PROJECT IMPLEMENTATION

ISSUES
AND
CONCERN
OBJECTIVE AND RATIONALE

This presentation and discussion tend to assist the Implementing


Agencies and to provide information in relation to implementation
issues and concern.
• The following aspect needs to be discussed and applied during
project implementation.
(a). Information's that specifies and compliments project
implementation.
(b). Supplements Contract Management and Construction
Supervisions process.
DESIGN GUIDELINES AND STANDARDS

Pavement Design; PCCP


Reference Standards for Local Roads:
• DPWH DO #11, S2014
Pavement Width - 6.10 meters minimum
Pavement Thickness - 230 mm
Design Speed - 60 km/hr. flat terrain
- 40 km./hr. rolling terrain
- 30 km./hr. mountainous terrain

note: Higher thickness of pavement maybe adopted but shall be verified from
pavement design analysis using AASHTO method as contained in DPWH
Design Guidelines and Criteria and Standards considering the latest AADT
and Axle loading.
DESIGN GUIDELINES AND STANDARDS

Geometric Design:
Reference Standard;
Recommended Geometric Design Standard

Max.
AADT Terrain Design Carriageway Shoulder Minimum Max. Super Min.
Speed width min. Width Radius Gradient Elevation RROW
(km/hr.) (m) (m) (%) (m)

400 F 60 6.1 1.5 130 6 10 15


and
below B 50 6.1 1.0 80 8 10 15

M 30 6.1 1.0 30 10 8 15
PROJECT MANAGEMENT ISSUES

Implementation Issues and Concern:


A. Documentation
Incomplete Contract Documents,such as:
1. Contract Agreement
2. General Conditions of Contract (GCC)
3. Special Conditions of Contract (SCC)
4. Detailed Drawings
5. Technical Specifications
6. Invitation to Bid (ItB)
7. Instructions to Bidders (ITB)
PROJECT MANAGEMENT ISSUES

A. Documentation:
8. Bid Data Sheet (BDS)
9. Addenda to the Bidding Documents (Bid Bulletins)
10. Bid Form
a. Priced Bill of Quantities
b. Detailed Estimates
c. Monthly Cash Flow and Payment Schedule
11. Eligibility Requirements
a. DTI/SEC Registration
b. Business Permit
c. PCAB License
PROJECT MANAGEMENT ISSUES

A. Documentation
A.1. Contract Documents
d. Statement of all ongoing and completed
government and private contracts including
contracts awarded but not yet started.
e. Audited Financial Statement
12. Performance Security
13. Net Financial Contracting Capacity
14. Notice of Award
PROJECT MANAGEMENT ISSUES

A.1. Contract Documents


15. Other Contract Documents; Clause 31.4 (f)
a. Technical
i. Construction Methods
ii. Construction Safety and Health Program (DOLE approved)
iii. Construction Schedule and S‐curve
iv. Equipment Utilization Schedule
v. List of Equipment
vi. Workforce Schedule
vii. List of Key Personnel with Curriculum Vitae
viii. Organizational Structure for the Contract
ix. Network Schedule, PERT/CPM
PROJECT MANAGEMENT ISSUES

A.1. Contract Documents


15. Other Contract Documents
b. Financial
i. Latest Income Tax Return
ii. Tax Clearance
c. Legal
i. Contractor’s All Risks Insurance (CARI)
ii. Omnibus Sworn Statement
iii. PhilGEPS Registration Certificate
iv. Notice to Proceed (NTP)
PROJECT MANAGEMENT ISSUES

A.1. Contract Documents


d. Others
i. BAC Resolutions of Award
ii. Bid Evaluation Report/Post Qualification Report
iii. Minutes of the Bid Opening
PROJECT MANAGEMENT ISSUES

Project Implementation Issues and Concern:


B. Certificate of Site Possession
- Road Right of Way cleared
C. Mobilization/Construction Surveys and Staking;
- no approved revised POW with back up computation
D. Processing of Billing Payments/Validation of Work Accomplish
i. no regular submission of SWA, monthly progress billing
ii. Final billing
F . Processing of Variation Order/Documentation
i. Extra work
ii. Additional work
PROJECT MANAGEMENT ISSUES

Project Implementation Issues and Concern:


G. Quality Control/Quality Assurance
i. Quality Control Plan
ii. Materials testing;
- Aggregates, Cement and other Construction Materials
iii. Design mix and Trial Mix (concrete)
iv. Trial Paving/Section
v. Approval of Design Mix, Construction Methodology
H. Correction of Defects
I. Project Completion Declaration
PROJECT MANAGEMENT ISSUES

Project Implementation Issues and Concern:


J. Time Extension
K. Issuance of Certificate of Completion/Acceptance
L. Application of Liquidated Damages
- termination of contract; based on delays, or cumulative
amount of LD
- LD computation
M. Release of Retention Money;
- on schedule implementation,
- with delays implementation
N. Management Conference
O. Insurance;
- CARI
PROJECT MANAGEMENT ISSUES
PROJECT MANAGEMENT ISSUES
PROJECT IMPLEMENTATION ISSUES

B. Mobilization:
- Failure to mobilize required equipment and workforce within
the specified period.
C. Validation of Statement of Work Accomplish (SWA)
- Overstated and erroneous accomplishment report
D. Processing of Billing Payment
- 1st progress billing should be at least 20%
- Delayed processing due to insufficient documentation, absence of operational
procedure; (Accounting vis-à-vis Engineering)
PROJECT IMPLEMENTATION ISSUES

E. Application and Processing of Variation order


- Unjustifiable grounds for Variation Order ; extra work, additional work
- Poor documentation
note: a. scope of works shall not be reduced so as to
accommodate appositive variation order.
b. time frame for the processing of VA from preparation up
to approval shall not exceed thirty (30) calendar days.
PROJECT IMPLEMENTATION ISSUES

F. Quality Control/Quality Assurance


- Poor application of Materials Engineering
- Inadequate number of Materials Engr. and Testing equipment
- Lack of construction supervision from PEO and the Contra
G. Correction of Defects
- Failure to correct defect prior final payment or during the Defects Liability
Period.
PROJECT MANAGEMENT ISSUES

H. Project Completion
- Delayed completion due to wrong appreciation of
contract and inappropriate application of time extension
- Delayed payment due to insufficient documentation.
I. Time Extension
- Granting of time extension without valid reason
PROJECT MANAGEMENT ISSUES

K. Issuance of Certificate of Completion and


Acceptance (CoC and CoA)
- untimely issuance of CoC and CoA
L. Liquidated Damages (LD)
- non application of Liquidated Damages to
contractors with expired contract and with
uncompleted works.
PROJECT MILESTONES

1 yr. 1 yr.

PRECON IMPLEMENTATION DEFECTS WARRANTY


Period LIABILITY
Period Period
Period

BID PERFORMANCE WARRANTY


Security Security Security

PLAN / START COMPLETE ACCEPT Warranty END


BUDGET

11/21/2019
CONSTRUCTION SUPERVISION ISSUES

• Lack of Engineers assign to the project


• Wrong construction methods applied
• Wrong type of equipment used in the construction site
• No Quality Control and Quality Assurance applied
• No regular Project Engineer and or Resident
Engineer/Construction Supervision Team at project site
both from contractor and PEO.
CONSTRUCTION SUPERVISION ISSUES

• Non-conformance to construction safety and health standards,


including environmental protection
a) Absence of safety officer
b) Non-deployment of traffic aide
c) Inadequate warning signs
d) Workers not wearing personal protective equipment (PPE)
e) Improper disposal of waste materials, including unsuitable materials
f) Inadequate office space for site engineers and bunkhouse for
workers
CONSTRUCTION SUPERVISION ISSUES

• Inadequate deployment of equipment, workforce and materials


• Insufficient documentation on contract management and construction
supervision, such as but not limited to:
a) Quality Control Program
b) Non-conformance to standard testing/quality control requirements
c) Absence of site instructions/ non-conformance notice
d) Absence of approved pouring permits/ work requests
e) Inadequate weather reporting and monitoring
f) No progress reports/ no updated work schedules
g) Inadequate documentation on variation orders and time extensions
CONSTRUCTION SUPERVISION ISSUES

Photos of project with Quality issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision and


Quality issues:
CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Road Safety issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with implementation issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Quality issues:


CONSTRUCTION SUPERVISION ISSUES

Photos of project with Construction Supervision issues:


PROJECT IMPLEMENTATION GOOD
PRACTICE

Good Practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
PROJECT IMPLEMENTATION GOOD
PRACTICE

Good practice:
IMPLEMENTATION ISSUES AND
CONCERN

QUESTIONS /CLARIFICATION
ON
ISSUES DISCUSSED