Room / Location

Floor

Perimeter

Height

Storage

Ground Floor

9.14

2.25

Kitchen / Dining

Ground Floor

14.90

2.25

Elevator Hallway

Ground Floor

7.85

4.20

I.T. Office

Ground Floor

11.56

2.25

Reception Area

Ground Floor

9.96

2.25

Stairs

Ground Floor - Mezzanine of


Ground Floor

11.80

2.37

Parking Area

Basement - Bottom of Ground


Floor

153.41

3.39

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

9.44

3.74

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

14.96

6.54

Electrical Room

Ground Floor

9.40

2.35

Exterior Plastering

Ground Floor - Roof Top

21.36

13.62

Stairs

Mezzanine of Ground Floor

16.94

2.25

Pantry / Waiting Area / Reception


Area

Mezzanine Floor

13.72

2.95

Staff Office's

Mezzanine Floor

33.20

2.95

Elevator Hallway

Mezzanine Floor

39.30

2.95

Along line "A"

Mezzanine Floor

7.89

2.95

Room / Location

Floor

Perimeter

Height

Consulting Office

Typical Floor

30.85

2.95

Pantry @ Consulting Office

Typical Floor

11.90

2.95

Arif Gold Office

Typical Floor

37.25

2.95

Pantry @ Arif Gold Office

Typical Floor

13.55

2.95

Women's Office

Typical Floor

14.50

2.95

Pantry @ Women's Office

Typical Floor

7.60

2.95

HR Office

Typical Floor

4.70

2.95

Elevator Hallway

Typical Floor

31.55

2.95

Stair

Typical Floor

11.30

2.95

Reception Area

Roof Floor

18.50

3.49

Manager Assistant Office

Roof Floor

14.05

3.49

Elevator Hallway

Roof Floor

4.55

3.49

General Manager Office

Roof Floor

23.63

3.49

Seminary

Roof Floor

8.26

3.49

Bedroom

Roof Floor

20.40

3.49

Vault

Roof Floor

26.95

3.49

Staff Office

Roof Floor

32.22

3.49

Room / Location

Floor

Perimeter

Height

Manager Office

Roof Floor

13.35

3.49

Hallway going to Bedroom

Roof Floor

8.90

3.49

Secretary

Roof Floor

30.00

3.49

Area for Plastering (12 mm thick)


Area for Plastering (20 mm thick)

Qty. Done

Area

Opening

Net Area

20.57

1.76

18.81

33.53

1.76

31.77

32.97

3.52

29.45

26.01

2.20

23.81

22.41

2.20

20.21

27.97

4.73

23.24

520.06

0.00

520.06

35.31

0.00

35.31

97.84

0.00

97.84

22.09

0.00

22.09

290.92

45.70

245.22

220.70

38.12

3.11

35.01

40.47

8.02

32.45

97.94

5.50

92.44

115.94

15.40

100.54

23.28

0.00

23.28

(as of Nov. 10, 2015)

Qty. Done

Area

Opening

Net Area

91.01

5.50

85.51

76.96

35.11

7.70

27.41

8.22

109.89

3.96

105.93

39.97

5.28

34.69

42.78

2.20

40.58

40.58

22.42

1.76

20.66

10.33

13.87

0.00

13.87

13.87

93.07

6.16

86.91

33.34

0.00

33.34

64.57

10.45

54.12

49.03

6.16

42.87

15.88

6.49

9.39

82.47

8.80

73.67

28.83

1.76

27.07

71.20

1.98

69.22

94.06

4.40

89.66

112.45

7.92

104.53

(as of Nov. 10, 2015)

Qty. Done

Area

Opening

Net Area

46.59

0.00

46.59

31.06

3.52

27.54

104.70

6.60

98.10

2,175.82

149.95

267.31

220.70

(as of Nov. 10, 2015)

Percentage Done
(as of Nov. 10, 2015)

Remarks

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Exterior Plastering

90.00%

Exterior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Percentage Done
(as of Nov. 10, 2015)

Remarks

90.00%

Interior Plastering

30.00%

Interior Plastering

Interior Plastering

Interior Plastering

100.00%

Interior Plastering

50.00%

Interior Plastering

100.00%

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Interior Plastering

Percentage Done
(as of Nov. 10, 2015)

Remarks

Interior Plastering

Interior Plastering

Interior Plastering

6.89%

Interior Plastering

82.56%

Exterior Plastering

Room / Location

Floor

Storage

Ground Floor

Kitchen / Dining

Ground Floor

Elevator Hallway

Ground Floor

I.T. Office

Ground Floor

Reception Area

Ground Floor

Stairs

Ground Floor - Mezzanine of


Ground Floor

Parking Area

Basement - Bottom of Ground


Floor

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

Electrical Room

Ground Floor

Exterior Plastering

Ground Floor - Roof Top

Stairs

Mezzanine of Ground Floor

Pantry / Waiting Area / Reception


Area

Mezzanine Floor

Staff Office's

Mezzanine Floor

Elevator Hallway

Mezzanine Floor

Along line "A"

Mezzanine Floor

Consulting Office

Typical Floor

Pantry @ Consulting Office

Typical Floor

Arif Gold Office

Typical Floor

Pantry @ Arif Gold Office

Typical Floor

Women's Office

Typical Floor

Pantry @ Women's Office

Typical Floor

HR Office

Typical Floor

Elevator Hallway

Typical Floor

Stair

Typical Floor

Reception Area

Roof Floor

Manager Assistant Office

Roof Floor

Elevator Hallway

Roof Floor

General Manager Office

Roof Floor

Seminary

Roof Floor

Bedroom

Roof Floor

Vault

Roof Floor

Staff Office

Roof Floor

Manager Office

Roof Floor

Hallway going to Bedroom

Roof Floor

Secretary

Roof Floor

Area for Plastering (12 mm

Area for Plastering (20 mm

Perimeter

Height

Area

9.14

2.25

20.57

14.90

2.25

33.53

7.85

4.20

32.97

11.56

2.25

26.01

9.96

2.25

22.41

11.80

2.37

27.97

153.41

3.39

520.06

9.44

3.74

35.31

14.96

6.54

97.84

9.40

2.35

22.09

21.36

13.62

290.92

16.94

2.25

38.12

13.72

2.95

40.47

33.20

2.95

97.94

39.30

2.95

115.94

7.89

2.95

23.28

30.85

2.95

91.01

11.90

2.95

35.11

37.25

2.95

109.89

13.55

2.95

39.97

14.50

2.95

42.78

7.60

2.95

22.42

4.70

2.95

13.87

31.55

2.95

93.07

11.30

2.95

33.34

18.50

3.49

64.57

14.05

3.49

49.03

4.55

3.49

15.88

23.63

3.49

82.47

8.26

3.49

28.83

20.40

3.49

71.20

26.95

3.49

94.06

32.22

3.49

112.45

13.35

3.49

46.59

8.90

3.49

31.06

30.00

3.49

104.70

Area for Plastering (12 mm thick)


Area for Plastering (20 mm thick)

Previous Qty.

Opening

Net Area

1.76

18.81

1.76

31.77

3.52

29.45

2.20

23.81

2.20

20.21

4.73

23.24

0.00

520.06

0.00

35.31

0.00

97.84

0.00

22.09

45.70

245.22

220.70

3.11

35.01

8.02

32.45

0.00

5.50

92.44

0.00

15.40

100.54

0.00

23.28

5.50

85.51

76.96

7.70

27.41

8.22

3.96

105.93

5.28

34.69

2.20

40.58

40.58

1.76

20.66

10.33

0.00

13.87

13.87

6.16

86.91

(as of Nov. 10, 2015)

0.00

33.34

10.45

54.12

6.16

42.87

6.49

9.39

8.80

73.67

1.76

27.07

1.98

69.22

4.40

89.66

7.92

104.53

0.00

46.59

3.52

27.54

6.60

98.10

2,175.82

149.95

267.31

220.70

Present Qty.

Cumulative Qty.

(as of Nov. 15, 2015)

(as of Nov. 15, 2015)

Cumulative
Percentage
(as of Nov. 15, 2015)
-

0.00

220.70

90.00%
-

32.45

32.45

100.00%

92.44

92.44

100.00%
-

8.55

85.51

100.00%

19.18

27.41

100.00%
-

0.00

40.58

100.00%

10.33

20.66

100.00%

0.00

13.87

100.00%
-

162.96

312.91

14.38%

0.00

220.70

82.56%

Remarks
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Exterior Plastering
Exterior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering

Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering
Interior Plastering

Interior Plastering
Exterior Plastering

Plastering Works
Room / Location

Floor

Total Net Area

Previous Qty.

Perimeter
9.14
14.90

Height
2.25
2.25

Area
20.57
33.53

Opening
1.76
1.76

18.81
31.77

18.81
31.77

Present Qty.
Cumulative Qty.
(as of Dec. 03, 2015) (as of Dec.03, 2015)

Remarks

100.00%
100.00%

Interior Plastering
Interior Plastering

Storage
Kitchen / Dining

Ground Floor
Ground Floor

Elevator Hallway

Ground Floor

7.85

4.20

32.97

3.52

29.45

0.00

0.00

0.00

0.00%

Interior Plastering

I.T. Office

Ground Floor

11.56

2.25

26.01

2.20

23.81

9.52

14.29

23.81

100.00%

Interior Plastering

Reception Area

Ground Floor

9.96

2.25

22.41

2.20

20.21

4.04

16.17

20.21

100.00%

Interior Plastering

Stairs

Ground Floor - Mezzanine of Ground


Floor

11.80

2.37

27.97

4.73

23.24

0.00

0.00

0.00

0.00%

Ramp Area

Basement - Bottom of Mezzanine of


Ground Floor

9.44

3.74

35.31

0.00

35.31

0.00

0.00

0.00

0.00%

Ramp Area

Basement - Bottom of Mezzanine of


Ground Floor

14.96

6.54

97.84

0.00

97.84

0.00

0.00

0.00

0.00%

Electrical Room

Ground Floor

9.40

2.35

22.09

0.00

22.09

0.00

0.00

0.00

0.00%

Exterior Plastering

Exterior Plastering

Ground Floor - Roof Top

21.36

13.62

290.92

45.70

245.22

220.70

0.00

220.70

90.00%

Exterior Plastering

Stairs

Mezzanine of Ground Floor

16.94

2.25

38.12

3.11

35.01

35.01

0.00

35.01

100.00%

Interior Plastering

Pantry / Waiting Area / Reception Area

Mezzanine Floor

16.00

3.50

56.00

8.02

47.98

47.98

47.98

100.00%

Interior Plastering

Staff Office's

Mezzanine Floor

33.20

3.50

116.20

5.50

110.70

110.70

0.00

110.70

100.00%

Interior Plastering

Elevator Hallway
Along line "A"

Mezzanine Floor
Mezzanine Floor

39.30
7.89

3.50
3.50

137.55
27.62

15.40
0.00

122.15
27.62

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

Interior Plastering
Interior Plastering

0.00
0.00

0.00

18.81
31.77

Cumulative
Percentage
(as of Dec.03, 2015)

Interior Plastering
Interior Plastering
Interior Plastering

Consulting Office

Typical Floor

38.12

3.40

129.61

5.50

124.11

124.11

0.00

124.11

100.00%

Interior Plastering

Pantry @ Consulting Office

Typical Floor

11.90

3.40

40.46

7.70

32.76

32.76

0.00

32.76

100.00%

Interior Plastering

Arif Gold Office

Typical Floor

37.25

3.40

126.65

3.96

122.69

122.69

0.00

122.69

100.00%

Interior Plastering

Pantry @ Arif Gold Office


Women's Office

Typical Floor
Typical Floor

13.55
14.50

3.40
3.40

46.07
49.30

5.28
2.20

40.79
47.10

40.79
47.10

0.00
0.00

40.79
47.10

100.00%
100.00%

Interior Plastering
Interior Plastering

Pantry @ Women's Office

Typical Floor

7.60

3.40

25.84

1.76

24.08

24.08

0.00

24.08

100.00%

Interior Plastering

HR Office

Typical Floor

4.70

3.40

15.98

0.00

15.98

15.98

0.00

15.98

100.00%

Interior Plastering

Elevator Hallway

Typical Floor

31.55

3.40

107.27

6.16

101.11

0.00

0.00

0.00

0.00%

Interior Plastering

Stair
Reception Area

Typical Floor
Roof Floor

11.30
18.50

3.40
3.50

38.42
64.75

0.00
10.45

38.42
54.30

0.00

0.00

0.00

0.00%

54.30

0.00

54.30

100.00%

Interior Plastering
Interior Plastering

Manager Assistant Office

Roof Floor

14.05

3.50

49.18

6.16

43.02

43.02

0.00

43.02

100.00%

Interior Plastering

Elevator Hallway

Roof Floor

4.55

3.50

15.93

6.49

9.44

9.44

0.00

9.44

100.00%

Interior Plastering

General Manager Office

Roof Floor

31.98

3.50

111.94

8.80

103.14

75.29

0.00

75.29

73.00%

Interior Plastering

Seminary
Bedroom

Roof Floor
Roof Floor

8.26
20.40

3.50
3.50

28.91
71.40

1.76
1.98

27.15
69.42

27.15
69.42

0.00

27.15
69.42

100.00%
100.00%

Interior Plastering
Interior Plastering

0.00

Vault

Roof Floor

26.95

3.50

94.33

4.40

89.93

35.97

0.00

35.97

40.00%

Interior Plastering

Staff Office

Roof Floor

32.22

3.50

112.77

7.92

104.85

104.85

0.00

104.85

100.00%

Interior Plastering

Manager Office

Roof Floor

13.35

3.50

46.73

0.00

46.73

46.73

0.00

46.73

100.00%

Interior Plastering

Hallway going to Bedroom


Secretary

Roof Floor
Roof Floor

8.90
30.00

3.50
3.50

31.15
105.00

3.52
6.60

27.63
98.40

27.63
98.40

0.00

27.63
98.40

100.00%
100.00%

Interior Plastering
Interior Plastering

0.00

toilet and Pantry

Mezzanine Floor

17.04

3.50

59.64

10.91

48.73

48.73

0.00

48.73

100.00%

Interior Plastering

FAST toilet and Pantry

Typical Floor

47.97

3.40

163.10

25.30

137.80

137.80

0.00

137.80

100.00%

Interior Plastering

Arif Gold toilet and Pantry

Typical Floor

28.67

3.40

97.48

12.74

84.74

84.74

0.00

84.74

100.00%

Interior Plastering

Finance toilet and Pantry


Gen.Mngr toilet and Bath

Roof Floor
Roof Floor

27.04
11.14

3.50
3.50

94.64
38.99

9.24
2.20

85.40
36.79

85.40
29.43

0.00
0.00

85.40
29.43

100.00%
80.00%

Interior Plastering
Interior Plastering

Mngr Asst toilet

Roof Floor

12.64

3.50

44.24

3.52

40.72

40.72

0.00

40.72

100.00%

Interior Plastering

toilet

Ground Floor

10.32

2.25

23.22

1.76

21.46

17.17

0.00

17.17

80.00%

Interior Plastering

Stair Slab bottom

Bsement to Roof floor

60.00

0.00

60.00

60.00

0.00

60.00

100.00%

Interior Plastering

Area for Plastering (12 mm thick)

2,360.53

1,761.50

30.45

1,791.96

75.91%

Interior Plastering

Area for Plastering (20 mm thick)

267.31

220.70

0.00

220.70

82.56%

Exterior Plastering

Storage
Kitchen / Dining
Elevator Hallway
I.T. Office
Reception Area

Ground
Ground
Ground
Ground
Ground

Floor
Floor
Floor
Floor
Floor

9.14
14.90
7.85
11.56
9.96

2.25
2.25
4.20
2.25
2.25

20.57
33.53
32.97
26.01
22.41

1.76
1.76
3.52
2.20
2.20

Stairs

Ground Floor - Mezzanine


of Ground Floor

11.80

2.37

27.97

4.73

Parking Area

Basement - Bottom of
Ground Floor

153.41

3.39

520.06

0.00

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

9.44

3.74

35.31

0.00

Ramp Area

Basement - Bottom of
Mezzanine of Ground Floor

14.96

6.54

97.84

0.00

Electrical Room

Ground Floor

9.40

2.35

22.09

0.00

Exterior Plastering

Ground Floor - Roof Top

21.36

Stairs

Mezzanine of Ground Floor

16.94

2.25

38.12

3.11

Pantry / Waiting Area /


Reception Area

Mezzanine Floor

13.72

2.95

40.47

8.02

13.62 290.92 45.70

Staff Office's

Mezzanine Floor

33.20

2.95

Elevator Hallway

Mezzanine Floor

39.30

2.95

Along line "A"

Mezzanine Floor

7.89

2.95

Consulting Office
Pantry @ Consulting Office
Arif Gold Office
Pantry @ Arif Gold Office
Women's Office
Pantry @ Women's Office
HR Office
Elevator Hallway
Stair
Reception Area
Manager Assistant Office
Elevator Hallway
General Manager Office
Seminary
Bedroom
Vault
Staff Office
Manager Office
Hallway going to Bedroom
Secretary

Typical Floor
Typical Floor
Typical Floor
Typical Floor
Typical Floor
Typical Floor
Typical Floor
Typical Floor
Typical Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor
Roof Floor

30.85
11.90
37.25
13.55
14.50
7.60
4.70
31.55
11.30
18.50
14.05
4.55
23.63
8.26
20.40
26.95
32.22
13.35
8.90
30.00

2.95
2.95
2.95
2.95
2.95
2.95
2.95
2.95
2.95
3.49
3.49
3.49
3.49
3.49
3.49
3.49
3.49
3.49
3.49
3.49

Area for Plastering (12 mm thick)


Area for Plastering (20 mm thick)

97.94

5.50

115.94 15.40
23.28

0.00

91.01 5.50
35.11 7.70
109.89 3.96
39.97 5.28
42.78 2.20
22.42 1.76
13.87 0.00
93.07 6.16
33.34 0.00
64.57 10.45
49.03 6.16
15.88 6.49
82.47 8.80
28.83 1.76
71.20 1.98
94.06 4.40
112.45 7.92
46.59 0.00
31.06 3.52
104.70 6.60

18.81
31.77
29.45
23.81
20.21

Interior
Interior
Interior
Interior
Interior

23.24

Interior Plastering

520.06

Interior Plastering

35.31

Interior Plastering

97.84

Interior Plastering

22.09

Exterior Plastering

90.00%

Exterior Plastering

Interior Plastering

100.00%

Interior Plastering

245.22

220.70

220.70

35.01

32.45

32.45

32.45

Plastering
Plastering
Plastering
Plastering
Plastering

92.44

100.00%

Interior Plastering

100.54

Interior Plastering

23.28

Interior Plastering

85.51
27.41
105.93
34.69
40.58
20.66
13.87
86.91
33.34
54.12
42.87
9.39
73.67
27.07
69.22
89.66
104.53
46.59
27.54
98.10

92.44

92.44

85.51
27.41
105.93
34.69
40.58
20.66
13.87

85.51
27.41
105.93
34.69
40.58
20.66
13.87

54.12

54.12

27.92

27.92

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
26.71%
-

Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior

Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering
Plastering

2,175.82 312.91 222.66 535.56 24.61% Interior Plastering


267.31 220.70 0.00 220.70 82.56% Exterior Plastering

PROJECT NAME: CONSTRUCTION OF ADMINISTRATION BUILDING


REFERENCE

As per BOQ

As per ACTUAL (Future Reference for the Sub-contractor Claim)

Floor

Perimeter

Height

Area

Storage

Ground Floor

9.14

2.25

20.57

1.76

18.81

Interior

Kitchen / Dining

Ground Floor

14.90

2.25

33.53

1.76

31.77

Interior

Elevator Hallway

Ground Floor

7.85

4.20

32.97

3.52

29.45

Interior

I.T. Office

Ground Floor

11.56

2.25

26.01

2.20

23.81

Interior

Reception Area

Ground Floor

9.96

2.25

22.41

2.20

20.21

Interior

11.80

2.37

27.97

4.73

23.24

Interior

153.41

3.39

520.06

520.06

Interior

9.44

3.74

35.31

35.31

Interior

14.96

6.54

97.84

97.84

Interior

Parking Area
Ramp Area
Ramp Area

Ground Floor - Mezz. of


Ground Flr.
Basement - Bottom of
Ground Floor
Basement - Bottom of Mezz.
of Ground Flr.
Basement - Bottom of Mezz.
of Ground Flr.

Height

Area

Opening

Net Area

(Interior or
Exterior)

Room / Location

Stairs

Opening Net Area Perimeter

Remarks for
Plastering

Electrical Room

Ground Floor

9.40

2.35

22.09

22.09

Exterior

Exterior Plastering

Ground Flr. - Roof Top

21.36

13.62

290.92

45.70

245.22

Exterior

Stairs

Mezzanine of Ground Floor

16.94

2.25

38.12

3.11

35.01

Interior

Pantry / Waiting Area /


Reception Area

Mezzanine Floor

13.72

2.95

40.47

8.02

32.45

Interior

Staff Office's

Mezzanine Floor

33.20

2.95

97.94

5.50

92.44

Interior

Elevator Hallway

Mezzanine Floor

39.30

2.95

115.94

15.40

100.54

Interior

Along line "A"

Mezzanine Floor

7.89

2.95

23.28

23.28

Interior

Consulting Office

Typical Floor

30.85

2.95

91.01

5.50

85.51

Pantry @ Consulting Office

Typical Floor

11.90

2.95

35.11

7.70

27.41

Interior

Arif Gold Office

Typical Floor

37.25

2.95

109.89

3.96

105.93

Interior

Pantry @ Arif Gold Office

Typical Floor

13.55

2.95

39.97

5.28

34.69

Interior

Women's Office

Typical Floor

14.50

2.95

42.78

2.20

40.58

14.80

3.47

51.36

2.20

49.16

Interior

Pantry @ Women's Office

Typical Floor

7.60

2.95

22.42

1.76

20.66

7.75

3.47

26.89

1.76

25.13

Interior

Toilet @ Women's Office

Typical Floor

6.00

Varies
(3.47/1.23)

19.25

1.76

17.49

Interior

HR Office

Typical Floor

4.70

2.95

13.87

13.87

Interior

Elevator Hallway

Typical Floor

31.55

2.95

93.07

6.16

86.91

Interior

Stair

Typical Floor

11.30

2.95

33.34

33.34

Interior

35.00

3.47

121.45

5.94

115.51

Interior

Interior and Exterior Plastering

PROJECT NAME: CONSTRUCTION OF ADMINISTRATION BUILDING


REFERENCE

As per BOQ

As per ACTUAL (Future Reference for the Sub-contractor Claim)


Opening Net Area Perimeter

Height

Area

Opening

Net Area

Remarks for
Plastering
(Interior or
Exterior)

Room / Location

Floor

Perimeter

Height

Area

Reception Area

Roof Floor

18.50

3.49

64.57

10.45

54.12

Interior

Manager Assistant Office

Roof Floor

14.05

3.49

49.03

6.16

42.87

Interior

Elevator Hallway

Roof Floor

4.55

3.49

15.88

6.49

9.39

Interior

General Manager Office

Roof Floor

23.63

3.49

82.47

8.80

73.67

Interior

Seminary

Roof Floor

8.26

3.49

28.83

1.76

27.07

Interior

Bedroom

Roof Floor

20.40

3.49

71.20

1.98

69.22

Interior

Vault

Roof Floor

26.95

3.49

94.06

4.40

89.66

Interior

Staff Office

Roof Floor

32.22

3.49

112.45

7.92

104.53

Interior

Manager Office

Roof Floor

13.35

3.49

46.59

46.59

Interior

Hallway going to Bedroom

Roof Floor

8.90

3.49

31.06

3.52

27.54

Interior

Secretary

Roof Floor

30.00

3.49

104.70

6.60

98.10

Interior

Area for Plastering (12 mm thick)

2,175.82

Area for Plastering (12 mm thick)

Interior

Area for Plastering (20 mm thick)

267.31

Area for Plastering (20 mm thick)

Exterior

Interior and Exterior Plastering