MEASUREMENT OF CONSTRUCTION WORKS III

(COST ANALYSIS)

REINFORCEMENT
Steel fabric reinforcement to MS 145 Ref. A7, weighting not less than
3.02kg/m2 with 150mm side and end laps in suspended slab (measured netno allowance made for laps)

DESCRIPTION :

UNIT :

M2

TYPE :

FABRIC REINFORCEMENT

DATA
Material
BRC Fabric - A7, MS145

RM7.80 /m

Labour
Barbender
General labour

=
=

RM70.00 /day
RM55.00 /day

CALCULATION

RM

RM

RM

A. MATERIAL COST
i) Fabric reinforcement A7
Add :
Lapping
Wastage
Tying wire & Spacer block

=
=
=

%
%
%
%

Therefore, Material cost


B. LABOUR COST
i) Labour cost for unloading and storing
1 general labour x

8 hrs

ii) Labour cost for cutting, bending, tying and fixing


1 barbender x

8 hrs

Therefore, Labour Cost


C. TOTAL COST
Cost for material & labour
Add :
15% Profit & Overhead

RATE FABRIC REINFORCEMENT A7

notes QSD231/syhidi/2011

/m

reinforcement/fabric/page1