STANDARD PROCEDURE
1
2
INDEX NUMBER T/P&T
DATE OF ISSUE
3
65820
4a
4b
235 / 62
5
99
6
Ro
2 JUNE 1994
TITLE:
ENGR. MUKHTAR
ENGINEER
CONCURRED BY:
APPROVED BY:
SALEH AL-GHUNAIMI
MANAGER
P&T66/nars
Rev. No:
SCECO CENTRAL
TRANSMISSION DEPARTMENT
DISTRIBUTION OF STANDARD PROCEDURES
LOCATION
DATE
P&T66A/nars
Page 2 of 9
Rev. No:
SCECO (CENTRAL)
TRANSMISSION DEPARTMENT
STANDARD PROCEDURE
1.0
INTRODUCTION:
1.1
PURPOSE
All electrical equipment installed in newly build substation is necessary to test and inspect
according to the site test procedure being presented here.
1.2
OBJECTIVES
To keep the contractors testing work in line with SCECO requirements, so that no equipment is
left unchecked before energization.
1.3
APPLICATION
Contractors and SCECO witnessing staff should follow the attached guide line for
precommissioning tests so that no test is forgotten and equipment remained unchecked. The guide
line specifies all kinds of site test to be performed on most of the S/S equipment meant for
transmission of electrical power.
SPRO-10/nars
Page 3 of 9
Rev. No:
SERIAL
NUMBER
TEST OBJECT
TEST
NO.
1.
Lv power cables
a.
b.
c.
2.
Lv switch, switch
gear
a.
b.
c.
3.
4.
Mcbs in lv ac
panels control &
protection panels
of all voltage
ratings
Meters in lv panels
TEST DESCRIPTION
Main
circuit
insulation
Resistance
Measurement by 2kV Megger or 2kV
A.C.H.V. Test for one minute.
Phasing check.
a.
Visual inspection
drawings.
b.
c.
a.
b.
c.
d.
CH3/nars
Page 4 of 9
of
ratings
as
per
SERIAL
NUMBER
5.
TEST OBJECT
13.8/33KV
SWITCHGEAR
Rev. No:
TEST
NO.
TEST DESCRIPTION
a.
b.
c.
d.
e.
f.
g.
h.
i.
CH3A/nars
Page 5 of 9
SERIAL
NUMBER
6.
TEST OBJECT
P/transformer
switchgear
Rev. No:
TEST
NO.
n.
o.
p.
q.
r.
s.
t.
u.
TEST DESCRIPTION
Fan Motors current to be Measured and
check against rating also check wiring size
suitable to carry the currents.
MCBs in Cooler Control Cubical to be
checked by current injection for trip test.
Check oil level in main tank tap changer
tank, Bushing etc. Test the oil level gauges
and its alarms.
Check earthing of Transformer wheel
stopper, silica gel color blue etc.
Check wiring size of Supply Cable of Fans
Motors and Main MCBs and incoming
cable. Run all Fans together and then
measure current in all wires of Fan Motors
and input supply cables. Check no
temperature arises on the Supply Wires.
Check Main MCCB in L.V. Distribution
Panel is of correct rating to Supply the
Transformer auxiliaries.
Labelling:
All auxiliary devices to be labelled as
shown in relevant drawing and actual name
should be written on the labels like Oil
Temp. Gauge, Winding Temp. Gauge,
pressure relief valve etc.
All Cable should be marked R, Y, B in big
letters on H.V. side and small letter on L.V.
side.
Name plate data should be complete and
installed at Mains light visible place.
Check for oil leakage, radiator valves open
position, Colour of Transf. or any bending
of body. Oil pockets of Thermosens of
Gauges, have oil inside etc.
CH3C/nars
Page 6 of 9
SERIAL
NUMBER
7.
TEST OBJECT
Auxiliary
transformer
Rev. No:
TEST
NO.
TEST DESCRIPTION
a.
b.
c.
d.
e.
f.
g.
h.
i.
8.
9.
10.
Neutral
resistors
earthing
13.8kv &
power cable
33kv
j.
a.
Megger Test.
b.
Resistance Measurement.
c.
a.
b.
c.
Phasing Test.
d.
H.V. Test.
a.
b.
Impregnation Test.
c.
d.
e.
f.
CH3D/nars
Page 7 of 9
10.
11.
12.
132kv cables
filled cables
oil
Rev. No:
g.
h.
i.
a.
Megger Test.
b.
c.
d.
e.
f.
S.V.L. Test.
g.
H.V. Test.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
CH3E/nars
Page 8 of 9
13.
14.
15.
Pilot cables
Voltage transformers
13.8kv,
33kv,
132kv,
220kv,
380kv rating
Measurands
Rev. No:
a.
Megger Test.
b.
c.
d.
a.
Megger Test.
b.
c.
Ratio Test.
d.
e.
Polarity Test.
H.V. Test with P.D. Test upto 1.5 Un only.
f.
a.
b.
c.
Winding Test.
CH3F/nars
Page 9 of 9