Professional Documents
Culture Documents
Content For Operation and Maintenance Manuals
Content For Operation and Maintenance Manuals
Volume I : Operation
Item
1
1.1
1.2
1.2
1.3
1.4
2
2.1
2.2
Description
Introduction
Description and Type of Development
Description and Status of Existing Treatment Facilities (Upgraded Plants)
Selection of Site
Choice of Treatment System
Effluent Quality
2.2.1
2.2.2
2.2.3
Process Description
General Process Flow
System Description
Physical Treatment Process
Chemical Treatment Process
Biological Treatment Process
3
3.1
3.2
Design Calculation
Basis of Design Information
Details of Design Calculations
4
4.1
4.2
4.3
4.4
5
5.1
5.2
Schedule of Equipment
Main Mechanical & Electrical Equipment
Pipes, Valves & Fittings, Instrumentation
6
6.1
6.2
6.3
6.4
6.8.1
6.8.2
6.8.3
7
7.1
7.2
7.3
8
8.1
8.2
8.3
6.5
6.6
6.7
6.8
Volume I I: Maintenance
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
23
25
26
27
28
29
30
31
Description
Catalogues, Technical specification, Performance data, Equipment installation, Equipment trouble-shooting, Periodic
maintenance procedures, Start-up/shutdown for mechanical & electrical equipment, Spare parts inventory, Certificates of
warranty, JPP equipment approval letter, etc.
Pump
Motor
Gearbox
Penstock
Static Screen
Mechanical Screen
Screw Conveyor/Compactor
Screenings Bin
Grit Removal System
Grease Removal System
Scraper Mechanism Primary Sedimentation
Aerators
Diffusers
Mixers
Blowers
Main Control Panel
Scraper Mechanism Secondary Clarifier
Thickeners
Dewatering Equipment
Disinfection Equipment/Apparatus
Measuring Instruments/Devices/Sensors
Pipes/Valves/Fittings
Lifting Devices
Electrical Equipment
Diesel Generator
Fire-Fighting Equipment
Sound-Proof Installations
Dryer
Odour Control Equipment
Progamme Logic Controller
Manhole Cover/Grating
Description
Process, Hydraulic, PID, Layout, Structure, Mechanical, Electrical, Architecture, Schedule, Standard Drawings, etc.
Hydraulic profile & Schematic Flow Diagram
Schematic Flow Diagram
Process & Instrument Diagram (PID)
Site Layout
Plant Layout
Inlet Works (Primary Screen, Wet Well & Dry Well)
Secondary Screen & Grit/Grease Chamber
Equalisation Tank & Distribution Chamber
Aeration Tank
Blower House & Control Room
Secondary Clarifier
Sludge Holding Tank
Sludge Digester
Sludge Thickener
Sludge Dewatering
Sludge Drying Bed & Cake Storage Shed
Chlorination Plant & Disinfection Tank
Effluent Discharge Chamber
Perimeter Fencing & Lighting
Schematic Line Diagram for Power Supply
Instrument Layout of Control Panel
Electrical Line Diagram of all Equipment
Schedule of Pumps
24
25
26
Item
27
28
29
30
Notes
i.
ii.
Description
Ladder Diagram for Programmable Logic Controller (PLC)
Architectural Drawings
Locations of Fire-Fighting Equipment
Mass Balance Diagram
A draft to be submitted for approval 60 days before date of operation of the facility and if manuals found to be inadequate,
the owner is required to make appropriate modifications.
A review of the approved manuals one year after initiation of plant operation and subsequent to the review, the manuals
shall be revised to reflect actual treatment plant experience.