You are on page 1of 1

MEGGER TEST REPORT

DATE (M/D/YYYY)

PROJECT NUMBER
PROJECT
FEEDER PANEL
IDENTIFICATION

STATION
CIRCUIT
NUMBER/FEEDER
NUMBER

VOLTS/
PHASE/
CYCLES

PHASE A

PHASE A

PHASE B

PHASE A

PHASE B

PHASE C

TO
PHASE B

TO
PHASE C

TO
PHASE C

TO
NEUTRAL

TO
NEUTRAL

TO
NEUTRAL

MCMURDO

PALMER

PHASE A
TO GROUND
CONDUCTOR

PHASE B
TO GROUND
CONDUCTOR

RPSC FIELD ENGINEER


PROJECT ENGINEER/DESIGNEE:

DATE

RPSC ELECTRICAL FOREMAN:

DATE

NSF REP/TITLE II INSPECTOR:

DATE

EN-MPS-725e

FEMC / RPSC

Paget 1 of 1

Revision 1

11/16//06

SOUTH POLE
PHASE C
TO GROUND
CONDUCTOR

Approved by Wayne L. Cornell

You might also like