UTILITIES FROM NATIONAL


GRID IN CLOSE PROXIMITY.

DRAFT 10M

10" pipe line approx. 2500 ft in length.

proposed office & lab 10' x 40'.


EXISTING 69 MBBL TANKS REQUIRED THE FOLLOWING.:
Tank drain system
Heater and mxer.
Pump and motor system.
Fire protection system.
replacement of tank bttm and roofs.
non destructive test of tank walls.