Project

: Avic Mixed Development Project

Meeting

: Technical Meeting

Date

: 10.12.2015

Time : 2.15 PM

AGENDA
1.
2.
3.

Submission of General Method statement


Surveying External /internal control points
Concrete
i. Technical Justification for V funnel test
ii. Test report of Mock up C70
iii. Test report on initial setting time
iv. Quality issues
v. Arrangement for Piling Stage 2

4.

Drawings issues (if any)


i. Structural
ii. Architectural
iii. MEP

5.

Contractors action on Site instructions and Defect Notifications


(Report on status for correction of non-conformities)

6.

Certification of Temp. wiring arrangement

7.

Lightning Protection during construction

8.

Environmental issues: Photographic survey, monitoring damage to the neighboring properties


Detail report on status of public complains by neighbors and actions

taken
Noise and vibration control method and records.
Effect on the project due to Night work
9.
Matters to be discussed by Kent Engineers
10. Matters to be discussed by CSCEC (if any)
11. Any other matters