlimitthemaximumpumpdepthandthereforemaylimitproductionfrom
thewell.Formaximizepumpsubmergence,itisimportanttomaintainbuildrateswithinguidelines.
AfterresearchanddiscussionwiththeESPsuppliers,thefollowingtableissetforthasarecommendedguideline
fordrillingoperations.Pleasenote,thesevaluesareconsideredindustrymaximum.MostESPsupplierswould
prefermoreconservativevaluesthanthoseoutlinedinthetablebelow.
Table1RecommendedGuidelines
EquipmentSize
CasingSize
MaxAllowable
Dogleg/100ft
338Series(3.38OD)
410.5#
12
100ft1.50/100ft
Maximum
DeviationatESP
OperatingPoint
90
338Series(3.38OD)
411.6#
10
160ft1.50/100ft
90
120ft
456Series(4.56OD)
515.5#
12
100ft1.50/100ft
90
50ft
135ft
456Series(4.56OD)
517#
TangentSection
Length/MaxDogleg
MaxString
Length
50ft
10
170ft1.5 /100ft
90
90
67ft
538Series(5.38OD)
723#
12
100ft1.50/100ft
538Series(5.38OD)
726#
10
170ft1.50/100ft
90
123ft
562Series(5.62OD)
723#
11
100ft1.50/100ft
90
67ft
170ft1.50/100ft
90
562Series(5.62OD)
726#
9
123ft
Logically,therewillbequestionsofpastexperiencewherebytheseguidelineshavebeenexceeded.Exceeding
these guidelines significantly increases the risk to damage of the ESP equipment during installation and
subsequentoperationifsuccessfullyinstalled.
GeneralRecommendations:
1.
2.
3.
4.
DrillingshouldnotexceeddoglegseverityguidelinesofTable1.
Therepresentativefromtheoperatingcompanyshouldalwaysaskthesuppliertoevaluatethedogleg
severityonawellbywellbasis.Therepresentativeshouldhighlightanyrisksorconcerns.
Two tangent sections may be advisable in many cases as follows (considered on a well by well basis;
basedonprojectGLRandprojectedproductionrates):
a. Tangentsection1atahigherpointinthewellbore(lowsailangle)
b. Tangentsection2inthehorizontalsectionformaximumpumpsubmergence.
ESPEquipmentGuidelines:
a. RunflatESPcablefromsurfacetothemotorleadextension(MLE)onallhorizontalorhighly
deviatedwells.Runthesmallestprofiletechnicallyacceptable.
b. Install the shortest possible ESP string when maximum doglegs guidelines are being
approached.
i. In this case; the use of tandem seals may not be recommended. However, multi
chamber single section seals should be utilized if volume and redundancy is
recommended.
c.
d.
5.
Avoidtheuseoflabyrinthsealsinallhorizontalwells
Avoidtheuseofrotarygasseparators;utilizevortexseparatorsifgasseparationisrequired.
i. TheuseoforientedintakesinhorizontalwellswithhighGLRratiosmaybeadvisable
e. Utilizesamelengthpumphousingswheninstallingtandemsectionpumps.
InstallationGuidelines
a. Cable continuity checks to be completed every 500 feet during installation in horizontal or
highlydeviatedwells.
b. Installcableclamps(e.g.preformedorcasttype)onallhorizontalorhighlydeviatedwells.
c. Utilize(install)cableguardsaroundtheESP(fromthemotortothepumpdischargehead).
d. Avoid,orminimize,theuseofcablebands.
e. Utilizeafulljointoftubingonthepumpdischargehead(avoidashortsub).
f. AttempttopasstheESPthroughahighdoglegsectiononacontinous,smooth,rate.
Thetangentsectionshouldnotexceed90degreesdeviation.
6.
Drilling7casedwellsallowsgreaterflexibilitywithdoglegsanddeviations.Accordingly,7casedwellswilloffer
moreoptionswithartificialliftwithregardstoequipmentandpumpsettingdepths.